sole_source_justification_D-21 Monaco.pdf

PDF 70 KB Posted

Attached to
Notice of Intent to Sole Source - Monaco D-21 System Upgrade
Solicitation number
FA520525QB050
Issued by

About this file

This is a Sole Source Justification document for a D-21 Monaco System Upgrade at Misawa Air Base, Japan. The contract will be awarded to Monaco Enterprises Incorporated (MEI), the original manufacturer and service provider for the existing Fire, Security, and Life Safety Equipment at the base. The upgrade involves replacing and configuring three computer towers at different fire stations, including installing new CPUs, monitors, and UPS backup power systems, upgrading to Windows 11 and D-21 V2 software, and transferring existing software licenses.

The procurement is a sole-source acquisition under simplified acquisition procedures, with an intent to sole source notification to be posted for potential alternative vendors. The estimated cost is based on previous similar awards ranging from $149,611 to $169,269. MEI will provide system installation, network connectivity verification, system performance validation, and up to 4 hours of operator training. The contract is for the 35th Contracting Squadron at Misawa Air Base, with the intent to award to MEI due to their proprietary software and previous system installation in 2020.

View the file

Other files

File Type Posted
Statement of Work D-21 Monaco Upgrade.pdf PDF
intention to sole source notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

Security Marking (select from the drop-down list)

March 2023 Security Marking (select from the drop-down list) Page 1 of 4March 2023 Security Marking (select from the drop-down list) Page 1 of 4

NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Funding level for this acquisition: >SAT and < $750K > $750K and < $15M

Contracting Activity: 35 CONS/PKB

Purchase Request / Local ID Number: F3D3A25104A001

Program / Project (and PE, if applicable): D-21 Monaco System Upgrade

Program Type (PEO or Other Contracting): Operational

Authority: AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)

AFFARS 5313.501 - 10 U.S.C. 3403, Special Emergency Procurement Authority (41 U.S.C. 1903)

Estimated Contract Cost (including options): $ Justification Type: Class Individual

COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure

** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

Date

21 May 2025

Contracting Officer Mutsuo Shibasaki

35 CONS/PKB, DSN: 226-3895

Signature

X

APPROVAL (AFFARS 5306.304(a) )

NOTE: A signature block will appear here based on the funding level selected above.

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 Security Marking (select from the drop-down list) Page 2 of 4March 2023 Security Marking (select from the drop-down list) Page 2 of 4

I. Contracting Activity.

FA5205

35th Contracting Squadron, Misawa AB ,Japan

II. Nature and/or description of the action being processed.

Sole Source requirement for D-21 Monaco System Upgrade.

III. Description of supplies/services required to meet agency needs.

D-21 Windows 11 upgrade.

Purchase and installation of D-21 Monaco V2 Reporting Software Tech Upgrades that include Provide and install/repair by replace three towers at Fires Stations Building 3003, Building 947 and Building 780. The system needs to be configured with Misawa AB current D-21 database, existing licenses and software will be transferred to new CPU, and update the D-21 system with RMF-able upgrade.

Provide and install one (1) repair by replace CPU (S-1) at Fire Station One Bldg 3003 to include;

- One (1) tower CPU, keyboard & mouse

- Configure the CPU with Base’s current D-21 database

- Configure with D-21 V2 software upgrade

- Existing software licenses will be transferred to the new CPU

- Existing CPU will be decommissioned from the Monaco system

- One (1) replacement widescreen monitors for new CPU compatibility

- One (1) short term back up UPS

- Provide and install one (1) repair by replace CPU (S-2) at Fire Station Two Bldg 947 to include;

- One (1) tower CPU, keyboard & mouse

- Configure the CPU with Base’s current D-21 database

- Configure with D-21 V2 software upgrade

- Existing software licenses will be transferred to the new CPU

- Existing CPU will be decommissioned from the Monaco system

- Two (2) replacement widescreen monitors for new CPU compatibility

- One (1) short term back up UPS

Provide and install one (1) repair by replace CPU (C-1) at Alarm Shop Bldg 780 to include;

- One (1) tower CPU, keyboard & mouse

- Configure the CPU with Base’s current D-21 database

- Configure with D-21 V2 software upgrade

- Existing software licenses will be transferred to the new CPU

- Existing CPU will be decommissioned from the Monaco system

- Two (2) replacement widescreen monitors for new CPU compatibility

- One (1) UPS short term back up power

- Provide and install one (1) desktop UPS short term back up power at Fire Station 1 Comm Room

- Provide and install one (1) desktop UPS short term back up power at Fire Station 2 Comm Room

- Provide and install one (1) desktop UPS short term back up power at Alarm Shop Comm Room

- Verify network connectivity at all installation facilities

- Validate the system performance after installation

- Provide up to 4 hours of D-21 operator training after system initialization while the installation technician is on-site

- At the conclusion of the project the contractor will provide its standard forms, system drawings, and documentation to detail the work that has been completed

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 Security Marking (select from the drop-down list) Page 3 of 4March 2023 Security Marking (select from the drop-down list) Page 3 of 4

IV. Statutory authority permitting other than full and open competition.

AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

Monaco Enterprises Incorporated (MEI) is a highly specialized manufacturing and installation company with experience in radio based fire, security, and mass notification systems, as well as video and security alarm systems for Military/ Government installations worldwide. MEI is the original manufacturer and service provider for the Fire, Security, and Life Safety Equipment and services currently in use at Misawa AB, Japan and were the one to install the system in 2020 per the FA520520F0075 award. These systems are primarily comprised of proprietary software developed by MEI and MEI licensed vendors, which is then licensed directly to the end users at Misawa AB.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

An intent to sole source notification will be posted on the government point of entry for other vendors to view and potentially provide alternatives

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

Based on comparison of prior awards in FPDS for the D-21 Monaco Upgrade within the last 3 years, prices are similar to the IGE developed by the customer. This is determined to be fair and reasonable.

FA561322P0217 = $169,269.05

FA441824P0048 = $149,611.59

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

Market research consisted of reviewing FPDS for previous Monaco D-21 awards. Additionally, there was a previous upgrade to the D-21 System for Misawa AB in 2020 (FA520520F0075). At least 3 were found within the last 5 years for Dept of the Air Force specifically but numerous awards were available from the other services. The customers market research contained an MFR stating how Monaco Enterprises Incorporated is the original manufacturer and service provider for the D-21 currently used in Misawa as well as their systems primarily comprising of proprietary software developed by MEI and MEI licensed vendors.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

N/A

X. List of any sources that expressed, in writing, an interest in the acquisition.

N/A

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

Future requirements will be reviewed and vetted, and future market research will be conducted.

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 Security Marking (select from the drop-down list) Page 4 of 4March 2023 Security Marking (select from the drop-down list) Page 4 of 4

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

Remove the Guidance pages below.

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items March 2023 Page of International Agreement Competitive Restrictions (IACR) March 2023 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document?

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?

Funding level for this acquisition:

Authority:

Justification Type:

COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.

(See "Specific Guidance for Completing this Template" below.)

I. Contracting Activity.

II. Nature and/or description of the action being processed.

III. Description of supplies/services required to meet agency needs.

IV. Statutory authority permitting other than full and open competition.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

XII. Certification by the Contracting Officer.

XIII. Certification by the technical/requirements personnel.

Specific Guidance for Completing this Template

I. Contracting Activity. (FAR 6.303-2(b)(1))

Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.

II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))

State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).

An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.

III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))

Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.

If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.

In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.

For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.

IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5)) Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.

Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204) VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

(FAR 6.303-2(b)(6))

Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:

Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.

Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.

Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.

VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))

Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.

VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))

Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.

When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.

If no market research was conducted, so state and provide the rationale.

IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))

Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.

X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))

If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))

Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.

Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.

If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.

For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.

[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))

As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))

As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

Do You Need to "REDACT" Text?

This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.

9.0.0.2.20120627.2.874785

security_markings: Security Marking (select from the drop-down list)
CurrentPage:
PageCount:
new:
amended-with-original:
Yes:
No:
range_under-700K:
range_700K-13.5M:
Contracting-Activity: 35 CONS/PKB
PR-ID-Number: F3D3A25104A001
Program-Project: D-21 Monaco System Upgrade
Program-Type: Operational
class:
individual:
Estimated_Cost:
Sign_and_Save_1:
Date: 21 May 2025
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-CSO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
Section-I-Text:
Section-II-Text:
Section-III-Text:
Section-IV-Text:
Section-V-Text:
Section-VI-Text:
Section-VII-Text:
Section-VIII-Text:
Section-IX-Text:
Section-X-Text:
Section-XI-Text:
Section-XII-Text:
Section-XIII-Text:
Remove-Guidance-Pages: 1

File details come from the government source that posted it. Updated .