B08_Attachment_1__Bid_Schedule.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- CERC Phase 2 A3 Bldg Stabilization Federal contract opportunity
- Solicitation number
- 140G0124R0022
About this file
This document appears to be a Bid Schedule for a federal contract opportunity related to the stabilization of the A3 main building at the U.S. Geological Survey's Columbia Environmental Research Center (CERC) in Columbia, MO.
The scope of work includes but is not limited to: adding steel helical piles to shore up the foundation, replacing portions of the basement slab and concrete walkways, and restoring site lawn areas affected by the work. The magnitude of construction is estimated between $250,000 and $500,000. Solicitation 140G0124R0022 will be issued on or about 7/22/2024 with written quotes due on or about 8/21/2024. This is a total small business set-aside acquisition with the NAICS code 238190 and a $19 million size standard. Bonds are required, and all responsible small business sources may submit a proposal to be considered.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Bid Schedule
| Project Number: | 140G0124R0022 | Date: | ||
| Project Title | Phase II: CERC A3 Main Building Stabilization | |||
| Project Location | Columbia, MO | |||
| Offeror Name | ||||
| Offeror Street | ||||
| Offeror City | State | Zip |
CLIN Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| 00001 | Division 1 | General Requirements | $ - 0 | ||
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 | |
| Division 3 | Concrete | - 0 | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 | |
| Division 9 | Finishes | - 0 | - 0 | - 0 | |
| Division 11 | Equipment | - 0 | - 0 | - 0 | |
| Division 31 | Earthwork | - 0 | - 0 | - 0 | |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 | |
| Deductive Bid Option 1 |
Schneider, Kimberly Reynolds: Schneider, Kimberly Reynolds:
| Enter as "-" amount | Division 1 | General Requirements | - 0 | $ - 0 | ||
| Division 31 | Earthwork | - 0 | ||||
| Base Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
| Overhead % | 0.00% | |||
| Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell G37). | - 0 | |||
| Profit % | 0.00% | |||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell G37) plus the calculated Overhead (cell G39). | - 0 | |||
| Bond % | 0.00% | |||
| Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell G37), the amount of calculated Overhead (cell G39) and the amount of calculated Profit (cell G40). | - 0 | |||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Schneider, Kimberly Reynolds: Schneider, Kimberly Reynolds:
Enter as "-" amount Edward L Roy: Date Offer Prepared/Submitted
Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell G37).
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell G37) plus the calculated Overhead (cell G39).
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell G37), the amount of calculated Overhead (cell G39) and the amount of calculated Profit (cell G40).
Edward L Roy: Enter all Labor Costs by Division
Edward L Roy: Enter all Material Costs by Division Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .