This document is a Solicitation for a construction contract to provide repair and maintenance to the U.S. Forest Service owned housing units on the Thorne Bay Ranger District in Thorne Bay, Alaska. The work involves replacing all water fixtures and potable water plumbing with PEX tubing in the Duplexes, Quads, and Bunkhouse facilities.

The Government estimates the magnitude of construction to be between $250,000 and $500,000. Offers are due by May 24, 2024 at 4:30pm Alaska time. This is a small business set-aside project, and offers received from other than small businesses will be rejected. The Government intends to award this as a firm-fixed-price construction contract. Offerors must submit prices for all items in the Schedule of Items. Award will be made on an all or none basis. The contract completion date is February 28, 2025.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 1240BJ24R0008 Project Name: GAOA Thorne Bay Compound Water Quality Mitigation: Phase 1

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

1240BJ24R0008

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

4/22/2024

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

1121926

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO: (E-Mail Only) Procurement & Property Services, Field Procurement Operations Northwest Zone – Construction & A-E Attn: Roxanne Anderson, CO

Note: All proposal documents must be e-mailed to roxanne.d.anderson@usda.gov. An e-mail copy of the Bid Bond is acceptable for proposals valued at $150,000.00 or greater.

9. FOR INFORMATION

CALL:

1-458-207-4946

A. NAME

Roxanne Anderson Contracting Officer

B. TELEPHONE NO. (Include area code) (NO

COLLECT CALLS)

roxanne.d.andeson@usda.gov

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

GAOA Thorne Bay Compound Water Quality Mitigation, Phase 1 Thorne Bay Ranger District, Tongass National Forest

Thorne Bay, Alaska Disclosure of the Magnitude of Construction Project: Between $250,000 and $500,000

Contractual POC: Roxanne Anderson – Contracting Officer Roxanne.d.anderson@usda.gov

All Questions about this project must be submitted to the Contracting Officer in writing – via email

Offerors must respond as described in Sections L and M. Proposals that fail to provide a complete response to the Technical Evaluation Factors (Section M) may be rejected and not considered further.

THIS IS A SMALL BUSINESS SET-ASIDE PROJECT. OFFERS RECEIVED FROM OTHER THAN SMALL

BUSINESSES WILL BE REJECTED

11. The Contractor shall begin performance within 10 calendar days and complete by February 28, 2025 after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

Ten (10)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and Emailed copies to perform the work required are due at the place specified in Item 8 by May 24, 2024 4;30pm Alaska. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than sixty (60) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

mailto:roxanne.d.anderson@usda.gov mailto:roxanne.d.andeson@usda.gov mailto:Roxanne.d.anderson@usda.gov rdanderson Highlight

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item

14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

IPP

25. OTHER THAN FULL AND OPEN COMPETITION

PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

(see block 7) Invoice Processing Platform IPP All invoices must be submitted electronically through the Invoice

Processing Platform IPP via www.ipp.gov.

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO

SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

ROXANNE ANDERSON

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD

Table of Contents

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.2 SCHEDULE NOTES

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

C.2 PROJECT LOCATION

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

C.4 TECHNICAL SPECIFICATIONS

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

F.2 OTHER REQUIREMENTS

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

G.2 – G.7 OTHER REQUIREMENTS

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES ................................................................................ Error! Bookmark not defined.

H.2 – H. 9 OTHER REQUIREMENTS ......................................... Error! Bookmark not defined.6

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L.1 PROVISIONS

SECTION M--EVALUATION FACTORS FOR AWARD

M.1 PROVISIONS

M.2 PROPOSAL EVALUATION

M.3 TECHNICAL EVALUATION FACTORS

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES

B.1 SCHEDULE OF ITEMS

Method Item Number of Unit Total Item Item Description Meas. Quantity Price Price

0001 Duplex Water Line Replacement EA 4 $ $

0002 Quad Water Line Replacement EA 3 $ $

0003 Bunkhouse Water Line Replacement LS 1 $ $

0004 Mobilization LS 1 $ $

TOTAL: $

B.2 SCHEDULE NOTES

EMAIL: __________________________________________________________

UNIQUE ENTITY ID (from SAM.gov): _______________________________

One award will be made from this solicitation, contractors must submit pricing for all items.

The Government intends to award this as a “firm-fixed price” construction contract.

Quoters must submit prices for all Items in the Schedule of Items above.

If the quoter does not intend to charge for an item, a price of “0” or “NO COST” should be shown. If the price is left blank or shown as “No Bid”, the entire quote may be considered not eligible for award.

Award will be on an all or none basis in accordance with Section M.

*Mobilization does not include on-site construction activities including the movement of personnel, materials, or equipment within the project site.

Designated Method of Measurement:

Actual Quantities (AQ). These quantities are determined from measurement of completed work.

Lump Sum Quantities (LS). These quantities denote one complete unit of work as required by or described in the task order including necessary materials, equipment, and labor to complete the job. They will not be measured.

Payment will be made on actual work performed, inspected, and accepted as described in these specifications unless otherwise noted.

All offerors will be required to provide a Bid Bond (20%) with their proposal submission.

Performance and Payment Bonds (100% each) will be required of the successful awardee.

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Pay Item (01) Mobilization.

System of Award Management Requirement

No award will be made to a Contractor not registered or is not active in the System of Award Management (SAM) or is not active in the system.

During the contract, the Contractor must always have an active status in SAM during the life of this task order. Invoices will be paid using the financial information provided in the Contractor’s SAM profile. Failure to keep an active status may result in payment delays and other administration delays.

See Section L and Section M for Instructions to Offerors and Submittal Requirements.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

The contractor shall provide all management, supervision, labor, personnel, transportation, materials, equipment, and supplies, except as otherwise specified, necessary to provide repair and maintenance to the Forest Service owned housing units on the Thorne Bay Ranger District (TBRD) in Thorne Bay, Alaska. All work shall be performed in accordance with this statement of work, specifications, and all federal, state and local laws and regulations. The work to be performed under this contract is to replace all water fixtures and potable water plumbing with PEX tubing in the Duplexes, Quads and Bunkhouse on the Thorne Bay Ranger District.

***SEE ATTACHED DOCUMENTS FOR FULL REQUIREMENTS***

C.2 PROJECT LOCATION

The project is located at the U.S. Forest Service Thorne Ranger District (TBRD) on the Tongass National Forest in Thorne Bay, Alaska 99829. The Duplex 1/2, Duplex 5/6, Duplex 7/8, Duplex 9/10, Quads, and Bunkhouse facilities are located at 1310, 1306, 1304, 1302, 1300, and 1301 Federal Way, respectively. Thorne Bay is located on Prince of Wales Island and is accessible via the Inter-Island Ferry authority, floatplane, or Island Air out of Ketchikan, Alaska.

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

The Government estimates the Magnitude of Construction to be between:

$250,000 to $500,000

C.4 TECHNICAL SPECIFICATIONS

452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

E.2 INSPECTION AND ACCEPTANCE (AGAR 452.246-70) (FEB 1988)

A. The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

B. Inspection and acceptance will be performed at the project site.

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.236-15 Schedules for Construction Contracts (APR 1984) 52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within _10_ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than _February 28, 2025_.

The time stated for completion shall include final cleanup of the premises.

F.2 NOTICE TO PROCEED (NTP)

A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer’s Representative (COR). No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within _14_days after the date of contract award. The conference will be held at a mutually agreed location or a scheduled teleconference.

G.2 OTHER REQUIREMENTS

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract/ task order. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.

N/A

G.3 PAYMENT FOR MATERIALS DELIVERED OFF THE SITE

As provided in FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, material acquired for incorporation into the project, and stored off site by the Contractor, may, at the option of the Contracting Officer, be included in progress payments. Prior to payment, such material will be subject to Government inspection and must be stored separately from other materials, and be identified as, "PROPERTY OF THE UNITED STATES, Project Name and Contract Number." In addition, the Contractor shall furnish the Government with a right of ingress and egress to the property together with right of removal.

G.4 PAYMENTS FOR INCIDENTAL ITEMS

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items.

All other work and materials will be considered incidental to and included in the payment for items shown.

G.5 PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Government or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

G.6 RETURN OF PERFORMANCE AND PAYMENT BONDS

Performance and payment security furnished under this contract must be retained by the Government for a minimum of one year after acceptance of all work under the contract.

Performance and payment security other than corporate or individual surety bonds will be returned to the Contractor one year after completion of work if no claims against these bonds have been filed at that time.

G.7 PAYMENT FOR PERFORMANCE AND PAYMENT SECURITY EXPENSES

It is mutually agreed that the premium costs for performance bonds, payment bonds and alternative payment protections furnished for this contract are included in the total amount bid for other items and that any payment to the Contractor for the cost of bonds made in accordance with FAR 52.232-5 refers only to corporate sureties listed in the current Department of Treasury Circular 570 and no advance payment will be made for bond premiums where other than corporate surety bonds are furnished. Bond premiums as used in this paragraph and FAR 52.232-5 shall include any Small Business Administration fees paid in connection with SBA guaranteed corporate surety bonds.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 REQUIRED SUBMITTALS

The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in the basic contract.

Submittals shall include the following unless otherwise required in the specification:

1. Date and revision dates.

2. Project name and contract number.

3. Name of Contractor, subcontractor, supplier, and manufacturer.

4. Specification section number.

5. Field dimensions and relation to adjacent structures.

6. Applicable standards such as ASTM or Federal Specifications.

7. Contractor's stamp, initial or signature, certifying the review of the submittal, verification of field measurements and compliance with contract documents.

8. Provide all submittals within 10 working days of the contract award unless otherwise required by the specification.

Submittals shall be sent to the Contracting Officer’s Representative (COR)

Submittals Referenced by Specification No.

Time of Government Approval After Submittal

Number of Sets

Safety Plan FAR 52.228-13 and

SOW 10.E

Prior to Prework Meeting 1

Copy of Required Insurance Coverage

Insurance work on Government Installation (FAR 52.228-5)

Prior to Prework Meeting 1

Work Schedule SOW Section 10C Prior to beginning work 1 Gypsum Board Product Data Section 092900, Part 1.2A Prior to ordering materials 1

Interior Painting Product Data and Samples

Section 099123, Part 1.2

Prior to ordering materials 1

Domestic Water Piping Product Data: For pipe, tube, fittings, valves, and couplings.

Section 221101, Part 1.4A

Prior to ordering materials 1

Water Samples Section 221101, Part 1.5A

After completion of work 1

Residential Plumbing Fixtures Product Data

Section 224100, Part 1.2A

Prior to ordering materials 1

Red-Line Drawings showing as-built conditions

SOW Section 11 Within 20 working days of completing work

PRODUCT SUBSTITUTION

Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitution will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

H.2 JOB-SPECIFIC SAFETY PLAN

Prior to the post award meeting, the Contractor shall provide a written job specific safety plan that recognizes the inherently hazardous conditions that will exist on this task order. Some of these hazardous conditions are, but not limited to: blasting, heavy equipment operation, traffic control on haul routes, loading and unloading of materials, site security, noises and dust task order and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA Regulations. The plan shall include all tasks and related activities anticipated to successfully complete the work.

H.3 SAFETY ITEMS

(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.

(b) The following checked activities have been identified by the Government as potential safety hazards, but not limited to:

[X] Confined Entry Space.

[X] Temporary excavation/deep trenching/slope stability.

[ ] Tree Felling.

[X] Fall hazard from work heights exceeding six feet.

[ ] Blasting.

[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[X] Heavy equipment operation.

[ ] Tree climbing and/or tower climbing.

[ ] Fire hazards.

[X] Hazard materials handling.

[ ] Electrical hazard.

[X] Hydraulic and/or pneumatic and/or other high pressure hazards.

[X] Mechanical hazards such as pulleys, springs, etc.

[X] Power tool operation including eye protection.

[X] Overhead hazards.

[ ] Steep slopes and /or downed logs.

[X] Insects including Asian Hornets.

H.4 PERSONAL PROTECTIVE EQUIPMENT

1. 29 CFR 1910 Subpart I, OSHA’s General Industry Personal Protective Equipment (PPE) standard contains the general requirements for the provision of personal protective equipment and requires employers to perform a hazard assessment to select appropriate PPE for hazards that are present or likely to be present in the workplace. OSHA requires that many categories of personal protective equipment meet or be equivalent to standards developed by the American National Standards Institute (ANSI).

2. Before a worker begins operating equipment, the Contractor must train the workers on the in the safe operation and use of equipment to all workers using such equipment.

