Sol_140P6026B0004.pdf

PDF 526 KB Posted

Attached to
BRVB - Entry Courtyard Improvements Federal contract opportunity
Solicitation number
140P6026B0004
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is an Invitation for Bid (IFB) for construction services at Brown V Board of Education National Historic Park in Topeka, Kansas. The solicitation number is 140P6026B0004, issued June 1, 2026, with bids due June 29, 2026 at 1:00 PM CT via virtual bid opening.

The work consists of entry courtyard improvements including removal of approximately 7,362 square feet of existing concrete courtyard and stair pavement, installation of new concrete paving and stairs maintaining historical jointing patterns with ABA-compliant slopes, relocation of seven existing signs to concrete viewing areas on NPS property, site grading and drainage modifications to redirect storm water from existing low points to a turf grass lawn area with an aggregate storage chamber, and installation of approximately 1,845 square feet of fiber-reinforced concrete pavement, 5,497 square feet of additional concrete pavement, 153 square feet of ABA curb ramps, 16-foot wide concrete stairs, ornamental handrails, detectable warning panels, turf grass sod, and traffic control measures. The contractor must begin work within 10 calendar days of notice to proceed and complete all work within 75 calendar days. This is a firm-fixed-price contract set-aside 100% for small businesses under NAICS code 237310 (Highway, Street, and Bridge Construction) with a $45 million size standard. Performance and payment bonds equal to 100% of the final contract award amount are required, along with a bid guarantee of 20% of the bid price (not to exceed $3 million). Bidders must be registered in SAM.gov with active status and comply with limitations on subcontracting per FAR 52.219-14. Prevailing wage rates apply. Bids must be submitted electronically in PDF format with completed SF 1442, bid schedule, SF 24 bid bond, completed provisions, and limitations on subcontracting report. The period of performance is August 1, 2026 through November 15, 2026.

View the file

Other files for this federal contract opportunity

Other files attached to BRVB - Entry Courtyard Improvements, newest first.
File Type Posted
Sol_140P6026B0004_Amd_0002.pdf PDF
BRVB_Entry_Courtyard_Improvements_-_QA_doc_0002.docx DOCX document
Sol_140P6026B0004_Amd_0001.pdf PDF
B12_MISC_Addendum_0001.pdf PDF
B08_Solicitation_-_Att_3_-_Wage_Determination.pdf PDF
B08_Solicitation_-_Att_2_-_Drawings.pdf PDF
B08_Solicitation_-_Att_4_-_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
B08_Solicitation_-_Att_1_-_Specifications.pdf PDF
B08_Solicitation_-_Att_5_-_Submittal_List.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140P6026B0004

NPS, MWR - MWRO MABO

601 Riverfront Drive Omaha NE 68102

Bridget Parizek electronically at bridget_parizek@ios.doi.gov

0044045021

PMH

Bridget Parizek 4028007927

06/01/2026

07/01/2026

10 75 52.211-10

BRVB - Entry Courtyard Improvements

This solicitation is a Sealed Bid. This is an electronic Invitation for Bid (IFB) for construction work at Brown V Board of Education National Historic Park in Topeka, KS. The resulting contract will be firm-fixed price. The complete specifications, provisions, and clauses are available at http://www.sam.gov. Please replace any mention of "substantial completion" with "final completion" throughout the entire specification document.

Work consists of improvements to be made within the City of Topeka Right-of-Way (ROW) as well as on NPS property.

New entry courtyard concrete paving and stairs in the same layout as the existing configuration, maintaining the historical jointing patterns that currently exist, but with reconfigured longitudinal and cross slopes that are ABA compliant. Existing signs will be relocated to concrete viewing areas on NPS property, rather than being within the city¿s ROW. The site will be graded so the existing low point where storm water currently pools will be relocated to the turf grass lawn area with drainage directed into an aggregate storage

Continued...

