This document is a Solicitation (Invitation for Bid or Request for Proposal) for a construction project to stabilize the A3 main building at the U.S. Geological Survey (USGS) Columbia Environmental Research Center (CERC) in Columbia, Missouri.
The scope of work includes adding steel helical piles to the foundation, replacing the basement slab and wall, and removing and replacing affected concrete sidewalks and landscaping. The contractor must provide all labor, materials, tools, equipment, and supervision. The magnitude of construction is estimated between $250,000 and $500,000. Solicitation 140G0124R0022 will be issued around 7/22/2024, with quotes due by 8/21/2024. Performance and payment bonds are required. A site visit is scheduled, and all contractors are strongly encouraged to attend. This is a 100% small business set-aside under NAICS code 238190 with a $19 million size standard. Proposals must be emailed to the USGS point of contact.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040666169
USGS OAG RESTON ACQUISITION BRANCH
205 NATIONAL CENTER
12201 SUNRISE VALLEY DRIVE
RESTON VA 20192
GRB
Kimberly Schneider 0000
1x 07/22/2024
140G0124R0022
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Phase II: A3 Main Building Stabilization Columbia Environmental Research Center
Columbia, MO, BE Project No. 18018
100% Small Business Set-aside
See Section L for Instructions and Section M for Evaluation Factors
***SITE VISIT SCHEDULED AND NOTED IN SECTION L, Reference FAR 52.236-27***
*Bid Guarantee Required, Ref FAR 52.228-1 and Section F for list of Deliverables*
*Bonds Required*
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
15 120 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
08/21/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USGS OAG RESTON ACQUISITION BRANCH
205 NATIONAL CENTER
12201 SUNRISE VALLEY DRIVE
RESTON VA 20192
GRB
Kimberly Schneider
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 59
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140G0124R0022
Phase II: A3 Stabilization Exterior Sidewalks
Delivery: 120 Days After Notice to Proceed
Delivery Location Code: 0006366840
USGS Columbia Environmental Researc
4200 New Haven Road
Columbia MO 65201 US
00010 Phase 2 A3 Building Stabilization Exterior
Sideway.
Provide all services, permits, labor, supervision, equipment, travel and materials to stabilize, add piles, replace underpinning, provide control joint around slab and replace portions of exterior sideway the Columbia
Environmental Research Center (CERC) A3 Main
Building Foundation.
Work must be performed in accordance with the specifications, drawings, wage decision, clauses, and all applicable federal, state, and local regulations.
See Bid Schedule in Attachment 1
Product/Service Code: C1PZ
Product/Service Description: ARCHITECT AND
ENGINEERING- CONSTRUCTION: OTHER NON-BUILDING
FACILITIES
For questions on this solicitation, contact
Kimberly Schneider, krschneider@usgs.gov.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Section B - Supplies or Services B-1 Bid Schedule
Section C - Description/Specifications C-1 Description of Work C-2 GS0347 Indoor Air Quality During Construction (MAR 2008)
Section E - Inspection and Acceptance E-1 52.246-12 Inspection of Construction. (AUG 1996)
Section F - Deliveries or Performance F-1 Deliverables F-2 52.236-15 Schedules for Construction Contracts. (APR 1984) F-3 52.242-14 Suspension of Work. (APR 1984) F-4 GS0919 Legal Holidays (JUN 2021)
Section G - Contract Administration Data G-1 GS0231 Technical Liaison-Technical Direction (NOV 2014) G-2 GS1126 Invoicing and Performance Statements (JUL 2001) G-3 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013) G-4 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)
Section H - Special Contract Requirements H-1 GS1326 Indemnity (JUL 2001) H-2 GS1338 Notice to Government of Delays (JUL 2001) H-3 GS1346 Compliance with OSHA-Govt owned Facilities/Equipment (APR 2003) H-4 GS1348 Accident Reporting (APR 2003) H-5 GS1440 Wage Determination Applicable (JUL 2001) H-6 USE AND REPORTING OF CONTRACTOR PERFORMANCE INFORMATION (DEC 2015) (DOI-AAAP-0050) Notice to Contractors - CPARS (DEC 2015)