3. The Contractor shall provide the appropriate personal protective equipment for the work required to be performed in the contract / task order, whenever necessary by reason of hazards or processes encountered that may cause injury or impairment in the function of any part of the body. Except for foot protection, all PPE must be provided by the employer at no cost to the employee. Includes:

• Head Protection

• Hearing Protection

• Eye/Face Protection

• Leg Protection

• Foot Protection

• Hand Protection

4. PPE must be sanitary and in reliable condition. Contractor shall not use defective or damaged PPE. PPE must be inspected by the Contractor prior to use on each work shift to ensure it is in serviceable condition.

5. A checklist of applicable PPE Guidelines typical for the work performed under this task order is available at https://www.osha.gov/SLTC/personalprotectiveequipment/index.htm or OSHA 3151-12 R 2003 Personnel Protective Equipment Booklet and other locations.

6. At all times, the Contractor is responsible for performing a risk assessment and providing the necessary PPE for their operation on this contract/task order.

7. The Contractor shall be in compliance with the all field sanitations. OSHA’s established minimum standards for field sanitation is applicable to this task contract/task order. Refer to Fact Sheet # 51 Field Sanitation Standards under the Occupational Safety and Health Act.

H.5 USE OF PREMISES

A. The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this task order in such a manner as not to interrupt or interfere with the conduct of Government business.

B. Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Forest Service land or lands administered by the Forest Service, the Contractor shall obtain written permission from the appropriate Ranger District. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a work order will specify all conditions and requirements. Sanitation facilities shall be provided for all employees of the Contractor and members of the campsite.

C. It is further stipulated that in addition to clean-up of any campsites, the Contractor shall remove his equipment from National Forest Service land before final acceptance and payment of the task order.

H.6 CONTRACTOR REPRESENTATIVE

Provide an onsite contractor representative who will oversee the performance of the work specified in this contract. Designate in writing to the CO, the name of the contractor representative and an alternate(s) who shall have the authority to authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contractor’s representative and alternate(s) must have a minimum of mid level management, supervision and operational experience as well as be able to read, write, speak, and understand English. Notify the CO/COR at least 10 work days in advance of any subsequent change of personnel in this position. Replacement personnel shall have the same level or better experience as the person being replaced.

H.7 GENERAL CONDITIONS and REQUIREMENTS

A. Background: The Forest Service compound in Thorne Bay has had a history of exceeding the EPA Action Levels for copper and lead in the drinking water due to corrosivity of the municipal water source and lead solder used in the copper plumbing. All the facilities were built in 1984.

The duplexes are slab on grade two-story wood framed buildings. Each unit has two full bathrooms and kitchen on the second floor.

There are 3 two-story wood framed quad buildings with shared walls and a crawlspace.

Each quad contains four 1 and 2 bedroom housing units for a total of 12 units. Each housing unit consists of a kitchen and one bathroom.

The bunkhouse is a two-story wood framed building with a crawlspace. Each floor consists of a kitchen and two bathrooms with 3 sinks in each. The first floor also has an individual apartment with a kitchen and bathroom sink.

B. Work Hours: 0800 to 1700 for occupied units and 0700 to 1800 for unoccupied units Monday through Friday excluding work on Federal Holidays, unless otherwise approved by the CO.

C. Work Schedule: Within 10 working days after the Notice to Proceed, Contractor shall submit a written work schedule showing beginning and completion dates for salient work items to the CO for approval. Contractor shall maintain the schedule up to date and shall provide it to the CO upon request. Contractor shall provide minimum two weeks of notice prior to starting work in order to properly notify tenants. Each housing unit or group of housing units shall be completed prior to moving onto the next. Coordination of logistics for limiting disturbance and inconvenience to the residents shall be a priority.

D. Safety: Contractor shall submit a written safety plan within 10 working days after the Notice to Proceed, but prior to any on-site activities. Plan shall address safety of occupant and contractor personnel, parking accommodations, and protection of improvements. Plan shall comply with and reference all applicable OSHA Construction and Workplace requirements.

E. Damage: Notify the CO immediately if any damage to the buildings is observed.

Contractor shall inspect and document existing improvements and vegetation, shall protect from damage for the duration of the contract, and shall be responsible for correction of damages caused by contractor’s operations at no cost to the Government.

F. Contractor’s Responsibility for Quantities: Quantities and dimensions provided are estimated; contractor shall determine and verify actual quantities dimensions required for proper completion of the work. As-builts provided have some minor modifications not included and shall be verified for quantity take-offs.

G. Permits: A building permit is not required as these are federally owned buildings.

H. Applicable Codes: All fittings and materials shall be NSF-61 compliant (Lead Free). The current family of ICC codes and NFPA 70, NEC apply to all work on this facility.

I. Material Storage and Handling: All material shall be delivered, stored, handled, and installed per manufacturer’s specifications and recommendations. Material storage is allowed on-site during construction and limited covered storage may be available.

Location(s) to be approved by Contracting Officer (CO).

J. Daily Cleanup: Remove all debris from the site daily. Debris generated by work shall be cleaned up and disposed of in accordance with all local, state, and federal regulations. Use a magnet daily especially around the parking area to cleanup any loose hardware. In all occupied units, the work area shall be minimized and shall be secured at the end of each workday.

K. Dust and Debris Control: Prevent the spread of dust and debris and avoid the creation of a nuisance, or hazard, in the living areas of the units. Sweep areas surrounding project for nails, screws, and other hazards as often as necessary to control the spread of debris that may result in injury to residents.

L. Contractor’s Use of On-Site Facilities: Contractor will have access to electric power at existing outlets and water service at existing hose bibs. Coordinate with existing tenant use.

Electric heaters and large consumers of electricity are prohibited. Contractor may utilize restroom facilities at Forest Service-owned bunkhouse.

M. Tenant Occupancy: Most housing units will be occupied by tenants, and the bunkhouse is typically around 100% occupancy from May - August. Contractor shall coordinate with the COR and individual tenants for unit access and any changes to water access.

N. Protection of Existing Improvements and Vegetation: Contractor shall inspect and document existing improvements and vegetation, shall protect from damage for the duration of the contract, and shall be responsible for the correction of damage caused by contractor’s work. Contractor shall submit a written plan for the protection of the building from the elements during roofing removal and installation.

H.8 GENERAL REQUIREMENTS

The contractor shall provide all materials, equipment, transportation, supervision, and labor required to:

• Secure water to affected units at cutoff valve to units.

• Replace all copper potable water plumbing from the above ground supply line to the bathroom sinks and kitchen sinks for all residential buildings. All other connections to the mechanical, appliances, shower, toilets, utility sinks, etc may be left in place.

• Replace existing system with new construction, keeping existing in operation until ready for changeover.

• Replace copper lines with equal size PEX tubing.

o Allow at least 1.5” of slack per 10’ of PEX tubing to allow for expansion and contraction.

o For horizontal runs, place supports at least every 32 inches. Use plastic hangers or metal supports designed for use with plastic tubing.

o Keep tubing a minimum of 12 inches vertically or 6 inches horizontally from sources of high heat such as heating appliances. Use copper pipe for inlets and outlets from hot water tanks within 12 inches of the tank.

o Insulate PEX tubing with 1” insulation in the Quad crawlspaces.

• Contractor may abandon existing domestic water copper piping in place.

• Replace all bathroom and kitchen sink fixtures as outlined in Table 1 below.

Provide 4 additional kitchen and bathroom fixtures for government storage.

• Remove all adjacent filtered drinking water spigot and plug hole with chrome plate.

• Replace under sink filter and housings with Culligan Big Blue Filter Housing 10” length or approved equal at all kitchen faucets for a total of 25. Diameter shall be congruent with adjacent piping. Plumb filter housings directly into the cold water supply line at each unit. Equip each housing with 0.5 micron lead and copper filter complying with NSF/ANSI 42 and NSF/ANSI 53 standards.

• Replace under sink supply lines and under sink shut off valves for all unit with a minimum of equal size diameter components.

• Install lead-free, flushable and reusable spin down sediment water filters with scraper at each supply line downstream from the shutoff valve and meter congruent with the pipe diameter. Filter shall be 50 Micron stainless steel mesh with transparent monitoring housing. System shall have a 360⁰ rotatable head connection to allow versatility for installation in areas with vertical supply lines. Plumb as recommended by manufacturer with bypass line and install ball valves before and after. Coordinate with COR for accessible placement.

o Quads and bunkhouse shall have a 110 oz capacity.

o Duplexes shall have a 16 oz capacity.

• Upon work completion, pressure test, flush new plumbing, disinfect, and test water for coliforms. Test from at least 3 fixtures in each duplex (12 total, each half of duplex houses will have at least one sample taken), 1 fixture in each quad housing unit (12 total), and 3 in the bunkhouse. Install boil water notice on fixtures until satisfactory results are received. Provide results to COR.

• All drywall work including cutting, patching, taping, mudding, texture, and painting shall be considered incidental to the work. Make consistent texture on surface, with seamless transitions. Make neat transitions between different surfaces, maintaining texture and appearance. Paint entire wall or ceiling surface for a consistent appearance.

• Provide red lined drawings to COR.

Table 1: Fixture Quantities Building Kitchen Faucets Bathroom Sink Faucets Duplex 1 1 2 Duplex 2 1 2 Duplex 5 1 2 Duplex 6 1 2 Duplex 7 1 2 Duplex 8 1 2 Duplex 9 1 2 Duplex 10 1 2 Quad 11 0 0 Quad 12 0 0 Quad 13 0 0 Quad 14 0 0 Quad 15 1 1

Quad 16 1 1 Quad 17 1 1 Quad 18 1 1 Quad 19 1 1 Quad 20 1 1 Quad 21 1 1 Quad 22 1 1

Bunkhouse 3 13 Surplus 4 4

TOTAL 23 41

H.9 GOVERNMENT-FURNISHED PROPERTY

The Forest Service will deliver to the Contractor the following listed materials, supplies, property or services; hereinafter referred to as Government-Furnished Items, at the pre-work conference or at a mutually agreeable time thereafter but in any case prior to field work. The Contractor shall be liable for all loss or damage of such Government-Furnished Items until it has been returned. Completion and final acceptance of work required under this contract will be contingent on the installation of all Government- furnished items in serviceable condition.

The Contractor will be charged by a reduction in contract payments the replacement cost of Government-furnished items lost or damaged to the extent of becoming unserviceable.

Government Furnished Items

Quantity When, Where, How to be Furnished

None - -

H.10 PROSECUTION OF WORK

(a) Construction activity shall be limited to the hours between 8 a.m. and 5 p.m., Monday through Friday, unless other hours are approved in writing by the CO. The Contractor shall conduct activities so that interference with the tenants shall be kept at a minimum.

(b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.

H.11 PHYSICAL DATA

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by the US Forest Service. Visual site surveys were performed.

Utilities: Electrical and Water

H.12 FAR 52.236-27 Site Visit (Construction) FEB 1995

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal work hours by contacting:

Name: Sean Wheeler 907-401-3762

All Questions about this project must be submitted to the Contracting Officer in writing – via email and should be received by the CO at least 7 days prior to the closing date of the solicitation.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses:

https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452) FAR and AGAR Deviations to clauses may be viewed at: Policies & Regulations | USDA

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

(MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) (Whistleblower

Guidance to contractor employees) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY

2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN

2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab Covered Entities (DEC 2023) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

(OCT 2018)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-2 Audit and Records -- Negotiation (JUN 2020) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.usda.gov/da/ocp/ppd/policies-regulations https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fcontent.govdelivery.com%2Fattachments%2FUSDAPSD%2F2023%2F04%2F04%2Ffile_attachments%2F2456937%2FWhistleblower%2520Guidance.docx&wdOrigin=BROWSELINK https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fcontent.govdelivery.com%2Fattachments%2FUSDAPSD%2F2023%2F04%2F04%2Ffile_attachments%2F2456937%2FWhistleblower%2520Guidance.docx&wdOrigin=BROWSELINK

52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (SEP 2023) 52.219-14 Limitations on Subcontracting (OCT 2022) 52.219-28 Post Award Small Business Program Rerepresentation (SEP 2023) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY

2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

(MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC

2010) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (MAY 2022) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN

2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction

Contracts (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN

2020) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022)

52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT

2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)

Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984) Alternate II (APR 1984)

52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-2 Subcontracts (JUN 2020) 52.244-6 Subcontracts for Commercial Products and Commercial Services (NOV 2023) 52.245-1 Government Property (SEP 2021) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994)

Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)

Alternate I (SEP 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Based Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archaeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

52.204-21 Basic Safeguarding of Covered Contractor Information Systems (NOV 2021)

(a) Definitions. As used in this clause– “Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

“Safeguarding” means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract

Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

http://uscode.house.gov/

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access;

and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

52.217-7 Option for Increased quantity – Separately Priced Line Item (MAR 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within ____________ (insert period of time).

52.225-9 Buy American Act-Construction Materials (OCT 2022)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, https://www.acquisition.gov/far/part-2#FAR_2_101 emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a…