This is a Solicitation, Offer, and Award form (Standard Form 1442) for a design-build construction project issued by the Department of Veterans Affairs.
The procurement is for Project 612-165: Design and Construction of a Parking Structure Replacing an Expiring Lease at the Martinez VA Medical Center in Martinez, California (150 Muir Road, Martinez, CA 94553-4668). This is a negotiated Request for Proposal (RFP) utilizing two-phase design-build selection procedures. The Government's budget for the requirement is $21,000,000, with the VAAR magnitude of construction ranging from $20,000,000 to $50,000,000. The NAICS code is 236220 and PSC code is Y1LZ. The procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns certified by the SBA and listed in the certification database at time of proposal submission and award. Sealed proposals in original and zero copies are due at 12:00 EDT on May 19, 2026, with public opening waived. The contractor must begin performance within 10 calendar days and complete it within 484 calendar days after receiving notice to proceed, with this performance period designated as mandatory. A bid guarantee (SF 24) is required in an amount of 20 percent of proposal price but not to exceed $3,000,000. Performance and payment bonds (SF 25 and SF 25A) are required per FAR 52.228-15. The contractor must submit lump sum pricing for both Line Item 0001 (Design & Construction Documents) and Line Item 0002 (Construction), with award made on the Grand Total. Pricing must be submitted in whole dollar values without cents. The solicitation was issued on April 15, 2026, and includes eleven attachments addressing the Statement of Work, RFP details, project specifications, wage determinations, and other contracting requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 84
36C77626R0036
X
04-15-2026
612-165
36C776
Department of Veterans Affairs
Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490
Independence OH 44131
Department of Veterans Affairs
Program Contract Activity Central
Shardae Webb (216) 791-3800 x49668
In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this procurement is set aside for SDVOSBs.
Project 612-165: Design and Construction for the Construct Parking Structure Replacing Expiring Lease at the
Martinez VA Medical Center in Martinez, California.
This procurement is being solicited using a two-phase design-build procedures.
The contractor is to provide design and construction services to complete the Construct Parking Structure Replacing
Expiring Lease Design Build project in accordance with this solicitation, specifications, and all applicable attachments.
This project is located at:
Martinez Veteran Affairs Medical Center
150 Muir Road
Martinez, CA 94553-4668
VAAR Magnitude of Construction: $20,000.000 to $50,000,000
NAICS Code 236220 and PSC Y1LZ
The Government's budget for this requirement is $21,000,000. Funding in excess of this amount is not available.
Contractor is required to fill in Unique Identifier in Block No. 14 on Standard Form (SF) 1442.
PLEASE NOTE: The Contractor agrees to attend any Post Award Conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.
10 (Ten) 484 x x
X 10 (Ten)
0 (Zero) 12:00 EDT
05-19-2026
X
90 (Ninety)
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your
Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C776
Department of Veterans Affairs
Program Contracting Activity Central
VAFSC
Department of Veterans Affairs
Financial Services Center
Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135
877-353-9791 512-460-5429
William Henkel
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or
Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
INFORMATION REGARDING PROPOSAL MATERIAL, BID GUARANTEE AND BONDS
1.1 BID MATERIAL
1.2 BID GUARANTEE
1.3 PAYMENT & PERFORMANCE BONDS
1.4 TAXES
INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS
2.2 REQUEST FOR PROPOSAL
2.3 SDVOSB SET-ASIDE
2.4 PRE-PROPOSAL SITE VISIT
2.5 TECHNICAL QUESTIONS
2.6 AMENDMENTS
2.7 PREPARATION OF PROPOSALS
2.8 PROPOSAL REQUIREMENTS
2.9 SELECTION PROCEDURES
2.10 DETERMINATION OF RESPONSIBILITY
2.11 VETS 4212
2.12 SYSTEM FOR AWARD MANAGEMENT (SAM)
2.13 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT SYSTEM (CPARS)
2.14 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS
2.15 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT
MANAGER
2.16 DEVIATION NOTICE (FEB 2025)
2.17 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
2.18 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY
SITE OF THE WORK (NOV 2025) (DEVIATION)
2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
2.20 52.228-1 BID GUARANTEE (SEP 1996)
2.21 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS
REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
2.22 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