Section I - Contract Clauses I-1 52.201-1 Acquisition 360: Voluntary Survey. (SEP 2023) I-2 52.203-3 Gratuities. (APR 1984) I-3 52.203-5 Covenant Against Contingent Fees. (MAY 2014) I-4 52.203-7 Anti-Kickback Procedures. (JUN 2020) I-5 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014) I-6 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014) I-7 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2007) I-8 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020) I-9 52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023) I-10 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017) I-11 52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011) I-12 52.204-13 System for Award Management Maintenance. (OCT 2018) I-13 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020) I-14 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014) I-15 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities. (DEC 2023) I-16 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) I-17 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) I-18 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) I-19 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) I-20 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) I-21 52.216-1 Type of Contract. (APR 1984) I-22 52.219-8 Utilization of Small Business Concerns. (FEB 2024) I-23 52.219-28 Post-Award Small Business Program Rerepresentation. (FEB 2024) I-24 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2018) I-25 52.222-6 Construction Wage Rate Requirements. (AUG 2018) I-26 52.222-7 Withholding of Funds. (MAY 2014)
I-27 52.222-8 Payrolls and Basic Records. (JUL 2021) I-28 52.222-9 Apprentices and Trainees. (JUL 2005) I-29 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988) I-30 52.222-11 Subcontracts (Labor Standards). (MAY 2014) I-31 52.222-12 Contract Termination - Debarment. (MAY 2014) I-32 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014) I-33 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) I-34 52.222-15 Certification of Eligibility. (MAY 2014) I-35 52.222-22 Previous Contracts and Compliance Reports. (FEB 1999) I-36 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) I-37 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method). (AUG 2018) I-38 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (MAY 2024) I-39 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021) I-40 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024) I-41 52.223-15 Reserved I-42 52.223-17 Reserved I-43 52.223-23 Sustainable Products and Services. (MAY 2024) I-44 52.225-9 Buy American - Construction Materials. (OCT 2022) I-45 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021) I-46 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran- Representation and Certifications. (JUN 2020) I-47 52.228-2 Additional Bond Security. (OCT 1997) I-48 52.228-5 Insurance - Work on a Government Installation. (JAN 1997) I-49 52.228-11 Individual Surety-Pledge of Assets. (FEB 2021) I-50 52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022) I-51 52.228-14 Irrevocable Letter of Credit. (NOV 2014) I-52 52.228-15 Performance and Payment Bonds - Construction. (JUN 2020) I-53 52.229-3 Federal, State, and Local Taxes. (FEB 2013) I-54 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) I-55 52.232-23 Assignment of Claims. (MAY 2014) I-56 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) I-57 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018) I-58 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) I-59 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (MAR 2023) I-60 52.233-1 Disputes. (MAY 2014) I-61 52.233-3 Protest After Award. (AUG 1996) I-62 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) I-63 52.236-2 Differing Site Conditions. (APR 1984) I-64 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) I-65 52.236-4 Physical Data. (APR 1984) I-66 52.236-5 Material and Workmanship. (APR 1984) I-67 52.236-6 Superintendence by the Contractor. (APR 1984) I-68 52.236-7 Permits and Responsibilities. (NOV 1991) I-69 52.236-8 Other Contracts. (APR 1984) I-70 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) I-71 52.236-10 Operations and Storage Areas. (APR 1984) I-72 52.236-11 Use and Possession Prior to Completion. (APR 1984) I-73 52.236-12 Cleaning Up. (APR 1984) I-74 52.236-13 Accident Prevention. (NOV 1991) I-75 52.236-21 Specifications and Drawings for Construction. (FEB 1997) I-76 52.236-26 Preconstruction Conference. (FEB 1995) I-77 52.242-13 Bankruptcy. (JUL 1995) I-78 52.243-4 Changes. (JUN 2007) I-79 52.244-6 Subcontracts for Commercial Products and Commercial Services. (FEB 2024) I-80 52.246-21 Warranty of Construction. (MAR 1994) I-81 52.248-3 Value Engineering - Construction. (OCT 2020)
I-82 52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) I-83 52.249-10 Default (Fixed-Price Construction). (APR 1984) I-84 52.252-2 Clauses Incorporated by Reference. (FEB 1998) I-85 52.252-6 Authorized Deviations in Clauses. (NOV 2020) I-86 52.253-1 Computer Generated Forms. (JAN 1991) I-87 1452.225-70 Use of Foreign Construction Materials (JUL 1996) I-88 1452.228-70 Liability Insurance (JUL 1996) I-89 1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996) I-90 52.219-6 Notice of Total Small Business Set-Aside (DEVIATION 2019-01)
