Communal_Irrigation_Schemes_Database_-_January_2014.pdf
PDF 56 KB Posted
- Attached to
- USAID/Zimbabwe's Poverty Reduction & Food Security-Livestock Development (PRFS-LD) Program Federal contract opportunity
- Solicitation number
- SOL-613-14-000009
About this file
Annex G Supporting Document
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Province District Scheme Name Irrigation
System
Water source Potential Irrigable area (ha)
Area equipp ed (ha)
Area in use (Ha) year builr
1st year rehab rehab works last yaer rehab rehab works source of funding Beneficiaries Status
River range Drag hose River 50 41 20 80 Functional
Shashe Surface River 200 100 43 1963 1982 canal 2013 barrage 184 Functional
Chikwarakwara Surface Borehole 65 65 32 1965 1982 canal 2011 fencing 126 Partly functional
Bili Surface River 21 21 21 1963 1982 canal 2011 transformer energizing 46 Functional
Kwalu Surface River 95 95 1965 1994 canal 2013 weir 211 Not functional
Jalukange Surface River 57 57 30 1963 1991 pumps nil 135 Not functional
Zvove surface Dam 5000 1000 Not functional
Ipaye Surface Dam 12.5 5.5 5.5 70 Functional Kwalu Surface River 95 95 211 Not functional
Lilombe Surface Dam 22 7 7 66 Functional Ndivhondifumo Drip Borehole 25 25 20 1 Not functional Dombolidenje Surface Dam 20 20 720 111 Functional Hlongwane Gravity Dam 7 7 7 20 Functional Tongwe Surface Dam 27.4 27.4 27.4 76 Functional
Ndambe phase
Drip Boreholes 5.7 5.5 5.2 30 Functional
Ndambe phase
Surface Dam 18 18 18 80 Functional
Chamatemo Surface Dam 4 4 Functional
Madzvikiti Surface Borehole 21 1 Functional
Sivule Surface Dam 2 3 30 Functional
Chisala Surface Dam 8.8 8.8 22 Functional
Ntsimbane Surface Dam 6 3 3 2010 Reahab of canal and dam spillway nil nil World Vision 40 functional
Tuli makwe Surface Dam 202 202 70 1964 2000 Canal rehab for block C and D nil nil SISP 491 Functional
Mankonkoni Surface River 42 40 20 1964 2004 rehab of canal and night storage dam, installation of mono pumps
2012 supply of mono pumps Gvt 80 functional
Sukwe Surface Dam 28 22 22 1967 2011 disel engines repaired 2012 drill and equip boreholes Community share trust 44 functional
Masholomoshe Surface Dam 38.8 38.8 16.6 1964 2002 canal rehab fish ponds and toilets 2012 rehab of canal, fish ponds and toilet SISP 131 Functional
Sebasa Surface River 65 60 2 1965 2007 Flushing of wall points nil nil Gvt 100 not functional
Guyu chelesa Sprinkler River 85 32 32 1997 2011 Night storage dam and pump house rehab 2012 Rehab of booster pump and infield sprinkler equipment
REA,
Community Share
Trust
160 functional
Rustlers gorge Surface River 32 32 5 1964 1994 Rehab of infield works and canal 2007 servicing of engines and canal rehab Gvt 64 functional
Mambale Sprinkler dam 28 14 14 2007 nil nil nil nil 56 Not Functional
Bambanani surface Dam 8 8 2.2 1999 nil nil nil nil nil 79 functional
Gaswa Surface Dam 5 1.7 1.7 nil nil nil nil 40 Functional
Tuli Lushongwe Drip borehole 50 50 2 2010 system changed from sprinkler to drip nil nil Western Maccotvole 54 partially functional
Mthabezi Surface Dam 150 0 0 nil nil nil nil nil 150 New
Tulimanyange Gravity 6 6 New
Silikwe Surface Dam 22 22 0 nil nil nil nil nil 50 not functional
Inyandeni Surface River 8 8 2.5 2011 fencing and rehab of pumping unit nil nil Dabane Trust Care 98 functional
Makwilila Surface Dam 8 8 0 nil nil nil nil nil 16 Not functional
Silalabuhwa Surface dam 437 437 437 1968 2005 Rehab of infield canal 2013 joint filler on canals 845 Functional
Manzamhlope Surface Dam 3 2 2 1999 nil nil nil nil SMIDSP,GVT 29 Functional
Sifinini Surface Dam 5 5 5 1998 2012 fencing canal rehab and suction pipe replacement 2013 Dam and storeroom construction WSP 8 Functional
Siwazi Surface Dam 23 20 20 1992 2013 Extension of canals nil nil WSP 50 Functional
Zhulube Surface Dam 15 15 15 2000 2012 canal construction 2013 Dam wall rehab WSP 40 Functional
Makhoshe Drip Dam 17 17 17 1999 nil nil nil nil 173 50 Functional
Malole Surface River 20 20 20 2004 nil nil nil nil 172 24 Functional
Matabeleland South
Beitbridge
Gwanda
Insiza
Zamanyoni masiyepambiliSprinkler dam 20 10 10 40 Not functional
Goffingo Surface Dam 10 10 10 20 Not
Libangwe Surface Dam 14 48 Not functional
Shashani Surface Dam 234 18 18 84 Functional
Vukani kafusi Surface Dam 8 8 0 22 Not Functional
Valley Sprinkler Dam 200 200 1995 2011 pump servicing nil nil 400 Functional
Arda outgrowers Surface Dam 150 100 100 300 Not functional
Mambale Sprinkler dam 28 14 14 1966 2006 pump repair 56 Not Functional
Mbembesanwa Sprinkler dam 14 14 3 1994 nil nil nil 28 Not functional
Moza Surface Dam 90 75 75 SMIDSP,GVT 200 Functional
Tshankwa Drag hose Dam 40 25 25 GVt 110 Functional
Ingwizi outgrowers Surface Dam 100 100 100 219 Not functional
Somnene Surface Dam 24 21 21 GVt 121 Functional
Mziki Drag hose sprinklerDam 35 35 35 70 Functional
Duncal Surface Dam borehole
14 14 14 World Vision 28 Functional
Mzinyathini Surface Dam 32 32 32 World Vision 80 Functional
Sewondo Surface Dam 30 30 30 60 Functional
Pakamane Surface River 3 3 3 20 Not functional
Mbilambowe Surface River 5 5 5 50 Not functional
Thutuka Surface River 2 2 2 1 Not functional
Mangwe Bambanani Pumping gravityDam 70 70 70 160 Not functional
Bangu Pumping Borehole 10 10 10 160 Not functional
Majojo Gravity Dam 5 5 4 25 Not functional
Thornville Gravity Dam 80 40 40 140 Functional
Bulilima
Umzingwane
Mangwe
Matabeleland South
Matobo
Remarks
Zesa,needs a
200KVA
transformer Rehabilitation of canals needed
Pumping unit should be replaced, repair damaged canal
Canals and pumps need repairing.
Pump breakdown and damaged cables.
Pumps are too small and old so they need to be replaced with the correct ones.
Needs funding.
Pump breakdown and damaged cables.
Irrigating borehole breakdown
Needs pump repair
Canals and pumps need repairing.
Needs rehab of canals and night storage dam needs borehole pumps and fencing
New fence required rehabilitation of water supply and canals, mono pumps required needs fencing
Requires new pumps, flashing of wall points
Needs new pump and engines
Scheme requires funding proposed proposed requires funding
Rehab in progress.
Leaking dam and canals requiresRehab on mainline and fencing
Pump needs repair
Needs rehabilitation
Pump needs repair
Needs new pump
Needs new sprinklers and hoses
High Zesa bill
Needs new pump and engines
Needs new pump and engines
On expansion to 90ha
High water bill, supplies cut off recently.
Facing water challenges no water no water no water
Pump removed for repair,no electricity borehole breakdown
Canals and pumps need repairing.
Rehab in progress.