EO 14398 - This requirement is for support service
Solicitation number
140G0326Q0184
Issued by

About this file

This is a Request for Quotation (RFQ) for a firm fixed-price, single-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract for seismic station site infrastructure construction and modernization services throughout California over a five-year period.

The U.S. Geological Survey (USGS), Earthquake Science Center seeks a contractor to construct and upgrade geophysical monitoring stations that contribute to ShakeAlert Earthquake Early Warning systems, National Volcano Early Warning systems, and induced seismicity hazard monitoring. The project encompasses three seismic station types: (1) construction of standard stations including equipment vaults, DC power systems with solar arrays, grounding systems, telemetry infrastructure, and drainage systems; (2) standard station construction with shallow postholes; and (3) posthole and vault installation at existing stations. Work includes demolition, excavation, concrete installation, electrical work (DC and solar systems), general construction, and site restoration. The contract minimum guarantee is $120,000.00 over the five-year ordering period (estimated October 1, 2026 through September 30, 2031), with a maximum contract value not to exceed $2,000,000.00. Initial task orders totaling the minimum will be awarded concurrently with contract award. This opportunity is set aside for small business contractors. The RFQ follows FAR Part 12 (Commercial Products/Services) and FAR Part 36 (Construction). Sealed offers are due September 2, 2026 at 12:00 PM Eastern Time. Responses must include a signed SF 1442 form, firm fixed-price quotes for each seismic station type with annual pricing for the five-year period, evaluation documentation, and RSVP confirmation for the August 24, 2026 site visit in Berkeley, California. Award decisions will be made using a trade-off evaluation considering technical capability (most important), past performance, and price. Construction wage requirements (prevailing wage/Davis-Bacon Act) apply. The contracting officer is Victor Nuno (victor_nuno@ios.doi.gov, 916-278-9442).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140G0326Q0184

USGS OAG SACRAMENTO ACQUISITION BR.

MODOC HALL, CSUS

3020 STATE UNIVERSITY DRIVE EAST

SACRAMENTO CA 95819-6027

0044037933

GSB

Victor Nuno 916-278-9442

08/18/2026

09/02/2026

10 365

1 62

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

USGS OAG SACRAMENTO ACQUISITION BR.

MODOC HALL, CSUS

3020 STATE UNIVERSITY DRIVE EAST

SACRAMENTO CA 95819-6027

GSB

Victor Nuno

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

Single Award Indefinite Delivery, Indefinite

Quantity (IDIQ) Contract for seismic station site infrastructure construction and modernization with 5-year ordering period.

This procurement follows the procedures outlined in RFO FAR Part 12, Acquisition of

Commercial Products and Commercial Services, and RFO FAR Part 36 - Construction and

Architect-Engineer Contracts.

This is a solicitation for a firm fixed price indefinite delivery-indefinite quantity (ID/IQ) contract for seismic station site construction and modernization throughout a five-year period. Services performed will be ordered as specified in each task order with pricing as specified in the contract. The Government shall place the first order totaling the minimum of

$120,000.00 over the full term of the contract, concurrent with the issuance of the Basic

Contract. The maximum quantity for the full term of the contact shall not exceed

$2,000,000.00. This maximum quantity is not a representative to an offeror or contractor that the maximum quantity will be required or ordered or that conditions affecting task orders will be stable or normal. The initial task order under this contract will fulfill the minimum quantity requirement and will be awarded concurrently with the award of this contract. Under terms of this contract, the

Government shall place orders totaling a minimum of $120,000.00 over the ordering period of the Contract.

The five-year ordering period (currently estimated as 10/01/2026 through 09/30/2031) may be adjusted based on the actual award date of the contract to permit an ensuing five-year ordering period. All dates in this document referring to the above five-year period will be adjusted accordingly at contract award.

The contract will be structured to allow for task orders against the resultant IDIQ contract to be fixed-price. Firm fixed-price delivery orders issued will be based upon the fixed

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) price for each seismic station type.

Contractor shall provide equipment, materials and labor in accordance with the attached

Statement of Work or otherwise described in individual Task Orders.

NAICS:238190 Other Foundation, Structure, and

Building Exterior Contractors

PSC Code: Y1PZ, Construction of Other

Non-Building Facilities

This opportunity is set aside for small business.

Evaluation criteria: trade-off.

Construction Wage Requirements Statute

(prevailing wage, formerly Davis-Bacon Act) will apply.

Your company must be registered and active in

System for Award Management (www.sam.gov) at time of proposal submission. Please submit

Unique Entity Identification (UEI) number with your quote.

Your submission shall include the following:

1.Signed SF 1442 form filled in with firm information, person signing, and date on Block

30a-c.

2.Firm, fixed price quote for each seismic station type and 5-year ordering period by completing the attached Schedule of Pricing.

Each year shall be individually priced in a clear and concise format.

3.Submit documentation sufficient for the

Government to evaluate your quotation in accordance with the evaluation factors identified in this solicitation.

4.RSVP site visit by the required due date.

Questions are due in writing to victor_nuno@ios.doi.gov by August 26th 12:00 PM

Eastern Time.

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

Responses are due by September 2, 2026, 12:00

PM Eastern Time.

Period of Performance: 10/01/2026 to

09/30/2031

00010 NEW 5-YEAR IDIQ SEISMIC STATION CONSTRUCTION

Product/Service Code: Y1PZ

Product/Service Description: CONSTRUCTION OF

OTHER NON-BUILDING FACILITIES

Direct questions pertaining to this

RFQ to: Victor Nuno

Contracting Officer victor_nuno@ios.doi.gov

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

Statement of Work Seismic Station Infrastructure Construction

Project Summary The U.S. Geological Survey (USGS), Earthquake Science Center (ESC) has a requirement for a contractor to build the site infrastructure for geophysical monitoring stations throughout California that will contribute critical earthquake data to ShakeAlert Earthquake Early Warning systems, National Volcano Early Warning systems, Induced Seismicity hazard monitoring systems, and other similar life-safety geophysical monitoring systems. Initially, fifteen seismic stations in Northern California used to monitor the Mount Shasta, Lassen National Park, and Long Valley Caldera volcanic areas will be upgraded. Another fifteen seismic stations supporting ShakeAlert will be either built or upgraded, plus another nine seismic stations will have wildfire mitigation construction undertaken to improve station resiliency. Beyond these seismic stations, additional similar construction is anticipated at other locations within California within the 5-year period of this contract. The project scope includes the installation of equipment vaults, DC power system (including solar array), grounding system, telemetry infrastructure, and drainage system that comprises a seismic station. Skills necessary include demolition, excavation, concrete, electrical (specifically DC and solar), general construction, and landscaping/site restoration. The sites listed in this document are representative and subject to change based on funding and permit availability.

Scope The project scope consists of three seismic station types:

1. Construction of the “standard” seismic station which includes the installation of the equipment vaults, DC power system (including solar array), grounding system, telemetry infrastructure, and drainage system that comprises a seismic station.

2. Construction of the standard station in #1, with the addition of a shallow posthole.

3. Construction of a posthole and vault only at an existing station.

The contractor will provide firm-fixed pricing for each of the first 3 seismic station types.

Appendix A.1 is the master list of the first 15 sites that will be constructed over 3 years (about 5/yr). Appendix A.2 is a map of the 15 sites, showing the geographical scope of the project. USGS reserves the right to change Appendix A.1 within the general scope of this effort in terms of geography and work requirements. Selection of sites to be built depends on acquisition of permits and

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184 access issues which are currently being worked on by the USGS. Appendices B.1-B.12 are schematic diagrams of the first three different elements.

This will be an IDIQ contract. The contractor will schedule work in conjunction with the USGS POC.

Notes and Responsibilities

1) [Schedule] The Infrastructure Contractor shall provide the USGS with a timeline of work to be completed and regular updates on progress throughout the project.

2) [Transportation] The Infrastructure Contractor shall provide transportation to and from the job site for personnel, materials, equipment needed for fabrication, drilling and installation, and debris disposal.

3) [Purchasing] The Infrastructure Contractor will provide all the needed parts for installation of seismic stations. The USGS provides the Infrastructure Contractor with a parts list and construction diagrams in the Appendices. Some additional materials will be needed for site completion that will not be explicitly listed on the parts list, such as nuts and bolts, zip ties, etc. The contract must adhere to the specific part numbers for items in the Bill of Materials; if the contractor cannot find the specific part, notify the USGS lead to discuss alternatives.

The USGS will provide the following items: solar pipe mounts (not antenna pipes), battery/radio enclosures, instrument enclosures, “Do Not Disturb” stickers, and GPS antenna. It is the Infrastructure Contractor’s responsibility to pick these items up at the USGS warehouse in Moffett Field or bring them with them to the job site. The Infrastructure Contractor will also need to provide the equipment needed to drill 1-3 meter depth postholes.

4) [Hardware] All nuts, bolts, screws, and associated hardware shall be either stainless steel or galvanized. If not specified, check with USGS lead.

5) [Training] All laborers must visit a seismic station with USGS staff to develop an understanding of what is required to install a seismic station. Additionally, any other required training must be completed before arriving at applicable sites.

6) [Crew contact] Each crew must declare a lead contact. It will be the lead contact's responsibility to coordinate with USGS staff and relay any scheduling, site information, etc. to all laborers on the crew. The lead contact must be on-site at all times during installation. The lead contact must possess and regularly consult the Scope of Work and Installation Guidelines documents. The lead contact must not be the employer.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

7) [Scheduling] Crew contacts and general contractors will work with USGS staff to plan installation schedules. Installation work will be scheduled regionally when possible to promote efficiency. One USGS personnel shall be onsite during the installations to provide guidance to the contracting crew. Communication between the lead contact and USGS staff will be needed to coordinate this arrangement.

8) [Work Hours] Some sites may have restrictions imposed by the landowner that limit work hours.

9) [Equipment checklist] Each crew must develop an appropriate equipment checklist and provide USGS staff with copies before the commencement of work. Before departing for installation work, the crew must review their equipment checklist to ensure sufficient supply. If a crew arrives at a site with insufficient supplies all crewmembers must clean-up appropriately, leave the site, and prepare to return at a later date.

10) [Overnight Storage of Materials and Equipment] Crews shall check with the USGS lead for each site to determine what materials, equipment, and vehicles can be left overnight at the site. For sites on public lands, overnight storage is not recommended.

11) [Site meet] For each crew’s first visit to their first and second site, they must meet a USGS staff member at a predetermined off-site location to discuss site rules and access. They will follow USGS staff to the site and then discuss the site layout and duties when on site.

No parties may access a site their first time without first participating in a site meet. After the first 2 joint site visits, the USGS Lead will decide if further site training is necessary. If no more joint site visits are deemed necessary, then the Infrastructure Contractor will be responsible for their actions while accessing the next sites. The USGS Lead should be consulted to ensure access has been granted by the landowner.

12) [Site Access Rules] When the contractor reaches the point at which they enter private property, several rules must be followed while working on the premises. Be aware that additional rules may be required by the landowner (see Appendix A.1, Special Considerations).

a. When required, make sure the USGS Lead contacts the landowner or manager 24 hours prior to entering their property.

b. Enter and exit the property by the same route every time. Do not wander off course.

c. Always leave gates as you find them, unless instructed to do otherwise. For example, if a gate is locked when you arrive, lock it behind you.

d. Use 4WD on unimproved dirt roads at all times, if available.

e. Do not drive on unimproved dirt roads within 24 hours of 0.1” of rain or more.

f. All vehicle drivers must have valid state drivers’ licenses.

13) [Environmental]

a. If at any time while working on the site the contractor digs up or discovers any foreign objects, work at the job site must stop immediately and the contractor must call the USGS lead. Foreign objects include bones, artifacts, historical items, buried pipes or wires, evidence of a historical site, and any other similar items.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

b. Any piece of equipment the contractor brings to the work site should be as devoid as possible of foreign materials (e.g. dirt from another project) or possible invasive species (e.g. plants stuck to the undercarriage of a truck). Remove those items before arriving on the property and remove new debris before leaving the property.

14) [Remove existing infrastructure] Unless instructed otherwise, for construction of sites with new “basic” NCSN site infrastructure or new “basic” site infrastructure plus a shallow posthole, pull up old vault(s); remove antenna mount(s); remove all cabling; dispose of all materials and trash except the following items: VCO, radio transmitter, sum amp, and sensor (with cable—do not cut the cable). Return these items to USGS when convenient. Restore the area to a natural state that closely mimics the current conditions. The site list (Appendix A.1) shows which stations may require removal of old equipment. Details can be provided at site walk through.

15) [Site preparation] USGS staff will mark locations of battery/radio and instrument enclosures prior to or the day of the contractor’s first visit. Contractor shall notify Underground Service Alert as necessary. USGS will also mark the location of any other unusual site features, such as trees and plants to avoid, and/or additional components to install, such as fencing.

16) [Safety]

a. BE FIRE CONSCIOUS. Wildfires can easily be started any time of year. The Infrastructure Contractor crew shall have available at least two (2) fire extinguishers at all times and all crew members shall know where they are and how to use them.

b. Absolutely NO smoking while on site unless you are inside your vehicle. Cigarette butts must be extinguished and stored within the vehicle.

c. Use all appropriate Personal Protective Equipment and safety practices at the job site. As mentioned, the underground vaults are confined spaces. Special PPE should be used when entering and working inside the vaults.

d. Do not disturb the wildlife and plant life (outside of the site footprint) while on private property. Do not disturb grazing animals.

e. WILDFIRES. The USGS safety protocols call for field operations to cease when fire approaches within 15 miles of a worksite. USGS staff will cease field work when the AQI exceeds 200.

17) [Documentation] Photograph all specified installation actions (see “Infrastructure Contractor Checklist” for a complete list), particularly including conduit trench, ground ring, and concrete forms (before concrete is poured). Where depth or length is specified, photograph measuring tape showing required measurement.

18) [Excavation] Some sites may not allow for heavy equipment and may require all excavation be done by hand. Consult site list in Appendix A.1 for site-specific requirements.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

19) [Finish] Ensure site is free of trash, microtrash, debris, rubble or other foreign or objectionable material. Rake area to level out any ruts or berms and restore a natural appearance to the site.

Work requirements

1) Preparation

a) Remove weeds, grass, and small brush (up to 5 ft tall and diameter) from the footprint of the new or upgraded site.

b) Unless otherwise instructed, remove and properly dispose of all existing seismic infrastructure at the work site. Consult with the USGS lead to understand if there are any portions of the existing site to not remove.

c) It is the infrastructure contractor’s responsibility to contact Underground Service Alert if required.

2) Construction The infrastructure consists of six main components: battery/radio enclosure; instrument enclosure; DC power system (including solar panel(s), solar mounting brackets, solar controllers, batteries, surge protection device (SPD), and associated cabling); grounding system (including ground rod, ground wires, bus bars, and a ground ring); telemetry system (including antenna, coaxial cables, and SPD); and drainage system.