Section J - List of Documents, Exhibits, and Other Attachments Section K - Representations, Certifications, and Other Statements of Bidders
K-1 52.204-8 Annual Representations and Certifications. (MAY 2024) K-2 52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020) K-3 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
(NOV 2021)
K-4 52.204-26 Covered Telecommunications Equipment or Services-Representation. (OCT 2020) K-5 52.209-5 Certification Regarding Responsibility Matters. (AUG 2020) K-6 52.209-7 Information Regarding Responsibility Matters. (OCT 2018) K-7 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. (FEB 2016) K-8 52.209-13 Violation of Arms Control Treaties or Agreements-Certification. (NOV 2021) K-9 52.223-1 Biobased Product Certification. (MAY 2024) K-10 52.223-4 Recovered Material Certification. (MAY 2008) K-11 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014)
Section L - Instructions, Conditions, and Notices to Bidders L-1 Instructions to Offerors - Supplement to 52.215-1 L-2 52.204-7 System for Award Management. (OCT 2018) L-3 52.204-22 Alternative Line Item Proposal. (JAN 2017) L-4 52.214-34 Submission of Offers in the English Language. (APR 1991) L-5 52.214-35 Submission of Offers in U.S. Currency. (APR 1991) L-6 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) L-7 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction.
(FEB 1999)
L-8 52.228-1 Bid Guarantee. (SEP 1996) L-9 52.233-2 Service of Protest. (SEP 2006) L-10 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995) L-11 52.236-28 Preparation of Proposals - Construction. (OCT 1997) L-12 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) L-13 52.252-5 Authorized Deviations in Provisions. (NOV 2020) L-14 1452.233-2 Service of Protest L-15 GS2160 Technical Proposal Instructions L-16 GS2301 Single Award
Section M - Evaluation Factors for Award M-1 1452.236-71 Additive or deductive items (JUL 1996) M-2 GS2320 Evaluation Factors M-3 GS2335 Evaluation and Award - Negotiated
Section B - Supplies or Services B-1 Bid Schedule
Reference Attachment 1 Bid Schedule
Section C - Description/Specifications C-1 Description of Work
The U.S. Geological Survey Columbia Environmental Research Center (CERC) has a requirement for Phase II construction to stabilize their A3 Main Building in order to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The contractor shall perform in accordance with the attached specifications, drawings, and all associated attachments.
The Work of Project is defined by the Contract Documents and includes but is not limited to the following:
1. The scope of work is located at the southeast, southwest, and northwest corner of the building. Steel helical piles will be added to shore up the foundation along the length of the southeast, southwest, northwest and basement column at B2, 4.5.
2. Cut basement slab and replace with underpinning at column grid: B2,4.5 in basement. Provide a control joint around new concrete basement slab, new vapor barrier, gravel and installation under slab work area. Partially disassemble the existing CMU wall at column B2,4.5 in ground floor room 11 and replace with new CMU grouted into existing wall and paint to match existing.
3. Remove and replace portions of existing concrete walk affected by the work at the main entrance and westside entrance and sidewalk. Replace and patio south of pergola on the eastside as needed. Restore site lawn areas affected by the work on all side of the building work area.
4. Replace sidewalks and curbs as shown in Civil drawings. Ensure that all new sidewalks and curb cuts meet accessible standards.
APPROVAL AND DECISION AUTHORITY: Within the specification at Attachment 2, any reference to "Architect" does not transfer approval or decision authority to any official other than the U.S. Geological Survey Contracting Officer or authorized representative(s) (acting within the scope and authority of their delegation, in accordance with the clause at G.1, 1452.201-70, Authorities and Delegations).
Construction Contraction Administration Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract
C-2 GS0347 Indoor Air Quality During Construction (MAR 2008)
(a) The contractor shall control contaminants at the source and/or operate the space in such a manner that the GSA indicator levels for carbon monoxide (CO), carbon dioxide (CO2 ), and formaldehyde (HCHO) are not exceeded. The indicator levels for office areas shall be:
CO - 9 parts per million (ppm) time-weighted average (TWA - 8-hour sample); CO2 - 1000 ppm (TWA); formaldehyde -
0.1 ppm (TWA).
