This is a Request for Quotation (RFQ) for firm fixed-price commercial security patrol services at the Bureau of Land Management (BLM) Coos Bay District Office in North Bend, Oregon. The solicitation number is 140L4326Q0100, with an offer due date of August 21, 2026, at 2:00 PM Pacific Time. The contract is designated for Women-Owned Small Business (WOSB) entities under a 100% set-aside, with NAICS code 561612 and a size standard of $29 million. Award is anticipated for August 10, 2026.
The requirement consists of one-year base period (October 1, 2026 – September 30, 2027) plus four one-year option periods extending through September 30, 2031, for a potential five-year total contract duration. Services include twice-daily security patrols seven days per week between 7:00 PM and 5:00 AM, standby alarm call responses, and alarm response services. The contractor must provide all equipment (vehicles, uniforms, two-way radios, flashlights, and cellular phones), maintain properly functioning vehicles, ensure all personnel pass background investigations per Oregon security licensing standards, and comply with Service Contract Labor Standards wage requirements (Security Guard – GS 6 at $19.21 plus benefits). Pricing shall be submitted on the completed price schedule with unit prices for physical security services (12 months per period) and estimated alarm response calls. Quotations must be submitted electronically to tiffany_eslinger@ios.doi.gov in two parts: a non-price section demonstrating relevant experience on at least three similar projects completed as prime contractor within five years, and a price section. Award will be made to the responsible firm whose quote is most advantageous to the Government, considering relevant experience and price using the "best value continuum" approach.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L4326Q0100_Amd_0003.pdf | ||
| Sol_140L4326Q0100_Amd_0002.pdf | ||
| Amendment_0002_with_Attachments_0002.pdf | ||
| Sol_140L4326Q0100_Amd_0001.pdf | ||
| Amendment_0001_with_Attachments_0001.pdf | ||
| B03_WD_2015-5579_Rev_28.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140L4326Q0100
See Schedule See Schedule
BLM OR-ST OFC PROC MGMT BR(OR952)
1220 SW 3rd Avenue, 12th Floor
PORTLAND OR 97204
08/21/2026 1400 PD
0044055261
Tiffany Eslinger 5032312008
LHA 100.00
LHA
Tiffany Eslinger
561612
$29
08/10/2026
0011276611
ADMINISTERED BY:
BLM OR-ST OFC PROC MGMT BR(OR952)
1220 SW 3rd Avenue, 12th Floor
PORTLAND OR 97204 US
DELIVER TO:
BLM-OR COOS BAY DISTRICT OFFICE*
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
1300 AIRPORT LANE
NORTH BEND OR 97423-2000 US
Physical Security Services, Coos Bay District
BLM, North Bend, Oregon
Delivery: 09/30/2027
Period of Performance: 10/01/2026 to
09/30/2027
00010 Base Period: Security CBDO
Product/Service Code: R430
Product/Service Description: SUPPORT-
PROFESSIONAL: PHYSICAL SECURITY AND BADGING
00020 Option Period 1: Security CBDO
(Option Line Item)
Anticipated Exercise Date 09/01/2027
Product/Service Code: R430
Product/Service Description: SUPPORT-
PROFESSIONAL: PHYSICAL SECURITY AND BADGING
Period of Performance: 10/01/2027 to
09/30/2028
00030 Option Period 2: Security CBDO
(Option Line Item)
Anticipated Exercise Date 09/01/2028
Product/Service Code: R430
Product/Service Description: SUPPORT-
PROFESSIONAL: PHYSICAL SECURITY AND BADGING
Period of Performance: 10/01/2028 to
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140L4326Q0100
09/30/2029
00040 Option Period 3: Security CBDO
(Option Line Item)
Anticipated Exercise Date 09/01/2029
Product/Service Code: R430
Product/Service Description: SUPPORT-
PROFESSIONAL: PHYSICAL SECURITY AND BADGING
Period of Performance: 10/01/2029 to
09/30/2030
00050 Option Period 4: Security CBDO
(Option Line Item)
Anticipated Exercise Date 09/01/2030
Product/Service Code: R430
Product/Service Description: SUPPORT-
PROFESSIONAL: PHYSICAL SECURITY AND BADGING
Period of Performance: 10/01/2030 to
09/30/2031
Physical Security Services for CB District Office, North Bend, Oregon SOLICITATION NO. 140L4326Q0100 BLM Coos Bay District Page 4 of 27
SECTION B – SERVICES AND PRICES
This requirement is for one (1) Firm Fixed Price Commercial Service Contract for security patrol services at the Coos Bay District Bureau of Land Management (BLM) Office in North Bend, Oregon. The contract contains a one-year Base plus an additional four (4) one-year term options.
CLIN 0010: BASE PERIOD
Item no. Item Description Quantity Unit of
Measure Unit Price Total
0001 Physical Security Services – Twice a day, 365 days per year
12 MO $ $
0001A Standby Alarm Calls – Regular Rate
4* EA $ $
0001B Standby Alarm Calls – Holiday Rate
4* EA $ $
0001C Alarm Call Responses 4* EA $ $
Total – Base Period $
*Estimated Quantity MO = Month EA = Each
CLIN 0020: OPTION PERIOD ONE (1)
Option Line Item
Item no. Item Description Quantity Unit of Measure
Unit Price Total
0002 Physical Security Services – Twice a day, 365 days per year
12 MO $ $
0002A Standby Alarm Calls – Regular Rate
4* EA $ $
0002B Standby Alarm Calls – Holiday Rate
4* EA $ $
0002C Alarm Call Responses 4* EA $ $
Total – Option Period 1 $
*Estimated Quantity MO = Month EA = Each
Continued on next page.
BLM Coos Bay District Page 5 of 27
CLIN 0030: OPTION PERIOD TWO (2)
Option Line Item
Item no. Item Description Quantity Unit of Measure
Unit Price Total
0003 Physical Security Services – Twice a day, 365 days per year
12 MO $ $
0003A Standby Alarm Calls – Regular Rate
4* EA $ $
0003B Standby Alarm Calls – Holiday Rate
4* EA $ $
0003C Alarm Call Responses 4* EA $ $
Total – Option Period 2 $
*Estimated Quantity MO = Month EA = Each
CLIN 0040: OPTION PERIOD THREE (3)
Option Line Item
Item no. Item Description Quantity Unit of Measure
Unit Price Total
0004 Physical Security Services – Twice a day, 365 days per year
12 MO $ $
0004A Standby Alarm Calls – Regular Rate
4* EA $ $
0004B Standby Alarm Calls – Holiday Rate
4* EA $ $
0004C Alarm Call Responses 4* EA $ $
Total – Option Period 3 $
*Estimated Quantity MO = Month EA = Each
CLIN 0050: OPTION PERIOD FOUR (4)
Option Line Item
Item no. Item Description Quantity Unit of Measure
Unit Price Total
0005 Physical Security Services – Twice a day, 365 days per year
12 MO $ $
0005A Standby Alarm Calls – Regular Rate
4* EA $ $
0005B Standby Alarm Calls – Holiday Rate
4* EA $ $
0005C Alarm Call Responses 4* EA $ $
Total – Option Period 4 $
*Estimated Quantity MO = Month EA = Each
Continued on next page.
BLM Coos Bay District Page 6 of 27
Item no. Item Description Total 00010 Total Base Period $
00020 Total Option Period 1 $
00030 Total Option Period 2 $
00040 Total Option Period 3 $
00050 Total Option Period 4 $
Total – All Option Periods (1-4)
Grand Total – Base plus All Option Periods
(End of Section B)
BLM Coos Bay District Page 7 of 27
SECTION C – STATEMENT OF WORK
1.0 Introduction
The Bureau of Land Management/Coos Bay District Office in North Bend, Oregon has a requirement for Security Patrol Services. The Contractor shall furnish all labor, equipment, supervision, transportation, materials and training (except as specified herein as Government furnished), to provide patrol services at the following locations:
BLM Coos Bay District Office 1300 Airport Lane North Bend, OR 97459
The work shall be performed in accordance with this specification and the referenced documents set forth in these specifications.
2.0 Duties
2.1 Contractor shall provide security services as follows:
a) Per Price Schedule Item No.'s 0001, 0002, 0003, 0004, 0005, nightly Security Services shall include checks seven (7) days per week. Service checks shall include two checks nightly at varied times in accordance with the statement of work between the hours of 7:00 p.m. and 5:00 a.m., unless otherwise directed by Government POC. Patrol times shall be varied.
b) Per Price Schedule Item No.'s 0001A, 0002A, 0003A, 0004A, and 0005A, answer stand by calls (notifications from main security alarm company) for the office complex and multi-purpose buildings.
c) Per Price Schedule Item No.'s 0001B and C, 0002B and C, 0003B and C, 0004B and C, 0005B and C, answer standby calls and provide physical alarm response services, if required, from 7:00 p.m. to 5:00 a.m.
weekdays and 24 hours per day on Saturdays, Sundays, and Holidays.
d) Secure facility on alarm calls when necessary and file reports with Law Enforcement.
e) Service shall be provided seven (7) days a week.
f) Leave door tag in main office doors and warehouse door nightly.
a. Door tag shall contain, at a minimum, information pertinent to each of the nights’ security checks, as per industry standards.
g) Leave messages for the Government POC at the main office front door. Contactor will be shown exact location at the pre-work meeting.
2.2 Office Complex and Multi-Purpose Buildings
Check all office and multi-purpose building exterior doors to ensure they are closed and locked. This shall include the office trailer, all doors at the warehouse building and the rolling and walk-in gates. Check for any windows open at the office trailer. Walk perimeter of fence line and check for any down and/or cut fence openings.
If doors, windows or gates are found unsecured contractor shall secure them and note time and location. If fence is cut or down contractor shall call BLM contact as shown below.
3.3 Contact List for Office Complex
a) Immediate Threats – North Bend City Police and BLM Law Enforcement
BLM Coos Bay District Page 8 of 27
b) Office Building Concerns – Other than those shown above. Contact personnel on call list (provided upon award of contract).
c) Unknown Person In and Around Complex – Down or Cut Fence. Contact personnel on call list (provided upon award of contract).
4.0 Non-Performance of Work
Work shall be considered not to have been performed when any one of the following conditions exists:
a) The work tasks were not performed in strict accordance with the performance standards and procedures listed.
b) The specified training, equipment, tools or supervision were not provided or in good working condition.
c) Any or all tasks were not performed as scheduled.
d) The standards of conduct are not met.
5.0 Safety
The Contractor shall conform to applicable OSHA and State of Oregon standards. Any problems found to be of an unusual nature or that may cause a security problem shall be reported in accordance with the BLM Contact List supplied at the time of the pre-work conference.
6.0 Pre-Work Conference
The Contractor shall meet with the Government POC before commencing work under this contract for the purpose of reviewing the administrative and technical portions of the contract.
7.0 Contract Qualifications
All officers must pass background investigation in accordance with the standard hiring procedures of licensed security services in Oregon.
8.0 Contractor-Furnished Items
The Contractor shall provide all materials and equipment necessary for security personnel to perform the service.
The Government POC shall approve all materials for use at the pre-work meeting. Contractor supplied materials shall include, but are not limited to vehicles, uniforms, portable two-way radios, flashlights, and cellular phone.
9.0 Uniforms
The Contractor shall ensure that all officers always possess and wear an appropriate uniform. Uniforms shall consist of matching shirt and pants with a clearly discernable Contractor insignia and clearly marked foul weather gear as necessary. All uniform items shall be approved by the Government POC at the pre-work meeting. Uniforms shall be maintained in a neat and orderly manner.
10.0 Defensive Equipment
The Contractor shall insure that all officers possess and maintain defensive equipment while providing services under this contract. This equipment shall include but not be limited to heavy-duty primary flashlight and pocket
BLM Coos Bay District Page 9 of 27 notebook (or similar item for making notes). Officers must have all equipment in possession prior to the start of the shift and always maintain the equipment on their person.
11.0 Vehicles
The Contractor shall ensure that all officers employed under this contract shall operate properly maintained vehicles.
Each officer must have a vehicle provided for his/her use during the entirety of the shift. Vehicle shall be in good operating condition and properly marked with the company name or insignia and function (i.e. “Security”).
12.0 Government-Furnished Items
Government furnished materials shall include building key card and employee call list with phone numbers. The Contractor shall be accountable for all Government supplied equipment and shall maintain records of the distribution of equipment and/or employees with access to Government facilities.
