This solicitation requests proposals for fossil well number one plugging and site reclamation services. Key details include the requirement to plug and abandon the specified well located in Lincoln County, Wyoming, improve and construct access roads totaling approximately 1.8 miles, and fully reclaim all areas after project completion. Offerors must provide pricing using the fixed-price contract type by August 17, 2021 to the Bureau of Land Management for an award period of August 30, 2021 through August 29, 2022. The solicitation is designated as 100% small business set-aside for NAICS code 213112 with a magnitude between $100,000 to $250,000.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040531829
BLM WY-STATE OFC BUS MGMT BR(WY951)
5353 YELLOWSTONE RD.
CHEYENNE WY 82009
LYA
BLM - WYOMING STATE OFFICE
5353 YELLOWSTONE ROAD
CHEYENNE WY 82009
ATTN: KELLY PALMER
Kelly Palmer (307) 7756057
1x 08/03/2021
140L6221R0027
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
FOSSIL #1 WELL PLUGGING & SITE RECLAMATION
100% SMALL BUSINESS SET-ASIDE
NAICS: 213112
STANDARD SIZED: $41.50 MM
MAGNITUDE: BETWEEN $100,000 AND $250,000
CONTRACT TYPE: FIXED PRICE
AWARD SELECTION PROCESS: LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA)
ALL WORK WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK AND SPECIFICATIONS
1. The Contractor shall furnish all labor, materials, tools, and equipment required to execute and complete the work as specified in the government bid schedule.
2. The work shall include all steps necessary to improve/construct the access road, plug and abandon the well described in section C below, and reclaim the wellsite and constructed/improved areas of the access road.
3. Contractor must improve existing two-track (approx. one mile) so that plugging equipment may access the well site. This may include grading and culvert
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 180 calendar days and complete it within ________________ ________________ calendar days after receiving
08/17/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
BLM WY-STATE OFC BUS MGMT BR(WY951)
5353 YELLOWSTONE RD.
CHEYENNE WY 82009
LYA
Kelly Palmer
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140L6221R0027 installation at washes. Width of bladed road shall not exceed 12 feet. Wash crossings will not exceed 16-ft of disturbance. Access road route is provided in Attachment 1, map Fossil #1
Access Road. Any deviation from the approved route will require prior approval from the BLM
Contract Officer.
4. Contractor must construct two-track access
(approx. 0.8 mile) from the end of the existing two-track to the well site. New two-track must be constructed to allow necessary plugging equipment to access the well. Width of road shall not exceed 12 feet. Access road route is provided in Attachment 1, map Fossil #1 Access
Road. Any deviation from the approved route will require prior approval from the BLM Contract
Officer.
5. If borrow or fill areas are required, sites must be identified and approved by BLM Contract
Officer prior to disturbance. Areas approved for fill or borrow must be reclaimed per reclamation requirements.
6. Contractor must mobilize the appropriate equipment to the site and plug the well in accordance with the attached procedure.
7. The Contractor shall keep the premises in a sanitary condition and free from waste material or rubbish.
8.The Contractor is responsible for all hazardous fluid spills on the site, including any petroleum products, and shall immediately clean up and remove such contaminates from the site in accordance with Federal, State, and local regulations.
9. The Contractor is responsible for the prevention and suppression of fires on public lands caused by its employees, contractors, or subcontractors. During conditions of extreme fire danger, surface use operations may be limited or suspended in specific areas at the discretion of the BLM Contract Officer.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140L6221R0027
10. The well casing and all access ports shall be secured and sealed at all times of no activity in order to prevent contamination, vandalism, and safety mishaps. Emergency pit shall be fenced to prevent safety mishaps and keep wildlife from entering pit area.
11. All debris and equipment removed from the well shall be temporarily placed on plastic tarps or sheeting in order to prevent staining or discoloring of the native soil.
12. The Contractor shall cut off and properly dispose of that portion of the existing well casing at 3 feet below the surface. Plug and abandonment marker will be welded to remaining casing, 3-feet below surface, as specified in item D.5.F of this statement of work.