(b) The contractor shall make a reasonable attempt to apply insecticides, paints, glues, adhesives, and heating, ventilating and air conditioning (HVAC) system cleaning compounds with highly volatile or irritating organic compounds, outside of working hours. The contractor shall provide at least 72 hours advance notice to the Government before applying noxious chemicals in occupied spaces, and adequately ventilate those spaces during and after application.
(c) To the greatest extent possible, contractor shall sequence the installation of finish materials so that materials that will be high emitters of Volatile Organic Compounds (VOCs) are installed and allowed to cure before installing interior finish materials, especially soft materials that are woven, fibrous, or porous in nature, that may adsorb contaminants and release them over time.
(d) Where demolition or construction work occurs adjacent to occupied space, contractor shall erect appropriate barriers (noise, dust, odor, etc.) and take necessary steps to minimize interference with the occupants. This includes maintaining https://www.doi.gov/pam/acquisition/policy/constructioncontract acceptable temperature, humidity and ventilation in the occupied areas during window removal, window replacement, or similar types of work.
(e) A final flush-out period of 48 to 72 hours should be provided before occupancy. Contractor shall ventilate with 100 percent outside air at the recommended air change rate (ASHRAE Standard 62) during installation of materials and finishes. If outside air would cause unacceptable inside temperature levels, humidity levels, and/or air quality, an alternate ventilation plan may be submitted to the Contracting Officer for approval.
(f) The contractor shall promptly investigate indoor air quality (IAQ) complaints and shall implement the necessary controls to address the complaint when requested to do so by the Contracting Officer.
(g) The Government reserves the right to conduct independent IAQ assessments and detailed studies in space it occupies, as well as in space serving the Government-leased space (e.g., common use areas, mechanical rooms, HVAC systems, etc.). The contractor shall assist the Government in its assessments and detailed studies by making available information on building operations and contractor activities, and providing access to space for assessment and testing, if required, and implement corrective measures required by the Contracting Officer.
Section E - Inspection and Acceptance E-1 52.246-12 Inspection of Construction. (AUG 1996)
(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not -
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(End of clause)
Section F - Deliveries or Performance F-1 Deliverables
F-2 52.236-15 Schedules for Construction Contracts. (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
Deliverable Reference Due Deliver To Bid Guarantee Section L: 52.228-1 Closing date of solicitation; Upon submission of proposal CS Performance and Payment Bond Section I: 52.228-15 Within 10 calendar days after receipt of contract award CS Proof of Liability Insurance Section I: 1452.228-70 Within 10 calendar days after receipt of contract award CS List of Subcontractors Section H: GS1354 Within 10 calendar days after receipt of contract award CS
SF1413 Statement and Acknowledgement of Subcontractor Section I: 52.222-11
Within 10 calendar days after award of this contract and within 7 days after the award of each subcontract thereafter.
CS
Preconstruction Conference Specification Section 01 31 00
Before commencing construction, no later than 15 calendar days after Notice to Proceed (NTP) CS and COR
Construction Schedule
FAR 52.236-15
Specification Section 01 31 00 Section 01 32 00
Within 10 calendar days after contract award CS and COR
Performance Statement Section G: GS1126 With each invoice for progress payment COR
Invoices Section G: DOI Electronic Invoicing, GS1126
Invoices for progress payments may be submitted no more frequently than monthly IPP, COR
Weekly payrolls for contract and each subcontractor Section I: 52.222-8 Within 7 days after regular payment date of the payroll week covered
CS
Ref: FAR 22.406-6(c)
Certification of Progress Payment (if applicable) Section I: 52.232-5 As work proceeds - no more often than monthly COR
Project Closeout Specification Section 01 77 00
A minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. CS and COR
DI-137 Release of Claims Section I: 1452.204-70 Prior to submitting final invoice CS and COR
Final Invoice n/a After submitting Release of Claims IPP and copy to COR
(End of clause)
F-3 52.242-14 Suspension of Work. (APR 1984)
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed (1) for any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(End of clause)
F-4 GS0919 Legal Holidays (JUN 2021)
The following legal holidays are observed by this Government agency:
New Year's Day January 01
Martin Luther King's Birthday 3rd Monday in January
Presidents Day 3rd Monday in February
Memorial Day Last Monday in May
Juneteenth National Independence Day June 19
Independence Day July 04
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veterans Day November 11
Thanksgiving Day 4th Thursday in November
Christmas Day December 25
When a holiday falls on Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.
In addition to the holidays listed above, the contractor agrees to observe leave days or closures designated by Federal Statute, Executive Order, or Presidential Proclamation.
Section G - Contract Administration Data G-1 GS0231 Technical Liaison-Technical Direction (NOV 2014)
(a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified below. As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.
(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the
Disputes Clause;
(4) Terminate, for any reason, the contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting Officer is authorized to obligate funds on this or any other contract action.
(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.
(d) The Technical Liaison assigned for this contract is:
Name: *To be provided upon award*
Telephone Number: []
Email: []
Address Line 1: []
Address Line 2: []
Address Line 3: []
(e) Only the Contracting Officer may designate a different Technical
Liaison.
G-2 GS1126 Invoicing and Performance Statements (JUL 2001)
Invoicing and Performance Statements (Construction)
(a) A copy of each invoice submitted with an IPP payment request must be submitted to:
U.S. Geological Survey [ ]
Attn: To be provided upon award.
(b) Invoices for progress payments may be submitted no more frequently than monthly.
(c) Invoices for progress payments must be accompanied by a contract Performance Statement, which shall show in detail the estimated percentage of completion and value of completed performance for each separately priced line item or, if applicable, each of the significant construction categories contained in the approved Schedule of Prices.
(d) See clause 52.232-5 for certification requirements.
G-3 GS1131 Unilateral Deobligation of Unexpended Funds (MAY 2013)
The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer. After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.
G-4 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
- Contractor generated invoice
- Payrolls
- Performance Statement if progress payment
- Release of Claims for final invoice
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
Section H - Special Contract Requirements H-1 GS1326 Indemnity (JUL 2001)
The contractor herein is "an independent contractor" and shall obtain all necessary insurance to protect himself from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the active negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.
H-2 GS1338 Notice to Government of Delays (JUL 2001)
In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the contracting officer and the COR (if one has been designated), in writing, giving pertinent details.
This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or of any rights or remedies provided by law or under this contract.
H-3 GS1346 Compliance with OSHA-Govt owned Facilities/Equipment (APR 2003)
Compliance with Occupational Safety and Health Act -- Government-Owned Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1970, as amended (OSHA). If, at any time during the performance of this contract, the Government-furnished facilities and/or equipment do not conform to OSHA standards, the contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.
H-4 GS1348 Accident Reporting (APR 2003)
If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.
H-5 GS1440 Wage Determination Applicable (JUL 2001)
In the performance of this contract, the contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Number MO20240084 dated 4/19/2024. The wage determination is incorporated into this contract as Attachment 4
H-6 USE AND REPORTING OF CONTRACTOR PERFORMANCE INFORMATION (DEC 2015)
(DOI-AAAP-0050) Notice to Contractors - CPARS (DEC 2015)
NOTICE TO CONTRACTORS
Contractor Performance Assessment Reporting System (December 2015)
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the 6.evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting "Accept the Ratings and Close the Evaluation".
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as "Pending" with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of notice)
Section I - Contract Clauses I-1 52.201-1 Acquisition 360: Voluntary Survey. (SEP 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https://www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.
(End of provision)
I-2 52.203-3 Gratuities. (APR 1984)
I-3 52.203-5 Covenant Against Contingent Fees. (MAY 2014)
I-4 52.203-7 Anti-Kickback Procedures. (JUN 2020)
I-5 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.
(MAY 2014)
I-6 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
I-7 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2007)
I-8 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)
I-9 52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023)
I-10 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)
I-11 52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011)
I-12 52.204-13 System for Award Management Maintenance. (OCT 2018)
I-13 52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020)
I-14 52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
I-15 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities. (DEC 2023)
I-16 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021)
I-17 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)
I-18 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)
I-19 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
I-20 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)
I-21 52.216-1 Type of Contract. (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
(End of provision)
I-22 52.219-8 Utilization of Small Business Concerns. (FEB 2024)
I-23 52.219-28 Post-Award Small Business Program Rerepresentation. (FEB 2024)
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 238190 assigned to contract number [ ].
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: [ ] .]
(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: [ ] .]
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.
(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: [ ].]
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .