FOSSIL 1 OIL WELL PLUGGING & RECLAMATION Federal contract opportunity
Solicitation number
140L6221R0027
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

About this file

This technical specification outlines requirements for temporary facilities and controls for a well plugging and reclamation project. The specification covers first aid, sanitation, traffic control, H2S safety, and site identification plans. It requires self-contained toilet facilities, dust control measures, landscape preservation, and cleanup following completion. Temporary access roads, storage areas, and haul routes must be constructed and maintained, then removed prior to contract completion. The related federal contract opportunity is for plugging and reclaiming Fossil 1 Oil Well located on Bureau of Land Management property in Wyoming.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 1SECTION 01500
GENERAL REQUIRMENTSTEMPORARY FACILITIES AND CONTROLS
DIVISION 1SECTION 01500
GENERAL REQUIREMENTSTEMPORARY FACILITIES AND CONTROLS

PART 1: GENERAL

1.1 SUMMARY

A. Section Includes: Requirements for first aid, sanitary facilities, vehicular access, Hydrogen Sulfide (H2S), temporary barriers and controls, and project identification.

1.2 SUBMITTALS

A. Plugging Wells: Submit three copies of the implementation and termination schedule for each well; and three reports of tests, inspections, meter readings, and similar procedures performed on wells.

B. Spill Prevention Control and Countermeasure Plan (SPCC): Submit an SPCC Plan where the location of a construction site is such that oil from an accidental spillage could reasonably be expected to enter into or upon the navigable waters of the United States or adjoining shorelines, and the aggregate storage of oil at the site is over 1,320 gallons or a single container has a capacity in excess of 660 gallons. Submit the SPCC Plan to the Contracting Officer at least 30 days prior to delivery or storage of oil at the site. The Plan must have been reviewed and certified by a registered professional engineer in accordance with 40 CFR, part 112, as required by section 311 of the Clean Water Act (Public Law 92500 as amended).

C. Traffic Control Plan: Submit one (1) copy. Include the following topics:

1.The requirements for specific signs, signals, barricades, and flag persons.
2.Always provide for an unobstructed passageway for one line of traffic on smooth and dustless lanes through the construction operations.
3.Provide for convenient access to private residence and business driveways and buildings along line of work.
5.Provide for such guards as may be necessary to ensure against accidents and avoid damage or injury to passing traffic in areas where the nature of construction operations in progress and equipment and machinery in use pose a hazard.

D. First Aid Plans: Submit one (1) copy of plan for providing medical attention for injured or disabled employees, including onsite emergency facilities and ambulance service, before start of operations.

E. Hydrogen Sulfide Safety Plan: Submit one (1) copy of the plan for mitigating risks associated with Hydrogen Sulfide (H2S). Plan shall conform to Onshore Oil and Gas Order No. 6.

1.3 QUALITY ASSURANCE

A.Regulations: Comply with applicable local regulations for haul routes over public highways, roads, or bridges. Comply with industry standards and applicable laws and regulations of authorities having jurisdiction including, but not limited to the following:
1.Health and safety regulations.
2.Utility company regulations.
3.Police, fire department, and rescue squad rules.
4.Environmental protection regulations.
5.Prevention and control of water pollution.

1.4 PROJECT CONDITIONS

A. Access Routes: Rightsofway for access to work from existing roads will be established by the Contracting Officer. Use only established roadways, areas, and haul routes.

PART 2: PRODUCTS

2.1 UTILITIES

A. General: Electrical power, telephone, heat, and water are not available on the site and will not be provided by the Government.

2.2 TOILET UNITS

A. Temporary Toilet Units: Provide self-contained, single-occupant toilet units of the chemical, aerated recirculation, or combustion type. Provide units properly vented and fully enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material.

2.3 PROJECT IDENTIFICATION

A. Project Site Sign: Furnish and install a project sign which shall be in accordance with 43 CFR 3162.6 Well facility and identification. The name of the operator will be listed as “BLM”.

PART 3: EXECUTION

3.1 INSTALLATION

A.Toilets: Install self-contained toilet units specified in Part 2 of this specification section. Shield toilets to ensure privacy. Use of pit-type privies will not be permitted.
1.Provide toilet tissue, paper towels, paper cups, and similar disposable materials for each facility. Provide covered waste containers for used material.

B. First-Aid Facilities: Make first-aid facilities and services obvious and easily available for providing emergency aid to personnel on the site.

3.2 VEHICLE TRAFFIC CONTROL

A.Preparation: Provide, erect, and maintain all necessary traffic control devices, including traffic cones, delineators, concrete safety barriers, barricades, suitable and sufficient flasher lights, flag persons, danger signals, and signs, as specified on approved Traffic Control Plan and as required by the State and local authorities having jurisdiction. Take all necessary precautions for protection of the work and safety of the public on roads affected by the work during the contract period as construction work proceeds.
1.Do not start any construction work along public or private roads until the proper traffic control devices for warning, channeling, and providing safety for the motorists as specified on the approved traffic control plan are in place at the construction site.
2.Maintain the condition, operation, and effectiveness of all traffic control devices throughout their period of use. Remove all temporary traffic control devices when no longer needed.

3.4 HAUL ROUTES, ROADWAYS, PARKING AREAS, AND STORAGE/STAGING AREAS

A.Temporary Roadways and Haul Routes: Construct and maintain temporary roadways, bridges, culverts, and drainage structures required for access from public thoroughfares to serve construction area, of a width and loadbearing capacity to provide unimpeded traffic for construction purposes and to allow unimpeded surface drainage.
1.After their completion, the roadways constructed under the contract will be available for use by the public and by the Contractor in the Contractor's construction operations for the remaining work under the contract.
2.Temporary roadways and detours may be constructed, as approved by the Contracting Officer, provided that such roadways are removed prior to completion of the work and slopes are returned to prescribed lines and original appearance as approved by the Contracting Officer.

B. Storage/Staging Areas: The Contractor may utilize a temporary location area for equipment, and materials, as approved by the Contracting Officer. Fencing of materials or equipment shall not be required at this site; however, the Contractor shall be responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area.

C. Maintenance: Maintain haul routes, roadways, parking, and storage areas, in a sound, smooth condition. Maintain the surfacing of roads and areas until completion and acceptance of all the work under this contract. Maintain the surfacing of gravelsurfaced roads and areas in a smooth condition until completion and acceptance of all work under this contract. Snow removal for convenience of the Contractor or to facilitate work operations of the Contractor is considered normal required maintenance.

D. Repair: Promptly repair ruts, potholes, low areas with standing water, and other deficiencies to maintain road and parking area surfaces and drainage in original or specified condition.

E. Removal: Remove materials used to construct temporary roadways, areas, and haul routes prior to contract completion. Recycle all salvageable materials as approved by the Contracting Officer. Remove underground materials to a depth of three (3) feet cap per Onshore Oil and Gas Order No. 2. III.G.10, fill and regrade site as necessary.

3.5 AIR POLLUTION CONTROL

A.Requirements: Utilize such methods and devices as are reasonably available to prevent, control, and otherwise minimize atmospheric emissions or discharges of air contaminants.
1.Do not operate equipment and vehicles that show excessive emissions of exhaust gases until corrective repairs or adjustments reduce such emissions to acceptable levels.
2.Provide dust control and abatement during construction. Prevent, control, and abate dust pollution on rightsofway provided by Government or elsewhere during performance of work. Provide labor, equipment, and materials, and use efficient methods wherever and whenever required to prevent dust nuisance or damage to persons, property, or activities, including, but not limited to, crops, orchards, cultivated fields, wildlife habitats, dwellings and residences, agricultural activities, recreational activities, traffic, and similar conditions.
3.Provide means for eliminating atmospheric discharges of dust during mixing, handling, and storing of cement, pozzolan, and concrete aggregate.

3.6 LANDSCAPE PRESERVATION

A. Preservation: Preserve the natural landscape and preserve and protect existing vegetation not required or otherwise authorized to be removed. Conduct operations, to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the work. Move crews and equipment within the rightsofway and over routes provided for access to the work in a manner to prevent damage to grazing land, crops, or property.

B. Protection: Protect vegetation from damage or injury caused by construction operations, personnel, or equipment using protective barriers or other methods approved by the Contracting Officer.

C. Anchorage: Do not use trees for anchorages except in emergency cases or as approved by the Contracting Officer. For such use, wrap the trunk with a sufficient thickness of approved protective material before any rope, cable, or wire is placed.

3.7 MAINTENANCE AND REMOVAL

A. Maintenance: Maintain temporary structures, facilities, and controls as long as needed for safe and proper completion of the work and as directed by the Contracting Officer.

B. Removal: Remove temporary structures, facilities, and controls as rapidly as progress of the work will permit and as approved by the Contracting Officer.

3.8 PROTECTION

A. Barriers: Provide earthen embankments and similar barriers around excavation and subgrade construction, sufficient to prevent flooding by runoff from heavy rains.

3.9 CLEANUP

A. Requirements: Construction debris, waste materials, concrete, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away.

B. Restoration Area: Upon completion of the project and after removal of materials, and equipment from within the area. Restore areas used by the Contractor for the storage of equipment or material, and site, to the original or better condition. Remove gravel used to traverse grassed areas and restore the area to its original condition, including topsoil and seeding, as necessary.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: The work described in this section will not be measured for payment.

4.2 BASIS OF PAYMENT

A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.

END OF SECTION