1 36

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

NPS, MWR - MWRO MABO

601 Riverfront Drive Omaha NE 68102

PMH

Bridget Parizek

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

chamber. During higher intensity rain fall events, storm water that ponds in the turf grass lawn area will be graded to allow for overflow discharge onto the ROW sidewalk and be conveyed to Monroe St by means of a new concrete curb ramp that accesses the existing pedestrian loading zone, ultimately draining to the city¿s existing storm sewer network.

The project includes removal of approximately

7,362 SF of existing concrete courtyard and stair pavement, 8 LF of existing stair handrails, removing/salvaging/and relocating 7 existing signs, removing/salvaging/and relocating 1 existing ABA door-button pedestal, removing/salvaging/and reinstalling 4 existing door stops, installing/removing approximately

276 LF of tree protection fencing, and installing/removing approximately 266 LF of straw wattles.

Bid Opening Information: The sealed bid opening process will be conducted virtually. There will be no in person bid opening available. Refer to the virtual bid opening information below for call-in information.

Bid Opening Date/Time: June 29, 2026 @ 1:00PM

CT

Dial in: 202-640-1187

Passcode: 981-159-410#

Project location: Brown V Board of Education

National Historic Park, 1515 SE Monroe St, Topeka, KS 66612

PROJECT MAGNITUDE: Between $250,000 and

$500,000

Bonds: Required as stated in Block 12. A bid guarantee is required 20%, but not to exceed

$3M. Bid bond is required to be submitted on a

Standard Form 24. A copy of the bid guarantee shall be emailed with your bid package.

Performance and Payment bonds/protection in the amount of 100% of the final contract award amount.

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NAICS: The associated NAICS code is 237310

Highway, Street, and Bridge Construction, Small

Business Size Standard $45m

Notice of Set-Aside: 100% set-aside for Total

Small Businesses

Period of performance: 75 calendar days from the Notice to Proceed

Site Visit: A site visit is highly encouraged.

Please see 52.236-27 for specific guidance.

Wage Rates: Wage Rate requirements are incorporated into the terms and conditions as an attachment.

System for Award Management (SAM): The successful offeror must be registered in

SAM.gov and have current online Representations and Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer.

Method and Instructions for Submitting Offer:

Refer to Section B, Bid Schedule, and Section

L, Instructions, Conditions, and Notices to

Offerors or Respondents. Complete bid package shall be emailed directly to bridget_parizek@ios.doi.gov

Questions: All questions shall be submitted in writing to bridget_parizek@ios.doi.gov. All questions must be submitted in writing no later than 5 days following the scheduled site visit.

Delivery: 75 Days After Notice to Proceed

Delivery Location Code: 0011283108

NPS, MWR, Brown v. Board

1515 SE Monroe Street

Topeka KS 66612-1143 US

00010 Entry courtyard paving and drainage

Product/Service Code: Z1PZ

Product/Service Description: MAINTENANCE OF

OTHER

NON-BUILDING FACILITIES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

Period of Performance: 08/01/2026 to

11/15/2026

140P6026B0004 BRVB – Entry Courtyard Improvements Page 6 of 36

TABLE OF CONTENT

Part I – The Schedule SECTION A – Solicitation/Contract Form Special Notice for Bidders SECTION B – Bid Schedule SECTION C – Specifications/Drawings SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance 52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996) SECTION F - Deliveries or Performance 52.236-15 Schedules for Construction Contracts (Apr 1984) (DEVIATION Jan 2026) 52.242-14 -- Suspension of Work (Apr 1984) SECTION G - Contract Administration Data 1452.201-70 Authorities and Delegations (Sep 2011) Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021) Construction Contract Administration

COMPLIANCE WITH RECENT EXECUTIVE ORDERS 14148/14208

SECTION H - Special Contract Requirements Part II – Contract Clauses SECTION I - Contract Clauses 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) .16 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (DEVIATION Mar 2026) 52.204-13 System for Award Management Maintenance (Oct 2018) (DEVIATION Mar 2026) 52.204-14 Service Contract Reporting Requirements (Oct 2016) (DEVIATION Mar 2026) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) (DEVIATION May 2026) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) (DEVIATION May 2026) 52.214-26 Audit and Records – Sealed Bidding (Jun 2020) Alternate I (Mar 2009) DEVIATION DATE 52.214-29 Order of Precedence – Sealed Bidding (Jan 1986) DEVIATION DATE 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) DEVIATION DATE 52.219-6 Notice of Total Small Business Set-Aside (Mar 2020) (DEVIATION Jan 2026) 52.219-8 Utilization of Small Business Concerns (Jan 2025) (DEVIATION Jan 2026) 52.219-14 Limitations on Subcontracting (Oct 2022) (DEVIATION Jan 2026) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) (DEVIATION May 2026) 52.222-3 Convict Labor (June 2003) (DEVIATION May 2026) 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation (Mar 2018) (DEVIATION May 2026) 52.222-6 Construction Wage Rate Requirements (Aug 2018) (DEVIATION May 2026) 52.222-7 Withholding of Funds (May 2014) (DEVIATION May 2026) 52.222-8 Payrolls and Basic Records (Jul 2021) (DEVIATION May 2026) 52.222-9 Apprentices and Trainees (Jul 2005) (DEVIATION May 2026) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) (DEVIATION May 2026)

140P6026B0004 BRVB – Entry Courtyard Improvements Page 7 of 36

52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION May 2026) 52.222-12 Contract Termination-Debarment (May 2014) (DEVIATION May 2026) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) (DEVIATION May 2026) 52.222-15 Certification of Eligibility (May 2014) 52.222-35 Equal Opportunity for Veterans (Jun 2020) (DEVIATION May 2026) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) (DEVIATION May 2026) 52.222-37 Employment Reports on Veterans (Jun 2020) (DEVIATION May 2026) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (DEVIATION May 2026) 52.222-50 Combating Trafficking in Persons (Oct 2025) (DEVIATION May 2026) 52.222-54 Employment Eligibility Verification (Jan 2025) (DEVIATION May 2026) 52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022) (DEVIATION May 2026) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) (DEVIATION May 2026) 52.222-90 Addressing DEI Discrimination by Federal Contractors (Mar 2026) (DEVIATION May 2026) 52.225-1 Buy American-Supplies (Oct 2022) DEVIATION DATE 52.226-7 Drug-Free Workplace (May 2024) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-1 Bid Guarantee (Sep 1996) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance -- Work on a Government Installation (Jan 1997) 52.228-12 Prospective Subcontractor Request for Bonds (Dec 2022) 52.228-15 Performance and Payment Bonds- Construction (Jun 2020) (DEVIATION May 2023) 52.229-3 Federal, State, and Local Taxes (Feb 2013) (DEVIATION Oct 2025) 52.229-11 Tax on Certain Foreign Procurements – Notice and Representation (Jun 2020) (DEVIATION Oct 2025) 52.229-12 Tax on Certain Foreign Procurements (Feb 2021) (DEVIATION Oct 2025) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Oct 2018) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-1 Disputes (May 2014) DEVIATION DATE 52.233-3 Protest after Award (Aug 1996) DEVIATION DATE 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) DEVIATION DATE 52.236-2 Differing Site Conditions (Apr 1984) (DEVIATION Jan 2026) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) (DEVIATION Jan 2026) 52.236-5 Material and Workmanship (Apr 1984) (DEVIATION Jan 2026) 52.236-6 Superintendence by the Contractor (Apr 1984) (DEVIATION Jan 2026) 52.236-7 Permits and Responsibilities (Nov 1991) (DEVIATION Jan 2026) 52.236-8 Other Contracts (Apr 1984) (DEVIATION Jan 2026) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) (DEVIATION Jan 2026) 52.236-10 Operations and Storage Areas (Apr 1984) (DEVIATION Jan 2026) 52.236-11 Use and Possession Prior to Completion (Apr 1984) (DEVIATION Jan 2026) 52.236-12 Cleaning Up (Apr 1984) (DEVIATION Jan 2026) 52.236-13 Accident Prevention (Nov 1991) (DEVIATION Jan 2026 52.236-14 Availability and Use of Utility Services (Apr 1984) (DEVIATION Jan 2026) 52.236-16 Quantity Surveys (Apr 1984) (DEVIATION Jan 2026) 52.236-21 Specifications and Drawings for Construction (Feb 1997) (DEVIATION Jan 2026) 52.240-91 Security Prohibitions and Exclusions (Dec 2025) (DEVIATION Mar 2026) 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Dec 2025) (DEVIATION Mar 2026) 52.242-13 Bankruptcy (July 1995)

140P6026B0004 BRVB – Entry Courtyard Improvements Page 8 of 36

52.243-4 Changes (Jun 2007) (DEVIATION Oct 2025) 52.244-5 Competition in Subcontracting (Aug 2024) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Oct 2025) (DEVIATION May 2026) 52.245-9 Use and Charges (Apr 2012) 52.246-21 Warranty of Construction (Mar 1994) 52.248-3 Value Engineering-Construction (Oct 2025) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - (ALT I) (Sept 1996) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991)

CLAUSES INCORPORATED BY FULL TEXT

1452.203-70 -- Restrictions on Endorsements (Jul 1996) 1452.204-70 -- Release of Claims (Jul 1996) 1452.228-70 -- Liability Insurance—Department of the Interior (Jul 1996) 52.219-14 Limitations on Subcontracting (Oct 2022) (DEVIATION Jan 2026) 52.225-9 -- Buy American–Construction Materials (Oct 2022) DEVIATION DATE Part III – List of Documents, Exhibits, and Other Attachments SECTION J – List of Attachments Part IV – Representations and Instructions SECTION K - Representations, Certifications, and Other Statements of Offerors 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-5 Authorized Deviations in Provisions (Nov 2020) 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Sep 2024) 52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation (Jun 2020) (DEVIATION Oct 2025)

PROVISIONS INCORPORATED BY FULL TEXT

52.203-2 Certificate of Independent Price Determination (Apr 1985) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) (DEVIATION May 2026) 52.209-13 Violation of Arms Control Treaties or Agreements – Certification (Nov 2021) (DEVIATION May 2026) SECTION L - Instructions, Conditions, and Notices to Offerors 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991)

PROVISIONS INCORPORATED BY FULL TEXT

52.214-3 Amendments to Invitations for Bids (Dec 2016) DEVIATION DATE 52.214-4 False Statements in Bids (Apr 1984) 52.214-5 Submission of Bids (Dec 2016) DEVIATION DATE 52.214-6 Explanation to Prospective Bidders (Apr 1984) 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999) DEVIATION DATE 52.214-12 Preparation of Bids (Apr 1984) 52.214-18 Preparation of Bids -- Construction (Apr 1984) 52.214-19 Contract Award -Sealed Bidding -- Construction (Aug 1996) 52.216-1 – Type of Contract (Apr 1984) DEVIATION DATE 52.222-5 -- Construction Wage Rate Requirements—Secondary Site of the Work (May 2014) (DEVIATION May 2026) 52.225-10 -- Notice of Buy American Requirement--Construction Materials (May 2014) 52.228-1 Bid Guarantee (Sep 1996) 52.233-2 Service of Protest Department of the Interior (Sep 2006) (DEVIATION) (Jul 1996) 52.237-1 – Site Visit (Apr 1984)

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS OR RESPONDENTS

SECTION M - EVALUATION FACTORS FOR AWARD

140P6026B0004 BRVB – Entry Courtyard Improvements Page 9 of 36

Part I – The Schedule

SECTION A – Solicitation/Contract Form

Invitation for Bids (IFB) are issued on a Standard Form (SF) 1442, Solicitation, Offer, and Award document.

Special Notice for Bidders

Signing of the bid shall be deemed to be a representation by the bidder that:

1.) Bidder is a construction contractor who owns, operates, or maintains a place of business, regularly engaged in the work described herein; or

2.) If newly entering into a construction activity, bidder has made all necessary arrangements for personnel, construction equipment, and required licenses to perform construction work as specified;

and

3.) Upon request, prior to award, bidder will promptly furnish to the Government a statement of facts in detail as to bidder’s previous experience (including recent and current contracts), organization (including company officers), technical qualifications, financial resources and facilities available to perform the contemplated work.

4.) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code for this acquisition is 237310 with a size standard of $45 Million. To be considered for award your company must obtain a Unique Entity Identifier (UEI). Your company needs to be registered in the System for Award Management (SAM) and be considered a small business for the size standard associated with the NAICS code stated above/utilized throughout this solicitation - this registration needs to be in an “active” status in SAM.gov at the time of RFQ/RFP/IFB submission close date - as well as, at the time of award and throughout the entire award/contract performance.

5.) Bidder agrees to the requirements contained in FAR 52.219-14, Limitations on Subcontracting

The bid opening will be held virtually. Bids are to be emailed and delivery confirmed on or before the date and time of the virtual bid opening. Bids are required to be submitted electronically following instructions contained in this solicitation.

CALL-IN INFORMATION: Bid Openings will be performed via meeting ID/conference call.

Interested parties may attend the bid openings by using the call-in information below:

Bid Opening Date/Time: June 29, 2026 @ 1:00PM CT Dial in: 202-640-1187 Passcode: 981-159-410#

SECTION B – Bid Schedule

Preparation of Bids: The Government will not be responsible for any costs incurred by offeror in the research, preparation, or submission of its bid.

Bid pricing shall be provided in accordance with the table below:

CLIN CLIN TITLE UNIT PRICE

10 Entry Courtyard Improvements

Lump Sum $

TOTAL: $

140P6026B0004 BRVB – Entry Courtyard Improvements Page 10 of 36

SECTION C – Specifications/Drawings

Work consists of improvements to be made within the City of Topeka Right-of-Way (ROW) as well as on NPS property. New entry courtyard concrete paving and stairs in the same layout as the existing configuration, maintaining the historical jointing patterns that currently exist, but with reconfigured longitudinal and cross slopes that are ABA compliant. Existing signs will be relocated to concrete viewing areas on NPS property, rather than being within the city’s ROW. The site will be graded so the existing low point where storm water currently pools will be relocated to the turf grass lawn area with drainage directed into an aggregate storage chamber. During higher intensity rain fall events, storm water that ponds in the turf grass lawn area will be graded to allow for overflow discharge onto the ROW sidewalk and be conveyed to Monroe St by means of a new concrete curb ramp that accesses the existing pedestrian loading zone, ultimately draining to the city’s existing storm sewer network. The project includes removal of approximately 7,362 SF of existing concrete courtyard and stair pavement, 8 LF of existing stair handrails, removing/salvaging/and relocating 7 existing signs, removing/salvaging/and relocating 1 existing ABA door-button pedestal, removing/salvaging/and reinstalling 4 existing door stops, installing/removing approximately 276 LF of tree protection fencing, and installing/removing approximately 266 LF of straw wattles.

Improvements include approximately 1,845 SF of 5" depth, fiber mesh, reinforced pc concrete pavement adjacent to existing trees, 5,497 SF of 5” depth, fiber mesh, pc concrete pavement, 153 SF of 6” depth, fiber mesh, #6 6x6 wire mesh pc concrete ABA curb ramps, 16’ wide pc concrete stairs with (4) - 6 ¼” risers and (3) - 13 ½” treads, 816 SY of 5” depth AB-3 aggregate subbase under pavement, 11 LF of ornamental stair handrails, 23 LF of combined pc concrete curb and gutter (type 1), 39 SF of ABA detectable warning panels with truncated domes, 50 CY of 4” depth top soil stripped and respread, 60 CY of excavation and haul-off, 3 CY of No.57 aggregate with filter fabric for storm water storage chamber, 4,200 SF of turf grass lawn sod, and traffic control. We anticipate that work would begin in late Summer 2026.

Additional requirements information is provided in the solicitation, specifications, supporting documents and other pertinent attachments.

“Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.”

SECTION D - Packaging and Marking

No clauses included

SECTION E - Inspection and Acceptance

52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

140P6026B0004 BRVB – Entry Courtyard Improvements Page 11 of 36

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph

(i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

SECTION F - Deliveries or Performance

Work shall be completed by skilled personnel per industry standards and manufacturer specifications.

52.236-15 Schedules for Construction Contracts (Apr 1984) (DEVIATION Jan 2026)

(a) (1) Within five days after the work commences on the contract or another period of time determined by the Contracting Officer, the Contractor shall prepare and submit to the Contracting Officer for approval a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the work (including acquiring materials, plant, and equipment).

(2) The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period.

140P6026B0004 BRVB – Entry Courtyard Improvements Page 12 of 36

(3) If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall continually update the actual progress in the schedule and shall submit it to the Contracting Officer by the means prescribed in the contract for transmittals or as directed by the Contracting Officer.

(c) (1) If the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to recover lost time and execute in accordance with the approved schedule, without additional cost to the Government.

(2) Such steps may include increasing the number of shifts, overtime operations, days of work, and/or the amount of construction plant.

(3) The Contractor shall submit, for approval, supplementary schedule(s) that demonstrate how the lost time will be recovered.

(d) If the Contractor does not recover the lost time, the Contracting Officer may determine that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of clause)

52.242-14 -- Suspension of Work (Apr 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.

However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed—

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

(End of clause)

SECTION G - Contract Administration Data

(a) Contact Information:

The Contracting Officer/Contract Specialist administrating the Contract:

Bridget Parizek

140P6026B0004 BRVB – Entry Courtyard Improvements Page 13 of 36

Contract Specialist National Park Service Telephone No. (402) 800-7927 Email: bridget_parizek@ios.doi.gov

(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.

(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.

(d) Any request for contract changes/modifications shall be submitted to the CO.

(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items.

All field changes must be approved by the CO prior to execution.

(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.

FINAL PAYMENT

Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, warranty of construction, release of claims and any other documents requested by the contracting office as applicable. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.

AVAILABILITY OF UTILITIES SERVICES

Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.

UTILITIES CONSERVATION

The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.

OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS

The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.

INTERIM AND FINAL INSPECTIONS

1. Prior to covering, enclosing, or hiding any of type work, the Contractor must contact the Government representative to perform an interim inspection. Failure to contact the Government representative perform an interim inspection prior to concealment may result in the Contractor being required to uncover performed work sufficiently to allow for proper inspection.

2. When ready for final inspection, the Contractor shall notify the CO and COR, requesting a final inspection in writing to the CO. The final inspection shall normally be requested a minimum of three (3) calendar days before the desired date or as otherwise negotiated with the Contracting Officer.

3. The final inspection will be onsite with the Contractor, the Contracting Officer’s Representative, and Contract mailto:bridget_parizek@ios.doi.gov

140P6026B0004 BRVB – Entry Courtyard Improvements Page 14 of 36

Specialist/Contracting Officer (when possible).

1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

The COR for this contract will be:

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.

(End of Local Clause)

Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

https://www.ipp.gov/

140P6026B0004 BRVB – Entry Courtyard Improvements Page 15 of 36

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Copy of vendor invoice document in PDF format, completed on the pay application document provided by contracting, which shows pricing breakdown for all line items. Once all signatures (Contractor’s / COR / CO) and approvals are completed on the pay application, the vendor can then upload this document into IPP as their invoice attachment.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of clause)

Construction Contract Administration

Federal Acquisition Regulation (FAR) 36.211(b) and RFO FAR 36.101-4 requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: FAR Overhaul - Part 36 | Acquisition.GOV

COMPLIANCE WITH RECENT EXECUTIVE ORDERS 14148/14208

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph

(t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.

Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

SECTION H - Special Contract Requirements

GREEN PROCUREMENT

To the extent that the construction services provided by the Contractor require provision of any of the types of products listed at https://sftool.gov/greenprocurement, the Contractor is expected to provide the green type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards.

Part II – Contract Clauses

SECTION I - Contract Clauses

52.252-2 Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): www.acquisition.gov

(End of clause)

52.252-6 Authorized Deviations in Clauses (Nov 2020) mailto:IPPCustomerSupport@fiscal.treasury.gov https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-36 https://sftool.gov/greenprocurement http://www.acquisition.gov/

140P6026B0004 BRVB – Entry Courtyard Improvements Page 16 of 36

As prescribed in 52.107(f), insert the following clause in solicitations and contracts that include any FAR or supplemental clause with an authorized deviation. Whenever any FAR or supplemental clause is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the clause when it is used without deviation, include regulation name for any supplemental clause, except that the contracting officer shall insert "(DEVIATION)" after the date of the clause.

Authorized Deviations in Clauses (Nov 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of Interior Acquisition Regulation (48 CFR Chapter

14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (DEVIATION Mar 2026) 52.204-13 System for Award Management Maintenance (Oct 2018) (DEVIATION Mar 2026) 52.204-14 Service Contract Reporting Requirements (Oct 2016) (DEVIATION Mar 2026) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) (DEVIATION May 2026) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) (DEVIATION May 2026) 52.214-26 Audit and Records – Sealed Bidding (Jun 2020) Alternate I (Mar 2009) DEVIATION DATE 52.214-29 Order of Precedence – Sealed Bidding (Jan 1986) DEVIATION DATE 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) DEVIATION DATE 52.219-6 Notice of Total Small Business Set-Aside (Mar 2020) (DEVIATION Jan 2026) 52.219-8 Utilization of Small Business Concerns (Jan 2025) (DEVIATION Jan 2026) 52.219-14 Limitations on Subcontracting (Oct 2022) (DEVIATION Jan 2026) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) (DEVIATION May 2026) 52.222-3 Convict Labor (June 2003) (DEVIATION May 2026) 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation (Mar 2018) (DEVIATION May 2026) 52.222-6 Construction Wage Rate Requirements (Aug 2018) (DEVIATION May 2026) 52.222-7 Withholding of Funds (May 2014) (DEVIATION May 2026) 52.222-8 Payrolls and Basic Records (Jul 2021) (DEVIATION May 2026) 52.222-9 Apprentices and Trainees (Jul 2005) (DEVIATION May 2026) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) (DEVIATION May 2026) 52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION May 2026) 52.222-12 Contract Termination-Debarment (May 2014) (DEVIATION May 2026) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) (DEVIATION May 2026) 52.222-15 Certification of Eligibility (May 2014) 52.222-35 Equal Opportunity for Veterans (Jun 2020) (DEVIATION May 2026) https://www.acquisition.gov/far/part-52#FAR_52_107

140P6026B0004 BRVB – Entry Courtyard Improvements Page 17 of 36

52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) (DEVIATION May 2026) 52.222-37 Employment Reports on Veterans (Jun 2020) (DEVIATION May 2026) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (DEVIATION May 2026) 52.222-50 Combating Trafficking in Persons (Oct 2025) (DEVIATION May 2026) 52.222-54 Employment Eligibility Verification (Jan 2025) (DEVIATION May 2026) 52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022) (DEVIATION May 2026) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) (DEVIATION May 2026) 52.222-90 Addressing DEI Discrimination by Federal Contractors (Mar 2026) (DEVIATION May 2026) 52.225-1 Buy American-Supplies (Oct 2022) DEVIATION DATE 52.226-7 Drug-Free Workplace (May 2024) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity- Construction Contracts (Dec 2007) 52.228-1 Bid Guarantee (Sep 1996) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance -- Work on a Government Installation (Jan 1997)…