GAOA Thorne Bay Compound Water Quality Mitigation
Solicitation number
1240BJ24R0008
Issued by

About this file

This document is Amendment 0001 to Solicitation 1240BJ24R0008 for the GAOA Thorne Bay Compound Water Quality Mitigation project. The amendment provides answers to contractor questions regarding the project scope, including the replacement of copper water lines with PEX tubing in the duplexes, quads, and bunkhouse facilities. Key details include:

The project requires replacing all water fixtures and potable water plumbing with PEX tubing in the Duplexes, Quads, and Bunkhouse at the Thorne Bay Ranger District in Alaska. The government estimates the construction magnitude to be between $250,000 and $500,000. The amendment clarifies that only the copper water lines going to the lavatory sinks and kitchen faucets need to be replaced, including opening walls to access the branch lines from the main supply. The amendment also confirms there is no digging required for the water line replacement. The solicitation closing date is not extended by this amendment.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

ROXANNE ANDERSON

GAOA Thorne Bay Compound Water Quality Mitigation, Phase 1, Thorne Bay Ranger District, Tongass National Forest Thorne Bay, Alaska This amendment 0001 is issued to:

1. Provide Answers to Questions that contractors have submitted as of 5/2/2024 (attached)

Procurement & Property Services, Field Procurement Operations Northwest Zone – Construction & A-E Attn: Roxanne Anderson, CO

1240BJ23R0008

1 2

05/02/2024

04/22/2024

Solicitation: 1240BJ24R0008

Questions and Answers for the Thorne Bay Compound Water Quality Mitigation

1. Can you send pictures of the blue filters and connections underneath kitchen sinks?

2. Can you provide specs for new fixtures you want installed?

All requirements should be provided in the Specifications attachment under SECTION 224100 - RESIDENTIAL

PLUMBING FIXTURES

3.Just to clarify, only the copper water lines going to lavatory sinks and kitchen faucets are being replaced?

Including opening up the walls underneath kitchen and lavatory sinks, replacing copper and installing new 1/4 turn shutoff valves. The branch lines for the lavatory and kitchen sink could be a ways from the main line next to there meter. Are we to replace from the branch T supplying lavatories and kitchen faucets?

The copper water lines from the above ground supply/main line to the bathroom and kitchen faucets for cold and hot sides shall be replaced with PEX. These supply/main lines originate in the crawlspace or from the slab.

Other branches may be replaced but are not required.

4. How many properties/units have crawl spaces below them?

Per Section 10. A of the Statement of Work, there are 3 quad buildings with shared walls and a crawlspace. The bunkhouse also has a crawlspace. The duplexes are slab on grade with no crawlspace.

5. Will any digging be required for replacement of water lines?

No.