13.0 Conduct
The Contractor shall be responsible for monitoring the conduct of all officers employed under this contract and shall insure that officers do not possess and are not under the influence of alcohol or any illegal drug, or under the influence of any prescription drugs that would interfere with the performance of duties. Officers employed under this contract shall be required to always comply with the following conditions: maintain a professional bearing, avoid socializing with the public, no personal calls or visits, no discussion of security arrangements other than with supervisors, the CO or Government POC. Failure to adhere to these conditions shall result in the immediate removal of the officer from this contract. Failure by the Contractor to monitor and adhere to the standards of conduct listed shall be considered grounds for deduction of payment or termination of the contract.
(End of Statement of Work)
(End of Section C)
BLM Coos Bay District Page 10 of 27
SECTION F – DELIVERIES OR PERFORMANCE
F.1.0 PERIOD OF PERFORMANCE
The contract shall commence from October 1, 2026 to September 30, 2027 for a period up to 5 years, if options are exercised.
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
F.3.0 STOP WORK ORDER
The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage.
Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either-
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in contract clause 52.212-4.
If a stop-work order is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work.
The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if-
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(End of Section F)
BLM Coos Bay District Page 11 of 27
SECTION G – CONTRACT ADMINISTRATION DATA
The following local clauses are provided in full text:
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)
(FEB 2021)
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.
The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice
1. Invoice billed according to contract line items and rates.
2. If partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(End of Section G) https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
BLM Coos Bay District Page 12 of 27
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1.0 ACCESS
In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.
H.2.0 WORK HOURS
Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.
H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK
H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.
H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.5.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
BLM Coos Bay District Page 13 of 27 the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.6.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR
1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
H.7.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:
• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
• USDA Biobased product listings published at www.biopreferred.gov.
• Energy Star® product listings published at www.energystar.gov/products.
• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements stated in the applicable clause(s):
• 52.223-1 Biobased Product Certification
• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts
• 52.223-4 Recovered Material Certification
• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items
H.8.0 RESTORATION OF RESOURCES
H.8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.
Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.
H.8.2 Site and Access Roads – Site and public or private access roads negligently damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.
H.9.0 UNAUTHORIZED PERSONNEL
http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories
BLM Coos Bay District Page 14 of 27
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
H.10.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.
The following clause is provided in full text:
SECURITY REQUIREMENTS: FACILITY ACCESS and INFORMATION TECHNOLOGY (August 2016)
(a) All Contractor employees must have an "Enter on Duty" (EOD) approval issued by the Bureau Personnel Security Office (PSO) before they begin performing work on any Bureau contract. The Contractor must ensure that all employees requesting an EOD are citizens of the United States of America, or an alien who has been lawfully admitted for permanent residence or employment (indicated by immigration status) as evidenced by Immigration and Naturalization Service documentation and the employee must have resided in the United States for a minimum of 3 years. The EOD may be issued in advance of a completed Background Investigation and may be rescinded by the PSO at any time. However, all contractors who require network access are required to complete the identity proofing process, and must be able to obtain a successfully adjudicated National Criminal History Check (NCHC) and National Agency Check with Inquiries (NACI) or higher to stay on the contract.
(b) Starting Work - Contractor employees with an approved EOD may begin performing unsupervised work on Bureau contracts. To remain on the contract, the Contractor employees will need a completed favorable Background Investigation.
(c) Rescission of EOD - The PSO may rescind the EOD at any time. This may occur as the result of additional information obtained or the final results of the background investigation.
(d) Background Investigation - Contractor employees who will have unsupervised access to Bureau facilities, access to the Department of the Interior (DOI) information technology (IT) systems or DOI data, or will develop custom applications, must have a favorably adjudicated background investigation from the Office of Personnel Management (OPM). Existing clearances at the same or higher level are acceptable upon the PSO’s review and approval. If the employee does not already have a complete investigation, they must apply for one. The employee may begin work with an EOD, but must receive a favorable background investigation to continue working on the contract. The background investigation includes obtaining fingerprints through a USAccess Credentialing Center for an FBI criminal history and a credit report. Once the investigation has been scheduled by OPM, the Bureau will receive advance reports. If those reports are favorable, the Bureau PSO will issue the EOD. The type of background investigation required is based on the risk/sensitivity level designation. Citizenship requirements and guidance for determining the appropriate type of background investigation required for the designated risk/sensitivity level are contained in DOI Departmental Manual (DM) Part 441. The DM is available on the Internet at http://elips.doi.gov/app_home/index.cfm?fuseaction=home.
(e) Electronic Questionnaire for Investigations Processing (e-QIP) – The Bureau uses the e-QIP for all background investigations or reinvestigations. To initiate an investigation, the Contractor, in collaboration with the COR, will complete an e-QIP Request Form. This request form is available through the COR. The COR will submit the completed request form to the Bureau PSO. The PSO will enter the information into e-QIP to either establish a new applicant profile or determine if an existing investigation that meets Bureau requirements is on file. The PSO will then contact the applicant to provide additional information and instructions. Generally, the Contractor is required to complete the following forms:
▪ e-QIP application (on-line)
▪ Fair Credit Release
▪ OF-306
▪ Fingerprints via USAccess Credentialing Centers
BLM Coos Bay District Page 15 of 27
The Contractor shall complete the required background investigation forms and submit them to the PSO. The PSO shall determine if individuals meet the required background investigation standards and citizenship requirements, and then make a suitability determination. Minimum standards used in suitability determinations are contained in the DOI Departmental Manual Part 441. The Government will pay for any background investigations required for contractor employees. If the Contractor employee’s background investigation is returned as unfavorable, the Government reserves the right to request reimbursement of the actual costs for the investigation from the Contractor.
(f) Reinvestigation - Contractor employees occupying high risk public trust positions must be reinvestigated every 5 years. A reinvestigation may be initiated prior to the normal periodic reinvestigation schedule when an individual’s continued ability to meet the minimum background investigation standards is in question. The electronic fingerprints on file in the USAccess system will be electronically submitted to OPM for the reinvestigation. The PSO shall review the records and documentation and make the suitability determination.
(g) Disputes - In the event of a disagreement between the Contractor and the Government concerning the suitability of a particular employee to perform work under this contract, the Government has the right of final determination. Determinations under this requirement are subject to the Disputes Clause, FAR 52.233-1. Failure of the Contractor to comply with the requirements of this clause could constitute grounds for termination for default.
(h) Physical Security Requirements - DOI Access Cards.
(1) Contractor employees must have a DOI Access Card before being given unsupervised access to a Government facility.
(2) To gain unsupervised access to Government facilities, Contractor employees must present their
DOI Access Card for examination by the security guard or electronically authenticate their DOI Access Card, as required. Contractor employees must keep their DOI Access Card in a shielded card holder, and visually display the card at all times while in the facility. Refusal or repeated neglect to display the DOI Access Card may result in limiting Contractor employee’s access to Government facilities or revoking of authorized access.
(3) When a Contractor employee is no longer working under this award, the Contractor is responsible for returning all DOI Access Cards, keys, and other Government property issued to that employee. The Contactor shall coordinate all returns with the COR. The COR is responsible for ensuring the Contractor complies with these requirements. However, failure by the Contractor to comply with these requirements may result in the Contractor’s liability for all costs associated with correcting any resultant breech in building security.
(i) Issuance & Maintenance - DOI Access Cards
(1) Process: To obtain a DOI Access Card the COR will use the online DOIAccess System to initiate the access request. Contractor employees will receive email notificat ions to enroll at a USAccess Credentialing Center with two forms of identification, and after adjudication, a second email notification to pick up and activate their DOI Access Card. The Contractor employee shall schedule an enrollment appointment at a USAccess center at least two weeks prior to the targeted EOD.
(2) Contractor Responsibilities: Contractor employees must complete actions in a timely manner to prepare for on-boarding and access to DOI network resources. The Contractor shall allow their personnel sufficient time to schedule and attend an enrollment appointment at the USAccess center prior to the contract start date. If the Contractor employee’s DOI Access Card becomes lost or stolen, the contractor employee shall notify the COR immediately to request a new DOI Access Card.
(3) COR Responsibilities: The COR (or designated individual) and Contractor shall maintain a listing of all Contractor employees who received a DOI Access Card, the date the card was issued, the date the electronic certificates expire (3 years from issue date), and the date the DOI Access Card expires (5 years from issue date). If the Contractor employee’s DOI Access Card or certificates will expire before the contract is completed, the COR (or designated individual) and Contractor is responsible for ensuring that the Contractor employee visits a USAccess center to update certificates on the existing card or obtain a new DOI Access Card. No later than one week prior to the DOI Access Card’s certificate or card expiration, the COR (or designated individual) shall notify the Contractor that DOI Access Card actions are required. The COR (or designated individual) and the Contractor shall update their listing to reflect the new issue date, certificate expiration date and card expiration date.
(j) Information Technology Security Requirements.
(1) Training – If contractor employees require access to any DOI/IT systems, the Contractor shall ensure its employees complete all Bureau/DOI required IT security training. The Contractor’s employees shall complete this training before being granted access to Bureau/DOI data or being issued network access. The current training requirements are: (i) annual end-user IT Security Awareness, (ii) annual IT Resources Rules of Behavior, and (iii) annual Role-Based Security training for IT professionals. The Contractor shall comply with all Bureau/DOI IT security training requirements in effect during contract performance. The COR will notify the Contractor of all Bureau mandatory IT training. The Contractor shall submit training completion certificates to the COR for all
BLM Coos Bay District Page 16 of 27 required training. Failure to meet this training requirement may result in removal of the contractor employee from the contract. The Bureau will determine if the contractor can later return to the contract.
(2) Access to Contractor’s Facilities for IT audit purposes - The Contractor shall afford Bureau and the Department of the Interior Office of Inspector General access to the Contractor’s and subcontractors’ facilities, installations, operations, documentation, databases, and personnel used in performance of the contract.
Access shall be provided to the extent required to carry out a program of IT inspection, investigation, and audit that will safeguard against threats and hazards to the integrity, availability, and confidentiality of Government data or to the function of computer systems operated on behalf of the Government and to preserve evidence of computer crime. If the Contractor questions the Government employee’s right to access its facilities, it should contact the CO for resolution.
(3) Contractor Location - Custom software development and outsourced operations shall be located in the United States to the maximum extent practical. If such services are proposed to be performed abroad, the Contractor shall provide an acceptable security plan that addresses the mitigation of problems related to communication, control, and protecting the confidentiality, integrity, and availability of IT systems and information.
(4) Applicable Standards - The Contractor shall follow all applicable Federal, DOI, and Bureau Bulletins, Directives, Guidelines, Manuals, Processing Standards, Memoranda, Policies and Standards; applicable OMB Memoranda; and all current National Institute of Standards & Technology (NIST) Special Publications. To comply with Federal Acquisition Regulation Subpart 39.101(d), contractors shall use the common security configurations available from the NIST website at http://checklists.nist.gov. NIST documents are available on the internet at http://csrc.nist.gov/publications/PubsSPs.html. OMB memoranda are available on the internet at http://www.whitehouse.gov/omb/memoranda/. The Contractor shall request copies of DOI and Bureau documents by contacting the COR.
(5) Incident Reporting - The Contractor shall immediately report computer security incidents affecting Bureau/DOI data and systems in accordance with the Bureau Computer Incident Response policy. The Contractor shall request copies of the Bureau Computer Incident Response policy by contacting the COR.
(6) Assessment and Authorization (A&A) and Continuous Monitoring.– The Contractor shall comply with Bureau policy when developing, upgrading, modifying or supporting applications and/or systems that require A&A and Continuous Monitoring. The Contractor shall request copies of Bureau A&A policy by contacting the COR. The A&A requirement does not apply when the Contractor's employees merely access data or have "read only" access.
(k) Documentation - The Contractor shall document all work performed and ensure that the appropriate Assessment and Authorization (A&A) documents are updated to reflect the work performed and the current state of Bureau systems and networks. The Documentation requirement does not apply when the Contractor's employees merely access data or have "read only" access.
(l) Personnel Changes, Contractor Request - The Contractor shall immediately notify the COR and PSO when an employee is reassigned or leaves the Contractor’s employment and prior to any termination. The Contractor must adhere to the Bureau or Office’s mandatory exit clearance procedure. Once the COR has been notified that a Contractor employee is leaving the contract, the COR will initiate the exit clearance process in the DOIAccess System and forward to the Contractor the necessary instructions and form required to be completed prior to the contractor's employee’s departure. This form must be completed by the Contractor's employee and signed by both the Contractor's employee and the COR and then forwarded to the bureau/office specific program responsible for employee, volunteer, and contractor departures.
(m) Personnel Removal, Government Request - The Government retains the right to direct the Contractor to remove any prime or subcontractor personnel, regardless of prior clearance or background investigation adjudication status, whose actions, while assigned to this contract, clearly conflict with the security interests of the Government. The justification for the Government’s direction to remove Contractor personnel will be documented and provided to the Contractor by the CO.
(n) Subcontract Inclusion - The requirements of this clause must be incorporated into any subcontract if the subcontractor’s employee must have access to Bureau facilities.
(End of clause)
BLM Coos Bay District Page 17 of 27
FIRE REQUIREMENTS PROCEDURES OUTLINE
This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.
1. CLOSED FIRE SEASON
The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.
Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:
• Fire tools must be on site;
• Fire extinguisher must be in all vehicles;
• Chainsaws must have a .023-inch mesh screen installed in the exhaust;
• Only unmodified saws are to be used in the forest;
• Approved spark arresters must be on all internal combustion engines;
• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;
• No smoking is permitted while working or traveling through any operations area in the forest;
• No use of explosives is permitted unless approved by the State Forester's representative;
• Permits to burn are required unless waived by a representative of the State Forester.
• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).
Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.
2. FIRE PRECAUTION LEVELS
There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.
It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.
Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.
Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.
From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.
shutdown will be evaluated on a site-by-site basis.
Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.
Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.
ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.
BLM Coos Bay District Page 18 of 27
OAR. 629-43-030 requires watchmen to be:
• Physically capable and experienced in operating any firefighting equipment on site.
• On duty for 3 hours after the shutdown of the last power-driven equipment for the day.
• Furnished adequate facilities for transportation and communications in order to summon assistance if needed.
• Patrolling and visually inspecting all sites where work was done during the day.
3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON
The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.
NUMBER OF PERSONNEL_______________________________
1- 4 5 6 7 8 9 10 11 12 13 14
KIND OF TOOLS NUMBER OF TOOLS REQUIRED_________________________
Pulaskis 1 1 1 1 1 1 2 2 2 2 2
Shovels 2 2 2 3 3 3 3 4 4 5 5
Hazel hoes 1 2 3 3 4 5 5 5 6 6 6
In addition to the above handtools, the operator/contractor must provide a backpack pump can filled with water located with the tool box in a readily available area.
All shovels are to be size 0 or larger, long handled. All tools shall be sharp and ready for service. Fire extinguishers as follows:
For chainsaws - 8 oz. capacity by weight.
For vehicles - UL rating of at least 4 BC.
4. ADDITIONAL WATER SUPPLY
Contractor shall comply with ORS 477.615 during fire season when inside or within one-eighth of one mile of a state forest protection district and furnish additional water supply and equipment for use in fire suppression in conformity with the rules promulgated by the Oregon State Forester, when directed by the Oregon State Forester in writing. When required, all water supply and equipment components shall be maintained and ready for immediate use.
During fire season when operating a stationary internal combustion engine inside or within one eighth of one mile of a state forest protection district, Contractor shall comply with ORS 477.650 and provide a water supply, with equipment for its use in fire suppression for each engine, in conformity with the rules promulgated by the Oregon State Forester. All water supply and equipment components shall be maintained and ready for immediate use.
(End of Special Contract Requirements)
BLM Coos Bay District Page 19 of 27
SECTION I – CONTRACT CLAUSES
The following clauses are incorporated by reference:
Number Date Title 52.212-4 Mar-26 Terms and Conditions—Commercial Products and Commercial Services 52.203-17 Nov-23 Contractor Employee Whistleblower Rights 52.203-19 Jan-17 Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements 52.204-9 Jan-11 Personal Identity Verification of Contractor Personnel 52.204-13 Mar-26 System for Award Management—Maintenance 52.209-6 Jan-25 Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment 52.209-10 Nov-15 Prohibition on Contracting with Inverted Domestic Corporations 52.219-6 Jan-26 Notice of Total Small Business Set-Aside 52.222-3 Jul-03 Convict Labor 52.222-19 Mar-26 Child Labor—Cooperation with Authorities and Remedies 52.222-36 Jun-20 Equal Opportunity for Workers with Disabilities 52.222-41 Aug-18 Service Contract Labor Standards 52.222-42 May-14 Statement of Equivalent Rates for Federal Hires 52.222-43 Aug-18 Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (Multiple Year and Option Contracts) 52.222-50 Oct-25 Combating Trafficking in Persons…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .