This document contains a statement of work (SOW) for renovating the interior auditorium of Building 15 at Joint Base Langley-Eustis in Virginia. The SOW requires demolishing existing wall coverings, ceiling grid, lights, carpet, seating and other finishes before installing new materials including carpet squares, ceiling tiles, wall finishes, theater seating, lighting, HVAC diffusers, and fire detection systems. Submittals are due by 2 April 2021 and the construction work is estimated to take 130 days to complete. Drawings are required to include floor plans, elevations, and other details.
This federal contract opportunity posting is for the Simplified Acquisition of Base Engineer Requirements (SABER) Indefinite Delivery Indefinite Quantity (IDIQ) contract at Joint Base Langley-Eustis. The single-award IDIQ contract has a base year and four option years with a total ceiling of $95 million. The solicitation is open only to 8(a) small businesses headquartered in SBA Region III, which includes Delaware, Maryland, Pennsylvania, Virginia, Washington D.C. and West Virginia. A mandatory site visit will be held on 19 March 2021 for the seed project to renovate the auditorium in Building 15.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
PROJECT MUHJ 20-4072
Renovate interior auditorium F. 15, LANGLEY AFB, VIRGINIA
2 April 2021
1. GENERAL REQUIREMENTS: All work associated with this project is classified as minor construction/repair. The following is a list of principal work items. Additional work that is not listed but may be required to accomplish the desired results is inclusive in this project scope. The Contractor shall provide all labor, equipment, testing, transportation, supervision, perform field investigations, and prepare minimal design documents according to the General Provisions at Attachment 1, the Clauses within this solicitation and the SOW for the following:
Project: MUHJ 20-4072 Work Order:
Project Title: Renovate interior auditorium F. 15 Location: F 15 Project Manager:
Scope: Repair all interior finishes to include wall covering, ceiling, lighting, carpet and seating.
2. ARCHITECTURAL:
2.1 Demo all wall coverings, ceiling grid, lights, carpet, cove base, and theater seating
2.2 Install new 26oz carpet squares to include the closet space (color to be picked by government)
2.3 Install new ceiling grid and tile ceiling is 9' (tile to be used is USG 2120 2x2)
2.4 Skim coat all walls to a level 4 finish
2.5 Prime and paint all walls to include closet (colors to be chosen by Government)
2.6 Caulk all windows on the inside
2.7 Install new theater seating with fold over desk for 92 personnel with 4 handicap
2.8 Prep and Paint all walls, Door, frames, and trim
2.9 Install new 4" cove base color to be chosen by others
2.10 Remove and reinstall curtains and projector screen
2.11 Install new window blinds in all windows window size is 86"X35"
3. MECHANICAL:
3.1. Install new HVAC diffusers
4. ELECTRICAL:
4.1 Install all new LED 2x2 light fixtures to replace 2x4 light fixtures
4.2 Install all new led cans light to replace the one existing
4.3 Install dimmers switches on all lights
4.4 Replace all electrical and communications outlet and plates with ivory color
4.5 Remove and reinstall all ceiling mounted speakers
5. FIRE SYSTEMS:
6.1 Replace all heat detectors as required
6.2 Install one new horn strobe in the room
6. SUBMITTALS:
6.1. Technical Plan
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
1186682897C Highlight
6.2. Detailed Cost Estimate organized by CSI/Location/Phase/Construction Classification/Other
6.3. Construction Work Schedule
6.4. AF Form 66, Material Submittal Schedule
6.5. Design Analysis/Calculations and Professional Engineer (PE) Certification Required: No
6.6. Test Reports Required: No
6.7. Drawings Required:
Cover Sheet x Existing Site Plan x New Site Plan x Demolition Plan Grading/Landscaping Plan Structural Plans Elevations-Exterior Roof Plan Wall/Roof Sections Floor Plans Elevations-Interior Finish Schedule Window/Door Schedule Arch Details/Finish Carpentry Reflected Ceiling Plan Mechanical Plan Plumbing Plan Electrical/Lighting Plan Lighting Schedule Power Plan/Panel Schedule Telecommunications Plan Fire Alarm/Detection Plan Fire Suppression Plan
633 MSG
WOMEN
CONFERENCE ROOM
MEN
COMMANDER
AUDITORIUM
633 FSS
FMA BUDGET OFFICE
FMA BUDGET OFFICE
QUALITY ASSURANCE
633 CPTS
633 CPTS
633 CPTS
UDM
ELEVATOR
1146 SQFT
BUILDING 15 - VISITOR DIRECTORY
.\Logos\US_Air_Force_Logo_Solid_Colour_svg_.png
A-WING
FIRST FLOOR SECOND FLOOR
ELEVATOR
633 FSS
NAF
MEN
MEN
108C
192 MSG
FINANCE CUSTOMER SERVICE
B-WING
FINANCE CUSTOMER SERVICE
633 CPTS
HUMAN RESOURCES
633 MSG
CIVILIAN PERSONNEL SECTION
633 ABW
633 FSS
PROMOTIONS SECTION
CIVILIAN TRAINING CENTER
633 FSS
WOMEN
MEN
MANAGEMENT
MEN
WOMEN
CONFERENCE ROOM
WOMEN
MEN
633 FSS
PERSONNEL
633 FSS
633 CPTS
633 CPTS
633 FSS
MILITARY PERSONNEL
WOMEN
CIVILIAN TRAINING
HEALTH - EO
WOMEN
MEN
MEN
WOMEN
WOMEN
COMMANDER
212A
AUDITORIUM
CASH LAB
CHAPLAIN - PSYCH
CUSTOMER SUPPORT
633 MSG
633 FSS
TRAVEL OFFICE
OUTBOUND
633 FSS
108A
108B
RETIREE ACTIVITIES
PERSONNEL SYSTEM
633 FSS
633 CPTS
633 FSS
FMA BUDGET OFFICE
CONFERENCE ROOM
FMA BUDGET OFFICE
633 CPTS
FMA BUDGET OFFICE
QUALITY ASSURANCE
633 CPTS
633 CPTS
OUTBOUND ASSIGNMENTS
633 CPTS
633 FSS
COMMANDER
633 CPTS
TESTING
FIRST SERGEANT
MANAGEMENT
UDM
AFLOA - MEDICAL CLAIMS
216A
FT EUSTIS
COMMANDER
633 FSS
ELEVATOR
TRAINING
633 FSS
211A
633 FSS
FORCE
633 FSS
READINESS
MANPOWER
633 FSS
215A
733 LRS
AMVETS
CHAPLAIN
A-WING
COMMERCIAL
C-WING
TMO
AREA DEFENSE
SUSTAINMENT
TMO
D-WING
207A
COUNSEL
633 MSG
C-WING
CUSTOMER SERVICE OFFICE
D-WING
JAG LEGAL
ASSISTANCE
AIRMAN AND FAMILY
633 FSS
READINESS
633 FSS
REIMBURSEMENT OFFICE
633 FSS
211B
MANPOWER AND
ORGANIZATION
CLAIMS
225A
CONFERENCE ROOM
REENLISTMENTS - TESTING
AFLOA - MEDICAL
B-WING
PROMOTIONS - SEPARATIONS
FORMAL TRAINING
IT SUPPORT
READINESS CENTER /
132152
AFRC NCOIC
23'
61'-3
25'-9
10'-6
4"
8'-9"
13'-2
9'-1"
18'-11"
12'-0
5'-1
10'-6"
8'-2"
10'-7"
2'
10'-7"
7'-2"
13'-0
4'-10"
19'-9
3'-2"
4'-10"4'-11"
15'-2"
2'-10"
3'
18'-0
4'-4"
2'-10"
24'
35'-4
22'-8"
19'-4
" 11'-7"
13'-1
12'-8"
11'-7"
6'-7"
16'-7"
6'-10"6'-10"
8'-1
4'-5"
19'-3
4'
7'-9
5'-8"
21'-4
14'-4"
5'-7
26'-5
14'-2
15'-5
3'-8"
39'-3
4'-11
8'-8
3'-9
11'-6"
10'-5
17'-6"
4'-4"
7'-5
5'-6"
6'-4"
5'-7
7'-11
4'-6"
5'-5
11'-10"
14'-11
10'-6"
11'-9
5'
5'
24'
25'
73'-7
13'-8
1'-4"
6'
23'-8
3'-11
7'-11"
11'-9
14'-10"
6'-7"
25'-5
13'-4
25'-10"
12'
21'
3'-7
22'-3
9'-11
21'
13'-0
20'-10
22'-5
28'-1
14'-6
24'-10"
5'-5
5'-5
13'-6
6'-4"8'-10"
4'-4
10'-10
14'-6"
13'-10"
1'-2
70'-0
13'-11
6'
6'-4"
9'-5
6'-4"
18'-9
15'-5
24'-6"
11'-6"
8'
11'-10"
9'-5
6'
6'-4"
6'
5'-6"
12'-2"
29'
28'
14'-9"
17'-3
5'-6
24'-4"
14'-8
20'-3
5'-10
12'-9"
11'-6"
11'-6
11'-6
11'-6
11'-6
18'
10'-10"
12'-6"
11'-6"
11' 11'
11'-5
12'
12'-2" 11'-11" 11'-11"
11' 11'-6" 11'-4" 9'-4"
10'
29'-8"
30'-4"
8'-5"
12'
13'-3
11'-6"
7'-5"
8'11'-8"
6'-10" 6'-10"
12'-10" 9'
6'-10"
7'3" X 5'10"
5'-4"
6'-5
6'-2"
26'-6"
20'-7
11'-5
11'-6"
20'-7"
9'-7
10'-10
9'-7
9'-4
2'-8
9'-9
12'-7"
12'-10"
4'-1
4'-1
12'-10"
18'-1"
12'-10
15'-3
13'-3
8'-3
15'-9"
11'-8"
11'-8"
9'-3"
5'-8"
3'
10'-10
10'-8
10'-10"
10'-3
18'-4"
22'
10'-9"
14'-9"
7'-3"
6'-2
12'
13'-5
6'-2
51'-0
21'-10"
41'
9'-10"
28'-7
1'-4"
41'
10'-9
5'-4"
7'-11
7'-8"
5'-4"
15'-8
23'-1
12'
23'-8"
6'-6"
18'-1
8'
6'-5
" 9'-9"
10'-6"
9'-3"
10'-5
8'-6"
10'-6"
15'-4"
28'-1
4'
17'-5
10'-4"
5'-10"
11'
32'-6
23'-5
30'-2"
23'-6"
40'-4"
93'-2"
63'-10
10"
7'
7' 21'-8"
7'-2
7'-7"
7'
7'-8"
14'-4"
23'-4
6'-9
8'-6"
9'-6"
10'-6
9'-6"
10'-6
6'-9
17'-8"
18'-0
29'-9"
10'-1"
4'-6
13'-4
17'
52'-8"
5'-6"
5'-4
11'-10
9'-9"5'-9"
5'-9"
16'-5"
11'-10
18'-3"
5'-9
5'-8"
6'-2"
5'-4
18'-3"
12'-3"
7'-9"
11'-10
3'-11"
18'-4
24'-1
8'-7
5'-7
18'-4
18'-6
5'-6"
7'-6" 6'-10"
11'-0
4'-6"
13'-8"
64'-5
27'-11"
38'-6"
17'-10"
11'-3
9'-9"
10'-11
33'-5
6'-3
23'-9"
33'-8
4'-5"
6'-11
16'-5"
15'-8
4'-11"
30'-4"
3'-8"
11'-2
35'-5"
18'-9"
8'-6"
3'
11'-3"
11'-1
"20'-3"
10'-5"
2'-11"
34'-8"
5'-8"
21'-10"
13'-1
12'-6"
8'-2
12'-10
12'-6"
8'
17'
25'-4"
13'-6"
11'-6"
12'-6"
29'-10"
2'-6"
17'-10"
4'-3"
17'-4"
13'-5
" 18'
17'-3
39'-10"
30'-2
20'-7
19'-11
11'-8
11'-6
11'-6
10'-8"
9'-8" 24'-10"
16'-6"
31'-3"
31'-9
29'-4
22'-7
11'-2"
31'-1
24'-0
9'-6"
15'-7
8'-1"
7'-6" 39'-3
34'-1"
9'-2"
12'-7
22'-3
22'-11
37'-10"
32'-0
30'-5
14'-8"
7'
11'-2" 11'-2"
10'
11'-2"
11'-6"
42'-6"
28'
14'-2"
17'-3
14'-7
7'-3"
34'-4
9'-6
12'-9"
9'
45'-6
6'-6"
12'-4"
7'-9
11'-4"
11'-10"
5'-8"
5'-11
13'-10
11'-3
5'
6'-6"
7'
5'
8'-10
12'-4"
6'-2"
8'
4'-2"
44'-4"
4'-8"
140'-11
5'-9"
7'-8
9'
13'-6"
13'-2"12'-3"
7'-4"
11"
4'
17'-8
" 17'-9" 9'-9" 23'-8"
7'-0
17'-3
20'-2
" 11'-6"
8'-6
4'-6"4'-6"
19'-1" 28'-4"
12'-9"
55'-9
8'-1
15'-6
5'-2
3'-10
23'-7
13'-9
6'-9"
7'
8'-4
70'-11"
11'-7
18'-2"
4'-6" 3'
17'-6"
7'-6
"7'-7"
26'-6"
3'
16'-8"
18'-8
13'-4"
12'-6"
26'-11
9'-5"
13'-3
16'-3"
4'-6"
4'-6"
8'-8"
28'
8'-1
24'-2"
21'-2
3'-10" 7'-1"
5'-10
17'-8"
6'-9"
51'-11
6'-8" 6'-8"
26'-2"
22'-7
45'-2
23'-8"
11'-6"
12'-8" 9'-7
6'-4"
11'-5
3'-6
7'-8"
9'-2
11'-8"
10'
10'-4
5'-8"
5'-1
7'7" X 10'1"
5'-6"
14'-5"
10'-4
7'-8"
10'-2
3'-10"
2'-4"
5'-6"
4'-11"
11'
5'-9
4'-5"
16'-3"
6'-11
2'-8"
21'-8
8'-6" 7'
25'-4"
9'-4"
16'-7
8'-4"
9'-4"
11'-7
13'-6
8'-6"
16'-9"
20'-5
5'-3
47'-7"
37'-11
26'-2
22'-0
28'-10"
13'-9
9'-5
6'-3
9'-3
12'-0
10'-0
9'-5
7'-8"
9'-10
16'-2
9'-2"
18'-6"
4'
7'-10"
2'-6"
9'-4"
7'-7
16'-11
8'
6'
2'
5'
10'-5
19'-7
21'-1
5'-4"
14'-7
27'-6"
19'-7
13'-7" 6'-6" 6'-9" 11'-2
4'
3'
16'-3
11'-8"
18'-6"
15'-6"
23'-1"
14'-7
9'-4"
11'-6
" 11'-6
13'-8"
7'-8"
9'-5
7'-8"
7'
29'-9"
8'-1" 6'-8"
2'-6"
6'-4"
21'-9"
13'-6"
8'-10"
13'-5
16'-3
" 6'-8" 4'-5
13'-10"
5'-6
37'-2
12'-9"
8'-9
" 10'-5" 10'-5" 8'-8"
19'-4
2'-7
2'-1
37'-11
23'-2
22'-8"
54'-7
8'-8"
23'-1
2'-2"
3'-3"
31'-1
104'-11
30'-9
38'-3"
7'
7'-2"
5'-5
17'-10"
6'-9"
23'-7
13'-9
" 16'-3"
18'-2
7'-8
" 7'-8
10'-2"
15'-9
"15'-9
15'-9
10'-2"
12'-9
13'-1
12'-9
4'-6"4'-6"
12'-2
14'-5
8'-9
8'-10"
4"
26'-1
17'-7
11'-10
11'-10
6'-3"
15'-7
15'-10"
2'-2"
29'-0
6'-11
" 7'32'-6
7'
46'-6
9'-4"
7'-5
4'-8"
7'-10"
14'-6"
8'-5
4'
10'-6" 6'-2
4'-2" 4'
2'-4"
5'-7
6'-6"
12'-10"
6'-7
7'-4
4'
10'-5
10'-5
178'-8
16'
12'-4"
7'
5'
6'-2"8'-10
13'-10
5'
11'-4"
15'-4
5'-8"
6'
7'-11
11'-10"
11'-3
7'-0
16'-2
13'-3
4'-6"
4'-6"
4'-2"
3'-10"
48'-9
26'-4
13'-9
6'-9"
5'-2
17'-8"
3'-10"
22'-7
CASUALTY SURVIVOR
BENEFITS
BUILDING 15 - VISITOR DIRECTORY
633 CPTS
633 FSS
633 MSG
AFRC
192 MSG ADDITIONAL SUPPORT
TMO / 733 LRS
ID SERVICES
LEGAL SERVICES
LEGEND
DRAWING PROVIDED THROUGH 633 CES/CENME GEOBASE
JBLE - LANGLEY AIR FORCE BASE
BUILDING 15 VISITOR DIRECTORY
DATE UPDATED: 28 SEP 2018 DRAWN BY: MSW
A-WING
FIRST FLOOR
633 FSS CUSTOMER SERVICE OFFICE - RM 114
633 FSS IT SUPPORT - RM 115
633 ABW JAG LEGAL ASSISTANCE - RM 116
SECOND FLOOR
633 MSG COMMAND SECTION - RM 206
633 FSS SUSTAINMENT - RM 207
TMO OUTBOUND - RM 208
TMO CUSTOMER SUPPORT - RM 209
COMMERCIAL TRAVEL OFFICE - RM 210
733 LRS PERSONNEL - RM 212
633 MSG CHAPLAIN - RM 212A
633 FSS TRAINING - RM 213
B-WING
FIRST FLOOR
AIRMAN AND FAMILY READINESS CENTER
SECOND FLOOR
633 CPTS / FMA BUDGET OFFICE - RM 200 / 201 / 204
633 CPTS QUALITY ASSURANCE / UDM - RM 202
633 FSS AUDITORIUM - RM 203
633 MSG CONFERENCE ROOM - RM 205
633 FSS MANPOWER AND ORGANIZATION - RM 229
633 FSS PERSONNEL SYSTEM MANAGEMENT - RM 235
633 CPTS COMMAND SECTION - RM 236
633 CPTS CONFERENCE ROOM - RM 237
C-WING
FIRST FLOOR
RETIREE ACTIVITIES OFFICE - RM 107 NAF HUMAN RESOURCES - RM 117
CIVILIAN TRAINING OFFICE - RM 108A
SECOND FLOOR
AFLOA / MEDICAL CLAIMS - RM 226 / 227
CASUALTY SURVIVOR BENEFITS - RM 228
633 CPTS CASH LAB - RM 108B
192 MSG CHAPLAIN, PSYCH, HEALTH, EO - RM 108C
633 CPTS FINANCE CUSTOMER SERVICE - RM 109 / 110
D-WING
633 FSS REENLISTMENTS, TESTING, PROMOTIONS, SEPARATIONS,
FIRST FLOOR
633 FSS READINESS - RM 230
633 FSS CIVILIAN PERSONNEL SECTION - RM RM 119 / 120 / 122
633 FSS CIVILIAN TRAINING CENTER - RM 123
SECOND FLOOR
633 FSS COMMAND SECTION - RM 215
633 FSS FT EUSTIS - RM 215A
633 FSS FIRST SERGEANT - RM 216
633 FSS MANPOWER / READINESS - RM 217
633 FSS FORCE MANAGEMENT - RM 218
633 FSS MILITARY TESTING - RM 219
633 FSS CONFERENCE ROOM - RM 221
OUTBOUND ASSIGNMENTS, FORMAL TRAINING - RM 222
AMVETS - RM 225A
AFRC NCOIC - RM 211B
.\Logos\US_Air_Force_Logo_Solid_Colour_svg_.png
| STATEMENT OF WORK (SOW) |
| FOR |
| PROJECT MUHJ 20-4072 |
| Renovate interior auditorium F. 15, |
| LANGLEY AFB, VIRGINIA |
| SUBJECT: Construction Time Estimate |
| 4 |
| 2 |
| 30 |
| 90 |
| 2 |
| Cleanup |
| 2 |
| 130 |
| 130 |
| BLDG 15 - Auditorium SQFT.pdf |
| Sheets and Views |
| BLDG 15 - New AFRC (9-23-2019)-Layout1 |
File details come from the government source that posted it. Updated .