This is a Request for Quote (RFQ) issued by the National Park Service (NPS), Northeast Regional Contracting Office, for reproduction wallpaper and carpet for the Ironmasters Furnishing Plan at Hopewell Furnace National Historic Site in Elverson, Pennsylvania.
The contractor must provide firm fixed-price quotes for the fabrication, delivery, and installation of reproduction wallpaper and carpeting sufficient to cover the Main Entryway & Staircase, Office, Parlor, and Dining Room of the Ironmaster's House, plus an additional 10% surplus yardage for the site to retain. The reproduction materials must accurately reflect original patterns used in these spaces during the mid-1800s. The contractor shall submit a detailed work plan including equipment and installation methods, provide test patterns for approval, and complete installation by September 20, 2027. The period of performance runs from September 21, 2026 to September 20, 2027. Quotes must be submitted electronically to Deborah Coles at Deborah_Coles@ios.doi.gov by 12:00 PM Eastern Time on Friday, September 4, 2026, with the subject line "140P4226Q0021 HOFU Wallpaper and Carpet." Technical questions are due by 12:00 PM Eastern Time on Wednesday, August 26, 2026. The solicitation is designated for Women-Owned Small Businesses (WOSB) with a NAICS code of 541410 and applies only to small businesses under FAR Part 12 for commercial products and services, using the Lowest Price Technically Acceptable evaluation methodology. Payment will be made in two phases: after colorways and materials selection, and after production, delivery, and installation completion. Contractor must maintain active System for Award Management (SAM) registration at time of award and submit invoices through the Department of Treasury's Invoice Processing Platform (IPP).
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140P4226Q0021
See Schedule See Schedule
DOI, NPS, NERO & NER SOUTH MABO
National Park Service Northeast Regional Contracting South/Philadelphia MABO 1234 Market Street, 20th Floor Philadelphia PA 19107
09/04/2026 1200 ED
0044036664
Deborah Coles 5406770325
PNC 100.00
PNC
Deborah Coles
541410
$9
08/05/2026
0011282844
ADMINISTERED BY:
DOI, NPS, NERO & NER SOUTH MABO
National Park Service
Northeast Regional Contracting
South/Philadelphia MABO
1234 Market Street, 20th Floor
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
Philadelphia PA 19107 US
DELIVER TO:
NPS, Hopewell Furnace NHS
2 Mark Bird Ln
Elverson PA 19520 US
Request for firm fixed price quote for reproduction wallpaper and carpet for the
Ironmasters Furnishing Plan at Hopewell Furnace
National Historic Site in Elverson, Pennsylvania as described in the attached
Statement of Work.
Questions must be sent to the Contracting
Officer at Deborah_Coles@ios.doi.gov by 12:00PM
Eastern Time on Wednesday, August 26, 2026.
Quotes must be sent to the Contracting Officer at Deborah_Coles@ios.doi.gov by 12:00PM Eastern
Time on Friday, September 4, 2026 with
"140P4226Q0021 HOFU Wallpaper and Carpet" in the subject line. FAXED SUMBISSIONS WILL NOT BE
ACCEPTED.
Contractor must have an active SAM registration at the time of award. www.SAM.gov
Delivery: 09/20/2027
Period of Performance: 09/21/2026 to
09/20/2027
00010 Ironmasters Furnishing Plan - Reproduction
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P4226Q0021
Wallpaper and Carpet
Product/Service Code: 9915
Product/Service Description: COLLECTORS'
AND/OR
HISTORICAL ITEMS
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P4226Q0021
PAGE OF
SECTION A - TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
PART I – The Schedule A Solicitation/Contract Form 1 B Schedule of Items 5 C Description/specifications/requirements 6 D Packaging and Marking 16 E Inspection and Acceptance 16 F Deliveries or Performance 16 G Contract Administration Data 17 H Special Contract Requirements 22
PART II – Contract Clauses I Contract Clauses 25
PART III – List of Documents, Exhibits, and Other Attachments J List of Attachments 36
PART IV – Representations and Instructions K Representations, Certifications, and Other Statements of Offerors 37 L Instructions, Conditions, and Notices to Offerors 46 M Evaluation Factors for Award 54
140P4226Q0021
SECTION B - SCHEDULE OF SERVICES
19.
ITEM
NO.
20.
SCHEDULE OF SERVICES
21.
QTY
22.
UNIT OF
MEASURE
23.
UNIT
PRICE
24.
TOTAL
Base Items
00010 Ironmasters Furnishing Plan – Reproduction Wallpaper and Carpet
1 Each $ $
Base and Optional Item Total $
NOTE: This acquisition utilizes Revolutionary FAR Updates (RFO) FAR 12 Acquisition of Commercial Products and Commercial Services – Specifically RFO FAR 12.201-1 – Simplified Procedures.
140P4226Q0021
SECTION C – Description/Specification/Requirements
Hopewell Furnace National Historic Site – Ironmasters Furnishing Plan – Reproduction Wallpaper and Carpet
C.0 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The National Park System currently has 433 units (often referred to as parks), covering more than 85 million acres in all 50 states, the District of Columbia, and US territories.
The NPS also has more than 150 related areas that are linked in importance and purpose to places managed directly by the National Park Service by preserving important segments of the nation's natural and cultural heritage. They are designated by acts of Congress or by the Secretary of the Interior (affiliated areas). The majority of related areas are not units of the National Park Service and are managed by other government agencies or non-government organizations and landowners. The National Park Service is involved in related areas by directly managing the entire or sections of a related area, or by providing technical or financial assistance.
The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS – Business Service Contracting Division (BSCD) – Contracting Operations – Northeast Region – Philadephia MABO. The NPS – BSCD-Northeast issues contracts through the Federal Acquisition Regulation’s (FAR) for supplies, services, construction, A&E for Northeast Regional Parks only.
C.1 HOPEWELL FURNACE NATIONAL HISTORIC SITE (HOFU)
Hopewell Furnace National Historic Site showcases an early American landscape of industrial operations from 1771 – 1883, Hopewell and other iron plantation laid the foundation for the transformation of the United States into an industrial giant for the time. The park’s 848 acres and historic structures illustrate the business, technology, and lifestyle of our growing nation.
For more information, please visit HOFU’s website at: https://www.nps.gov/hofu/index.htm
C.2 BACKGROUND
Hopewell Furnace National Historic Site (HOFU) encompasses 848.06 acres of land associated with the iron-making operation begun by Mark Bird in 1771 in southeastern Pennsylvania. The furnace and surrounding acreage were sold several times in the eighteenth century before being purchased by the Buckley and Brooke families in 1800. These families retained ownership of the property until the Federal government purchased it in 1935. The furnace reached its peak of production and prosperity during the 1830s. By the middle of the nineteenth century, however, new technologies began to supersede the method of production employed at Hopewell.
The Civil War and the expansion of American railroads provided a market for Hopewell’s pig iron for some decades after this time, but technological advances eventually made the furnace unprofitable, forcing its closure. The furnace went out of blast for the final time in 1883. The enabling legislation for the park (8/3/1938) declared the site to be of national significance due to its “relationship to the colonial history of the United States”.
The wallpaper in the home has all been reproduced to some extent. One space in particular: the Entryway and Main Stair has had replacement paper produced and reinstalled during an earlier preservation campaign. This reproduction paper is now failing, due to continued use and wear associated with the historic structure, and the wallpaper does not historically reflect what would have been found in this type of house. For this reason, the park seeks to acquire reproduction wallpaper that will be used in the conservation treatment of the areas of historic interior. Replacing the inaccurate, damaged wallpaper with period appropriate reproduction wallpaper is essential to maintaining the historic fabric aesthetic design of the home.
C.3 SUMMARY OF WORK
The contractor shall provide Hopewell Furnace National Historical Site (HOFU) of the National Park Service with all the labor, supplies, materials, travel, facilities, and shipping/delivery necessary to fabricate, deliver, and install rolls of reproduction wallpaper and carpeting sufficient to cover the following rooms in the Ironmaster’s House: Main Entryway & Staircase, Office, Parlor, and Dining Room (see attachment 2).
https://www.nps.gov/hofu/index.htm
140P4226Q0021
C.4 OBJECTIVES/TASKS
Production shall include selection and fabrication of four wallpapers with two rooms requiring borders and four rooms of carpeting.
Production of sufficient carpeting and printed wallpaper to hang in the Main Entryway and Staircase, Office, Parlor, and Dining Room. Sufficient yardage to accommodate pattern matching and unavoidable waste due to normal installation procedures and accommodating unique configurations of the rooms plus an additional 10% surplus yardage for Hopewell Furnace National Historic Site to keep on hand shall be provided.
The Contractor shall:
1. Work closely with the COR and insure clear and accurate communication.
2. Have access to samples of the reproduction wallpaper for the purpose of selecting colorways. These samples will be sent to the Contractor for analysis and review. They shall remain the property of the US government and shall be returned with the final shipment of printed wallpaper.
3. Verify the amount of wallpaper to be provided for the Main Entryway and Staircase, Office, Parlor, and Dining Room.
4. Submit a detailed plan of work, to include equipment, materials, and installation.
5. Submit final test patterns of wallpaper & borders for approval by project COR.
6. Deliver finished rolls of reproduction wallpapers and install in designated rooms.
The goal of this project is to acquire accurate reproduction wallpapers and carpeting for installation in the Main Entryway and Staircase, Office, Parlor, and Dining Room in the Ironmaster’s House at Hopewell Furnace NHS. The pattern of the wallpaper and carpet must be an accurate reproduction of an original pattern used in this type of space during the mid-1800s.
The wallpaper and carpet will be installed in a room open to the public for tours and interpretation throughout the year. These rooms are a part of a furnished historic house museum. The wallpaper and carpet will substantially enhance visitor experience.
C.5 OTHER INCIDENTAL WORK
• Once the COR has verified with the Contractor on selected colorways and patterns the Contractor shall verify the amount of wallpaper to be provided for the Main Entryway and Staircase, Office, Parlor, and Dining Room.
• Submit a detailed plan of work, to include equipment, materials, and installation methods.
• Complete and deliver final products of wallpapers and carpeting for installation by contractor.
C.6 PLACE OF PERFORMANCE AND HOURS OF OPERATION
Hopewell Furnance National Historic Site 2 Mark Bird Lane Elverson, PA 19520
The project shall be accomplished at the contractor’s facility with final installation taking place in the Ironmaster’s House at Hopewell Furnace NHS.
Hours of Operation: Normal operating hours are Wed.-Sun. 9am-5pm. The COR can be available on Mon & Tue if the contractor makes arrangement prior to the work.
Period of Performance:
September 21, 2026 – September 20, 2027
140P4226Q0021
C.7 SCHEDULING AND COORDINATION
The COR will be responsible for acting on behalf of the Contracting Officer (CO) on all matters of work within the scope of the contract. Approval of all work beyond the scope of the contract is reserved for the CO. The contractor is responsible for notifying the COR in writing all work that is beyond the scope of the contract.
C.8 GENERAL CONTRACTOR RESPONSIBLITIES
The Contractor must deliver wallpaper and carpeting to cover the entirety of the Main Entryway and Staircase, Office, Parlor, and Dining Room of the Ironmaster’s House, plus an additional 10% for Hopewell Furnace National Historic Site to keep on hand. The wallpaper and carpeting will be installed professionally by trained individuals to ensure the utmost care is taken while performing this type of work in a historical structure.
C.9 CONTRACTOR/EMPLOYEE QUALIFICATIONS
Previous experience with production of historically accurate wallpaper based on provided samples. Experience with installation of historical wallpaper in historical structures requiring attention to detail & maintaining the historical fabric of the structure. Experience working with historical sites to obtain cutting edge materials that allow options such as low maintenance for housekeeping purposes as well as proven products that withstand changing environments, such as temperatures, relative humidity, and visible/UV light.
C.10 SAFETY
1. The Contractor shall be responsible for the safe conduct of all operations, shall adhere to applicable OSHA standards (29 CFR 1910.266), and be subject to inspection by NPS Safety Officer.
2. During the execution of this contract, the Contractor must conform to the rules and regulations, as amended and as set forth by:
• 29 CFR 1910 – OSHA General Industry Regulations & Standards.
• National Park Service Occupational Safety and Health Program – Reference Manual 50B - Reference Manual 50B: NPS
Occupational Safety and Health Program
• Most Recent Superintendents Compendiums as amended:
o HOFU https://home.nps.gov/hofu/learn/management/compendium.htm
• All Contractor or employee conduct is subject to park rules and regulations concerning: littering, wildlife harassment, collecting, resource damage and other topics as specified for the NPS in the Code of Federal Regulations title 36 (eCFR :: 36 CFR Part 2 -- Resource Protection, Public Use and Recreation).
• Work area shall always be maintained in a clean and safe condition.
• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).
• All on-site vehicles will also be marked with the company name (if applicable).
• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.
• Contract employees shall not possess, distribute, consume, use or cause to be used any controlled substance or alcohol on the job site on Government property. Any employee using a controlled substance prescribed by a physician shall get written permission from the Contracting Officer to continue performance of assigned duties for this contract. Any contractor or contractor employee found to be in violation of this section will be permanently prohibited from the NPS property. Actions taken under this section shall not relieve the contractor of the requirement to provide sufficient personnel to perform adequate and timely service as required in this contract.
3. Contractor and operators shall follow all OSHA regulations which apply to the work activities. OSHA Regulations for tree removal operations can be found at http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id =9862
4. The contractor shall maintain the ability to contact 911 or HOFU within 15 minutes in case of an emergency while on site.
https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://home.nps.gov/hofu/learn/management/compendium.htm https://www.ecfr.gov/current/title-36/chapter-I/part-2 https://www.ecfr.gov/current/title-36/chapter-I/part-2 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id
140P4226Q0021
5. The Contractor shall ensure that any Contractor employee shall be in good health and free of any communicable disease prior to commencing work at this facility. The Contractor shall maintain and follow an exposure control plan for bloodborne pathogens in accordance with OSHA standard 29 CFR 1910.1030. Any necessary medical certificates, exams and treatments are at the expense of the Contractor.
C.11 PERSONAL PROTECTIVE EQUIPMENT (PPE)
1. The Contractor shall furnish personal protective equipment (PPE) to crew members respective of the type of work being completed.
2. The contractor shall train workers in the safe operation and use of equipment that they will be using to accomplish the work under this contract. Occupation Safety & Health Administration (OSHA) standards PPE shall be followed; information can be found at OSHA PPE Standards.
3. PPE, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
4. Defective or damaged PPE shall not be used and shall be either repaired or replaced.
C.12 ACCIDENT REPORTING
1. Accident Reporting: Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 days of a reportable accident, send a report of the accident to the Contracting Officer.
2. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
3. The COR will provide the numbers for the rescue services to the contractor upon award.
C.13 FIRE PREVENTION AND PROTECTION
• Any accidental fire starts shall be reported immediately to COR and/or HOFU Fire Management Fire Management. Should the fire exceed the size of a campfire and threaten workers safety, the contractor should depart the area and call 911 or HOFU Fire Management Fire Management immediately.
• Hazard Control: Take all necessary precautions to prevent fire during construction. Keep flammable substances or materials at a safe distance from use of volatile or noxious substances.
• Smoking is prohibited in the work areas in sites designated for the contractor’s use. Designate a space away from the work area be used for smoking. Cigarette butts must be disposed of properly.
C.14 SECURITY
1. The contractor’s employees shall have personal identification on their person at all times while working at this project.
Employees working after normal working hours must check in with the on-duty NPS Law Enforcement Officer.
2. Any contractor-owned vehicle(s) used must meet established Pennsylvania Department of Transportation and NPS regulations (e.g. safety, insurance, etc.). All vehicles will be identified with the contractor’s logo to facilitate easy identification.
3. The contractor is responsible for safeguarding all Government property that they come in contact with during the performance of this contract. The contractor shall also be expressly responsible for safeguarding their property. At the close of each workday, facilities, equipment and supplies shall be secured.
140P4226Q0021
4. The contractor shall be responsible for restoring any damaged property or equipment caused by the contractor. The restoration shall be to its original condition at no additional charge to the Government.
5. The Contractor, or any representative, and all contractor employees entering the Government reservation, shall abide by all security regulations of this installation which may be in effect during the contract period; and shall be subject to such checks as may be deemed necessary to insure that no violations occur. All contractor personnel shall follow any instructions given by the COR, and NPS Law Enforcement personnel in case of fire, hurricane or any other emergencies.
6. All Contractor personnel shall wear attire appropriate for the specific task. Clothing not to be worn tank tops, shorts, sandals, or other inappropriate clothing as determined by the Contracting Officer’s Technical Representative (COR). The contractor shall ensure that each employee or representative of the Contractor shall present a clean and professional appearance.
C.15 DRONES/UNMANNED AERIAL VEHICLE (UAV) USAGE
The use of drones and/or UAVs are not authorized at any NPS location during performance of this contract.
C.16 PROHIBITION OF WEAPONS/FIREARMS
18 USC 930 is Federal law that supersedes Section 512 of Public Law 111-24 and prohibits the possession of a firearm or other dangerous weapon in a Federal facility. Federal facilities are buildings or parts thereof owned or leased by the Federal Government, where Federal employees are regularly present for the purpose of performing official duties. No weapon or firearms are authorized within HOFU at any time.
C.17 GENERAL COMMUNICATION REQUIREMENTS
• Contractor shall furnish a serviceable cellular telephone, radio, or other NPS-approved device while on- site to communicate with the National Park Service and to provide for the safety of the contract employees.
• If the Contractor’s employees do not speak English, the Contractor’s job site supervisor shall be fluent and conversant in both English and the language of their non-English speaking employees.
• The Contractor shall contact the COR/POC with project progress notifications prior to completion. The time frame for these progress notifications shall be coordinated in writing between COR/POC and Contractor, and maybe either daily, weekly, etc.
As the Contractor near the completion of the specified work, a site visit will be scheduled with the COR/POC to determine if the work has been successfully completed.
C.18 RESOURCE DAMAGE
All conduct outside of the specified work is subject to park rules and regulations concerning littering, wildlife harassment, collecting, resource damage and other topics as specified for the NPS in the Code of Federal Regulations title 36, which can be found at http://www.gpoaccess.gov/ecfr/
C.19 IDENTIFICATION OF CONTRACTOR EMPLOYEES
All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel not required to obtain and wear badges in the performance of this service.
In accordance with AP&P 1443.37-1 the following requirements will be applicable to any and all on-site contractor personnel:
a) Contractor personnel should not in any way represent themselves as government employees. Contractor personnel shall wear badges clearly identifying them as contractors when working outside of government office space. Badging should be visible http://www.gpoaccess.gov/ecfr/
140P4226Q0021 at all times. In addition, contractor personnel shall dress in clothing appropriate to the office/environment in which they are working.
b) Government office space occupied by contractor personnel shall be clearly labeled with the individual’s name and/or company affiliation.
c) Contractor personnel shall be clearly identified as “contractors” in printed material such as telephone directories, etc. They shall be listed separately on organization charts or any other document that shows direct lines of supervision.
d) Contractors shall provide proper identification when making phone calls or speaking to others during performance of their scope of services. This means they shall indicate to the other party that they are a contractor, rather than a government employee.
e) Contractor personnel shall complete all necessary computer and security training/documentation before receiving access to the NPS computer network.
f) Contractor personnel shall not receive "all-employee" e-mail or other communications intended for NPS employees, unless it relates directly to the work the contractor is doing for the NPS or involves health or safety issues, for example security alerts or severe weather conditions. They shall not have access to internal NPS web pages, unless it relates directly to the work the contract employee is doing for the NPS.
g) Contractor personnel may use NPS e-mail systems when it is required to perform the work the contractor is doing for the NPS. The e-mail addresses of the contractor must include a label that identifies their contractor status (e.g. John Doe contractor would have an e-mail address john_doe@contractor.nps.gov). In addition, contractor personnel shall indicate in their e-mail signature block that they are a contractor and the contractor for whom they work. Doing so clearly identifies this individual each time they send an e-mail message using the NPS system, and it identifies their status as a contractor employee in the e-mail directory.
h) Unless stipulated in the contract, contractor personnel shall not drive government vehicles.
i) Contractor personnel are not authorized to purchase property and supplies with government funds.
j) Generally, all Government-furnished property shall be set forth in the contract or agreement; however, when it is not, use of additional property must be approved, in advance, by the CO.
k) Contractor personnel shall not be invited to official NPS “social” events, functions, meetings, or orientation tours which are not specific to the contract. However, attendance of contractor personnel at staff meetings, which convey some benefit in the contractor personnel performing their contractual duties, is allowed at the discretion of the CO.
l) Contractor personnel must sign appropriate agreements to protect sensitive, privileged and confidential information.
C.20 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT ADMINISTRATION
1. Contracting Officer: The Contracting Officer (CO) has overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.
2. Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to;
(A) Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;
(B) Requesting removal of unsuitable contractor employees;
(C) Ensuring adequacy of schedule and Quality Control Plan, including changes;
(D) Ordering re-performance of unacceptable work or performance by other mean, etc.
3. Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.
C.21 INTERRUPTION OF WORK
ENVIRONMENTAL - The Contracting Officer, by issuance of a stop work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions or fire danger. The Contractor shall be given a resume work order, which shall document the date the stop work order ended. An allowance has been included in the contract time for short-term environmental delays up to one day at a time. The count of contract time shall therefore continue during stop work of one day or less, but the count of
140P4226Q0021 contract time shall stop during stop work orders in excess of one day at a time. All periods of stop work by the Government shall be documented. Actions taken under this paragraph shall be subject to Special Clause 1 – Stop Work.
C.22 ENVIRONMENTAL REGULATIONS
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:
• Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;
• Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);
• Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
• Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);
• Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);
• National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);
• Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);
• Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
C.23 PRESERVATION OF HISTORICAL/ARCHEOLOGICAL/CULTURAL RESOURCES
1. Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of terrain because of any Federal construction project.
2. The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, cultural, or archeological data the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location.
3. Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, until work is permitted to resume by written order from the CO. the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location. The CO and/or COR will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resources Discovered During Construction) and other relevant laws are followed. Work in other areas may proceed as approved by the
CO.
4. Where appropriate by reason of discovery, the CO may order delays in the time of performance and/or changes in the work.
If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
5. The Contractor must insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
C.24 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed.
If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.
C.25 HAZARDOUS MATERIAL IDENTIFICATION
Submit Safety Data Sheet (SDS)’s as required per 29 CFR 1910.1200 as amended. The contractor must provide one digital copy of each SDS for applicable hazardous chemicals used and/or provided in performance of any work under this contract.
140P4226Q0021
C.26 GOVERNMENT FURNISHED PROPERTY/INFORMATION
The park will provide access to the Ironmaster’s House as necessary to perform installation of wallpaper and carpeting in the designated rooms. The Contractor shall be responsible for the preservation and care of the rooms in the structure when performing work associated with this project. Furnishings usually on exhibit in the designated rooms will be removed by park staff prior to installation and will be the responsibility of the park to reinstall upon completion.
C.27 LOSS OR DAMAGES
The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries, death, or damages to Property arising from all work activities of the Contractor.
If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this contract, the contractor shall be responsible for the same. The government, at its option, in lieu of repayment, may require the contractor to replace at his own expense, all property as directed by the Contracting Officer.
C.28 WORK BY THE GOVERNMENT
The Government reserves the right to undertake performance by Government forces or other Contractors, the same type of similar work as contracted for herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.
C.29 OTHER CONTRACTS
The Government may undertake work with its own forces or award other contracts for additional work, and the Contractor shall fully cooperate with such other Contractors and Government employees and carefully fit its own work to such additional work as may be directed by the CO. The Contractor shall not commit or permit any act, which shall interfere with the performance of work by any other Contractor or by Government employees.
C.30 EXTENT OF OBLIGATION
The Government obligation for performance of this contract beyond the award price is contingent upon the availability of funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the amount that has been authorized through the issuance of a contract modification or change order by the CO.
C.31 BIOBASED AND SUSTAINABLE PRODUCTS
The Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential0 Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for biopreferred products that m a y b e required in performance of this contract:
• Adhesive and Mastic Removers – Minimum Biobased Content 58%
• Adhesives - Minimum Biobased Content 24%
• Carpets - Minimum Biobased Content 7%
• Eyewear – Minimum Biobased Content 25%
• Floor Cleaners - Minimum Biobased Content 77%
• Paper Products – Nonwriting Paper – Minimum Biobased Content 25%
• Safety Equipment – Minimum Biobased Content 25%
140P4226Q0021
• Shopping and Trash Bags – Minimum Biobased Content 22%
• Wall Coverings - Minimum Biobased Content 62%
For more information including definition of terms with regard to the Department of Agriculture Biobased Program go to:
https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml
C.32 DEFINITIONS (Not included in Federal Acquisition Regulations)
Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Calendar Days - Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.
Clothing – Utility Gloves - A fitted hand garment used to protect hands in industrial and construction work.
Contract Pay Item - A pay item designated on the bid schedule and described by a specification.
Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plans, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.
Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.
Eyewear – Products that are worn over the eyes, either to provide protection (from the sun, impact, chemicals, etc.) or to enhance vision. Eyewear consists of frames and lenses, either separately or together. This category includes contact lenses.
Materials - Any substances for use in the construction of the project and its appurtenances.
Personal Protective Equipment (PPE) – Equipment used by workers that protect against worksite accidents, such as goggles, ear plugs, face shields and gloves.
Quality Assurance - Actions taken by the Government to assure contracted services meet all SOW and Specification requirements.
Safety Equipment – Equipment used by workers that protects against worksite accidents, such as goggles, ear plugs, face shields and gloves.
Shopping and Trash Bags – Open-ended bags that are typically made of thin, flexible film and are used for containing and transporting items such as consumer goods and waste. Examples include trash bags, can liners, shopping or grocery bags, pet waste bags, compost bags, and yard waste bags. This category does not include product packaging disposable containers, or semi-durable and non-durable films.
Specifications - A general term applied to all written directions and requirements pertaining to performance of work.
Standard Specifications - Specifications established for region wide use for construction of facilities which cover most items of work likely to be performed; such as Earthwork, Base Courses, Pavement, Concrete, etc.
Utility Services - Are services such as electricity, gas, steam, water and sewage.
https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml
140P4226Q0021
C.33 TRAVEL
The contractor shall be responsible for all travel necessary to complete the work described in the Scope of Work.
C.34 NOTIFICATION OF SUBCONTRACTING
The contractor shall within 14 days after award notify the Contracting Officer upon entering into any subcontract arrangement, as required by FAR 52.222-11 – Subcontracts (Labor Standards). The subcontractor shall have the experience and be equipped for such work. The written notification shall be completed:
A. Prime Contract Number and Subcontract Number (if applicable) B. The name and address of the Prime Contractor.
C. The name and address of the subcontractor.
D. The date upon which the subcontract was entered into and its duration.
E. A detailed description of the work being subcontracted.
F. Project Name and Location of Work.
G. Identify the names of any intermediate subcontractors (if applicable) H. Must be signed by both Prime Contractor and Subcontractor
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
140P4226Q0021
SECTION D—PACKAGING AND MARKING
{For this Contract, there are NO clauses in this Section}
SECTION E—INSPECTION AND ACCEPTANCE
{For this Contract, there are NO clauses in this Section}
SECTION F—DELIVERIES OR PERFORMANCE
{For this Contract, there are NO clauses in this Section}
140P4226Q0021
SECTION G—CONTRACT ADMINISTRATION DATA
G.1 POST AWARD CONFERENCE
Prior to commencement of work, the CO, CS or COR and/or POC will arrange a meeting with the contractor to discuss the contract terms and work performance requirements. A work progress schedule will be proposed by the contractor at this meeting complete with a schedule of values. It will be scheduled as soon as possible after the date of the contract award. It is anticipated that this meeting will take place All dates and locations of the conference will be mutually agreed upon and may be held via Microsoft Teams, onsite, or a combination of both.
G.2 GOVERNMENT FURNISHED PROPERTY
The Government may provide Government Property to the Contractor for use as stated below. If Government Property is provided the property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract and as stated at the Order Level.
Item No. Property Description Qty Location Date Available or Delivery Date
1 N/A
G.3 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR POINT-OF-
CONTACT (POC)
A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award of the contract in accordance with DIAR 1452.201-70 Authorities and Delegations (SEP 2011). The name will be designated on a letter or form.
B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.
C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.)
D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR’s requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
E. The COR's major duties and responsibilities are contained in Contracting Officer Representative Letter. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:
1. Approve Change Orders and Modifications
2. Take action to terminate the contract for default or Government convenience.
3. Make contract adjustments under the Differing Site Conditions clause.
140P4226Q0021
4. Grant extensions of contract time.
5. Approve assignment of claims.
6. Make final decisions under the Disputes clause.
7. Make final acceptance under the contract.
8. Make final decisions under the Suspension of Work clause.
9. Make equitable adjustments.
10. Authorize change in amount of Payment Retention.
11. Approve subcontractors.
12. Approve payments with deductions or final payment.
13. Approve use and possession prior to completion.
14. Enforce the warranty provisions.
15. Issue any direction that would result in a possible change to contract requirements.
F. The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements and/or performance.
• The POC is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual document executed by the CO prior to completion of the contract.
• The CO should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the OCO provided they do not affect the delivery schedule or performance period stated in the contract.)
• On all matters that pertain to the contract terms the Contractor must communicate with the CO.
Whenever, in the opinion of the Contractor, the POC requests effort outside the scope of the contract, the Contractor should so advise the CO. If the POC persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.4 ADMINISTRATIVE CONTRACTING OFFICE
(a) Contact Information:
Deborah Coles Contracting Officer National Park Service Telephone No. 540-677-0325 Email: deborah_coles@ios.doi.gov
(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in mailto:deborah_coles@ios.doi.gov
140P4226Q0021 conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.
Any request for contract changes/modifications shall be submitted to the CO.
(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items.
All field changes must be approved by the CO prior to execution.
(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.
I…