2.23 52.233-2 SERVICE OF PROTEST (DEVIATION NOV 2025)
2.25 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES
INCORPORATED BY REFERENCE (JAN 2008)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT
2018)(DEVIATION NOV 2025)
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS-
CERTIFICATION (NOV 2021) (DEVIATION NOV 2025)
3.3 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND
REPRESENTATION (JUN 2020) (DEVIATION SEP 2025)
GENERAL CONDITIONS
4.1 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JAN 2025) (DEVIATION NOV 2025)
4.2 52.222-35 EQUAL OPPORTUNITIES FOR VETERANS (JUN 2020) (DEVIATION
NOV 2025)
4.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) (DEVIATION NOV
2025)
4.4 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JAN 2025) (DEVIATION NOV 2025)
4.5 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV
2025) (DEVIATION)
4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (NOV 2025) (DEVIATION)
4.7 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (NOV 2025) (DEVIATION)
4.8 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (NOV 2025) (DEVIATION)
4.9 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (SEP 2025) (DEVIATION)
4.10 SPECIAL NOTES REGARDING FAR 52.229-3: FEDERAL, STATE AND LOCAL
TAXES (DEVIATION SEP 2025):
4.11 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
4.12 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.13 MANDATORY WRITTEN DISCLOSURES
4.14 IT CONTRACT SECURITY
4.15 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.16 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 72
4.17 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.18 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.19 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.20 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (MAY 2020) (DEVIATION MAR 2026)
4.21 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MAR 2026) 74
4.22 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899
(DEVIATION)(APR 2025)
4.23 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.24 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)
DESIGN BUILD SPECIFICATIONS
4.25 PARTNERING
4.26 GENDER
4.27 CONTRACTOR'S COST BREAKDOWN
4.28 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES
4.29 OWNERSHIP OF ORIGINAL DOCUMENTS
4.30 RETENTION OF REVIEW DOCUMENTS
4.31 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED
PLANNING INFORMATION
4.32 COORDINATION WITH MEDICAL CENTER
4.33 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR
LIST OF ATTACHMENTS
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVI
CES
QUANTI
TY
UNI
T UNIT PRICE AMOUNT
1.00 JB _______________ _______________
Design & Construction Documents: Contractor shall provide the complete design of the parking structure and all requirements listed in the project's SOW.
Contractor shall furnish all labor, material, equipment, and supervision to provide the required documents for construction including Drawings, Specifications, construction cost estimates, and other documents as necessary in accordance with the SOW in all Specifications.
Contract Period: Base
1.00 JB _______________
Construction: Contractor shall provide all construction related activities such as pre-construction, site-prep, general construction, alterations, necessary removal of existing structures, renovations, post-construction services, commissioning, project close-out and any other required elements of work to provide a complete and usable facility.
Contractor shall furnish all labor, material, equipment and supervision to perform all required elements of work in accordance with the SOW, Specifications and all applicable attachments.
Contract Period: Base
GRAND TOTAL _______________
NOTICE
1. Line Item 0001 (Design) and Line Item 0002 (Construction) contains all the work for this project.
2. Offerors must provide a lump sum price for Line Item 0001 (Design) and Line Item 0002 (Construction). Failure to do so will render their offer unacceptable.
3. Award will be made on the Grand Total (Line Item 0001 Design and Line Item 0002 Construction).
4. Pricing must be submitted in whole dollar values. Do NOT include pricing in cents.
5. Contractor is required to fill in their Unique Entity Identifier associated with SAM.gov in Block
No. 14 on Standard Form (SF) 1442.
6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.3.
INFORMATION REGARDING PROPOSAL MATERIAL, BID
GUARANTEE AND BONDS
1.1 BID MATERIAL
Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request For Proposals (RFP). The VA will not provide printed copies of drawings or specifications. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE
A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the proposal being deemed unacceptable. Copies of the SF 24 may be obtained from https://www.gsa.gov/forms.
1.3 PAYMENT & PERFORMANCE BONDS
The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds shall be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds - Construction. Copies of SFs 25A and 25 may be obtained from https://www.gsa.gov/forms.
1.4 TAXES
Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” (DEVIATION SEP 2025) and its Special Note in their pricing. The FAR clause and its Special Note provide guidance on taxes being applied to pricing.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gsa.gov%2Fforms&data=05%7C02%7C%7C7197924ab06b4510c2cb08dd1867cd0b%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638693556286629207%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=MT5QogE1p45j8KY7G3NL%2BRIn0UgyKEY8mmn8Lp5c5oQ%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gsa.gov%2Fforms&data=05%7C02%7C%7C7197924ab06b4510c2cb08dd1867cd0b%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638693556286629207%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=MT5QogE1p45j8KY7G3NL%2BRIn0UgyKEY8mmn8Lp5c5oQ%3D&reserved=0
INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO
OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS
All solicitation related documents will be published to Contract Opportunities at:
https://sam.gov/.
2.2 REQUEST FOR PROPOSAL
This solicitation is issued as a Request For Proposal (RFP) utilizing the two-phase design-build selection procedures in accordance with FAR 36.101-2. Phase II of the solicitation shall be prepared in accordance with FAR Part 15, with evaluation criteria developed in accordance with FAR 15.104. The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value to the Government. It is the intent of the Government to award without negotiations; however, the Government reserves the right to conduct negotiations if necessary.
All Phase I and Phase II proposals shall be subject to evaluation by a team of Government personnel. The proposals will be evaluated in accordance with the content provided in the solicitation. In Phase I of the Two-Phase Design-Build process, Offerors will submit a proposal in accordance with the two (2) evaluation factors listed below. Upon receipt of Phase I proposals, the VA team will evaluate and determine the highest qualified Offerors based on their Phase I submissions. A maximum of five (5) Offerors will be selected to provide a proposal for Phase II.
Offerors not selected to provide a Phase II proposal will be notified that they are no longer being considered for this project. Phase II proposals will be evaluated in accordance with FAR Part 15, the three (3) Non-Price evaluation factors listed below, and Price for Phase II. The Government intends to award a contract resulting from this solicitation to the responsible Offeror using a Trade- Offs method, after evaluations, in accordance with the factors in the Two-Phase Design-Build solicitation. A responsible determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.
2.3 SDVOSB SET-ASIDE
This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. To be considered eligible to receive award of a resulting contract, offerors must be certified as SDVOSBs by the U.S. Small Business Administration (SBA) and listed in the SBA certification database at the time of proposal submission and at time of award. Offers received from entities that are not certified SDVOSBs will not be considered. Failure to be certified at the time of proposal submission and at time of award will result in the offer being deemed unacceptable and ineligible for award. A joint venture may be considered eligible as an SDVOSB if the joint venture complies with the requirements in 13 CFR 128.402.
2.4 PRE-PROPOSAL SITE VISIT
A formal site visit has been scheduled for this project. This will be the only opportunity for potential offerors to visit the site. This site visit will be available to Offerors during Phase II of evaluation.
All potential offerors, subcontractors and suppliers are strongly encouraged to attend this site visit.
https://sam.gov/
2.5 TECHNICAL QUESTIONS
Questions of a technical nature must be submitted by prospective offerors via e-mail to:
Shardae Webb at Shardae.Webb@va.gov and William Henkel at William.Henkel@va.gov. The subject line of each e-mail must read: Martinez Parking Garage - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF PHASE I QUESTIONS IS Wednesday, April 29th at 12:00 PM EST.
2.6 AMENDMENTS
Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.
2.7 PREPARATION OF PROPOSALS
The Government will not pay for any costs incurred in preparation and submission of proposals.
2.8 PROPOSAL REQUIREMENTS
A. General:
1. Proposals shall be based on solicitation document issued for RFP number
36C77626R0036. Proposals will be in the format stipulated in this document.
2. Proposals shall be received on or before the date and time specified in Block 13 of the
SF 1442. There will be no public opening of the proposals.
3. Proposal Submission:
i. Submit proposals via e-mail to: Shardae Webb at shardae.webb@va.gov and William Henkel at william.henkel@va.gov
ii. Emails are limited to five (5) MB.
iii. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted.
4. Bid Bond (PHASE II ONLY):
i. The bid bond shall be submitted as part of the electronic proposal submission.
An original hard copy of the bid bond will be requested by the VA, after the award selection.
ii. Failure to furnish the required bid guarantee on the proper form and for the proper amount, by the time specified in Block 13 of SF 1442, shall result in rejection of the proposal. See FAR Provision 52.228-1, Bid Guarantee, contained in the solicitation.
5. Page size for all proposal documents will be 8.5 x 11 inches, with 1-inch margins around the page perimeter. Pages will be single spaced. Each page shall count as one (1) page.
Proposals shall be submitted using Times New Roman, with font no smaller than 11 point with normal proportional spacing.
6. Page formatting restrictions do not apply to drawings, but each page does apply to the page count. Pages submitted in excess of the page count will not be evaluated. *Page count does not apply to Phase II.
2.9 SELECTION PROCEDURES
Evaluations will be based on the following evaluation factors:
Phase I mailto:Shardae.Webb@va.gov mailto:William.Henkel@va.gov https://sam.gov/ mailto:shardae.webb@va.gov mailto:william.henkel@va.gov
1. Technical Qualifications
2. Past Performance
Phase II
1. Technical Solution
2. Draft Project Schedule
3. Price
A. Phase I Proposal Format And Evaluation:
1. Format: The offer, including title page, detailed table of contents, and preface for Phase I shall be submitted in one (1) PDF document and shall not exceed a total of TWENTY- FIVE (25) pages. Factor 2: Past Performance information does not count towards this page limitation. The Offeror shall not include any price or price related material in the Phase I proposal. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.
2. Capability to Perform: The Offeror shall provide a letter from their surety demonstrating the offeror’s total bonding capacity and current available bonding capacity. Total bonding capacity and current available bonding capacity must be outlined in a letter dated no earlier than the solicitation release date. Capability to perform will not count towards the page limitation.
3. Evaluation Factors – 1-2 are of equal importance:
Factor 1: Technical Qualifications (Technical)
Submission Criteria: The Offeror shall submit an organizational chart and indicate the prime responsible firm (or firms, if a J/V) and individuals, as well as the roles and responsibilities of individuals proposed as consultants and subcontractors. Provide a list of all consultants and all proposed major subcontractors, including telephone number, address, and name of contact.
The Offeror shall provide resumes that describe the design build team’s qualifications, to include education and/or certification(s), of the following personnel. (page limitation, two (2) pages per requested resume):
• Project Manager
• Site Superintendent
• On-site Quality Control Specialist
• Lead Architect
• Lead Structural Engineer (SE required)
• Lead Civil Engineer (PE required)
*Dual hatting will not be allowed.
For each of these required key personnel, the offeror shall identify the available capacity and any current projects they are working on with the anticipated completion dates. The Offeror shall describe its approach for managing performance under this solicitation, including techniques for management of work coordination with subcontractors and measures/corrective action that will be taken for substandard performance. The Offeror shall describe proposed Design-Build Peer Review techniques along with the Quality Assurance/Quality Control Plan.
Evaluation Methodology: Technical Qualifications will evaluate the relevant management, required technical personnel, and subcontractor capabilities and qualifications of the team to provide the required planning, implementation, and completion of the project. The VA will consider education and certifications, as well as relevant experience in an operational health care facility. The VA will also evaluate how the Offeror organized personnel for this project, and the lines of authority between the construction firm, design firm, and key subcontractors.
Factor 2: Past Performance
Submission Criteria: Offerors shall demonstrate successful experience in relevant projects in size, scope, and complexity to the solicitation. Past performance will be evaluated based on the size, scope, and complexity of completed projects, within active healthcare environments, particularly within the Veterans Health Administration (VHA). Offerors shall provide at least two
(2) and no more than three (3) projects that demonstrate their ability to perform the proposed effort. Projects must be at least 75% completed or have been completed within the past five (5) years from the date proposals are due. Past Performance information does not count towards the page limitation for Phase I proposals.
Size: Each submitted project must have a total value exceeding $10 million.
Scope: Projects must involve construction of a fully functional parking garage, demolition, electrical work, site development, utilities installation, and structural and mechanical construction. Preferably projects completed within VHA facilities.
Complexity: Projects must demonstrate parking garage construction in an active healthcare setting, with minimal system downtime. This includes effective phasing, coordination of critical path activities, and a detailed understanding of the statement of work.
Narrative: Each project submitted for past performance evaluation shall use the Project Information Sheet for Contractors (Attachment 3 in the solicitation) and include all of the required/requested information . Offerors shall also provide a narrative describing past performance on projects requiring complex coordination and the risk mitigation actions taken.
This shall include:
Management of site outages, system cutovers, and the communication standards used to inform multiple stakeholders of key coordination dates
• Handling of long-lead item procurement and adherence to critical path schedules
• Resolution of past performance issues, including corrective actions taken for substandard performance
• Description of the mitigation plan for any current performance challenges such as cost overruns, schedule delays, subcontractor issues, or changes in key personnel or subcontractors.
At least one of the projects submitted must have been completed by the Prime. Offerors lacking relevant past performance history may submit information regarding predecessor companies or key personnel who have performed on other contracts. Such information shall, as a minimum, include: Name(s) of Predecessor Company/Sub-contractor and/or Key Personnel and include: Complete Address and Point of Contact; Telephone Number; and email address.
For offerors that are joint ventures, the evaluation will take into account past performance of the joint venture as well as the past performance of each party to the joint venture.
Quality Assessment: If a completed past performance evaluation is available in CPARS, it shall be submitted with the proposal for each project identified. If a CPARS report is not available, a completed and signed Past Performance Questionnaire (attachment 4) must be submitted in lieu of a CPARS report for the project. If an offeror has no relevant past performance history, the offeror must affirmatively state it possesses no relevant past performance history. Without this statement, the Offeror may be rated less favorably for failure to submit the required information.
Offerors without relevant past performance or for whom past performance information is not available cannot be evaluated favorably or unfavorably for this Factor. Past performance evaluations may also be conducted using information obtained from CPARS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representative(s), Contractor Performance Assessment Reporting System (CPARS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
Evaluation Methodology: Past Performance will be evaluated on the basis of performance, recency and relevancy to arrive at an overall Confidence Rating.
Recency and Relevancy Evaluation: The Government will evaluate each project submitted to ensure the project is recent, meaning projects must have been completed within the last eight years, or at least 75% complete. Projects older than five years or not at least 75% completed will not be evaluated. The Government will evaluate each recent project to determine the relevancy of the project to the solicitation requirements. The relevancy determination will be based on the Project Information Sheet provided by the Offeror.
If a completed past performance evaluation is available in CPARS, it shall be submitted with the proposal for each project identified. If a CPARS report is not available, a completed and signed Past Performance Questionnaire must be submitted in lieu of a CPARS report for the project.
If an offeror has no relevant past performance history, the offeror must affirmatively state it possesses no relevant past performance history. Without this statement, the Offeror may be rated less favorably for failure to submit the required information.
If a project is not recent, it will not be evaluated further meaning a relevancy rating nor performance confidence rating will be assigned. Projects that are determined to be not relevant will not be assessed for quality.
Past performance demonstrating higher levels of success and quality on recent and relevant projects similar in scope and magnitude to this solicitation present lower levels of risk and will be more favorably rated. Offerors should make every attempt to provide past performance for projects by furnishing a Past Performance Questionnaire completed by the customer or a CPARS rating, if applicable and available.
Overall Performance Confidence Rating: The purpose of the past performance evaluation is to assess the degree of confidence the Government has in the Offeror’s ability to meet the solicitation requirements based on the Offeror’s demonstrated record of performance. The Government will combine the recency and relevancy considered for the Offeror to assign a single Past Performance Confidence.
Per FAR 15.305 (a)(2)(iv), offerors without a record of relevant past performance or for whom information on past performance is not available may not be evaluated favorably or unfavorably on past performance. Offerors with no recent and relevant performance history or whose performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned shall receive the “Neutral Confidence” rating, meaning the rating is treated neither favorably nor unfavorably.
Phase II Proposal Format And Evaluation:
1. Format: Phase II proposals shall be based on solicitation documents and the instructions provided by the Contracting Officer in the Phase II Notice of Offerors notifying Offerors that they were selected as one of the most qualified Offerors in Phase I. Technical, Price and Administrative sections of the Offerors proposals will be evaluated independently;
therefore, the Offeror must submit the proposal in three (3) Volumes: Volume I Technical, Volume II Price and Volume III Administrative. Offerors must send Volumes I, II and III as attachments in separate e-mails. Each volume must be labeled with the Offeror's organization, business address, and VA Solicitation Number. Each volume must be submitted as searchable PDF documents attached to an e-mail. Portions of proposals submitted via drop-box, hyperlink, or format rather than a searchable PDF attached to an email will not be considered, which may render the proposal incomplete. The proposal, in its entirety, shall not exceed three (3) e-mails (one e-mail for each volume). Each e-mail, including its attachments, must be less than 5MB in size. Offerors must Include page numbers and its company name in the header or footer of each page of all attachments.
2. Volume I Technical Solution and Draft Project Schedule: Offerors shall format Volume I Technical proposal as listed below. The specific evaluation criteria and methodology is below including, all non-price factors is not restricted to a page limitation.
a. Technical must include a title page; detailed table of contents and preface Volume I Technical shall be submitted in one (1) PDF document for Volume I Technical and shall not exceed a total of TWENTY-FIVE (25) pages. The title page, table of contents and preface are excluded from the page limits. Offerors must not include any price or price related material in the Volume I Technical proposal. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.
b. A page is defined as each face of an 8.5 X 11-inch sheet of paper with 1-inch margins around the page perimeter containing information. The background color of each page of the submission shall be white or ivory stock and each page shall count as one (1) page. Excess pages will not be evaluated. Text lines must be single-spaced, and proposals shall be submitted using Times New Roman, with font no smaller than 12 point with normal proportional spacing. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Times New Roman are permissible in the presentation of graphic material only.
c. The Offeror’s proposal must address each evaluation factor listed in this solicitation. Failure to submit a proposal in the format required that addresses each factor may result in the proposal being deemed ineligible for award.
3. Volume II Price: Offerors shall format the Volume II Price proposal as listed below.
The specific evaluation criteria and methodology is below.
a. Volume II including price only shall not exceed a total of Ten (10) pages following the formatting requirements stated in general proposal requirements.
The Offeror shall submit Volumes I, II, and III in electronic format as searchable PDF documents. The proposal, in its entirety, shall not exceed three emails (one for each volume) of 5MB each. Include page numbers and the company name in the header or footer of each page.
b. Offerors shall ensure the Signed Standard Form (SF) 1442 is provided.
Offerors shall acknowledge receiving amendments by filling out section 19 of the SF 1442.
4. Volume III Administrative Information: If an offeror fails to include all of the below information in its proposal, then the proposal may be deemed incomplete and ineligible for award.
a. Representations & Certifications:
By submitting its offer, the Offeror verifies that, as of the date of its offer, its representations and certifications posted electronically in SAM for the applicable provisions are current, accurate, and complete. The Offeror’s representations and certifications in SAM are hereby incorporated by reference into its offer.
b. Information Regarding Responsibility Matters:
Offeror shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.
c. Violation of Arms Controls Treaties or Agreements:
Offeror must provide their response to FAR 52.209-13 (b)(1) or (2) Violation of Arms Controls Treaties or Agreements.
d. Tax on Certain Foreign Procurements – Notice and Representation:
The offeror shall provide their response to FAR 52.229-11 (d).
e. Post Award Small Business Program Representations:
Offeror shall provide their response to FAR 52.219-28 (g), if applicable.
f. Limitations on Subcontracting:
The offeror shall complete and sign the VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction required in VAAR 852.219-75 and return it with their proposal submission as a separate document (Attachment 8 – Limitations on Subcontracting – Martinez). The completed and signed form will become part of the official award documentation.
Complete the certification and ensure that the appropriate box is checked.
VAAR 852.219-75 imposes an obligation on the person executing the certification to enter the following information below the paragraph which begins with the word ‘Certification:’
1. Offeror’s Name: The name should match the actual legal name of the offeror as captured in SAM.gov. If the offeror’s name is ‘SDVOSB Craftsman, LLC,’ the full legal name of the entity must be entered in each separate section of the certification that contains the following brackets: [Insert Name of Offeror]. It is not sufficient for the offeror’s company name to be inserted at the bottom of the certification only. The offeror’s name must be entered in the brackets referenced above.
2. Printed Name and Title of Signee: Enter the printed name and job title of the signee.
3. Signature: The certification statement must be signed by an individual who is authorized to execute the certification on behalf of the offeror.
4. Date: The certification must be properly dated.
5. Company Name and Address: The certification must include the signee’s complete business name and address.
g. Notice to SDVOSB Joint Venture/Mentor Protegee:
Any offeror submitting an offer as a joint venture must provide a copy of the joint venture agreement signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR §
128.402 and (2) will perform the contract in compliance with the joint venture agreement. Additionally, the certification from the certified SDVOSB partner must be submitted. Failure to submit the agreement and certification with the offeror’s proposal will render the offeror ineligible for award.
5. Evaluation Factors - 1-2 are in Descending Order of Importance.
Basis for award: All evaluation factors other than price, when combined, are significantly more important than price.
Phase II Evaluation:
Factor 1: Technical Solution (Technical)
Submission Criteria: Based on solicitation documents, site visit, and the Offeror’s Phase I Technical Qualifications, provide a detailed narrative and design approach schematics describing the Offeror’s technical solution to the project to achieve design and construction objectives as described in the solicitation.
The Technical Solution will be evaluated for inclusion of the technical areas listed in the specifications, Statement of work, and phasing plan for demolition and construction. Calling out major events or physical barriers that would need to be designed around. The VA will evaluate Offeror’s specific detail in each of the technical areas regarding design and constructability of design. The Offeror’s narrative should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed.
The Offeror’s narratives shall include the following technical areas:
• VA security Design Guide and Manual as it pertains to anti-suicide for VA and fall protection.
• VA Design Guides and TIL Design Requirements particularly to VA Barrier Free “ADA” requirements.
• Design Approach: Describe the techniques and methods.
• Construction Approach: Describe the techniques and methods for this construction project to include coordination with the design package, projected timelines and phases and coordination of work.
The Offeror shall address the technical areas of concern listed above and describe how they will minimize any risks they identify associated with the identified areas of concern. The narrative shall indicate that the Design-Build team understands the site complexities and address how their approach offers constructability advantages of an operational parking garage in a hospital setting.
Note: The original team proposed for Phase I shall be maintained for Phase II. All personnel proposed are subject to substitution requirements contained in this solicitation.
Evaluation Methodology: The VA will evaluate the Technical Solution and use as an aid to help determine that the Offeror understands the project and can perform all of the required elements. The Technical Solution will be evaluated for inclusion of the technical areas listed in the criteria. The VA will evaluate an Offeror’s specific detail in each of the technical areas regarding design and constructability of design. The Offeror’s narrative should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed.
Factor 2: Draft Project Schedule (Technical)
Submission Criteria: The offeror shall demonstrate their understanding of the requirement and timeline by submitting a draft project schedule for design and construction that adheres to the requirements outlined in the attached Specification Section 01 32 16.16 Schedule for Design- Build. The Offeror’s schedule shall address, at minimum, the following:
• The Offeror’s plan for performing design services to include internal quality control reviews before submission to the VA
• Proposed phasing to ensure essential services required for medical center operations are not disrupted
• Proposed start of construction and demonstration of realistic timeframes for submittals, procurement, and construction activities, complete contract closeout activities to include final inspections, punch list corrections, and submission of closeout documents, submittals, record drawings, etc.
The project will start at the issuance of the Notice to Proceed. For scheduling purposes, assume the Notice to Proceed will be issued fourteen (14) calendar days after the award date. (Note:
that there is no guarantee the Notice to Proceed will be issued within this timeframe.)
Evaluation Methodology: The VA will evaluate the Draft Project Schedule and use as an aid to help determine that the Offeror understands and can perform all the required elements to complete the project in the time frame specified with limited impact, to the greatest extent possible, to the Medical Center. The project schedule submitted with the offer should not be construed as the agreed upon schedule as per FAR 52.236-15, the contractor shall, within twenty-one (21) Calendar days after receiving the Notice to Proceed, submit an interim project schedule which will supersede the project schedule submitted in the Phase 2 proposal. The interim project schedule will be subject to VA approval and must show the project being accomplished within the time frame specified on SF 1442 [Block 11].
Note: The performance period proposed by cannot exceed the time specified in the solicitation, and FAR 52.211-10, Commencement, Prosecution, Completion of work.
Completion dates that are shorter than specified in the solicitation and FAR 52.211-10, Commencement, Prosecution, and Completion of Work, may be given more favorable consideration if supported by narratives that explain methodologies and innovative approaches to accelerate delivery, while fully mitigating risks to the execution and quality of design and construction. Proposed accelerated project schedule and completion dates shall become contract requirements upon award.
Factor 3: Price
Submission Criteria: Carefully follow “Instructions, Conditions, and Notices to Offerors”, Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the price schedule when submitting price offers. Enter the proposed dollar amount for each line item in the Price Schedule.
The price must be Firm Fixed Price. The Offeror must take care not to include remarks that take exception to the Government’s Specifications/Drawings or pricing requirements or otherwise preclude the Government from evaluating the offer, which will result in the offeror’s proposal being rejected.
Evaluation Methodology: The total evaluated price will be determined by the Offeror's price provided on the Price Schedule inclusive of all line items.
Note: If none of the offerors are within the available funding limitation or is otherwise determined to be other than fair and reasonable, the VA reserves the right to enter into negotiations with those offerors who are determined to be within the competitive range.
If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further negotiations.
B. FINAL PROPOSAL REVISIONS (section only applies if negotiations are conducted):
1. If determined to be necessary, proposal revisions will be requested from the Offerors determined by the CO to be in the competitive range based on the selection criteria.
Negotiations may be conducted with those Offerors falling within the competitive range, after which proposal revisions will be requested. Proposal revisions will be submitted as per Section 2.7(A), above, except as noted below and will be due at a time and place to be determined.
2. Offerors submitting proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals. Offerors will provide necessary changes to individual paragraphs, as briefly as possible, and include a table of contents, which indicates where within the initial proposal the additional information or changed documents would be placed. Proposal revisions shall include a completed SF 1442 that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final proposal revisions Offeror’s price proposal is greater than its initial price proposal.
2.10 DETERMINATION OF RESPONSIBILITY
In accordance with FAR subpart 9.1, Responsible Prospective Contractors, a responsibility determination will be made for the apparent awardee prior to processing the award. The Contracting Officer reserves the right to request information to assist the Government in determining the apparent successful offeror responsible, including information regarding the offeror’s previous experience (including points of contact), organization (including company officers), technical qualifications, financial resources, and other information deemed necessary.
NOTE: Any information received by the Government that would be cause for a negative determination of responsibility may make the offeror ineligible for award.
2.11 VETS 4212
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at:
http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The http://www.dol.gov/vets/vets4212.htm
Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.
2.12 SYSTEM FOR AWARD MANAGEMENT (SAM)
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements. The Offeror shall be registered at time of Phase I submission, Phase II submission, and award. The Offeror shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer or quotation in response to this solicitation and at the time of award.
2.13 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR
PERFORMANCE ASSESSMENT SYSTEM (CPARS)
As prescribed in Federal Acquisition Regulation (FAR) Part 42.1102(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $900,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement, VA uses an online database, CPARS, which is maintained by the Naval Sea Logistics Center in Portsmouth, New Hampshire. CPARS is available to all Federal agencies and is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
Each contractor whose contract award is estimated to exceed $900,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting the CPARS Customer Service Desk at cpars-helpdesk@us.navy.mil. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.14 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT
CHECKS
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .