This document is a combined synopsis/solicitation for commercial items issued as a Request for Proposal (RFP) by the National Park Service for wayside exhibit planning, design, fabrication, and installation services for Cuyahoga Valley National Park in Ohio.
The contractor shall provide all services including labor, materials, equipment, facilities, and travel to plan, design, fabricate, and install wayside exhibits at two locations within the park - Sagamore Hills and Peninsula. The exhibits will replace outdated exhibits and better interpret natural history topics, reflect the park's inclusive storytelling research, and improve access for people with disabilities. The solicitation is set aside for small businesses under NAICS code 339950 with a 500-employee size standard. Proposals are due by August 12, 2024 and the government anticipates award of one best value, firm-fixed price contract. The period of performance is from September 1, 2024 to September 30, 2026.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service – Harpers Ferry Center – Con Ops National Solicitation Number: 140P2124R0070 – Wayside Exhibit Planning, Design, Fabrication and Installation Services for Cuyahoga Valley National Park
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
Solicitation Number 140P2124R0070 is issued as a Request for Proposal (RFP) constitutes the entire solicitation. Proposals and price quotations with detailed breakdown are being requested. This acquisition will be conducted pursuant to FAR Part 13. This solicitation document incorporates all mandatory commercial item provisions and clauses in effect through Federal Acquisition Circular 2024-05, effective May 22, 2024.
This is set aside for small business concerns under the North American Industry Classification System (NAICS) 339950, Sign Manufacturing Services with a related small business size standard of 500 employees.
The government anticipates award of one (1) best value, firm-fixed price contract.
REQUIREMENT: The project shall be for the planning, design, fabrication, and installation of wayside exhibits for Cuyahoga Valley National Park, Brecksville, Ohio in accordance with the specifications as detailed in this contract and its attachments. The project consists of wayside exhibits located in both Sagamore Hills, Ohio and Peninsula, Ohio, respectively. The project includes coordination with the Contracting Officer (CO), Contracting Officer’s Representative (COR), and park staff. Due to space limitations, the complete commercial item specifications are contained in Solicitation Number 140P2124R0070. Interested contractors should download this document. The National Park Service is not responsible for locating or securing any information that is not identified in the quotation. The government contemplates award of one best value, firm-fixed price contract resulting from this solicitation.
The following Federal Acquisition Regulation (FAR) clauses and provisions are applicable to this announcement and are available at www.acquisition.gov.
52.212-1 Instructions to Offerors-Commercial Items; 52.212-2 Evaluation-Commercial Items; 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services; 52.212-4 Contract Terms and Conditions Commercial Items; 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services; 52.232- 33 Payment by Electronic Funds Transfer-Central Contractor Registration; 52.233-1 Disputes in Solicitations and Contracts; 52.233-4 Applicable Law for Breach of Contract Claim; and 52.245-1 Government Property.
Proposals shall be prepared in accordance with the attached solicitation. Failure to adhere to these instructions may render your proposal unacceptable.
• Questions to the solicitation are due via email by 10:00 AM ED on July 24, 2024. Questions submitted using any other method will not be entertained. All questions concerning this request for proposal should be referred to Sheila Spring, Contracting Officer via email at sheila_spring@nps.gov.
Offerors who contact anyone outside of the Office of Acquisition Management regarding this requirement may automatically be excluded from competition.
• Proposals are due via email by 10:00 AM ED on August 12, 2024. The address is included in the solicitation for mailing flash drives in the event files are over the threshold for submitting via email. Flash drives MUST be received by the date and time specified for proposals or it will be considered late and handled as such in accordance with FAR Policies and Procedures. Offerors are hereby notified that if your proposal is not received by the date/time and at the location specified in this announcement, that it will be considered late. The quote shall be submitted electronically via email to sheila_spring@nps.gov with the Subject line clearly identifying “Solicitation Number 140P2124R0070 – Wayside Exhibit Planning, Design, Fabrication and Installation Services for Cuyahoga Valley National Park”. Offers by telephone, transmitted via facsimile (fax), or submitted using any other method will not be accepted.
mailto:sheila_spring@nps.gov mailto:sheila_spring@nps.gov
SYSTEM FOR AWARD MANAGEMENT: Offerors shall be required to have a Unique Entity Identifier (UEI) number and an active registration in SAM, System for Award Management (www.sam.gov) at the time of award; and Online Representations and Certifications at the SAM Website, and shall be considered a small business for the size standard associated with the NAICS code.
http://www.sam.gov/
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
PHF
Harpers Ferry WV 25425 IDC Building 67 Mather Place DOI, NPS, HFC - Acquisition Managem
0009060803 CODE 16. ADMINISTERED BYCODE
X
X
X
339950
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORPWA
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
08/12/2024 1000 ED
07/11/2024
3045356239Sheila Spring (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140P2124R0070
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 76 0040666494OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Harpers Ferry WV 25425 IDC Building, 67 Mather Place NPS, Harpers Ferry Center
15. DELIVER TO
Denver CO 80225 P.O.Box 25287 MS WCP
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
NPS, WASO - WCP Contracting
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
QUESTIONS DUE BY 10:00 AM ET - 07/24/24
PROPOSALS DUE BY 10:00 AM ET - 08/12/24
Provide all services including labor, materials, equipment, facilities, and travel (except as otherwise specified) to provide the NPS with wayside exhibit planning, design fabrication, and installation services for Cuyahoga Valley National Park in accordance with the attached Scope of Work and Attachments.
Delivery: 09/30/2026
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Sheila Spring
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00010 CUVA_WE PLN, DESIGN, FAB & INSTALL
Product/Service Code: M1PB
Product/Service Description: OPERATION OF EXHIBIT
DESIGN (NON-BUILDING)
Period of Performance: 09/01/2024 to 09/30/2026
00020 CUVA_WE PLN, DESIGN, FAB & INSTALL
Product/Service Code: M1PB
Product/Service Description: OPERATION OF EXHIBIT
DESIGN (NON-BUILDING)
Period of Performance: 09/01/2024 to 09/30/2026
00030 CUVA_WE PLN, DESIGN, FAB & INSTALL-TRAVE
Product/Service Code: M1PB
Product/Service Description: OPERATION OF EXHIBIT
DESIGN (NON-BUILDING)
Period of Performance: 09/01/2024 to 09/30/2026 https://www.fbms.doi.net/prsmnetprd/app_themes/pri smclassic/images/document_module_continue_image.pn
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
76 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 76
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2124R0070 g
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation Number:
140P2124R0070
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
1.0 PROJECT BACKGROUND
Cuyahoga Valley National Park includes more than fifty square miles of thick forest, deep gorges, green wetlands, and rocky waterfalls. There are also historic villages, an old canal towpath, farm fields, a covered bridge, and a sightseeing railroad in the park.
This project will be specifically for Brandywine Falls and the area formerly called Virginia Kendall Park, two highly visited sites and entrance points at the park. The project will consist of replacing outdated exhibits first installed in the 1990s. These new wayside exhibits will better interpret natural history topics, reflect the park’s recent inclusive storytelling research and new interpretive theme framework, respond to public feedback from a 2022 “Welcoming Trailheads” project, and improve access for people with disabilities.
2.0 GENERAL
The project shall be for the planning, design, fabrication, and installation of wayside exhibits for Cuyahoga Valley National Park, Brecksville, Ohio. The project consists of wayside exhibits located in both Sagamore Hills, Ohio and Peninsula, Ohio, respectively. The project includes coordination with the Contracting Officer (CO), Contracting Officer’s Representative (COR), and park staff.
The contractor shall provide all services including labor, materials, equipment, facilities, and travel necessary to perform the work in accordance with the specifications as detailed in this contract and its attachments. Work shall include the planning, design, fabrication, and installation of all wayside exhibit structures, graphic layouts, and artwork. Work shall also include comprehensive research to obtain thorough reference material necessary to plan, design, fabricate, and install all items required in this contract.
2.1. Project Management
The Project Manager (PM) shall be the primary point of contact between the contractor and COR.
The PM shall have full authority to act for the contractor on all matters relating to the contract.
and shall perform the following work:
a. Be available to take or respond to telephone calls or electronic mail messages during normal hours of operation (8:30 am–5:00 pm local time).
b. Establish office procedures to ensure that messages are relayed to the Project Manager when out of the office or because of time zone differences.
c. Respond to emergency messages from the COR on the same day they are received. All non-urgent messages from the COR shall be responded to in no more than two (2) business days.
2.2. Quality Control
The contractor shall provide quality control to ensure that all elements of project work meet the requirements of the contract specifications and that all modifications are implemented.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
The Project Manager shall provide routine inspections of in-house and subcontracted work to ensure it meets contract specifications and shall oversee the quality of work produced and implemented at all phases of the project. Any work found not acceptable or compliant with the specifications shall be corrected prior to inspection or review by the COR.
2.3. Government-Furnished Property
If government-furnished material is provided during the course of the work, the contractor shall receive, inspect, and inventory all government-furnished materials, provide a report to the COR of the materials received, and ensure that this material is forwarded to the appropriate unit or person within the contractor’s organization for use in the project. The Project Manager shall notify, in writing via email, the COR within seven (7) days after receipt if government-furnished materials are not satisfactory for their intended purpose. The Project Manager shall notify the COR via email as soon as possible, but no later than three (3) business days, if government-furnished materials are lost or damaged while in the contractor’s possession. The contractor shall be responsible for the security and protection of government-furnished property or materials in connection with this contract. Following acceptance of all work by the government, the contractor shall return all government-furnished property to the COR.
2.4. Schedule
The contractor shall schedule, coordinate, oversee, and manage work produced and installed under this contract. The contractor shall prepare an overall project schedule including milestone dates for all submittals, fabrication, and submit to the COR for approval. The contractor shall track all work progress to ensure that the project is completed according to the schedule. The contractor shall coordinate and confirm the dates for all work with the COR. The contractor shall notify the COR, in advance, in writing when work shall not be completed by the dates in this contract and provide an updated schedule for completion. Consultation with federally recognized tribes shall be factored into the overall schedule and will require at least a 90-day review period to review materials for two deliverables.
2.4.1 Status Reports
Provide a monthly status report to the COR that includes the status of the project, issues that affect the schedule and budget, and an updated schedule based on the information at hand.
2.4.2 Project Schedule
The contractor shall produce a detailed, complete project schedule listing all required submittals and their review times. The project schedule shall also include site visits, shop inspections, warrant activities, and closeout submittals.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
The contractor shall submit a preliminary project schedule to the COR for review and approval seven (7) working days prior to the post award meeting. The contractor shall update the approved schedule and resubmit to the COR three (3) working days prior to every project status meeting for the life of the project. The contractor shall notify the COR, in advance and in writing, when work shall not be completed by the dates in this contract and provide an updated schedule for completion.
2.5. Meetings, Travel, and Presentations
Meet with the CO, COR, and park staff as specified below. The contractor shall document all issues discussed and decisions made relative to the project. The contractor shall prepare and distribute to the COR a trip report or meeting minutes of all telephone conversations, site visits, in-person meetings, or other discussions related to the project.
Meeting Purpose Location or Type
Required Contractor Attendees
Duration/Days on site
Post-award call TEAM Meeting Project Manager 15 minutes Site Visit At Park Project Manager
Writer Exhibit Designer
Three (3), 8-hour days
Shop Inspection Contractor’s Facilities or Virtual
Meeting
Project Manager One (1) 8-hour day
Installation At Park Project Manager Audio Describer
Installers
TBD by the Contractor
Comment Discussion and Reconciliation
Virtual Meeting Project Manager Five (5), 1-hour meetings and as needed
2.6. Submittals
At any point in the exhibit planning and design process the COR may require informal submittals of the contractor’s work-in-progress to document the current status and level of production of the project.
The contractor shall coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward all submittals to the COR for review and acceptance. Receive all reviewed submittals and take appropriate action according to the acceptance or rejection by the COR, as follows:
2.6.1. Acceptance and Rejections
1. Accepted Submittals – The contractor shall ensure that all changes, revisions, or additions required by review comments are addressed and incorporated into future submittals.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
Accepted with Revisions—At the discretion of the COR, the government may accept the overall submittal, and ask for resubmittal of individual elements or pages to be updated or corrected prior to moving to the subsequent deliverable or phase of work.
2. Rejected Submittals - When submittals are rejected, the COR will notify the contractor, in writing, identifying the reasons for rejection. The contractor shall ensure that the submittal is completed and/or revised as required and resubmitted within the time scheduled by the COR. Reasons for rejection include:
a. Incomplete Submittals – Acceptance of the submittal is delayed because required elements are missing. The contractor shall submit all missing elements.
b. Unacceptable Submittals – The submittal is rejected due to poor quality of work or work that does not otherwise meet the established project goals. The contractor shall submit new material.
2.6.2. Submittal Format
1. Two (2) printed copies and one (1) electronic PDF copy of each document submittal are required.
2. Submittals shall be sent via overnight delivery service unless otherwise specified in the scope of work below.
3. Both printed and electronic submittals shall be delivered seven (7) calendar days prior to scheduled presentation of material.
4. Any Microsoft Office submittals shall be provided in an accessible 508-compliant format.
2.6.3. Transmittal Sheet
The contractor shall include a transmittal in the form of a printed letter, PDF document, e-mail, or fax cover sheet along with all samples, proofs, prints, reports, digital files, digital images, and multimedia files, sent from the contractor to the COR. This includes all copies sent to the park or other copied recipients.
The transmittal shall include the following minimum information:
• "From" (contractor's name and contact information)
• "To" (COR's name)
• Date submittal was shipped
• Project name and park name
• Itemized list of contents
• List of copied recipients who received the same submittals
2.7. Accessibility
Wayside exhibits planned, designed, and fabricated for the National Park Service (NPS) shall follow the latest published version of Attachment B, Programmatic Accessibility Guidelines for National Park Service Interpretive Media. These guidelines are a combination of best practices, NPS and Department of the Interior directives, and federal laws. Federal laws include the
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
Architectural Barriers Act, Sections 504 and 508 of the Rehabilitation Act as amended, and the 21st Century Communications and Video Accessibility Act.
The contractor shall be aware of and pursue principles of universal design throughout all phases of the planning, design, and fabrication process. Universally designed wayside exhibits can be accessed, understood, utilized, and appreciated to the greatest extent possible by all users regardless of ability. Universal designs reflect not only accommodations to select groups but approaches that are broadly inclusive and integrated into a larger whole to the benefit of all users.
Principles of universal design are detailed in Appendix C of Attachment B, Programmatic Accessibility Guidelines for National Park Service Interpretive Media.
Accessibility requirements for visitors with specific disabilities shall be addressed within the designed wayside exhibits. If the site or criteria of the project do not address accessibility as defined in the attachments, or poses challenges to accessibility (e.g., inaccessible location of wayside exhibit), a full description of required corrective actions shall be provided to the COR for any proposed accessibility solutions. The government shall review proposed solutions and when deemed necessary, provide additional guidance to the contractor up to and including exceptions and/or modifications to the contract to address outstanding accessibility requirements. Refer to Attachment B, Programmatic Accessibility Guidelines for National Park Service Interpretive Media for requirements addressed under specific disabilities.
2.7.1. Audio Description for Wayside Exhibits
Every wayside exhibit shall have audio description for people who are blind or have low vision. Audio Description will be delivered through the park’s mobile app. Audio description shall be based on provided photos and/or video of wayside site showing the immediate and surrounding area.
2.7.2 Transcript of the Narrated Content
Wayside exhibits that include audio shall have transcript of its narrated content made available on site. Delivery will be determined during the site visit.
2.8. Design Parameters
In planning and designing for production of wayside exhibits hereunder, the contractor shall address the following essential design parameters:
• life safety
• barrier-free design
• accessibility/universal and programmatically accessible design
• sustainability
• energy conservation
• security provisions
• integration with existing landscape and structures where relevant
• functionality, maintenance, durability, and other lifecycle requirements
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
2.8.1 Use Rights
The contractor shall acquire use rights and production quality copies of all third-party images and other intellectual property (IP) required to produce the graphic layouts in the exhibit as specified in Attachment A, National Park Service Wayside Exhibit Planning, Design, Fabrication and Installation Specifications. All images shall be able to be displayed by the government in other media to promote or display the wayside exhibit.
2.9. Codes and Standards
All wayside exhibits shall be produced in accordance with applicable codes, standards, parameters, or regulations noted in this or other sections of this contract, and in the location in which the wayside exhibit shall be installed. In case of conflict between codes, standards, or regulations, the most stringent requirement shall apply.
1) Latest Standards Reference to standard specifications of any technical society, organization, or association, or to codes, manuals, or regulations of federal or local authorities shall mean the latest standard, code manual, regulation, specification, or tentative specification adopted and published at least thirty (30) days prior to submittal of proposals, unless specifically stated otherwise.
2) Contracting Officer as Authority Any code, standard, regulation, or specification listed below, in the attachments in
10.0 List of Attachments or otherwise referenced herein, that references the “authority having jurisdiction”, “local authority”, or “governmental authority” shall be interpreted to refer to the Contracting Officer as being this authority for purposes of interpreting/clarifying codes, standards, regulations, and specifications.
3.0 Wayside Exhibit Planning, Design, Fabrication Services
3.1. General
Work shall include planning and designing wayside exhibits services including audio description of all fabricated wayside exhibit elements. See Attachment A, National Park Service Wayside Exhibit Planning, Design, Fabrication, and Installation Specifications. The contractor shall provide all technical, professional, non-personal services, including all labor, materials, equipment, supplies, facilities, travel, management, and supervision necessary to provide Cuyahoga Valley National Park with production ready files for outdoor interpretive wayside exhibits.
Planning and design services includes the following phases and types of work:
• Pre-Proposal
• Wayside Proposal 1
• Wayside Proposal 2
• Design Development 1
• Design Development 2
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
• Design Development 3
• Pre-Production
3.1.1. Specifications
The contractor shall perform all services required hereunder in accordance with this Statement of Work (SOW) and all attachments.
3.1.2. Post-award Conference Call
Upon award, the contractor shall participate in a project kick-off conference call to review contracting requirements and procedures with the project CO and COR.
3.2. Pre-Proposal
In pre-proposal, the contractor shall gain a clear understanding of the project’s history, the park’s resources, and the roles of other project team members and stakeholders. Work in this phase focuses on preparing a solid foundation for all work that follows, ensuring that the project is logically structured, and its goals are understood and realistically attainable within the budget, schedule, and other specified parameters.
The contractor shall:
1) Review government-furnished materials.
2) Travel to site. The Project Manager, Writer, and Exhibit Designer shall travel to the Park for three 8-hour days for a site visit.
3) Conduct initial meeting and presentation as follows:
a. Orientation to park experience.
b. Initial meeting agenda.
c. Presentation should include:
(i) Components of what makes a good wayside exhibit, including examples demonstrating qualities and principles
(ii) The process and stages of wayside exhibit development
(iii) Roles and responsibilities
(iv) Contract deliverables
(v) Site analysis schedule
(vi) Draft project schedule
(vii) Set time and date for close-out meeting
4) Complete site analysis as follows:
a. Visit and identify potential wayside exhibit sites with park staff and subject-matter experts.
b. Identify the following for each wayside exhibit:
(i) Subject or resource
(ii) Site-specific significance
(iii) Purpose
(iv) Orientation and photos
(v) Size
(vi) Panel material
(vii) Base structure
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
(viii) Site conditions
c. Develop sketches to facilitate discussions and agreement.
d. Review site-specific resources.
5) Identify additional resources
6) Facilitate trip close-out meeting
7) Prepare trip report
8) Share all raw photography from site visit
3.3 Wayside Exhibit Proposal
Create a wayside proposal for twenty-one (21) interpretive wayside exhibits. In addition to a standard proposal, include the following:
- One map o Locations of proposed exhibits o Locations of exhibits to be replaced in kind
- Illustrations References
- Tactile References
3.4 Wayside Exhibit Plan – See Attachment H, Sample Plan
Create production-ready InDesign files for twenty-one (21) wayside interpretive exhibits. The plan shall incorporate text and graphics. Contractor to acquire and document all use rights information.
The government will provide existing artwork for two panels. Minor design changes may be needed prior to or during fabrication
3.5 Text
Contractor shall research and create all text following NPS standards found in Attachment I, Typographic Standards and Attachment K, HFC Editorial Style Guide.
3.6 Graphics
Contractor shall research and obtain use rights (outside of stock photography or government furnished materials) for up to ten (10) images that allows for an image or PDF of the wayside exhibit to be displayed by the government in other media to promote or display the wayside exhibit.
Existing images and/or illustrations to be provided by the government upon request.
3.7 Maps
Create the following maps according to Attachment F, Wayside Exhibit Map Standards. See Attachment L, Sample Maps and Access Data.
3.7.1 Create three (3) 2D, area-specific trail maps including unique “You Are Here” and access data. Access data includes surface, tread width, grade, and cross slope.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
3.8 Audio Description
Create audio description scripts for all wayside exhibits. Audio description content shall describe each wayside element, images/items within the wayside element, tactile elements, all text within the wayside element, and what the sighted visitor sees in the surrounding vistas related to subject being interpreted. Audio description should comply with Attachment B, Programmatic Accessibility Guidelines for National Park Service Interpretive Media.
3.9 Illustrations
Create three (3) full size and color illustrations. Illustrations should be developed in similar style as shown in Attachment N, Illustration References.
3.9.1 New artwork to depict a nature scene at the Ledges rock formation, highlighting a variety of key geological features, animals, and plants, both large and small.
3.9.2 New artwork to depict a nature scene of the Ledges Forest, highlighting a variety of key animals and plants, both large and small.
3.9.3 New artwork to depict Brandywine Falls rock layers and their associated geological timeframes. This works together with the 3.8.2 rock layer tactile.
3.10 Tactiles
Create six (6) tactile models. See Attachment N, Tactile References. All tactile models shall be mounted to corresponding wayside exhibit, either directly onto the wayside panel or on a separate pedestal. (Exact method to be determined at site visit.) All tactiles to include scale, raised lettering and braille letters. Ensure that tactile models have adequate drainage.
3.8.1 Bronze tactile to depict aerial view of Brandywine Falls area. This tactile will feature rock formations, waterfall, creek, trails, roads, and elevation change. The purpose of this tactile is universal design, but particularly to provide orientation for low-vision users who may not be able to relate map features to the visible landscape.
3.8.2 Bronze tactile to depict Brandywine Falls geology features and rock layers, such as shale. A tactile of the sandstone may be a sample of real rock provided by the government. These will support the 3.7.3 illustration.
3.8.3 Bronze tactile to depict aerial view of Ledges area. This tactile will feature rock formations, trails, shelters, forest area, and playfields. The purpose of this tactile is universal design, but particularly to provide orientation for low-vision users who may not be able to relate map features to the visible landscape.
3.8.4 Bronze tactile to depict zoomed-in view of Ledges area, showcasing different types of rock formations at the Ledges site.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
3.8.5 Bronze tactile to depict plants and/or animals located at the Ledges site. Animals might include bats, warblers, etc.
3.8.6 Flipbook tactile to include multiple images related to the Kendall Lake site.
Contractor to propose material.
4.0 Production
Work shall include the creation of illustrations, fabrication of panels, bases, and shipping of all fabricated elements.
4.1 Illustrations
Create three (3) new illustrations as determined in final proposal.
4.2 Panels
Fabricate the following double-sided aluminum panels for outdoor use.
• Five (5) – 36” width x 48” height
• Nine (9) – 48” width x 24” height
• Five (5) – 36” width x 24” height
• Two (2) – 24” width x 24” height
4.3 Base Hardware
The contractor shall fabricate the following bases. Paint color shall be NPS Dark Brown at Virginia Kendall sites and NPS Gray at Brandywine Falls.
Fabricate the following painted aluminum bases with cane strike bars in accordance with Attachment G, VIS Hardware Manual as determined in the final proposal. Types of bases may include low profile, double-inline upright, triple-inline upright, wall-mounted frames, bulletin cases, accessory bars with brochure holders. Paint color shall be NPS Dark Brown, spatter coat. All bases shall have a 10-year warranty against structural failure.
• Two (2) – 36” width x 48” height Upright In-Ground
• Two (2) – 36” width x 48” height Upright Wall-Mounted Frames for Kiosk Structure
• Nine (9) – 48” width x 24” height Low Profile In-Ground or Deck-Mount. Mounting method to be determined at site visit.
• Four (4) – 36” width x 24” height Low Profile In-Ground or Deck-Mount. To be determined at site visit.
• Two (2) – 24” width x 24” height Low Profile In-Ground or Deck-Mount.
• One (1) – 36” width x 48” height Bulletin Case Wall-Mount for Kiosk Structure
• One (1) – Three-Sided Kiosk to match existing towpath style. See Attachment M, Towpath
Kiosk References.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
5.0 INSTALLATION
All bases outlined in Section 4.3 above and one (1) 36” width x 24” height Deck-Mount base from the existing hardware, to be government-furnished shall be installed according to installation plans and assembly instructions. Installation includes the removal of existing wayside hardware, and assembly and installation of all wayside exhibit elements including bases, panels, ancillaries, tactiles, accessories, and accessibility features.
5.1 On-Site Removal/Installation Meeting
Coordinate with the COR to schedule an on-site installation/removal meeting with the following agenda:
1. Assess existing conditions which impact the installation of the wayside exhibits, including access to installation location, parking, and weather.
2. Field-verify and precisely mark wayside exhibit location as identified in Wayside Proposal.
3. Coordinate and locate a secure laydown, storage, and staging area for the wayside exhibits, contractor materials, and installation equipment.
The contractor shall provide all the equipment and machines to complete the work. The contractor shall provide earthmoving equipment, augur, lifts, concrete mixing equipment, and all other tools.
The contractor shall ensure that all personnel using this equipment are trained. The contractor shall not use government-furnished equipment or tools for installation. The contractor shall call Ohio Utilities Protection Service (OUPS) prior to any excavation or removal of wayside exhibits.
5.1.1 Removal of Existing Wayside Exhibits
Remove, recycle, and dispose of existing wayside exhibit structures unless instructed otherwise by the government to save and/or repurpose components. Where structures are removed, all holes and surrounding ground area at the removal site shall be filled and repaired.
5.1.2 Safety
The contractor shall provide adequate personnel to install the wayside exhibit and components specified in Wayside Proposal. Equipment operators shall be fully trained.
Installation crews shall be required to always wear Personal Protective Equipment (PPE) while on-site installing the wayside exhibits. PPE includes high-visibility vests with conspicuity, reflective stripes, gloves, ear-plugs, goggles, and hard hats as required for using tools or operating machines used during the installation.
1. Work Zones Provide a visual and physical barrier between the wayside exhibit installation work zone and public foot traffic to keep out unauthorized intrusions, for safety of the public and for the protection of the work being performed.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
2. Barriers Safety cones, self-supporting orange construction fencing, and caution tape, and panels or sawhorses identified with signs, are acceptable components of work zone barriers. Work zones include power tool stations as well as installation work areas.
Power cords, tools, hoses, and hardware shall be kept inside the work zones.
3. Signs Provide signs on the work zone barrier, identifying the area as a work area and closed to the public. If hard hats are in use in an area, identify it as a hard hat area, only.
4. Access Provide clear, accessible passageways to areas of public access which pass through the work zone. Separate the public access from the work zone using barriers on both sides, identified by signs.
5.1.3 Assembly
Assemble all wayside exhibits according to COR-approved shop drawings specifications.
5.1.4 Staging Area
Waysides shall be stored on-site during installation in a designated staging area. Prior to the installation, the contractor shall coordinate with the COR to locate a secure staging area and plan how wayside and equipment storage shall be accomplished to provide protection of the waysides, contractor equipment and tools, and to minimize disruption of park operations. The contractor shall submit their plan for staging and parking, to the COR for review and approval prior to the installation.
5.1.5 Underground Utilities
The contractor shall ensure that all underground utilities are located and flagged before any excavation and wayside exhibit installation occurs. The contractor shall work with NPS staff to identify and flag. The contractor shall bear the responsibility of costs of any repairs if the site is not surveyed and flagged prior to installation. Where installation problems may occur due to underground utilities, the contractor shall inform the COR in writing and coordinate an alternate location for the wayside exhibit or shall hand dig the site.
5.1.6 Installation Site Closure
The general installation site shall be open to visitors during the installation period. The immediate area where the work is occurring shall be closed off by the contractor with stanchions, caution tape, and “Do Not Enter” signs.
To protect site installation crews in high-traffic vehicular areas, the installation site shall be protected with warning barricades, roped enclosures, and signs. The barricaded area shall
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page be large enough to allow staging of equipment, storage of waysides and components, and waste debris while working.
Along roadways the contractor shall park all equipment and vehicles in a safe operating location to eliminate the potential for accidents. Hi-visibility safety signs shall be erected on both sides of the roads, and in advance of the work zone. Vehicles in roadway work zones shall be fitted with yellow flashing lightbars or beacon style lights. Work zones located along curves or in blind sight lines shall employ a flag-person and additional warning signs to maintain a safe work zone.
Work areas in pedestrian zones along sidewalks, trails, or the visitor center shall be protected with warning barricades, roped enclosures, and signs. Holes for footers or post installation shall not be left open and unprotected. Concrete footers with exposed rebar shall be covered during the curing process.
The contractor shall work with the park contact to provide a detour route during site closures, if necessary. In the event of overnight closure such as for foundation pours, the site shall be protected and barricaded to prevent pedestrian and visitor injury as well as theft of materials left unattended.
Recycle shipping containers and packing materials at the installation site that are not retained for re-use.
5.1.7 Site Condition and Cleanup
During the installation, the contractor shall maintain all areas in a clean condition daily and provide means of preventing dirt, weeds, or waste material from being tracked into adjacent areas of the site. The contractor shall provide bags and containers for storage of trash. The contractor shall be responsible for removing waste materials generated during installation from the park daily. The contractor shall not dispose of their waste within the park, on park grounds, in dumpsters, or containers that belong to the government or to other contractor’s working on-site.
The contractor shall thoroughly clean wayside structures and surfaces to remove handprints, dust, and miscellaneous markings generated during the installation. The contractor shall handle all acrylic, glass, and graphic panels with clean gloves.
The contractor shall refill all holes and repair all surfaces disturbed during installation of waysides and structures with identical materials. Ground surfaces shall be cleaned up, smoothed out, and reseeded with matching grass.
5.1.8 Existing Work
The contractor shall request authorization from the COR prior to cutting, drilling, altering, or removing material within the site. The contractor shall not cut down trees, trim trees or remove bushes, shrubs, or other plant vegetation without coordinating such work with the COR. Work that is replaced shall match existing work. The contractor shall restore anything
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page damaged or defaced due to the contractor’s error during installation to the original condition. Restoration work shall be coordinated with the COR prior to start of work.
5.1.9 Walkthrough Inspection
Coordinate with the COR to schedule an on-site final walk-through meeting with the following agenda:
1. Verify that all items identified in Wayside Proposal have been assembled and installed.
Each wayside exhibit shall be inspected against the shop drawings to confirm signs were installed in accordance with contract specifications.
2. Verify that all wayside exhibits identified in Wayside Proposal have been removed and surrounding areas have been restored to smooth ground level.
3. Identify punch-list deficiencies (items that need to be corrected by the contractor).
Record and maintain a list of the punch-list deficiencies as they are identified by the COR and provide a copy of the list to the COR after the walk-through inspection.
4. Conduct a project closeout session with the COR and park staff. Return any remaining government-furnished materials in the contractor’s possession.
5.1.10 Punch List
To the greatest extent possible, the contractor shall complete punch list items while on site for the Primary Installation. If punch list items cannot be completed during Primary Installation, an additional trip to the installation site shall be required.
1. Prepare and submit an installation punch list to the COR.
2. After installation and prior to acceptance, if deficiencies or corrections are noticed in the wayside exhibits, the contractor shall be required to return to the installation site and complete or correct punch list items at no cost to the government.
6.0 PACKAGING AND DELIVERY
6.1. Deliverables and Destination Point
All deliverables shall be shipped Free On Board (FOB) destination, within consignee’s premises, with all shipping and transportation costs prepaid, unless otherwise specified below. Deliverables shall be shipped by either registered or certified mail to ensure that shipments can be traced, if lost.
6.1 Deliverables Shall Include the Following
6.1.1 Post-award Conference Call, uploaded to TEAMS folder
- Word document of notes
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
- PDF of draft schedule
6.1.2 Trip Report, uploaded to TEAMS folder
- Word document describing what was discussed at each site noting any need for contract modification, if any
- All raw photography from site visit
- PDF of updated schedule
6.1.3 Draft Wayside Exhibit Proposal, uploaded to TEAMS folder
- PDF of proposal including cover page, narrative, exhibit list, exhibit records, and thumbnails showing text blocks, graphics (images, illustrations, maps, quotes)
- PDF of map with location of proposed exhibits
- PDF of thumbnails of illustrations
- PDF of thumbnails for tactile elements
- PDF of map thumbnails for new/updated maps
- PDF of updated schedule
- PDF of draft resource and reference list
6.1.4 Final Wayside Exhibit Proposal, uploaded to TEAMS folder
- PDF of final proposal with all NPS comments incorporated
- PDF of revised map with location of proposed exhibits
- PDF of revised thumbnails of illustrations
- PDF of revised thumbnails for tactile elements
- PDF of revised map thumbnails for maps
- PDF of updated schedule
- PDF of revised resource and reference list
6.1.5 Draft Wayside Exhibit Plan, uploaded to TEAMS folder
- PDF of full layouts showing complete text and graphics, including:
o map of wayside exhibit locations o detailed black and white illustrations o revised new/existing maps o revised drawings/renderings of tactile elements
- PDF of draft tactile element designs
- PDF of updated schedule
- PDF of revised resource and reference list
6.1.6 Revised Wayside Exhibit Plan, uploaded to TEAMS folder
- PDF of revised layouts showing revised text and graphics, including:
o revised, detailed color illustrations o revised maps o revised drawings/renderings of tactile elements
- PDF of drawings and reference package for tactile elements
- PDF of draft design intent drawings for each exhibit base
- PDF of updated schedule
- PDF of revised resource and reference list
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
6.1.7 Final Wayside Exhibit Plan, uploaded to TEAMS folder
- PDF of final layouts with final text and graphics
- Word Document of final English text for all exhibits
- PDF of documentation of all image sources and use rights
- PDF of final color illustrations
- PDF of final maps
- PDF of revised reference package for tactile elements
- PDF of revised design intent drawings for each exhibit base
- PDF of updated schedule
- PDF of revised resource and reference list
6.1.8 Production-Ready Files & Samples
- Two (2) sets of full-size color prints of each wayside exhibit. One (1) set mailed to the COR and one (1) set mailed to the park.
- Two (2) sets of sample materials. All samples shall be larger than 2”x2” but not larger than 10”x10”. One (1) set mailed to the COR and one (1) set mailed to the park. Samples shall be representative of final product to be delivered. Each set shall contain:
o One (1) aluminum base painted NPS Dark Brown with spatter coat finish.
o One (1) aluminum base painted NPS Gray with spatter coat finish.
o One (1) wood sample stained to match existing kiosk materials.
o One (1) double-sided aluminum panel o One (1) sample of bronze tactile o One (1) sample of interactive flip book material
- PDF of final fabrication drawings for hardware, uploaded to Teams folder
- PDF of updated schedule, uploaded to Teams folder.
- Production-ready digital layout files with high-resolution image, illustration and map files, uploaded to Teams folder
- Graphic use rights and license information, uploaded to Teams folder
6.1.9 Prototypes of interactive tactile elements, mailed to the park.
- Six (6) 50% to scale 3D printed models of chosen tactiles.
6.1.10 Fabricated wayside exhibit elements including panels, bases, tactiles, and two (2) 1/2 pints of NPS Dark Brown and NPS Gray touch up paint for the bases mailed to the park. No loading dock is available at park— a lift gate is available for unloading.
6.1.11 Trip Report for installation, uploaded to Teams folder
- Word document identifying all work that was completed during site visit, includes any deviations to proposed locations
- Word Document of draft audio description scripts
- RAW photos of all installed exhibits
6.1.12 Close-out package, uploaded to TEAMS folder
- Final InDesign files with linked images and fonts for each layout in non-proprietary formats, including all revisions and corrections made during production.
Document Title:
Wayside Exhibit Plan, Design, Fabrication and Installation for Cuyahoga Valley National Park
Page
- RAW images in non-proprietary formats
- Final production PDFs for each layout
- Section 508-compliant PDFs for each exhibit, without printer’s marks
- Section 508-compliant Word Document of final text
- Section 508-compliant Word Document of final audio description script
- FileMaker Pro source file for proposal
- PDF of final documentation of all image sources and use rights
- Maintenance manual for exhibit panels, and bases
- Return any government-furnished property
- Final resource list
- Warranties
- Excel document of the lifecycle costs for each as-built wayside exhibit, including panel, base, and tactile elements
6.2. Deliverables Shall Be Sent To The Following:
Items 6.1.1 through 6.1.9 (only one set of full-size prints) shall be sent to:
COR Name & Contact (TBD at award) National Park Service Harpers Ferry Center IDC Building, 67 Mather Place Harpers Ferry, WV 25425
Items 6.1.9 (only one set of full-size prints) shall be sent to:
Cuyahoga Valley National Park 9329 Riverview Road…