Communal_Irrigation_Schemes_Database_-_January_2014.pdf

PDF 56 KB Posted

Attached to
USAID/Zimbabwe's Poverty Reduction & Food Security-Livestock Development (PRFS-LD) Program Federal contract opportunity
Solicitation number
SOL-613-14-000009
Issued by
US Agency for International Development Zimbabwe

About this file

Annex G Supporting Document

View the file

Other files for this federal contract opportunity

Other files attached to USAID/Zimbabwe's Poverty Reduction & Food Security-Livestock Development (PRFS-LD) Program, newest first.
File Type Posted
SF33.pdf PDF
PRFS-LD_RFP_-_Amendment_1_-_Final.pdf PDF
Zim_Ag_Eval_Final_Report_-_6.12.14_DH_Format.pdf PDF
ZimbabweAgFinancialMarketAssess_Volume1_Final.pdf PDF
Zimbabwe_Food_Grain_Economy_First_Draft__Dec_2013.pdf PDF
Demand_and_Supply_of_Short-Term_Credit_in_Agriculture_-_August_20_2011.pdf PDF
Horticulture_Competitiveness_Strategy_Development_edited_30Sept_2013.pdf PDF
2014_Local_Compensation_Plan_for_Zimbabwe.pdf PDF
PERFORMANCE_REPORT.docx DOCX document
ZimbabweAgFinancialMarketAssess_Volume2_Final.pdf PDF
Market_Mechanisms_Assessment_Final_2-13.pdf PDF
Zimbabwe_EGAD_IEE_Amend_072511.pdf PDF
Zimbabwe_Agricultural_Sector_Market_Study_final.pdf PDF
Livestock_Competitiveness_Strategy_Discussion_Paper_-_10_Sept_2013.pdf PDF
USAID_Zimbabwe_Gender_Analysis_and_Assessment.pdf PDF
Attachment_2_-_Forms_-_USAID_DBA_Application.doc DOC document
Attachment_2_-_Forms_-_SF_LLL.pdf PDF
Attachment_2_-_Forms_-_USAID_Subcontracting_Plan_Template_May2014-2.doc DOC document
Attachment_1_-_Technical_Annexes.docx DOCX document
Attachment_2_-_Forms_-_AID1420-17-2.doc DOC document
PRFS-LD_RFP_FBO.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Province District Scheme Name Irrigation

System

Water source Potential Irrigable area (ha)

Area equipp ed (ha)

Area in use (Ha) year builr

1st year rehab rehab works last yaer rehab rehab works source of funding Beneficiaries Status

River range Drag hose River 50 41 20 80 Functional

Shashe Surface River 200 100 43 1963 1982 canal 2013 barrage 184 Functional

Chikwarakwara Surface Borehole 65 65 32 1965 1982 canal 2011 fencing 126 Partly functional

Bili Surface River 21 21 21 1963 1982 canal 2011 transformer energizing 46 Functional

Kwalu Surface River 95 95 1965 1994 canal 2013 weir 211 Not functional

Jalukange Surface River 57 57 30 1963 1991 pumps nil 135 Not functional

Zvove surface Dam 5000 1000 Not functional

Ipaye Surface Dam 12.5 5.5 5.5 70 Functional Kwalu Surface River 95 95 211 Not functional

Lilombe Surface Dam 22 7 7 66 Functional Ndivhondifumo Drip Borehole 25 25 20 1 Not functional Dombolidenje Surface Dam 20 20 720 111 Functional Hlongwane Gravity Dam 7 7 7 20 Functional Tongwe Surface Dam 27.4 27.4 27.4 76 Functional

Ndambe phase

Drip Boreholes 5.7 5.5 5.2 30 Functional

Ndambe phase

Surface Dam 18 18 18 80 Functional

Chamatemo Surface Dam 4 4 Functional

Madzvikiti Surface Borehole 21 1 Functional

Sivule Surface Dam 2 3 30 Functional

Chisala Surface Dam 8.8 8.8 22 Functional

Ntsimbane Surface Dam 6 3 3 2010 Reahab of canal and dam spillway nil nil World Vision 40 functional

Tuli makwe Surface Dam 202 202 70 1964 2000 Canal rehab for block C and D nil nil SISP 491 Functional

Mankonkoni Surface River 42 40 20 1964 2004 rehab of canal and night storage dam, installation of mono pumps

2012 supply of mono pumps Gvt 80 functional

Sukwe Surface Dam 28 22 22 1967 2011 disel engines repaired 2012 drill and equip boreholes Community share trust 44 functional

Masholomoshe Surface Dam 38.8 38.8 16.6 1964 2002 canal rehab fish ponds and toilets 2012 rehab of canal, fish ponds and toilet SISP 131 Functional

Sebasa Surface River 65 60 2 1965 2007 Flushing of wall points nil nil Gvt 100 not functional

Guyu chelesa Sprinkler River 85 32 32 1997 2011 Night storage dam and pump house rehab 2012 Rehab of booster pump and infield sprinkler equipment

REA,

Community Share

Trust

160 functional

Rustlers gorge Surface River 32 32 5 1964 1994 Rehab of infield works and canal 2007 servicing of engines and canal rehab Gvt 64 functional

Mambale Sprinkler dam 28 14 14 2007 nil nil nil nil 56 Not Functional

Bambanani surface Dam 8 8 2.2 1999 nil nil nil nil nil 79 functional

Gaswa Surface Dam 5 1.7 1.7 nil nil nil nil 40 Functional

Tuli Lushongwe Drip borehole 50 50 2 2010 system changed from sprinkler to drip nil nil Western Maccotvole 54 partially functional

Mthabezi Surface Dam 150 0 0 nil nil nil nil nil 150 New

Tulimanyange Gravity 6 6 New

Silikwe Surface Dam 22 22 0 nil nil nil nil nil 50 not functional

Inyandeni Surface River 8 8 2.5 2011 fencing and rehab of pumping unit nil nil Dabane Trust Care 98 functional

Makwilila Surface Dam 8 8 0 nil nil nil nil nil 16 Not functional

Silalabuhwa Surface dam 437 437 437 1968 2005 Rehab of infield canal 2013 joint filler on canals 845 Functional

Manzamhlope Surface Dam 3 2 2 1999 nil nil nil nil SMIDSP,GVT 29 Functional

Sifinini Surface Dam 5 5 5 1998 2012 fencing canal rehab and suction pipe replacement 2013 Dam and storeroom construction WSP 8 Functional

Siwazi Surface Dam 23 20 20 1992 2013 Extension of canals nil nil WSP 50 Functional

Zhulube Surface Dam 15 15 15 2000 2012 canal construction 2013 Dam wall rehab WSP 40 Functional

Makhoshe Drip Dam 17 17 17 1999 nil nil nil nil 173 50 Functional

Malole Surface River 20 20 20 2004 nil nil nil nil 172 24 Functional

Matabeleland South

Beitbridge

Gwanda

Insiza

Zamanyoni masiyepambiliSprinkler dam 20 10 10 40 Not functional

Goffingo Surface Dam 10 10 10 20 Not

Libangwe Surface Dam 14 48 Not functional

Shashani Surface Dam 234 18 18 84 Functional

Vukani kafusi Surface Dam 8 8 0 22 Not Functional

Valley Sprinkler Dam 200 200 1995 2011 pump servicing nil nil 400 Functional

Arda outgrowers Surface Dam 150 100 100 300 Not functional

Mambale Sprinkler dam 28 14 14 1966 2006 pump repair 56 Not Functional

Mbembesanwa Sprinkler dam 14 14 3 1994 nil nil nil 28 Not functional

Moza Surface Dam 90 75 75 SMIDSP,GVT 200 Functional

Tshankwa Drag hose Dam 40 25 25 GVt 110 Functional

Ingwizi outgrowers Surface Dam 100 100 100 219 Not functional

Somnene Surface Dam 24 21 21 GVt 121 Functional

Mziki Drag hose sprinklerDam 35 35 35 70 Functional

Duncal Surface Dam borehole

14 14 14 World Vision 28 Functional

Mzinyathini Surface Dam 32 32 32 World Vision 80 Functional

Sewondo Surface Dam 30 30 30 60 Functional

Pakamane Surface River 3 3 3 20 Not functional

Mbilambowe Surface River 5 5 5 50 Not functional

Thutuka Surface River 2 2 2 1 Not functional

Mangwe Bambanani Pumping gravityDam 70 70 70 160 Not functional

Bangu Pumping Borehole 10 10 10 160 Not functional

Majojo Gravity Dam 5 5 4 25 Not functional

Thornville Gravity Dam 80 40 40 140 Functional

Bulilima

Umzingwane

Mangwe

Matabeleland South

Matobo

Remarks

Zesa,needs a

200KVA

transformer Rehabilitation of canals needed

Pumping unit should be replaced, repair damaged canal

Canals and pumps need repairing.

Pump breakdown and damaged cables.

Pumps are too small and old so they need to be replaced with the correct ones.

Needs funding.

Pump breakdown and damaged cables.

Irrigating borehole breakdown

Needs pump repair

Canals and pumps need repairing.

Needs rehab of canals and night storage dam needs borehole pumps and fencing

New fence required rehabilitation of water supply and canals, mono pumps required needs fencing

Requires new pumps, flashing of wall points

Needs new pump and engines

Scheme requires funding proposed proposed requires funding

Rehab in progress.

Leaking dam and canals requiresRehab on mainline and fencing

Pump needs repair

Needs rehabilitation

Pump needs repair

Needs new pump

Needs new sprinklers and hoses

High Zesa bill

Needs new pump and engines

Needs new pump and engines

On expansion to 90ha

High water bill, supplies cut off recently.

Facing water challenges no water no water no water

Pump removed for repair,no electricity borehole breakdown

Canals and pumps need repairing.

Rehab in progress.