Seismic_Station_IDIQ_5-Year__Schedule_of_Pricing.xlsx
XLSX spreadsheet 9 KB Posted
- Solicitation number
- 140G0326Q0184
About this file
This is a pricing schedule template for a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract supporting seismic station construction for the U.S. Geological Survey Earthquake Science Center under Executive Order 14398.
The pricing sheet establishes firm-fixed pricing for three line items across a base ordering period and four additional one-year ordering periods. Item 1 covers construction of standard seismic stations including equipment vaults, DC power systems with solar arrays, grounding systems, telemetry infrastructure, and drainage systems. Item 2 addresses the same standard seismic station construction with the addition of a shallow posthole installation. Item 3 covers posthole and vault construction only at existing station locations. Contractors are required to enter firm-fixed prices for each item across all five contract years in the designated cells. All pricing cells currently display $0.00, indicating this is a blank template awaiting contractor pricing submissions. The template is associated with solicitation number 140G0326Q0184 issued by the Department of the Interior's U.S. Geological Survey Office of Acquisitions and Grants.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140G0326Q0184_Amd_0001.pdf | ||
| UPDATED_APPENDIX_A1_-_Station_List_20260901_0001.pdf | ||
| Sol_140G0326Q0184.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| FIVE-YEAR SEISMIC STATION CONSTRUCTION IDIQ PRICING | ||||||
| Item | Description | Base Ordering Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 |
| 1 | Construction of the standard seismic station, including equipment vaults, DC power system (including solar array), grounding system, telemetry infrastructure, and drainage system. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | Construction of the standard seismic station described in Item 1, with the addition of a shallow posthole. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | Construction of a posthole and vault only at an existing station. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL EVALUATED PRICE | ||||||
| Enter the firm-fixed price for each item and contract year in the yellow cells. |
File details come from the government source that posted it. Updated .