This is a Request for Quotation (RFQ) for grading and paving construction services at Lassen Volcanic National Park in California. The solicitation number is 140P8426Q0035, issued on May 29, 2026, with quotations due by June 12, 2026 at 5:00 PM Pacific Time.
The National Park Service seeks quotations for two construction line items: (1) Pave and Grade Summertown Service Road and Maintenance Area, and (2) Pave and Grade Mineral Headquarters Historic District. Both items are lump-sum fixed-price contracts. The Government estimates total project costs under $300,000 but notes this is not a ceiling or floor. The work must commence within 10 calendar days of receiving notice to proceed and be completed within 120 calendar days. This is a Total Small Business Set-Aside; only small business concerns meeting the NAICS 237310 size standard of $45 million in annual gross receipts may submit quotations. Performance and payment bonds equal to 100 percent of the contract price are required, due within 10 calendar days of award. Quotations must include a 20 percent bid guarantee per FAR 52.228-1. An organized site visit is scheduled for June 8, 2026 at 9:00 AM at the Lassen Volcanic National Park headquarters (38050 Highway 36E, Mineral, CA 96063). Davis-Bacon wage rates apply. The evaluation factors for award are: (1) Price, (2) Relevant Experience with similar projects in the past six years, (3) Technical Approach, and (4) Past Performance references. Quotations must be submitted electronically via email to brenda_lewis@ios.doi.gov with the RFQ number in the subject line, including Standard Form 1442, Technical Information Form, completed price schedule, offer guarantee, and proof of SAM registration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8426Q0035_Amd_0002.pdf | ||
| Sol_140P8426Q0035_Amd_0001.pdf | ||
| B11_Site_Visit_Sign_In_Sheet_LAVO_Grade_and_Pave_0001.pdf | ||
| B12_Questions_and_Answers_LAVO_Grade_and_Pave_0001.pdf | ||
| B08_Attachment_3_140P8426Q0035_Tech_Info_Form.pdf | ||
| B03_Wage_Determination_Lassen_and_Tehama_County.pdf | ||
| B08_Attachment_5_140P8426Q0035_SF24.pdf | ||
| A06_Specifications_LAVO_Grade_and_Pave.pdf | ||
| B08_Attachment_4_140P8426Q0035_Tech_Info_Form_-_Subcontractor.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P8426Q0035
NPS, PWR - PORE MABO
Point Reyes National Seashore 1 Bear Valley Road Point Reyes Station CA 94956-9703 brenda_lewis@ios.doi.gov
0044041694
PPR
Brenda Lewis 206-220-4018
05/29/2026
06/12/2026
10 120
The Department of the Interior, National Park Service (NPS) at Lassen Volcanic National Park (LAVO) has a requirement for grading and paving in two different locations in the park, Lassen and Tehama Counties, California. The project is located at Lassen Volcanic National Park, at Summertown Road near the
Northwest entrance of Manzanita Lake and in Mineral Headquarters Historic District. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation.
The Government seeks offers with a total price less than $300,000. Offerors should not interpret this figure as a ceiling (or as a floor) on offers; rather, this information is provided as a courtesy to prospective offerors. The Government may select an offer for award with a price below, at, or exceeding this figure if it finds that offer provides the best value and funds are available.
The North American Industry Classification System (NAICS) Code for this requirement is 237310, with a corresponding size standard of $45 million in annual gross receipts for the past three years.
Continued...
1 40
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
DOI, NPS, PWR - PORE MABO
Point Reyes National Seashore 1 Bear Valley Road Point Reyes Station CA 94950
PPR
Elizabeth Chico
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
This acquisition is a Total Small Business
Set-Aside. Quotations are solicited only from small business concerns. Quotations received from concerns that are not small business concerns shall not be considered.
The Government anticipates award of a firm-fixed-price purchase order resulting from this solicitation. Evaluation for award will be made in accordance with the simplified acquisition procedures outlined in FAR Part
13.106. The Government anticipates issuing an
order resulting from this request for quotation to the responsible quoter whose quotation will be most advantageous to the Government, price and other factors considered as listed in the
Request for Quotation (see Section M).
See Section J Attachment 1: Specifications, for a detailed description of the requirement.
Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a quotation.
SITE VISIT information can be located in
Section L.
Submit questions only through email to the person identified in Section L.
Quotations must be received in their entirety via email as instructed in Section L. They must be received no later than the date and time specified in Block 13 of the SF 1442 (unless a future Amendment to the Solicitation extends this deadline).
Delivery: 11/01/2026
Delivery Location Code: 0011283316
NPS, Lassen Volcanic NP
38050 Hwy 36 E
Mineral CA 96063 US
Period of Performance: 07/01/2026 to
11/01/2026
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
00010 Regrade and Pave Summertown
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND
RAILWAYS
00020 Regrade and Pave 16 and 17 Parking Area
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND
RAILWAYS
Joe Pettegrew is designated at the Contracting
Officer's Representative (COR) for this contract and will be responsible for certifying receipt and acceptance of the services rendered.
RFQ No. 140P8426Q0035, Grade and Pave, Lassen Volcanic National Park
Table of Contents
Part I – The Schedule
Section A – Solicitation/Contract Form
Section B – Supplies or Services and Prices
B.1 – Price Schedule
Section C – Description/Specifications/Statement of Work
C.1 – Project Specifications
Section D – Packaging and Marking
Section E – Inspection and Acceptance
E.1 – 52.246-12 – Inspection of Construction (AUG 1996)
Section F – Deliveries or Performance
F.1 – Clauses Incorporated by Reference
F.2 – Commencement, Prosecution, and Completion of Work
F.3 – Deliverable (Post-Award): Contractor’s Daily Logs
Section G – Contract Administration Data
G.1 – Contract Administration
G.2 – Correspondence
G.3 – Appointment of Contractor Representative/Superintendent
G.4 –1452.201-70 – Authorities and Delegations (SEP 2011)
G.5 – 1452.204-70 – Release of Claims – Department of the Interior (JUL 1996)
G.6 – Construction Contract Administration
G.7 – Notice to Contractors – Contractor Performance Assessment Reporting System
G.8 – Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (FEB 2021)
Section H – Special Contract Requirements
H.1 – Wage Rates
H.2 – Workers Compensation
H.3 – Site Specific Safety and Health Plan
H.4 – Archeological Findings
H.5 – Conduct of Operations
H.6 – Seasonal Shutdown
Part II – Contract Clauses
Section I – Contract Clauses
I.1 – Clauses Incorporated by Reference
I.3 – 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA Designated Items
(MAY 2008)
I.4 – 52.225-9 – Buy American–Construction Materials (OCT 2022)
I.6 – 52.228-15 Performance and Payment Bonds-Construction (JUN 2020) (DEVIATION MAY 2023)
I.7 – 1452.228-70 – Liability Insurance – Department of Interior (JUL 1996)
I.9 – 52.252-2 – Clauses Incorporated by Reference (FEB 1998)
I.10 – 52.252-6 – Authorized Deviations in Clauses (NOV 2020)
Part III – List of Documents, Exhibits, and Other Attachments
Section J – List of Attachments
J.1 – Attachments
Part IV – Representations and Instructions
Section K – Representations, Certifications and Other Statements of Offerors
Section L – Instructions, Conditions, and Notices to Offerors
L.1 – Provisions Incorporated by Reference
L.2 – Offer Affordability
L.3 – Site Visit (Construction)
L.4 – 52.216-1 – Type of Contract (APR 1984)
L.5 – 52.225-10 – Notice of Buy American Requirement--Construction Materials (MAY 2014) ..33
L.6 – 52.228-1 – Bid Guarantee (SEP 1996)
L.7 – 52.252-1 – Solicitation Provisions Incorporated by Reference (FEB 1998)
L.8 – 52.252-5 Authorized Deviations in Provisions (Nov 2020)
L.9 – Acquisition 360: Voluntary Survey
L.9 – Instructions for the Submission of Quotations and Other Information
L.10 – Responsibility Determination
Section M - Evaluation Factors for Award
M.1 – Evaluation Factors for Award
Part I – The Schedule
Section A – Solicitation/Contract Form
Solicitation, Offer, and Award (SF 1442) - pages 1- 4 of this package.
Section B – Supplies or Services and Prices
B.1 – Price Schedule
The following Quote/Price Sheet shall be used to quote/state pricing.
QUOTE/PRICE SHEET
SOLICITATION NUMBER: 140P8426Q0035
PARK - PMIS: LAVO- 351252 AND 206780
DEVELOPED AREA: Lassen Volcanic National Park, Lassen and Tehama Counties, California PROJECT TITLE: Grade and Pave Quoters are required to submit, at a minimum, a quotation that conforms to the solicitation documents with pricing for all Base line items and all Option line items (if any). Failure to do so may render your quotation unacceptable. For any lump-sum (LS) line items, provide the total price only. For any unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs on a related item. In case of error in summation, the total of the corrected amounts govern.
Round totals and extend prices to whole dollars.
PRICE
SCHEDULE
LINE ITEM
NUMBER
PRICE SCHEDULE LINE
ITEM TITLE
QUANTITY
UNIT OF
MEASURE
UNIT
PRICE
TOTAL PRICE
Pave and Grade Summertown Service Road and Maintenance Area
1 LS $ $
Pave and Grade Mineral Headquarters Historic District
1 LS $ $
TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ----------------------------------
(End of Clause)
Section C – Description/Specifications/Statement of Work
C.1 – Project Specifications
See the attached project specifications and associated documents, listed in Section J of this procurement, for project requirements.
(End of Clause)
Section D – Packaging and Marking
There are no clauses in this section.
Section E – Inspection and Acceptance
E.1 – 52.246-12 – Inspection of Construction (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not --
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may --
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
Section F – Deliveries or Performance
F.1 – Clauses Incorporated by Reference
The following contract clauses pertinent to this section are incorporated by reference (by Citation Number, Title, and Date) per the clause at FAR “52.252-2 – Clauses Incorporated By Reference” in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to a clause’s full text.
52.242-14 Suspension of Work (APR 1984)
(End of Clause)
F.2 – Commencement, Prosecution, and Completion of Work
The Contractor shall be required to commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, prosecute the work diligently, and complete the entire work ready for use not later than 120 days following receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
F.3 – Deliverable (Post-Award): Contractor’s Daily Logs
Contractor shall prepare a daily log for each day work is performed under this contract. Copies of daily logs shall be submitted to the Contracting Officer, and may be compiled and submitted weekly, with payroll.
Time necessary for completion of daily log is approximately 15 to 30 minutes. The contractor may choose to use its own format as long as the following elements are included on the log:
(a) Project Name
(b) Contract number
(c) Date
(d) Prime Contractor and/or Subcontractor
(e) Work performed, including number of employees by job categories (indicate if "prime" or "sub")
(f) Heavy equipment on job, hours worked (indicate if "prime" or "sub")
(g) Materials delivered
(h) Official visitors to site
(i) Inspections performed
(j) Verbal instruction received from government on construction deficiencies
(k) Certification (prime contractor's signature/COR's signature)
Section G – Contract Administration Data
G.1 – Contract Administration
The Contracting Officer’s Representative (COR) for this order will be:
Joe Pettegrew Chief of Maintenance Lassen Volcanic National Park 530-200-3065 joe_pettegrew@nps.gov
The Contract Specialist (CS) responsible for administering this order will be:
Brenda Lewis Contract Specialist brenda_lewis@ios.doi.gov
The Contracting Officer (CO) with overall responsibility for this order will be:
Elizabeth Chico Contracting Officer 559-580-2693 elizabeth_chico@ios.doi.gov
(End of Clause)
G.2 – Correspondence
Copies of all correspondence and written notices between the Contracting Officer’s Representative and the Contractor shall be sent to the cognizant Contract Specialist at the email address below. All correspondence shall state the contract number in the subject line of the email.
Brenda Lewis Contract Specialist brenda_lewis@ios.doi.gov
(End of Clause)
G.3 – Appointment of Contractor Representative/Superintendent
Prior to the commencement of work under this contract, the Contractor shall provide the Contracting Officer with the name and telephone number of at least one responsible individual who will be available on a daily basis to respond to operational problems and/or emergencies. In the event the contract involves more than one subcontractor, the designated site superintendent shall be a W-2 employee of the prime contractor. The Contractor agrees that notice to the designated representative shall constitute notice to the
Contractor and further agrees to be bound by any commitments or representations made by such representative.
(End of Clause)
G.4 –1452.201-70 – Authorities and Delegations (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority.
The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
G.5 – 1452.204-70 – Release of Claims – Department of the Interior (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-
137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of Clause)
G.6 – Construction Contract Administration
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to defeminization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at:
https://www.doi.gov/pam/acquisition/policy/constructioncontract.
(End of clause)
G.7 – Notice to Contractors – Contractor Performance Assessment Reporting System
In accordance with DOI and NPS policy, past performance evaluations may be prepared for this acquisition.
For more information see the Contractor Performance Assessment Reporting System (CPARS), available online at https://cpars.gov/.
G.8 – Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
https://www.doi.gov/pam/acquisition/policy/constructioncontract https://cpars.gov/ https://www.ipp.gov/
The Contractor shall submit a draft Invoice Package, including copies of the following documents, to the National Park Service’s (NPS) Contracting Officer’s Representative (COR), with a copy to the Contract Specialist/Contracting Officer, a minimum of 5 working days prior to submittal of the formal Invoice through IPP. Within 5 working days of receipt, the COR shall provide an acceptability recommendation to both the NPS Contract Specialist/Contracting Officer (CS/CO) and the Contractor. If the COR recommends acceptance, the Contractor shall submit a copy of the final version of the COR’s checklist and the Invoice Package to the NPS through IPP.
1. Completed copy of the COR’s final Construction Payment Request Checklist (Submit only with the formal submittal to IPP)
2. Completed copy of the Pay Estimate Form (including signed certification of subcontractor payments as required by contract clause 52.232-5)
3. Certified copies of Payroll Reports per Contract clause 52.222-8 Payrolls and Basic Records.
4. Completed copy of the Payroll Report PII Certification sheet
5. Information required by contract clause 52.232-27, Prompt Payment for Construction Contracts
6. A copy of the current construction schedule
7. A copy of the current Schedule of Values
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its quotation.
Section H – Special Contract Requirements
H.1 – Wage Rates
Davis-Bacon Wage Rates apply for this project and are attached to this solicitation (See Section J). The project is located in Lassen and Tehama Counties, California.
(End of Clause)
H.2 – Workers Compensation
The Contractor is required to be insured against liability for workmen's compensation or to undertake self-insurance in accordance with the provisions of Section 3700 of the Labor Code of the State of California.
Evidence of coverage is required before commencement of project work.
(End of Clause)
H.3 – Site Specific Safety and Health Plan
A site specific safety and health plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors. The prime contractor shall be responsible for development, implementation, and oversight of the site specific plan. The site specific safety and health plan shall establish in detail, the protocols necessary for recognition, evaluation, and control of hazards associated with each task performed. The plan shall address site specific safety and health requirements and procedures based upon site specific conditions. The level of detail provided in the site specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.
As work proceeds, the site specific safety and health plan shall be adapted to new situations and new conditions. Changes and modifications to the accepted site specific safety and health plan shall be made with the knowledge and concurrence of the safety office, site superintendent, and contracting office. Should any unforeseen hazard become evident during the performance of work, the contractor shall bring such hazard to the attention of the safety office and COR, both verbally and in writing for resolution as soon as possible. In the interim, necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment.
Prior to submittal to the COR, the site specific safety and health plan shall be signed and dated by the prime contractor's safety and health manager and site superintendent. The site specific safety and health plan shall be part of the contractor's safety and Health program. The contractor shall submit to the COR the contractor's site specific safety and health plan for review and approval by the safety office.
Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations. This includes, but is not limited to, Occupational Safety and Health Administration (OSHA) standards, 29 CFR, Part 1910 and Part 1926. Where the requirements of applicable laws, criteria, ordinances, regulations, and referenced documents vary the most stringent requirements shall apply.
(End of Clause)
H.4 – Archeological Findings
(a) Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery;
notify Contracting Officer immediately of the findings; and continue operations in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for Contractor, he will be compensated by an equitable adjustment under the General Provisions of the Contract.
(End of Clause)
H.5 – Conduct of Operations
At all times the Contractor shall conduct his organization in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and with such appropriate regulations as the Superintendent may prescribe. Work on Saturdays, Sundays, Federal holidays or at night may be performed only with the prior consent of the Contracting Officer. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park except with approval of the Contracting Officer.
(End of Clause)
H.6 – Seasonal Shutdown
It is recognized that seasonal climatic conditions regularly occur in some of the National Park Service areas that restrict and in some cases prohibit normal construction activities. The actual timing of a seasonal shutdown will be determined by the Contracting Officer. The Contractor shall give the Contracting Officer at least two weeks’ notice prior to the anticipated resumption of work. The actual date that work is resumed is subject to the approval of the Contracting Officer. The amount of time during a seasonal shutdown is taken into consideration when the completion time as stated in the Contract is determined.
Therefore, the contract time will not be extended due to seasonal shutdowns.
Part II – Contract Clauses
Section I – Contract Clauses
I.1 – Clauses Incorporated by Reference
The following contract clauses pertinent to this section are incorporated by reference (by Citation Number, Title, and Date) per the clause at FAR “52.252-2 – Clauses Incorporated by Reference” in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to a clause’s full text.
52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN
2017) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)
(DEVIATION MAR 2026)
52.204-13 System for Award Management – Maintenance (OCT 2018) (DEVIATION MAR 2026) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (JAN 2025) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) (DEVIATION JAN 2026) 52.219-27 Notice of Set-Aside For, or Sole-Source Award to, Service-Disabled Veteran-Owned Small 52.219-28 Post-Award Small Business Program Representation (JAN 2025) (DEVIATION JAN 2026) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) (DEVIATION FEB 2025) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination-Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (JAN 2025)
52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2024) 52.223-23 Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025) 52.225-13 Restriction on Certain Foreign Purchases (FEB 2021) 52.226-7 Drug-Free Workplace (MAY 2024) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.228-11 Individual Surety—Pledges of Assets (FEB 2021) (DEVIATION May 2023) 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.233-1 Disputes-(MAY 2014)-Alternate I (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) (DEVIATION JAN 2026) 52.236-5 Material and Workmanship (APR 1984) (DEVIATION JAN 2026) 52.236-6 Superintendence by the Contractor (APR 1984) (DEVIATION JAN 2026) 52.236-7 Permits and Responsibilities (NOV 1991) (DEVIATION JAN 2026) 52.236-8 Other Contracts (APR 1984) (DEVIATION JAN 2026) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr
1984) (DEVIATION JAN 2026)
52.236-10 Operations and Storage Areas (APR 1984) (DEVIATION JAN 2026) 52.236-11 Use and Possession Prior to Completion (APR 1984) (DEVIATION JAN 2026) 52.236-12 Cleaning Up (APR 1984) (DEVIATION JAN 2026) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) (DEVIATION JAN 2026) 52.236-21 Specifications and Drawings for Construction (FEB 1997) (DEVIATION JAN 2026) 52.240-91 Security Prohibitions and Exclusions (DEVIATION MAR 2026) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2025) (DEVIATION
FEB 2025)
52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
I.3 – 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA Designated Items
(MAY 2008)
(a) Definitions. As used in this clause—
“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and
(2) Submit this estimate to the Contracting Officer via the Contracting Officer’s Representative.
(End of Clause)
I.4 – 52.225-9 – Buy American–Construction Materials (OCT 2022)
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of https://www.acquisition.gov/far/part-2#FAR_2_101 those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S.
supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
https://www.acquisition.gov/far/part-25#FAR_25_105
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
None
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i)The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1)The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2)For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-12#FAR_12_505 is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1)The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2)For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .