Sol_Facility Diagram_75F40124Q00355.pdf
PDF 1 MB Posted
- Attached to
- Epoxy Floor Resurfacing Federal contract opportunity
- Solicitation number
- 75F40124Q00355
About this file
This document appears to be a facility diagram related to Solicitation Number 75F40124Q00355 for Epoxy Floor Resurfacing. The diagram highlights specific areas within the facility that require resurfacing, including the cage wash prep areas in Phase One (rooms G147 and G137, approximately 1,614 SF), the primate corridors in Zone 5 (room G155 with anteroom G153, approximately 1,963 SF), and the Clean/Soiled Cage Wash and Quarantine areas in Zone 3 (rooms G180 and G182, approximately 1,963 SF, and a small patch area in G161 and Zone 7 corridor, approximately 1,648 SF). The solicitation is being issued by the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_A4_Revised SOW_75F40124Q00355.pdf | ||
| Sol_Q and A_Final 062724_75F40124Q00355.pdf | ||
| Sol_Zone 5 Corridor Map_75F40124Q00355.pdf | ||
| Sol_Q and A_as of 062424_75F40124Q00355.pdf | ||
| Sol_A1_Revised RFQ Attachment_75F40124Q00355.pdf | ||
| Sol_Q and A_75F40124Q00355.pdf | ||
| Sol_Wage Determination_Montgomery County_75F40124Q00355.pdf | ||
| Sol_RFQ Attachment_75F40124Q00355.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ferrine Highlight
Ferrine Highlight
Ferrine Sticky Note See map sections 2 and 3 highlighted cage wash prep areas phase one rooms G147 and hallway G137, 1614 SF. and primate corridors zone-5, room G155 with anteroom G153, 1963 SF.
Section 3 Large Animal Holding, Clean/Soiled Cage Wash and Quarantine
ZONE 3
� 2 □ Rackwasher
::r :, = !. l'l.""'""""'�""""':---•.J
I
•I••B1 Ill Ill I
Soiled Side Cage Wash G182
ZONE 7
SADDLEBAG AIR HANDLER
To Buildings 2, 22, 31, 32, 62, 64 Service Tunnel To Buildings 51, 52, 71
•■■■■I I :i, Service Tunnel u
Service Tunnel Building 52 ::�!
Loading Oock .•• m C ii:
(0 u, u, .. To Building 51 I I I I I I I:,, Ferrine Highlight
Ferrine Highlight
Ferrine Highlight
Ferrine Highlight
Ferrine Sticky Note See map section 2 and 3 for Phase two clean and dirty cage rooms G180 and G182 approximately 1963 SF, and small patch area in G161 and zone 7 corridor area approximately 1648 SF.
File details come from the government source that posted it. Updated .