The enclosures shall be placed according to locations marked by the USGS lead prior to installation.

a) [Battery/Radio Enclosure]

i. Dig an appropriately sized hole to fit a 2”x6” concrete form with a nominally flat bottom. The top of the battery/radio enclosure form should be level in all directions and sits at grade. The orientation of the rectangular hole should have the side with the solar/antenna pipe oriented roughly east-west, thus facing south.

ii. Use one steel mesh reinforcing mat. Center the mat top to bottom and side to side in the form, making sure that nowhere the steel extends to daylight.

iii. Use a reproducible template/jig to set bolts in place at specified points (See Appendix B.4). These bolts will be used to attach the enclosure and solar mounts.

iv. Pour concrete. Use a high-early-strength concrete such as Quikrete5000.

v. Use a trowel to smooth and flatten the top of the concrete.

vi. Let cure overnight (minimum 12 hours) before removing the forms and continuing work around the enclosure.

vii. Bolt the enclosure to the concrete pad.

viii. Install conduit connectors and conduit to the outside of the box.

ix. Install foam insulation.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

x. Install latches and locks and apply a “Do Not Disturb” sticker.

b) [Instrument Enclosure]

i. Dig an appropriately sized hole to fit a 2x6 concrete form with a nominally flat bottom. The top of the enclosure form should be level in all directions and sits approximately 16-20” below grade. The orientation of this hole is not critical and can be oriented in whatever direction is most convenient. However, with this hole it is critical for the bottom of the hole to be undisturbed and not contain any loose soil. We recommend digging the last several inches by hand if possible, to avoid disturbing the bottom of the hole. Remove any loose soil so that coupling between the concrete and dirt/rock is optimal.

ii. Dig additional holes, proceed with a or b, depending on whether a posthole is required:

a) At Basic NCSN sites (with no posthole), at each inside corner of the main hole, dig an additional 6” diameter hole (“pier”), 10” deep (total of 4 more holes). For 2’x3’ instrument enclosure only.

b) At sites with postholes: Posthole to be centered within the concrete pad and instrument enclosure. If bedrock is present within the first half meter of the surface, the posthole must be a minimum depth of one meter. If bedrock is reached between 0.5 and 3 meters depth, the posthole must extend into the bedrock a minimum of 0.5 meters. If no bedrock is present, posthole depth will be the maximum of 3 meters. The posthole shall be 10” in diameter. Ensure that the 6” PVC casing is set to +/-1° of 90° vertical. PVC should extend above the concrete pad 6-8”. Once the PVC is set to vertical, the PVC should be grouted into place. When the grout is set, the contractor may continue onto the pouring of the concrete pad.

iii. Use one steel mesh reinforcing mat. Center the mat top to bottom and side to side in the form, making sure that nowhere the steel extends to daylight. Using bailing wire, tie on 8” long J-bolts (or bent rebar) to the mesh such that the J-bolt dangles freely in the pier hole (see Appendix B.5).

iv. Photograph the hole such that the USGS lead can sign off for compliance.

v. Pour concrete up to the level of the steel mesh. Use a high-early-strength concrete such as Quikrete5000. Make sure the concrete fills the piers and that the reinforcing J-bolt sits such that it is not touching the edges of the pier holes. The water-to-concrete mix is particularly important for this enclosure. Cracking (after curing) is not acceptable.

vi. Carefully set enclosure on steel mesh and concrete making sure it is centered in concrete forms and that the top is level.

vii. Continue pouring concrete until the form is filled. Make sure the inside is at the same level as the outside.

viii. Use a trowel to smooth and flatten the top of the concrete. The inside should be particularly smooth and level.

ix. Let cure sufficiently before removing the forms and continuing work around the enclosure.

x. See Appendix B.6, D.6, and D.7 for special instrument enclosure/shallow borehole instructions.

xi. Install foam insulation.

xii. Install latches and locks and apply a “Do Not Disturb” sticker.

c) [DC Power System]

i. Install the powder-coated 3” pipe to the Battery/Radio Enclosure concrete pad. This pipe holds the solar panels and radio antenna as described in Appendices B.8.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

ii. Mount the solar panel(s) to the pipe. Point the solar array due south (within +/- 3 degrees) with an angle of [latitude + 15] degrees up from horizontal (see figure below).

iii. Install and secure ½” Electriflex Type-LA conduit from the solar panel junction box(es) to the battery/radio enclosure. Secure conduit to the pipe mounts using stainless steel hose clamps at a minimum of 18” intervals. Use ½” conduit to connect solar panel junction boxes if more than one solar panel is called for.

iv. Dig a 12” deep trench in as straight a line as possible between the two enclosures. Install 1.5” Electriflex Type-LA conduit in the trench.

v. Install conduit connectors and conduit to the outside of the box. All conduit connections to the enclosures shall be made at least 3” above grade (in the Instrument Enclosure, that usually means the connection is just below the lid). Backfill the trench with native soil and compact with feet or a tamping tool.

vi. Run 2-conductor cable, LMR-240 coax (GPS), Cat 6, and 6AWG ground wire through the conduit between the Battery/Radio Enclosure and the Instrument Enclosure. The cable should be long enough to leave 6’ extra in both enclosures. Coil the ends and tape up the cut ends using Super 33+ electrical tape to protect the ends.

vii. Install Nixalite bird deterrent spike strip to the top of the top-most solar panel.

viii. Clean glass on solar panel(s).

d) [Grounding System]

i. Install bus bars in both the Battery/Radio Enclosure and in the instrument enclosure as specified in the Grounding System

Detail diagram from Appendix B.10.

ii. Dig a minimum 12” deep trench around battery/radio enclosure foundation (may use space created when removing concrete forms). Install a 2AWG tinned copper ground wire ring around the enclosure. Exothermically weld both ends to the ground rod. Backfill trench with native soil and compact.

iii. Drive an 8-foot, 5/8” ground rod into the ground within 2 feet of the battery/radio enclosure and exothermically weld it to the ground ring. If the ground rod cannot be driven vertically, it can be driven in at an angle of no more than 45 deg. from vertical. DO NOT CUT ground rod. If ground rod cannot be driven in completely, drive ground rod to refusal, then dig a

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

12” deep trench adjacent to it and bend the ground rod into an “L” and place the horizontal section in the trench. Then, exothermically weld the horizontal end of the ground rod to the ground ring.

iv. Install other grounding components and make electrical connections as per Appendix B.10. All ground wires shall have a green insulating jacket (except for ground ring).

e) [Telemetry System]

i. Antenna mounting:

1. For yagi-style antennas, with azimuth between 276 and 84 (northern semicircle):

a. Install a 3” to 1.5” pipe reducer to the top of the threaded solar pipe.

b. Install a 2ft long pipe (1.5” galvanized) to the pipe reducer. Tighten with a pipe wrench. Add a 1.5” fence pipe cap to the top of the pipe.

c. Mount antenna to the top of the pipe mount, horizontally polarized. Ensure that no antenna element is directly above the solar panel(s).

d. Align the antenna to the listed azimuth (Appendix A.2). Do not overtighten the stainless steel U-bolts.

2. For yagi-style antennas, with azimuth between 85 and 275 (southern semicircle)

a. Install an offset antenna mount to the solar pipe (see Appendix B.7).

b. For 900MHz-style antennas, install a pipe (1.5” x 3’ galvanized steel pipe) to the end of the offset mount. Make sure the pipe extends to at least 1ft above the top of the solar pipe.

c. For 165MHz-style antennas, the solar array will have to be installed in a higher position than normal and above the antenna. A 9ft tall solar/antenna pipe will be required. Install the solar array such that the bottom of the lowest solar panel is no lower than 7.5ft above ground level. This may require the addition of a pipe extension. Install two pipe standoff brackets to the solar/antenna pipe at a level such that the 165MHz yagi will have at least 18” separation to the solar array and about 6’ above ground level. Space the brackets a minimum of 18” apart and mount a 1.5” x 2’ galvanized steel pipe to the ends of the brackets to hold the antenna mount. See Appendix B.7.

d. For 900MHz-style antennas, mount the antenna to the top of the 1.5” pipe mount, horizontally polarized. Ensure that no antenna element is directly above the solar panel(s).

e. Align the antenna to the listed azimuth (Appendix A.2). Do not overtighten the stainless steel U-bolts.

f. Add a 3” fence pipe cap to the top of the solar pipe.

3. For cellular antennas:

a. Install a 3” to 1.5” pipe reducer to the top of the threaded solar pipe.

b. Install a 2ft long pipe (1.5” galvanized) to the pipe reducer. Tighten with a pipe wrench

c. Mount a right-angle bracket to the top of the 1.5” pipe. Face the bracket away from the solar panel(s).

d. Mount the antennas to the angle brackets.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

ii. RF and GPS Coax – Install 1” Electriflex Type-LA conduit to protect each coax cable (total of 2). One end should terminate at a point 1ft below the respective antennas and the other on the side of the battery box. Secure conduits to the solar pipe and mounts using stainless steel hose clamps at a minimum of 18” intervals.

iii. Mount the appropriate frequency (DC-6Ghz) surge protection devices (SPDs) to the main bus bar inside the battery box.

iv. Run LMR400 coaxial cables in the 1”conduits and attach one end to the antenna connector and one end to the SPD (for both

GPS and 900MHz).

v. Seal the antenna/coax connection with this method: first layer, starting on the end with the connector, tightly apply 3M/Scotch

Super 33+ electrical tape in a continuous wrap to at least 3 inches back onto the cable jacket; second layer, starting on the end with the connector, tightly apply 3M Butyl Mastic Tape 2212 or Scotch Rubber Mastic Tape 2228 in a continuous wrap to at least 2 inches back onto the jacket; top layer, starting on the end with the connector, tightly apply 3M/Scotch Super 33+ electrical tape in a continuous wrap to completely cover the second layer.

vi. Apply a thick plug of clear GE SiliconII caulking to the open ends of the 1” conduits near the antenna such that is seals moisture out of the conduit.

vii. Run CAT6 Ethernet cable with molded connectors through the 1.5” conduit between the Battery/Radio Enclosure and the Instrument Enclosure. The cable should be long enough to leave 6’ extra in both enclosures. Coil the ends and tape up the molded connectors using Super 33+ electrical tape to protect the connectors.

f) [Drainage System]

i. For Battery/Radio Enclosure:

1. Grade soil away from the enclosure

ii. For Instrument Enclosure:

1. Install a perforated 3” drainage pipe around the enclosure below grade as illustrated in Appendix B.9. Wrap with a soil cloth.

2. Connect ends with a wye. Install non-perforated 3” drain pipe in a trench from the wye on a downward grade out to “daylight”. Cap end of drain pipe with a perforated end cap to keep critters out.

3. Backfill trenches around all drain pipe with ¾” crush drain rock. Fill to a level to completely cover drain pipe and up to grade. Cover the drain rock with soil filter cloth.

4. Backfill native soil around the enclosure to a level about 4” below the bottom of the enclosure lid. Ensure that the backfill completely covers the drainage system and also grades away from the enclosure. Compact the backfill soil with feet or a tamping tool. Do not bury any condulets.

3) Finish, Clean Up, and Documentation

a) In a few cases a fence may need to be installed around the Battery/Radio Enclosure and solar panels to keep livestock out. See Appendix

A.2, Special Considerations, for any sites where a fence is required. The 4-sided fence will consist of:

i) 4 pressure-treated 6”x6” posts, 1 in each of the 4 corners, sunk a minimum of 2.5’ deep.

ii) 3 (three) 12’L x 64”H powder-coated steel fence panels with appropriate hardware to attach to the fence posts.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

iii) 1 (one) 12’L x 52”H powder-coated steel gate panel with appropriate hardware such that it can swing open (outward) to at least 45deg.

and then latched closed (no lock is necessary).

iv) It should be installed so that no fence panel shades the solar array and so that there is enough room for a person to work in front of the enclosure.

b) All construction debris shall be cleaned up and removed from the site.

c) Concrete wash out shall be contained and removed from the site.

d) All disturbed ground shall be graded to match surrounding landscape as best as possible. Break up large dirt clods and avoid piles of rocks.

e) Cut vegetative debris shall be either dispersed (in the case of grasses) or stacked neatly in a manner that does not present a significant eyesore on the landscape.

f) Digital photographs shall be taken during site construction to properly document work completed and so that non-visible (e.g. ground ring) components can be verified as being completed. At least 3 additional photographs shall be taken after completion to document the main infrastructure of the site: the Battery/Radio/Solar system; the Instrument Enclosure; and one that shows the entire site.

4) Acceptance Testing

After the site is installed by the Infrastructure Contractor, the USGS lead will visit each site and use the infrastructure contract checklist to determine the completeness of job. If the job is determined to be incomplete, the USGS lead will notify the contractor of specific deficiencies.

The contractor will determine a day in which to complete the tasks at the site and complete them in a timely manner.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

List of Appendices Appendix A.1 – Station List Page 17 Appendix A.2 – Maps of Stations Page 19 Appendix B.1 – Station Schematic Page 22 Appendix B.2 – Solar/Battery Enclosure Page 23 Appendix B.3 – Seismic Enclosure Page 28 Appendix B.4 – Posthole Schematic Page 31 Appendix B.5 – Backfilling Page 33 Appendix B.6 – Solar/Antenna Mast Page 34 Appendix B.7 – Drainage Detail Page 35 Appendix B.8 – Grounding Detail Page 36 Appendix B.9 – Battery Enclosure Power System and Wiring Page 37 Appendix B.10 – Seismic Enclosure Wiring Page 38 Appendix B.11 – Battery Enclosure Foam Page 39 Appendix B.12 – Seismic Enclosure Foam Page 40 Contractor Checklist Page 41 Bill of Materials Page 44

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

APPENDIX A.1

Station Name Region Coordinates Special Considerations

LBC Butte Creek Hat Creek, CA 40.83674, -121.34993 LCSB College of the

Siskiyous Weed, CA 41.41588, -122.39381

LEL Emerald Lake Lassen National Park

41.41588, -122.39381 No access for mini excavator. Site will have to be put in by hand. Site is ~200 yards from vehicle access.

LMC McCloud McCloud, CA 41.27416, -122.12197 Site is being moved; new location is TBD LME Manzanita

Entrance Lassen National Park

40.53764, -121.57132

LRD Reading Peak Lassen National Park

40.46504, -121.46344 Likely no access for mini excavator. Site will likely have to be put in by hand. Site is ~300 feet from vehicle access.

MCS Casa Hot Springs

Mammoth Lakes, CA

37.65487, -118.90576 Sensor enclosure and posthole only.

MCV Convict Lake Mammoth Lakes, CA

37.59003, -118.82911 No access for mini excavator. Site will have to be put in by hand. Site is ~200 feet from vehicle access.

Trailers unlikely to make it the last mile of road to site.

MDC Deadman Creek Mammoth Lakes, CA

37.70969, -119.04183 No access for mini excavator. Site will have to be put in by hand. Site is 200 feet from vehicle access.

MDR Doe Ridge Mammoth Lakes, CA

37.63796, -118.83588

MEM East Mammoth Mammoth Lakes, CA

37.66604, -118.93977

MGPB Gravel Pit Mammoth Lakes, CA

37.62608, -118.90288

MLC Laurel Canyon Mammoth Lakes, CA

37.61211, -118.91528 No access for mini excavator. No access with trailers last mile to site. Site will have to be put in by hand.

Tools and materials will have to be shuttled from Sherwin Creeks Rd/Laurel Lakes Rd intersection.

USGS staff can assist with UTV and personnel.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

MLH Little Hot Creek Mammoth Lakes, CA

37.67855, -118.81496

MLM Lookout Mountain

Mammoth Lakes, CA

37.72803, -118.94693

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

APPENDIX A.2

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

APPENDIX B.1

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

APPENDIX B.2 – Solar/Battery Enclosure

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

APPENDIX B.3 – Seismic Enclosure

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

APPENDIX B.4 – Posthole Schematic

APPENDIX B.5 – Backfilling Around the Enclosure

APPENDIX B.6 – Construction of Solar/Antenna Mast

APPENDIX B.7 – Drainage Detail

APPENDIX B.8 – Grounding Detail

APPENDIX B.9 – Battery Enclosure Power System and Wiring

APPENDIX B.10 – Seismic Enclosure Cabling

APPENDIX B.11 – Battery Enclosure Foam Detail

APPENDIX B.12 – Seismic Enclosure Foam Detail

Infrastructure Contractor Checklist “Notes” provided after each section for missing items, incomplete task explanation, etc.

Battery/Radio Enclosure

Enclosure level 1 ½” conduit connections to enclosures at least 3” above grade

Oriented nominally east-west Batteries installed, on wood blocks

Top of concrete smooth Foam installed

Forms removed Latches and locks in place

Enclosure bolted to concrete “Do Not Disturb” sticker in place

Conduit to instrument enclosure buried min. 6” deep, backfilled completely, and compacted No excess holes/water sealed

Notes:

Instrument Enclosure

Enclosure level Posthole Vertical

Enclosure at correct height above grade Posthole extends 6-8” above concrete pad

Top of concrete smooth with no cracks Latches and locks in place

Top of concrete level “Do Not Disturb” sticker in place

Forms removed No excess holes/water sealed

Foam installed

Notes:

Solar/DC Power System Pipe installed plumb, with proper bolts securing it to battery/radio enclosure Power cable run through 1 ½” conduit

Solar panels with correct mount 6’ of extra power cable in both enclosures

Bird spike strip installed on top Power cable coiled up at both ends

Solar array installed facing south Terminal strip, solar controller, and solar SPD installed

Solar array installed with proper angle Batteries are connected in parallel and wing nuts tightened

Solar panel(s) glass clean Battery jumper cable between solar controller and batteries secured

½” conduit installed between solar panel and battery enclosure Wiring is correct

Conduit secured to pipe with zip ties Solar array values within specs:

Panels (if more than 1) have junction boxes connected with ½” conduit Measured volts:

Power cable run between solar array and solar controller, and between panels if more than 1 Measured amps:

Notes:

Grounding System

Bus bars, standoffs in both enclosures Ground rod no more than 45deg. from vertical and driven in completely

No hard kinks or bends in any wires For ground rods that can’t be driven completely, alternative trench/bend method is followed

Proper lug connections throughout (one- or two-hole depending on the application) Ground ring at least 12” deep

Connections to box and pipe have powder coat ground off Ground ring is exothermically welded to ground rod

Correct gauge wire for each connection, all with green insulating jacket Exothermic welds are clean and secure

Solar and coaxial cable SPD’s are mechanically connected to ground bar in battery enclosure Ground wire to solar pole wing bracket

Ground wire runs through the 1 ½” conduit and is connected to each bus bar

Ground wire to solar panel frame (and between frames if more than one panel)

Conduit running to ground bar, and sealed with silicone caulking Ground wire to bus bar in battery enclosure

Copper paste at all lug connections outside of the enclosures Notes:

Telemetry System

Antenna mount Conduit secured to solar pipe stainless steel hose clamps

GPS Antenna and Antenna Mount SPDs are correct frequencies

Antenna azimuth and polarization: Coax run through 1” conduit and secured at both ends

Measured azimuth: Connection of coax to antenna is sealed properly

Polarization: CAT6 run through the 1 ½” conduit between the 2 enclosures

2 Conduits (RF and GPS) with coax runs up to 1ft below antenna and the end sealed with silicone caulking

6’ of extra Ethernet cable in both enclosures, coiled up, and taped off

Notes:

Drainage System

For battery/radio enclosure:

Soil graded away from enclosure

For instrument enclosure:

3” perforated drainage pipe around enclosure Trenches around drain pipe backfilled with ¾” drain rock

Drainage pipe wrapped in soil cloth Drain rock covered with soil filter cloth

Ends connected with a wye Native soil is backfilled covering drainage system, and is about 4” below enclosure lid

3” non-perforated drain pipe is trenched, on a downward grade

Backfill grades away from enclosure and is compacted

End has a perforated cap

Notes:

Overall Site

Site clean, no trash due to install All nuts on brackets and mounts tight

Disturbed ground graded back to natural appearance Old site equipment removed (if applicable)

Brush properly disposed Distance between enclosures:

Notes:

Pictures Taken and Supplied Battery/Radio enclosure excavation showing foundation preparation before concrete pour Drainage system before native soil burial

Instrument enclosure excavation showing foundation preparation before concrete pour Conduit trench between the enclosures

Ground ring trench Overall view of battery/radio enclosure with solar array and antenna

Ground rod(s) and exothermic weld(s) to ground ring Overall view of instrument enclosure

Drainage system before crush rock burial Overall view of entire site

Bill of Materials (per site) Item # Foundations and Drainage Quantity

1 Concrete form, 2"x6" wood (48"x48" ID) (for Battery/Radio Enclosure) 1 2 Concrete form, 2"x6" wood (36”x48” ID) (for Instrument Enclosure) 1

3 High-early-strength concrete, 60 lbs bags [Quikrete 5000 or equivalent] 30-40 bags 16-18 bags MCS only

4 Steel reinforcing mesh 1 ea. per pad 5 1/2"x8" bent rebar or 8" J-bolts (for Instrument Enclosure footings, GWKB, LWPB) 4 6 2" Dobies 12-24* 7 Battery enclosure/solar mast jig 1 8 1/2"x6" Galvanized bolts for anchors w/ appropriate hardware 9 Wellcap (Campbell Manufacturing 6" Watertight Well Cap – SKU# WTC6P), 7 10 6" Schedule 80 PVC Pipe, 10’ 7 11 6" Schedule 80 PVC Pipe Cap 7 12 Grout 6-12 bags/site 13 PVC Cement and primer 7 14 3/4" Crushed rock 10 cu. ft.

15 3" Perforated drain pipe 25 ft.

16 3" Solid drain pipe Min 6 ft 17 3" Y-connector for drain pipe 1 18 3" Slotted end cap for drain pipe 1 19 Drain sleeve for perforated pipe 25 ft.

20 Soil fabric to cover crushed rock 50 sq. ft.

Grounding 21 GPS LPU [Polyphaser DGXZ+06NFNF-A] 1 22 Coax SPD (for 900MHz applications) [L-COM AL-NFNFB-6 ] 1 23 Ground Bar Kit ¼” x ~2.5” x ~19.5” [Commscope UGBKIT or similar] 2 24 Threaded Standoff Insulator (provided in above #27 kit otherwise Harger R4150S3) 4 25 Copper-plated Steel Ground Rod 5/8"x8' 1

26 2 AWG Tinned-Copper Ground Wire 30 ft.

27 6 AWG Insulated, Stranded Ground Wire, green jacket 100 ft.

28 1-hole Lug Connector 8 29 2-hole Lug Connector 12 30 1/2” Flexible liquid-tight conduit [Electroflex LA] 10-15 ft.

31 1/2" Liquid-tight fitting / male adapters [Hubbel H0501] 5 32 Exothermic Weld Kit, w/ proper molds [CAD Weld or equivalent commercial product] 1 33 Antioxidant copper paste 1

Battery/Radio + Seismic Enclosure 34 2'x3' Battery/Radio Enclosure 1 35 N/A 36 2'x3' Instrument/Sensor Enclosure 1 37 Custom foam insulation for both enclosures (expanded polystyrene, 1lb) 1 ea.

38 SunXtender PVX-1040HT 100AH Batteries (GWKB) 4 39 MC4 Solar wire 10AWG 12 ft.

40 1.5” Flexible liquid-tight conduit (for connection between enclosures) [Electroflex LA] 40-80 ft.

41 1.5" Liquid-tight fitting / male adapters with 45° angle [Hubbel H15041] 2/site 42 Cat6 Ethernet cable 50-100 ft.

43 GPS and radio coax LMR400 30 ft.

44 GPS and radio coax LMR240 40-80 ft.

45 1” Flexible liquid-tight conduit [Electroflex LA] 30 ft.

46 1" Liquid-tight fitting / male adapters with 45° angle [Hubbel H15041] 2 47 GPS Mount, L Bracket, 397XD 1 48 12AWG Power cable 50-100 ft.

Solar Mast / Antenna Mount 49 900 MHz Yagi antenna [Kathrein-Scala TY-900] 1 50 1.5"dia. x 2' galvanized steel pipe, SCH40, threaded at one end 1 51 3" to 1-1/2" galvanized pipe reducer 1 52 1-1/2" or 3" pipe cap 1 53 Solar Panels - Commercial grade, aluminum frame, 12VDC. See App. A.2 for specs 2 54 Solar panel side-of-pole mounting bracket kit (for 2 panels) [Sunwize 007953] 1

55 Solar panel side-of-pole mounting bracket kit (for 1 panel) N/A 56 MC4 connectors, 10AWG solar wire 4–6 57 Bird Spikes (length of solar panels) [Nixalite Model H] 1 58 Bird spikes mounting clips [Nixalite MHRB], 6/32"x1" ss bolts + nuts and washers 1 59 3.5" Galvanized U-bolts 2 60 Stainless steel hose clamps 4–6 61 Solar/Antenna pipe - 3"x9' 1 62 GPS antenna 1

900MHz yagi antenna standoff – Needed for antenna azimuths 900-2700

63 Hot-dipped Galvanized Unistrut, 24" 2 64 Hot-dipped Galvanized Unistrut, 30" 1 65 3/8" x 2.5"dia. Galvanized U-bolts 2

Miscellaneous 66 1/2" x 1.5" galvanized carriage bolts, washer, lock washer, and nut 4 67 2"x4"x30" wood blocks (for batteries to sit on) 2 68 Masterlock hinged hasp 2 69 6/32" Mounting hardware 2 sets 70 Masterlock lock 4 71 N/A 72 Concrete form, 2"x6" wood (36”x36” ID) (for Instrument Enclosure) 1

PROVIDED BY USGS

REQUIRED ITEMS TO BE SUBMITTED FOR APPROVALS.

Seismic Station Site Infrastructure Indefinite Delivery Indefinite Quantity Contract – RFQ No. 140G0326Q0184

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. The full text of a solicitation provision may be accessed electronically at https://www.acquisition.gov/far/ and at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 .

The following provisions are incorporated by reference, with fill-ins noted as appropriate:

52.203-11 – Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Sep 2024) 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) 52.203-18 – Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements- Representation (Jan 2017) 52.204- 7 – System for Award…