13. Upon completion of well plugging operations to the satisfaction of the BLM Contract Officer, the Contractor shall remove all trash, equipment, casings, pipe, and pumps. If there are any hydrocarbon spills, the spill must be removed, and the soil must be disposed of properly. The
Contractor shall also dispose of all fluids produced during the cementing operations in an approved disposal facility.
14. The constructed portion of the access road
(approx. 0.8 miles) must be fully reclaimed back to its original state by the Contractor. The
Contractor must return the improved portion of the access road (approx. one mile) to its condition prior to improvement (two-track). This includes culvert and any added material removal, recontouring and seeding of any portions graded during access road improvement. Reclamation must be done to the satisfaction of the BLM Contract
Officer.
B. General Information
1. This well is located in Sage Grouse Core
Habitat (Core) and Sagebrush Focal Area (SFA), and is subject to the following timing limitations:
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140L6221R0027
a. No surface use is allowed during March 15 ¿
June 30
C. Well Information:
1. Location: The well is located in Lincoln County, Wyoming approximately 6.2 miles West of
Kemmerer, Wyoming at the following location:
LEASE NO: UNKNOWN
WELL NAME: Fossil #1
API#: 49-023-05039
LOCATION: SENE, Section 23, T.21 N., R.117 W., 860¿ FSL, 1100¿ FEL
1. INCLUDED DUNS NUMBER ON PROPOSAL
2. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site
Conditions, and 52.236-3, Site Investigations and
Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-
August 9, 2021, 8:00 A.M. Mountain Time
(c) Participants will meet at-
Meet at the BLM - Kemmerer Field Office, 430
North Highway 189, Kemmerer WY 83101.
Please contact both Andrew Kauppila, akauppila@blm.gov and Kelly Palmer, kpalmer@blm.gov if planning to attend the site visit to RSVP.
RSVPs to the site visit must be received by
August 5, 2021, 3:00 P.M. if planning to attend.
If no RSVPs are received the site visit will be cancelled.
If attending the site visit, it is recommended that an off-road vehicle (UTV/ATV) will be needed due to a 1.8 mile walk to the site from the road.
Contractors/vendors cannot ride with Government employees or in Government vehicles. All attendees will adhere to all Federal and State
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
6 41
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140L6221R0027
COVID-19 protocols and maintain at least 6 feet distance from other attendees.
(End of Provision)
3. ALL PROPOSALS MUST BE EMAILED TO THE
CONTRACTING OFFICER, THE REFERENCE NUMBER AND
TITLE NEED TO BE ENTERED IN THE SUBJECT LINE.
FAXED OR MAILED PROPOSALS ARE NOT BEING ACCEPTED
AT THIS TIME.
CONTRACTING OFFICER (CO) KELLY PALMER,
307-775-6057, KPALMER@BLM.GOV
Legacy Doc #: BLM
Delivery Location Code: 0004276768
BLM-WY WYOMING STATE OFFICE*
5353 YELLOWSTONE RD
PO BOX 1828
CHEYENNE WY 82003 US
Period of Performance: 08/30/2021 to 08/29/2022
00010 FOSSIL #1 OIL WELL PLUGGING AND RECLAMATION
Product/Service Code: Z2QA
Product/Service Description: REPAIR OR ALTERATION
OF RESTORATION OF REAL PROPERTY (PUBLIC OR
PRIVATE)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
140L6221R0027 Fossil #1 Oil Well Plugging & Reclamation
Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract
County: Lincoln County, WY
Type of Construction: Support Activities for Oil and Gas Operations
Magnitude:
Between $100,000 and $250,000
NAICS:
213112
SIZE STD:
$41.50
SET-ASIDE:
100% Small Business
Bureau of Land Management
Technical Representative Contracting Officer (CO)
Name: Kelly Palmer
Email: kpalmer@blm.gov
Questions Due: August 11, 2021, at 2:00 PM Mountain Time, questions submitted after this date will not be accepted. Questions will not be answered over the phone.
Proposal Submittal Information: Response Due Date is August 17, 2021, 2:00 P.M. Mountain Time
RESTRICTIONS ON CONTACTS
Beginning upon release of the request for proposal (RFP) through contract award, contacting government employees who may be associated with this work by participating offerors on the subject of this RFP is inappropriate. Offerors for this RFP, including subcontractors and teammates, shall not attempt such contacts during this period. All correspondence shall be through the CO.
