B08_Attachment_1__Bid_Schedule.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
CERC Phase 2 A3 Bldg Stabilization Federal contract opportunity
Solicitation number
140G0124R0022
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This document appears to be a Bid Schedule for a federal contract opportunity related to the stabilization of the A3 main building at the U.S. Geological Survey's Columbia Environmental Research Center (CERC) in Columbia, MO.

The scope of work includes but is not limited to: adding steel helical piles to shore up the foundation, replacing portions of the basement slab and concrete walkways, and restoring site lawn areas affected by the work. The magnitude of construction is estimated between $250,000 and $500,000. Solicitation 140G0124R0022 will be issued on or about 7/22/2024 with written quotes due on or about 8/21/2024. This is a total small business set-aside acquisition with the NAICS code 238190 and a $19 million size standard. Bonds are required, and all responsible small business sources may submit a proposal to be considered.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bid Schedule

Project Number:140G0124R0022Date:
Project TitlePhase II: CERC A3 Main Building Stabilization
Project LocationColumbia, MO
Offeror Name
Offeror Street
Offeror CityStateZip

CLIN Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

00001Division 1General Requirements$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Deductive Bid Option 1

Schneider, Kimberly Reynolds: Schneider, Kimberly Reynolds:

Enter as "-" amountDivision 1General Requirements- 0$ - 0
Division 31Earthwork- 0
Base Division Subtotals :$ - 0$ - 0$ - 0
Overhead %0.00%
Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell G37).- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell G37) plus the calculated Overhead (cell G39).- 0
Bond %0.00%
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell G37), the amount of calculated Overhead (cell G39) and the amount of calculated Profit (cell G40).- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Schneider, Kimberly Reynolds: Schneider, Kimberly Reynolds:

Enter as "-" amount Edward L Roy: Date Offer Prepared/Submitted

Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell G37).

Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell G37) plus the calculated Overhead (cell G39).

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell G37), the amount of calculated Overhead (cell G39) and the amount of calculated Profit (cell G40).

Edward L Roy: Enter all Labor Costs by Division

Edward L Roy: Enter all Material Costs by Division Total Base Offer Cost $ - 0 $ - 0 $ - 0