SUBMITTAL OF QUESTIONS
Offeror is to consolidate questions related to this solicitation and site visit in a request for information (RFI) formatted Word document. RFI is to be emailed as an editable attachment to Kelly Palmer kpalmer@blm.gov prior to the date and time listed on the cover page of this solicitation. Only written RFI’s will be considered and responded to. BLM responses to the RFI will be posted as an amendment to the solicitation on https://sam.gov/content/home.
AWARD SELECTION PROCESS
Lowest Price Technically Acceptable (LPTA)
Firm-Fixed Price mailto:kpalmer@blm.gov
SPECIAL CONTRACT REQUIRMENTS
WORK HOURS
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:00am and 4:00pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
COMMUNICATIONS
“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Mountain Standard Time.
FIRE DANGER SEASON
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
DRAWINGS
(a)Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b)Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full size drawings may contact the Contracting Officer identified in the solicitation.
PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
(a)The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
(b)If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
(c)Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
(d)The Contractor will be responsible for protecting the cultural resources within the affected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
FEDERAL HOLIDAYS
The following Federal Legal Holidays are observed:
New Year’s Day Martin Luther King, Jr. Day
President’s Day Memorial Day
Independence Day Labor Day
Columbus Day Veterans Day
Thanksgiving Day Christmas
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should a provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated:
"The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
https://www.cpars.gov/ https://www.cpars.gov/
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
PROPOSAL SUBMITTAL
Proposals must be in accordance with and in the order detailed in this section. Proposals are due by the date and time specified on the cover page of this document. It is the responsibility of offerors to ensure their proposal is received by the recipient and by the due date and time. The offeror is to submit a fully compliant proposal to the following email addresses:
Kelly Palmer/ kpalmer@blm.gov
VOLUME FORMAT INSTRUCTIONS
(a) Each volume must be contained in a separate file.
(b) Each volume must contain a cover page with the following information:
(1) Prime Contractor’s Name
• DUNS
• Contact Information:
o Name o Phone o Email o Address
(2) Volume Number & Title
(c) The proposal must be 11 pitch/point font or larger which would fit on 8 1/2" x 11" page. Color charts, photos, tables, or diagrams shall not exceed 11" x 17". The font size for captions, charts, tables, and diagrams must be no smaller than 10 point.
(d) The proposal shall be within the required page limitation and each page in each section must be consecutively numbered. Pages in excess of the noted page limitation will not be read or considered.
(e) The proposal shall be within the required page limitation and each page in each section must be consecutively numbered. Pages in excess of the noted page limitation will not be read or considered.
(f) The proposal and its page limitations are as follows:
VOLUME TITLE NOUMBER OF COPIES
REQUIRED
TOTAL PAGE
LIMITATION
Volume 1 Required Documentation 1 electronic copy Unlimited
Volume 2 Technical Approach 1 electronic copy 10*
Volume 3 Pricing 1 electronic copy Unlimited
*The following are excluded from the page count: (1) Bid Schedule, (2) Standard Forms 1442 and 30, (3) Table of Contents, (4) Section Dividers (Tabs), (5) Cover Pages, (6) Title Pages and (7) Pricing.
VOLUME 1 - REQUIRED DOCUMENTATION
(a) Complete Blocks 14, 15, 16, 17, and 19 of Standard Form (SF) 1442. An official with authority to contractually bind the offeror's company must complete and sign Blocks 20a, 20b, 20c, 30a, 30b, and 30c of the SF1442 in accordance with the procedures prescribed in the Federal Acquisition Regulation Subpart
4.102. Failure to complete and sign all required blocks will result in an unacceptable offer.
(b) Acknowledgement of Amendments: Acknowledge all solicitation amendments using one of the methods set forth in Block 11 of Standard Form 30, the form on which any amendment will be issued. This includes completing blocks 8, 15A, 15B, and 15C and the SF 1442, and block 19, Acknowledgement of Amendments.
(c) Short Cover Letter:
(1) Offeror’s (company) name, address, and phone number
(2) Point of contact for two individuals within the company (phone number and email address)
(3) Entity making this submittal:
Parent Company _______ Subsidiary _______ Division ________ Branch Office _______
(4) Year company/entity was established: __________
(5) List any former company/entity names and reason(s) for revision/restructuring if applicable
(6) Original signature of the individual with the authority to bind the contractor and to negotiate.
(7) Statement that the proposal is valid for the time period set in block 13, Additional Solicitation Requirements, of the 1442.
(8) Response to the following questions:
o Judgments, Claims, and Lawsuits: Are there any judgments, claims, and/or lawsuits pending or outstanding against or involving entity or partners comprising your entity?
No ___, Yes ___. If yes, submit details of all judgments or claims against either parent office or division/branch that will be responsible for the accomplishment of this project on a separate sheet.
o Is your entity or partners comprising your entity under suspension or debarment by any Federal, state or local agency, or been terminated on any past projects (Federal or others)?
No ___, Yes ___. If yes, submit details on a separate sheet.
o IAW FAR 52.209-7(b), the offeror [ ] has [ ] does not have current active federal contracts and grants with a total value greater than $10,000,000.
o IAW FAR 52.204-24(d), the offeror represents that it [ ] will [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.
VOLUME 2 - FACTOR 1, TECHNICAL APPROACH/CAPABILITIES
(a) Subfactor 1: A construction plan in the form of a narrative shall be provided detailing completion of major project milestones. The construction plan shall explain, in paragraph format the sequence of events that will take place to accomplish the subject requirement. Indicating a thorough understanding of the work required as well as a sound and reasonable approach to complete all project elements. The construction plan successfully illustrated the capability of the offeror to manage all project elements to include suppliers, subcontractors, and employees.
(b) Subfactor 2: The construction schedule was provided in a Gantt or similar format and is within the
Governments specified period of performance. Schedule indicates and understanding of the project requirements and utilizes a logical approach to sequencing.
(c) Subfactor 3: Past performance projects deemed not relevant will be rejected and not be considered.
Projects deemed not recent (greater than three years) will be disregarded. The evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have relevant experience or subcontracts that will perform major or critical aspects of the proposed agreement when such information is relevant to this acquisition. The evaluation will also consider information provided relative to corrective actions taken to resolve problems on past or existing contracts. Offerors receiving a rating of No Confidence will not be considered for award.
(d) Evaluation of past performance also includes:
(1) Feedback provided by reference(s) contacted including quality of work performed (material and workmanship), correction of deficiencies, completeness of submittals, O&M, “as-builts”, payroll, schedules, etc., met customer expectations and in compliance with construction documents.
(2) Feedback provided by reference(s) contacted including performance; resolution of delays, identification and correction of work, meeting progress schedules, submission of schedules, completion of punch list items, submission of submittals including documents and as-builts. All the foregoing completed in a timely manner. Warranty issues should have been addressed promptly.
(3) Experience with firm fixed priced contracts and cost control.
(e) In consideration of an Offeror’s total past performance information, one of the following ratings will be assigned:
PERFORMANCE CONFIDENCE ASSESSMENT RATINGS
Rating Description Satisfactory Confidence
Based on the offeror’s performance record, the Government has an expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort
Unknown Confidence
No performance record is identifiable, or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.
d) Offerors receiving a final rating of “No Confidence” will not be considered for award.
Each subfactor shall receive one of the following ratings:
RATING DESCRIPTION
Acceptable Proposal meets requirements and indicates and adequate approach and understanding of requirements, and risk of unsuccessful performance is no worse than moderate.
Unacceptable Proposal does not meet requirements of the solicitation and this contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is not awardable.
VOLUME 3 - FACTOR 3, PRICE
(a) Reasonableness. Techniques and procedures described under FAR 15.404-1(b), Price Analysis, will be the primary means of assessing proposal reasonableness. The evaluation techniques described under FAR 15.404-1(c) through (g), as determined appropriate, may also be performed in further determining the reasonableness of the proposal. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through cost and price analysis techniques as described in FAR 15.404, Proposal Analysis. For additional information, see FAR 31.201-3, Determining Reasonableness.
(b) Unbalanced Pricing. All offers priced line items shall be analyzed to determine if prices are unbalanced. An offer may be rejected if it is determined that the lack of balance poses an unacceptable risk to the Government.
(c) Affordability: An affordability assessment will consider if the proposed price is within the Government’s funding profile.
EVALUATION FACTORS FOR AWARD
BASIS FOR CONTRACT AWARD
(a) This acquisition will utilize the Lowest Priced Technically acceptable (LPTA) procedures to make a best value award. This is a competitive LPTA in which technical shall be rated Acceptable or Unacceptable. By submission of its offer, the Offeror accepts all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Offerors with Unacceptable tactical ratings will not be considered for award. Failure to meet a requirement may result in an offer being determined technically unacceptable. Offerors must clearly identify and exception to the solicitation and conditions and provide complete accompanying rational. While the Government will strive for maximum objectivity, the technical Acceptable/Unacceptable process, by its nature, is subjective; therefore, professional judgment is implicit throughout the evaluation process.
(b) The Government intends to make ONE award based on the evaluation of proposals submitted in response to this solicitation. Award will be made to the responsible offeror whose proposal conforms to all solicitation requirements, such as terms and conditions, representations and certifications, technical requirements, and also provides the best value to the Government based on the results of the evaluation
LPTA EVALUATION PROCESS
The LPTA evaluation process will be accomplished as follows:
(a) Technical Acceptability. Each offeror’s technical proposal will be evaluated to determine if the Offeror provides a sound, compliant approach that meets the requirements of the detailed specifications provided in this solicitation and demonstrates a thorough knowledge and understanding of those requirements. An evaluation rating of Technically Acceptable/Unacceptable will be assigned upon completion of the technical proposal evaluations. If an offeror receives a technical rating of “Unacceptable” for any subfactor, they will not be considered for contract award.
(b) Past Performance Evaluation.
(1) Past performance evaluation results in an assessment of the Government’s confidence in the Offeror’s ability to fulfill the solicitation requirements. The overall confidence assessment will be based upon the recent, relevancy, and quality evaluation of all references reviewed. The past performance evaluation considers each offeror's demonstrated record of performance in meeting users' needs. The performance confidence assessment is rated after evaluating aspects of the offeror's recent past performance, focusing on quality of performance that is relevant to this requirement. If an Offeror receives a past performance rating of “No Confidence”, they will not be considered for contract award.
(2) Sources of Past Performance Information for Evaluation. Past performance information will be provided by the offeror. The Government shall also obtain past performance information from the Past Performance Information Retrieval System (PPIRS). Additionally, offerors are advised the Government will use data provided by sources other than the offeror to evaluate past performance. This information may be obtained from questionnaires from interviews with project managers, CO’s, and other sources known to or found by the Government. The Government may also use information from previous source selections or contractor capability assessments if the information is recent and relevant.
(3) Definitions.
(i) Recent: Recent is defined as a project completed or significantly completed within 3 years from the issuance date of this solicitation.
(ii) Relevant: Past performance effort involving much of the same magnitude of effort and complexities this solicitation requires. Effort and complexities is defined by the scope, tasks and requirement’s specifications. Therefore, projects will be considered not relevant if the past performance effort did not involve any of the magnitude of effort and complexities required by this solicitation. Projects including similar task associated with the requirements of this solicitation as determined by the scope of work and specifications building type, size, magnitude (cost), complexity and scope, and/or contained similar features, functions, components, systems, and/or project(s) was for a federal, state, or local municipality. The magnitude is defined in Block 10 of the SF 1442.
(c) Price Evaluation. Price must be determined fair, reasonable, affordable, and balanced will be evaluated in accordance with, Price, below.
PART 1-THE SCHEDULE
SPECIFICATIONS, STANDARDS AND DRAWINGS
1. The Contractor shall furnish all labor, materials, tools, and equipment required to execute and complete the work as specified in the government bid schedule.
2. The work shall include all steps necessary to improve/construct the access road, plug and abandon the well described in section C below, and reclaim the wellsite and constructed/improved areas of the access road.
3. Contractor must improve existing two-track (approx. one mile) so that plugging equipment may access the well site. This may include grading and culvert installation at washes. Width of bladed road shall not exceed 12 feet. Wash crossings will not exceed 16-ft of disturbance. Access road route is provided in Attachment 1, map Fossil #1 Access Road. Any deviation from the approved route will require prior approval from the BLM Contract Officer.
4. Contractor must construct two-track access (approx. 0.8 mile) from the end of the existing two-track to the well site. New two-track must be constructed to allow necessary plugging equipment to access the well.
Width of road shall not exceed 12 feet. Access road route is provided in Attachment 1, map Fossil #1 Access Road. Any deviation from the approved route will require prior approval from the BLM Contract Officer.
5. If borrow or fill areas are required, sites must be identified and approved by BLM Contract Officer prior to disturbance. Areas approved for fill or borrow must be reclaimed per reclamation requirements.
6. Contractor must mobilize the appropriate equipment to the site and plug the well in accordance with the attached procedure.
7. The Contractor shall keep the premises in a sanitary condition and free from waste material or rubbish.
8. The Contractor is responsible for all hazardous fluid spills on the site, including any petroleum products, and shall immediately clean up and remove such contaminates from the site in accordance with Federal, State, and local regulations.
9. The Contractor is responsible for the prevention and suppression of fires on public lands caused by its employees, contractors, or subcontractors. During conditions of extreme fire danger, surface use operations may be limited or suspended in specific areas at the discretion of the BLM Contract Officer.
10. The well casing and all access ports shall be secured and sealed at all times of no activity in order to prevent contamination, vandalism, and safety mishaps. Emergency pit shall be fenced to prevent safety mishaps and keep wildlife from entering pit area.
11. All debris and equipment removed from the well shall be temporarily placed on plastic tarps or sheeting in order to prevent staining or discoloring of the native soil.
12. The Contractor shall cut off and properly dispose of that portion of the existing well casing at 3 feet below the surface. Plug and abandonment marker will be welded to remaining casing, 3-feet below surface, as specified in item D.5.F of this statement of work.
13. Upon completion of well plugging operations to the satisfaction of the BLM Contract Officer, the Contractor shall remove all trash, equipment, casings, pipe, and pumps. If there are any hydrocarbon spills, the spill must be removed, and the soil must be disposed of properly. The Contractor shall also dispose of all fluids produced during the cementing operations in an approved disposal facility.
14. The constructed portion of the access road (approx. 0.8 miles) must be fully reclaimed back to its original state by the Contractor. The Contractor must return the improved portion of the access road (approx. one mile) to its condition prior to improvement (two-track). This includes culvert and any added material removal, recontouring and seeding of any portions graded during access road improvement. Reclamation must be done to the satisfaction of the BLM Contract Officer.
B. General Information
1. This well is located in Sage Grouse Core Habitat (Core) and Sagebrush Focal Area (SFA), and is subject to the following timing limitations:
a. No surface use is allowed during March 15 – June 30
C. Well Information:
1. Location: The well is located in Lincoln County, Wyoming approximately 6.2 miles West of Kemmerer, Wyoming at the following location:
LEASE NO: UNKNOWN
WELL NAME: Fossil #1
API#: 49-023-05039
LOCATION: SENE, Section 23, T.21 N., R.117 W., 860’ FSL, 1100’ FEL
Access Road: From intersection of HWY 189 and HWY 30 near Best Western in Kemmerer, take HWY 30 West 8.3 miles to County Road 328. Turn left onto County Road 328 and drive South 0.1 miles to County Road 341. Turn left onto County Road 341 and continue straight for 0.8 miles. There will be a turn-off on the left-hand side of the road. Take the turn-off and proceed through the gate. If gate is closed, proceed through and close gate after entering. Well site is approximately 1.8 miles from gate. An existing two track extends about one mile and will need to be improved for equipment access; and the remaining 0.8 miles of access road will need to be constructed. See Attachment 1 for access road route.
All work shall be performed under as single firm-fixed price contract.
Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction Deliveries or Performance AUG 1996
52.242-14 Suspension of Work APR 1984
CLAUSES INCORPORATED BY FULL TEXT
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements & Internet Payment Platform (IPP) (August 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Copy of Original Invoice referencing the contract number, Certification or Progress Payments Under Fixed-Price Construction Contracts and/or DI-137 Release of Claims
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
LOCAL INTERNET PAYMENT PLATFORM (IPP) HOTLINE
To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:
1. Company Name
2. Contract Number
3. Invoice Number
4. Invoice Amount
5. A brief description of why you are calling
6. Your contact information
If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contract Officer with the day and time you contacted the Payment Hotline.
CLAUSES INCORPORATED BY REFERENCE
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
May 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity May 2014 52.204-7 System for Award Management Oct 2018 52.204-25 Prohibition on Contracting for Certain Telecommunications and
Video Surveillance Services or Equipment Aug 2020
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
Jun 2020
52.215-2 Audit and Records--Negotiation Jun 2020 52.215-8 Order of Precedence--Uniform Contract Format Oct 1997 52.215-11 Price Reduction for Defective Cost or Pricing Data--Modifications Jun 2020 52.215-13 Subcontractor Cost or Pricing Data--Modifications Jun 2020 52.222-3 Convict Labor Jun 2003 52.222-6 Construction Wage Rate Requirements Aug 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records Jul 2021 52.222-9 Apprentices and Trainees Jul 2005 52.222-10 Compliance with Copeland Act Requirements Feb 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards Feb 1988 52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition of Segregated Facilities Apr 2015 52.222-26 Equal Opportunity Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction Apr 2015 52.222-36 Equal Opportunity for Workers with Disabilities Jun 2020 52.223-5 Pollution Prevention and Right-to-Know Information May 2011 52.225-13 Restrictions on Certain Foreign Purchases Feb 2021 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic
Enterprises Jun 2000
52.227-1 Authorization and Consent Jun 2020 52.227-4 Patent Indemnity-Construction Contracts Dec 2007 52.228-2 Additional Bond Security Oct 1997 52.228-5 Insurance - Work on a Government Installation Jan 1997 52.232-5 Payments under Fixed-Price Construction Contracts May 2014 52.232-23 Assignment of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts Jan 2017 52.232-33 Payment by Electronic Funds Transfer—System for Award
Management Oct 2018
52.233-1 Disputes May 2014 52.233-3 Protest After Award Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim Oct 2004 52.236-2 Differing Site Conditions Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work Apr 1984 52.236-5 Material and Workmanship Apr 1984 52.236-6 Superintendence by the Contractor Apr 1984 52.236-7 Permits and Responsibilities Nov 1991 52.236-8 Other Contracts Apr 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements Apr 1984
52.236-10 Operations and Storage Areas Apr 1984 52.236-11 Use and Possession Prior to Completion Apr 1984 52.236-12 Cleaning Up Apr 1984 52.236-13 Accident Prevention Nov 1991 52.236-14 Availability and Use of Utility Services Apr 1984 52.236-15 Schedules for Construction Contracts Apr 1984 52.236-17 Layout of Work Apr 1984
52.236-21 Specifications and Drawings for Construction Feb 1997 52.236-21 Alt I Specifications and Drawings for Construction (Feb 97) - Alternate I Apr 1984 52.236-26 Preconstruction Conference Feb 1995 52.243-4 Changes Jun 2007 52.243-5 Changes and Changed Conditions Apr 1984 52.244-6 Subcontracts for Commercial Items Jul 2021 52.246-21 Warranty of Construction Mar 1994 52.249-1 Termination for Convenience of the Government (Fixed-Price) Apr 1984 52.249-10 Default (Fixed-Price Construction) Apr 1984 52.253-1 Computer Generated Forms Jan 1991 1452.203-70 Restrictions on Endorsement-Department of Interior Jul 1996 1452.204-70 Release of Claims-Department of Interior Jul 1996
CLAUSES INCORPORATED BY FULL TEXT
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT (OCT 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
(a) Definitions. As used in this provision—
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub.
L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .