SOL_140D0426R0111_OSHA_AE.pdf

PDF 447 KB Posted

Attached to
OSHA A/E Renovation Design and Phasing
Solicitation number
140D0426R0111
Issued by

About this file

This is a Request for Proposal (RFP) for Architecture and Engineering (A/E) design services and project phasing services for the Department of Labor's Occupational Safety and Health Administration (OSHA).

The OSHA Frances Perkins Building renovation project requires comprehensive A/E design services including schematic design, design development, construction documents, and project phasing strategy. The work involves designing renovations for multiple suites (N3100, N3600, N3700) at 200 Constitution Avenue NW, Washington, DC, with specialized requirements in space planning incorporating daylighting access, energy conservation, asbestos mitigation, and renovation phasing related to a dated infrastructure. The contract type is Firm-Fixed Price (FFP) with a 12-month performance period from award. Optional Construction Procurement Assistance and Management Services may be added with a performance period not to exceed 12 months. This is a small business set-aside with NAICS Code 541310 (Architectural Services) and a $12.5M size standard. The firm must be licensed and registered to practice architecture and engineering in Washington, D.C., and registered in the System for Award Management (SAM) prior to award.

The evaluation board will select the three most highly qualified firms based on: (1) professional qualifications of key personnel (Principal Architect, Senior Project Manager, Senior Interior Designer); (2) specialized experience and technical competence demonstrated through 3-7 projects completed within the past seven years; (3) capacity to accomplish work within the required timeframe; and (4) past performance on relevant projects. Firms must submit Standard Form 330 (SF330) not exceeding 75 pages with project examples, resumes, organizational charts, and past performance documentation (CPARS or Past Performance Questionnaires). RFP questions are due September 23, 2026 at 3:00pm EDT; responses are due October 13, 2026 at 10:00am EDT. One organized site visit is scheduled for September 18, 2026 at 10:00am ET. The most highly qualified firm will be given approximately 14 days to submit a price proposal, with award made to the firm providing a fair and reasonable price. The Contracting Officer is Ericka Graham (ericka_graham@ibc.doi.gov, 571-560-2329), and the Interior Business Center's Acquisition Services Directorate handles procurement, award, and contract administration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

INTERIOR BUSINESS CENTER

Washington, DC 20240

Request for Proposal (RFP) Project Title: A/E Design and Project Phasing Services Solicitation: 140D0426R0111

Part 1 – General

1.1 Issuing Agency:

Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD)

1.2 Requesting Agency:

Department of Labor (DOL), Occupational Safety and Health Administration (OSHA)

1.3 Contract Information:

AQD is a Federal Franchise Fund Contracting Office that operates under the authority of the Government Management Reform Act, as amended. AQD provides contracting support to all Federal Agencies and the Department of Defense. AQD Procurement will handle solicitation, award, contract administration, and invoice payments for this requirement.

This acquisition is for Architecture and Engineering (A/E) design services and will be awarded in accordance with Federal Acquisition Regulation (FAR) Subpart 36 - Architect-Engineer Services as deviated in the Revolutionary FAR Overhaul (RFO). Any offerors must be licensed and registered to work in Washington, D.C., and to be eligible for contract award the contractor must be registered in the System for Award Management (SAM). This is a small business set-aside.

NAICS Code: 541310 – Architectural Services Product Service Code: C211 - Architect and Engineering- General: Landscaping, Interior

Layout, and Designing SB Size Standard: $12.5M

1.4 Contract Administration:

(a) In no event shall any understanding, agreement, change, or other matter that deviates from the terms of this RFP between the contractor and a person other than the IBC AQD Contracting Officer (CO) be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by the Contracting Officer (CO).

(b) The CO is Ericka Graham, 571-560-2329, ericka_graham@ibc.doi.gov

(c) Contracting Officer’s Representative (COR): Provided upon award

(d) Contractor’s Information: TBD mailto:ericka_graham@ibc.doi.gov

Washington, DC 20240

(e) All contract administration associated will be performed by the CO and COR unless otherwise designated. Changes in the CO or COR will be made by written modification.

(f) The Contractor shall establish processes and assign appropriate resources to effectively administer the requirement. Duties include but are not limited to: responding to Government requests for contractual actions in a timely fashion; having a single point of contact between the Government and Contractor personnel assigned to support requirements; and assigning work effort and maintaining proper/accurate time keeping records of personnel assigned to work on the requirement.

1.5 Contract Type:

The anticipated contract type is Firm-Fixed Price (FFP).

1.6 Period of Performance:

The work must be completed within 12 months from the date of award. The Construction Procurement Assistance and Management Services will be optional services, and the performance period will be established when exercised. It will not exceed 12 months.

1.7 Place of Performance

Work will be primarily performed at the contractor’s site. Site visits and any on-site work will be performed at:

Frances Perkins Building 200 Constitution Ave. NW, Washington, DC 20210 Suites N3100, N3600, and N3700

1.8 Site Visits

Any site visits must be coordinated with the COR a minimum of five (5) business days in advance to ensure availability and to coordinate access. Reference Statement of Work (SOW) section 1.5 – Administrative Information for information about scheduling and requirements for any site visits or on-site work.

Typical availability will be Monday, Wednesday, and Friday (except Government Holidays) between the hours of 10am and 2pm, but mutually agreed upon days/times can be arranged with the COR.

1.8.1 Government Holidays

Government personnel will not be available and the Anacostia Park will be closed on following observed holidays: New Year's Day, Martin Luther King’s Birthday, Presidential Inauguration Day (metropolitan DC area only), George Washington’s Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day, and any other day designated by Federal Statute, Executive Order, or Presidential Proclamation.

Washington, DC 20240

1.9 Contractor Personnel

The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management and control of the resources assigned to the requirement. The Contractor is responsible for managing and overseeing the activities of all Contractor personnel, as well as subcontractor efforts used in performance of the contract. The Contractor's management responsibilities shall include all activities necessary to ensure the accomplishment of timely and effective delivery in accordance with the requirements contained in the SOW.

1.10 Subcontractors

The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement.

1.11 Non-Personal Services Contract

This is a “non-personal services” contract. It is therefore understood and agreed that the contractor and/or the contractor’s employees shall: (1) perform the services specified herein as independent contractors, not as employees of the government; (2) be responsible for their own management and administration of the work required and bear sole responsibility for complying with any and all technical, schedule, or financial requirements or constraints attendant to the performance of this contract; (3) be free from supervision or control by any government employee with respect to the manner or method of performance of the services specified; and (4) pursuant to the government’s right and obligation to inspect, accept or reject the work, comply with such direction of the COR; or the duly authorized representative as is necessary to ensure accomplishment of the contract objectives. The contractor shall include this language in all subcontracts for contractor support services under this contract.

1.12 Government Furnished Property (GFP)

The use of Government-Furnished Property is not anticipated for this contract.

1.13 Government Furnished Information (GFI)

Reference SOW Section 1.5.9 for a listing of Government Furnished Information.

1.14 Release of Information

The contractor shall not, unless authorized in writing by the Contracting Officer, release or provide any information or interpretation concerning data prepared under this contract to prospective construction contractors, manufacturers, or suppliers for their use in bidding or submitting quotations. Any cost estimates prepared by the A/E under this contract for use either by the Government or the contractor shall be considered privileged information and will not be divulged to any third party.

1.15 Publicity

(a) Except with the prior approval of the Contracting Officer, the firm or any of its consultants shall not release for publication any drawing, rendering, perspective, sketch, photograph, Washington, DC 20240 report, specification, cost estimate, or other material of any nature pertaining to the facilities for which services are performed under the terms of this contract.

(b) The provision of this article shall extend also to the release of any such material to any person not so authorized by the Contracting Officer.

1.16 Data Rights

All information acquired and documents generated during this effort shall belong to the Government. The Government will retain all rights and privileges, including those of patent and copy, to all Government furnished data and any contractor developed data. The Contractor shall neither retain nor reproduce for private or commercial use any data or other materials furnished under this contract. The Contractor agrees not to assert any rights at common law or in equity or establish any claim to statutory copyright in such data. These rights are not exclusive and are in addition to any other rights and remedies to which the Government is otherwise entitled elsewhere in this contract. No proprietary data or software shall be used or generated for this acquisition. The Government has rights to the data, which must not be used for marketing unless approved in advance by OSHA. Reference FAR Clauses 52.227-17 Rights in Data – Special Works (Dec 2007) for more information on the data rights.

1.17 Return of Data

The Government shall have the right to request the Contractor to return all data provided by the Government and/or developed/generated during the performance of this requirement. The Contractor shall return all data within 15 calendar days, upon request by the Contracting Officer.

Such request will be submitted in writing.

The Contractor shall timely convert all data, stored in electronic form, to a format, defined by the Government, within the 15-day transfer period. The Contractor shall convey such data at no-cost to the Government.

1.18 Organizational Conflicts of Interest

Award of a task order for A/E services for a particular project as described in the contract and the award of a contract for related construction work to the same firm, a parent firm, or its sub-consultants are prohibited. The A/E shall decline to enter into negotiations for any contract, if the firm, its parent firm, or sub-consultants intend to compete for the related construction contract.

This includes concept design, which includes preparation of project programming documents for all work identified in the Scope of Services or other activities that result in identification of project scope and cost. The prime firm and sub-consultants for this contract will be required to perform throughout the contract term.

The contractor, its representatives, its subcontractors, or employees performing work under this contract shall not subsequently provide services of a professional nature to any contractor, subcontractor, or consultant responsible for any phase of construction of any project developed as a result of this contract, participate in construction or design-build construction contract. In addition, no firm, its subcontractors, or individual(s) performing work under the subject contract

Washington, DC 20240 shall, unless authorized in writing by the Contracting Officer, release or provide any information or interpretations concerning data prepared under this contract to prospective construction contractors, manufacturers, or suppliers for their use in bidding or submitting quotations.

1.19 Quality Control

A documented internal Quality Control Program (QCP) must be applied to all services performed and must be used by all subcontractors or consultants. The QCP should include a system that identifies persistent quality issues and reduces their incidence in subsequent submittals. The system must include documentation that is reviewable by OSHA upon request.

In accordance with FAR 52.236-23 - Responsibility of the Architect-Engineer Contractor (JAN 2026), the contractor accepts ultimate responsibility, liability, and duty to control the quality of the services provided to OSHA. The contractor is responsible for professional quality, technical accuracy, and the coordination of all design subcontractors or consultants. The contractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, specifications, and other services.

1.20 Universal Design and Accessibility

All planning, design and construction projects shall meet and exceed the requirements of the Architectural Barriers Act Accessibility Standards (ABAAS), Section 504 (program access) and Section 508 (electronic and information technology access) of the Rehabilitation Act of 1973.

1.21 Protection of Historical and Archeological Data

The contractor agrees that should it, any of its employees, or subcontractors during the performance of this contract, discover evidence of possible scientific, prehistorical, historical, archaeological data, it will notify the CO and COR immediately, giving the location and nature of the findings. Written confirmation shall be forwarded within 2 working days. The contractor shall exercise care to avoid damage to artifacts or fossils uncovered during excavation operations and shall provide such cooperation and assistance as may be necessary to preserve the findings for removal or other disposition.

1.22 Executive Orders, Laws, and Regulations

Comply with Design Imperatives of the 2024 P100 Facilities Standards of the Public Building Services plus all applicable Executive, Secretarial and Director’s Orders, laws, management policies and regulations. Further information is in the SOW.

1.23 Fee Limitation

The six percent (6%) fee limitation (fee is limited to six percent (6%) of estimated construction costs) for A/E services applies only to the actual preparation of final designs, drawings, and specifications. Any services which are not integral part of the production of drawings and specifications may be excluded for the fee limitation.

1.24 Document Standards

Washington, DC 20240

Design shall be accomplished by licensed or registered design professionals in accordance with applicable codes and industry standards such as, but not limited to National CAD Standards (NCS) and Construction Specifications Institute (CSI) Manual of Practice.

1.25 Key Personnel

(a) The Contractor shall assign to this contract the following Key Personnel:

• Senior/Principal Architect

• Senior Project Manager

• Senior Interior Designer

The final award may have additional or alternate Key Personnel as a result of the proposed positions. Reference SOW Section 2.2.3 Key Personnel for additional information and qualification requirements.

(b) During the first 120 calendar days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph

(c) below. After the initial 30 calendar day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 calendar days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. This clause will be modified to reflect any approved changes of key personnel.

Part 2 - Statement of Work

See Attachment A – SOW OSHA Renovation Design & Phasing

Washington, DC 20240

Part 3 – Provisions and Clauses

3.1 Custom Contract Clauses

Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (February 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

- Invoice detailing completed tasks

- Description of billed item with quantity, unit rate, and total

- Total Invoice Amount

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal.

(End of Local Clause)

AQD Contractor Performance Assessment Reporting System (Dec 2015)

1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts.

The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

Washington, DC 20240

2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.

Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6. The following guidelines apply concerning your use of the past performance evaluation:

Washington, DC 20240

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of custom clause)

3.2 Contract Provisions

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.acquisition.gov/far/part-52

(End of provision)

Provision Title Date 52.203-2 Certificate of Independent Price Determination* Apr 1985 52.203-11 Certification and Disclosure Regarding Payments to Influence

Certain Federal Transactions Sep 2024

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation

Jan 2017

52.204-7 System for Award Management (Deviated Mar 2026) Nov 2024

Washington, DC 20240

52.209-2 Prohibition on Contracting with Inverted Domestic Corporations— Representation (Deviated May 2026)

Nov 2015

52.209-5 Certification Regarding Responsibility Matters (Deviated May 2026)*

Aug 2020

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Deviated May 2026)*

Feb 2016

52.209-13 Violation of Arms Control Treaties or Agreements—Certification (Deviated May 2026)*

Nov 2021

52.215-1 Instructions to Offerors—Competitive Acquisition – Alternate I Nov 2021 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other

Than Certified Cost or Pricing Data Nov 2021

52.216-1 Type of Contract Apr 1984 52.219-1 Small Business Program Representations (Deviated Jan 2026)* Feb 2024 52.232-13 Notice of Progress Payments Apr 1984 52.233-2 Service of Protest Sep 2006 52.237-1 Site Visit Apr 1984 52.240-90 Security Prohibitions and Exclusions Representatives and

Certifications Mar 2026

*Referenced provisions will be reviewed via SAM.

Provisions Incorporated in Full Text:

52.252-5 Authorized Deviations in Provisions (Nov 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Department of Interior Acquisition Regulation (Sec. 205(c), 63 Stat. 390, 40 U.S.C. 486(c); and 5 U.S.C. 301) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

DIAR Provisions

1452.215-71 Use and Disclosure of Proposal Information - Department of the Interior (Apr 1984)

(a) Definitions. For the purposes of this provision and the Freedom of Information Act (5 U.S.C.

552), the following terms shall have the meaning set forth below:

(1) “Trade Secret” means an unpatented, secret, commercially valuable plan, appliance, formula, or process, which is used for making, preparing, compounding, treating or processing articles or materials which are trade commodities.

Washington, DC 20240

(2) “Confidential commercial or financial information” means any business information (other than trade secrets) which is exempt from the mandatory disclosure requirement of the Freedom of Information Act, 5 U.S.C. 552. Exemptions from mandatory disclosure which may be applicable to business information contained in proposals include exemption (4), which covers “commercial and financial information obtained from a person and privileged or confidential,” and exemption (9), which covers “geological and geophysical information, including maps, concerning wells.”

(b) If the offeror, or its subcontractor(s), believes that the proposal contains trade secrets or confidential commercial or financial information exempt from disclosure under the Freedom of Information Act, (5 U.S.C. 552), the cover page of each copy of the proposal shall be marked with the following legend:

“The information specifically identified on pages ____________ of this proposal constitutes trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act. The offeror requests that this information not be disclosed to the public, except as may be required by law. The offeror also requests that this information not be used in whole or part by the government for any purpose other than to evaluate the proposal, except that if a contract is awarded to the offeror as a result of or in connection with the submission of the proposal, the Government shall have the right to use the information to the extent provided in the contract.”

(c) The offeror shall also specifically identify trade secret information and confidential commercial and financial information on the pages of the proposal on which it appears and shall mark each such page with the following legend:

“This page contains trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act and which is subject to the legend contained on the cover page of this proposal.”

(d) Information in a proposal identified by an offeror as trade secret information or confidential commercial and financial information shall be used by the Government only for the purpose of evaluating the proposal, except that (i) if a contract is awarded to the offeror as a result of or in connection with submission of the proposal, the Government shall have the right to use the information as provided in the contract, and (ii) if the same information is obtained from another source without restriction it may be used without restriction.

(e) If a request under the Freedom of Information Act seeks access to information in a proposal identified as trade secret information or confidential commercial and financial information, full consideration will be given to the offeror's view that the information constitutes trade secrets or confidential commercial or financial information. The offeror will also be promptly notified of the request and given an opportunity to provide additional evidence and argument in support of its position, unless administratively unfeasible to do so. If it is determined that information claimed by the offeror to be trade secret information or confidential commercial or financial

Washington, DC 20240 information is not exempt from disclosure under the Freedom of Information Act, the offeror will be notified of this determination prior to disclosure of the information.

(f) The Government assumes no liability for the disclosure or use of information contained in a proposal if not marked in accordance with paragraphs (b) and (c) of this provision. If a request under the Freedom of Information Act is made for information in a proposal not marked in accordance with paragraphs (b) and (c) of this provision, the offeror concerned shall be promptly notified of the request and given an opportunity to provide its position to the Government.

However, failure of an offeror to mark information contained in a proposal as trade secret information or confidential commercial or financial information will be treated by the Government as evidence that the information is not exempt from disclosure under the Freedom of Information Act, absent a showing that the failure to mark was due to unusual or extenuating circumstances, such as a showing that the offeror had intended to mark, but that markings were omitted from the offeror's proposal due to clerical error.

(End of provision)

FAR 52.233-2 Service of Protest Department of the Interior (JUL 1996) (Deviation)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer via email by obtaining written and dated acknowledgment of receipt from the Contracting Officer.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor, Acquisitions and Intellectual Property, 1849 C Street, NW., Room 6511, Washington, DC 20240.

(End of provision)

3.3 Contract Clauses

52.252-2 Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov/far/part-52

(End of clause) https://www.acquisition.gov/far/33.101#FAR_33_101

Washington, DC 20240

Clause Title Date 52.202-1 Definitions Jun 2020 52.203-3 Gratuities Apr 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government Jun 2020 52.203-7 Anti-Kickback Procedures Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity May 2014

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity May 2014

52.203-12 Limitation on Payments to Influence Certain Federal Transactions Jun 2020

52.203-17 Contractor Employee Whistleblower Rights Jun 2020

52.203-19

Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

Jan 2017

52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards (Deviated MAR 2026) Jun 2020

52.204-13 System for Award Management Maintenance (Deviated MAR 2026)

Oct 2018

52.204-14 Service Contract Reporting Requirements (Deviated MAR 2026) Oct 2016 52.204-19 Incorporation by Reference of Representations and Certifications Dec 2014 52.209-6 Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment (Deviated MAY 2026)

JAN 2025

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Deviated MAY 2026)

OCT 2018

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Deviated MAY 2026)

NOV 2015

52.215-2 Audit and Records—Negotiation JUN 2020 52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other

Than Certified Cost or Pricing Data—Modifications

NOV 2021

52.219-6 Notice of Total Small Business Set-Aside (Deviated JAN 2026) NOV 2020 52.219-8 Utilization of Small Business Concerns (Deviated JAN 2026) JAN 2025 52.219-14 Limitations on Subcontracting (Deviated JAN 2026) OCT 2022 52.219-28 Post-Award Small Business Program Rerepresentation (Deviated

JAN 2026)

JAN 2025

52.222-3 Convict Labor JUN 2003 52.222-35 Equal Opportunity for Veterans (Deviated May 2026) JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities (Deviated May

2026)

JUN 2020

52.222-37 Employment Reports on Veterans (Deviated May 2026) JUN 2020

Washington, DC 20240

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards AUG 2018 52.222-44 Fair Labor Standards Act and Service Contract Labor

Standards—Price Adjustment

MAY 2014

52.222-50 Combating Trafficking in Persons (Deviated May 2026) OCT 2025 52.222-54 Employment Eligibility Verification (Deviated May 2026) JAN 2025 52.222-55 Minimum Wages for Contractor Workers Under Executive Order

14026

JAN 2022

52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.222-90 Addressing DEI Discrimination by Federal Contractors MAY 2026 52.223-5 Pollution Prevention & Right-To-Know Information MAY 2024 52.223-23 Sustainable Products and Services (Deviated May 2026) MAY 2024 52.226-7 Drug-Free Workplace MAY 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While

Driving

MAY 2024

52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement

JUN 2020

52.227-17 Rights in Data—Special Works DEC 2007 52.229-3 Federal, State, and Local Taxes FEB 2013 52.232-10 Payments under Fixed-Price Architect-Engineer Contracts APR 2010 52.232-17 Interest MAY 2014 52.232-23 Assignment of Claims MAY 2014 52.232-26 Prompt Payment for Fixed-Price Architect-Engineer Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer—System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.233-1 Disputes MAY 2014 52.233-3 Protest after Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-22 Design Within Funding Limitations (Deviated JAN 2026) APR 1984 52.236-23 Responsibility of the Architect-Engineer Contractor (Deviated

JAN 2026)

APR 1984

52.236-24 Work Oversight in Architect-Engineer Contracts APR 1984 52.236-25 Requirements for Registration of Designers JUN 2003 52.237-2 Protection of Government Buildings, Equipment, and Vegetation APR 1984 52.240-91 Security Prohibitions and Exclusions MAR 2026 52.240-93 Basic Safeguarding of Covered Contractor Information Systems

(Deviated MAR 2026)

DEC 2025

52.242-13 Bankruptcy JUL 1995

Washington, DC 20240

52.242-14 Suspension of Work APR 1984 52.242-17 Government Delay of Work APR 1984 52.243-1 Changes—Fixed Price--Alternate III (Deviated OCT 2025) APR 1984 52.244-2 Subcontracts JUN 2020 52.244-4 Subcontractors and Outside Associates and Consultants

(Architect-Engineer Services)

AUG 1998

52.244-6 Subcontracts for Commercial Products and Commercial Services (Deviated MAY 2026)

OCT 2025

52.248-2 Value Engineering – Architect-Engineer MAR 1990 52.249-7 Termination (Fixed-Price Architect-Engineer) APR 1984 52.253-1 Computer Generated Forms (Deviated MAY 2026) JAN 1991

Clauses Incorporated in Full Text:

52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5 332.

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits

To be completed at award ____________________________

(End of clause)

52.252-6 Authorized Deviations in Clauses (Nov 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of Interior Acquisition Regulation (Sec. 205(c), 63 Stat. 390, 40 U.S.C. 486(c); and 5 U.S.C. 301) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section5341&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section5341&num=0&edition=prelim

Washington, DC 20240

DIAR Clauses

1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

Washington, DC 20240

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

1452.203-70 Restrictions on Endorsements (Jul 1996)

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.

(End of clause)

1452.204-70 Release of Claims (Jul 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

(End of clause)

1452.215-70 Examination of Records by the Department of the Interior.

As prescribed in 1415.209-70, insert the following clause:

Examination of Records by the Department of the Interior (APR 1984)

For purposes of the Examination of Records by the Comptroller General clause of this contract (FAR 52.215-1), the Secretary of the Interior, the Inspector General, and their duly authorized representative(s) from the Department of the Interior shall have the same access and examination rights as the Comptroller General of the United States.

(End of clause)

1452.228-70 Liability Insurance – Department of the Interior (JUL 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amount of the insurance shall be not less than as follows:

Washington, DC 20240

$200,000………each person

$500,000 ……...each occurrence

$20,000………...property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

Part 4 – RFP Instructions and Conditions

4.1 Proposal Preparation/Instructions

To ensure timely and equitable evaluation of proposals, firms must follow the instructions in this section. Firms are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Firms must clearly identify any exception to the solicitation terms and conditions and provide detailed rationale.

The Government is not liable for any costs incurred by the firm for the preparation and submission of the response to this opportunity.

1. Site Visit: OSHA will host one (1) organized site visit during the solicitation period.

Date/Time: Friday, September 18, 2026, at 10:00am ET

Location: 200 Constitution Ave. NW, Washington, DC 20210 Notes: Allow time to find street parking near the building. Enter through the Visitor’s Entrance located at 3rd and C St. NW. POC will meet at the visitor’s entrance at the agreed upon time to escort.

No contractor questions will be answered during the site visit. Contractors are asked to take note of any questions and submit them with the RFP questions.

Washington, DC 20240

POC: Courtney Kim, kim.courtney.t@dol.gov, 1-202-693-1000 ext. 10244 *POC should only be contacted regarding the site visit. Questions regarding the solicitation or project must follow the procedures below.

2. RFP Questions Due Date: Questions are due by September 23, 2026 at 3:00pm EDT.

Responses must be submitted via email to CO Ericka Graham, ericka_graham@ibc.doi.gov.

a. Please include “Firm Name – Solicitation Number – Questions” in the Subject Line.

b. Questions must be submitted using Attachment B – OSHA Reno Design Q&A

c. Responses to questions will be provided as a Solicitation Amendment and posted to

SAM.gov.

3. RFP Response Due Date: Responses to this RFP are due by October 13, 2026 at 10:00am EDT using the below procedures. All responses must be submitted electronically using the link provided. Late responses will not be evaluated.

4. How to Submit Responses:

a.) Firms must submit complete responses in accordance with the Submission Requirements in Section 4.3. Responses must be submitted using the link below.

After selecting the link, the firm will either Drag and Drop the files where indicated or click “Select Files” and upload them. Once all files are uploaded, click the “Submit” button. Incomplete responses will not be evaluated.

Submit Responses – RFP 140D0426R0111 b.) File Name: Label all files with the Firm Name, Solicitation Number, and a brief file description. For example, “Firm ABC – 140D0426R0111 – SF330 Part I”.

c.) Please email CO Ericka Graham, ericka_graham@ibc.doi.gov a notification of submission to receive a confirmation of receipt. It is the firm’s responsibility to ensure timely receipt of submissions.

4.2 Mandatory Registrations

a.) In accordance with FAR 52.236-25 - Requirements for Registration of Designers (June 2003), the A/E firm must be a registered/licensed architectural and/or engineering firm to be eligible for award. Provide proof that firm is permitted by law to practice the professions of architecture and engineering, (e.g. state registration number, or a brief explanation of the firm’s licensing in jurisdictions that do not register firms) in the District of Columbia. Failure to submit the required proof could result in a firm’s elimination from consideration.

b.) To be eligible for a contract award, the firm must be registered in System for Award Management (SAM). Failure to register in the SAM Database prior to contract award will render your firm ineligible for award.

mailto:kim.courtney.t@dol.gov mailto:ericka_graham@ibc.doi.gov https://doi-ibc.app.box.com/f/b4b46a26cec545f5aa18a1ebd8055377 mailto:ericka_graham@ibc.doi.gov

4.3 Submission Requirements

Qualified contractors that are interested in submitting an offer must submit one Standard Form 330 (SF330). The firm is required to complete ALL sections of Part I and Part II of the SF330.

Firms must comply with the instructions of the SF330 and the requirements stated within this document. Instructions and Fillable copies of the SF330 document may be obtained from the GSA Forms Library:

Forms | GSA

Firms may opt to provide the SF330 in Microsoft Word or InDesign, so long as includes all the required sections. An electronic, wet, or digital signatures from an authorized individual is acceptable. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details is the sole responsibility of the firm. Files must be clearly indexed and logically assembled on letter sized pages. Standard margins (not less than the SF330 and standard size fonts (not less than 11pt) are required. Headers, footers, tables, spreadsheets, figures, and graphics may have a font size no less than 8pt.

The SF330-Part I must not exceed 75 pages. All pages are considered part of the count with the exception of the following: cover page, table of contents, CPARS or Past Performance Questionnaires (PPQ), labor category tables, dividers/divider pages, acronym tables, licenses/proof of A/E firm registration, and any Partnership or JV paperwork. Please include page numbers on pages that will be counted towards the page limitation. Pages that exceed the limits listed below will not be evaluated.

4.4 SF-330 Document Content Format

Submissions must include the following items, or firm will be considered non-responsive and will not be evaluated:

Introduction o Cover Page with Firm Name, Address, SAM UEI / CAGE number, and the name and contact information for the point of contact for the proposal.

o Table of Contents (bookmarked) o Provide proof that firm is permitted by law to practice the professions of architecture and engineering, (e.g. state registration number, or a brief explanation of the firm’s licensing in jurisdictions that do not register firms).

o Acknowledgement of Solicitation Amendments, if applicable (provide signed copies of

SF-30).

o Please indicate all technical-related assumptions that have been made, conditions that have been stipulated, or exceptions that have been taken with the SOW or solicitation as written. If technical assumptions are not noted in this section of the proposal, it will be assumed that the offer reflects no technical assumptions for award and the offeror agrees to comply with all of the terms and conditions set forth herein. The offeror is advised that https://www.gsa.gov/forms?combine=sf330&field_form_type_value=All&field_form_category_value=All&captcha_sid=29107683&captcha_token=DNONzTojbPrmV5o77WjeAiE66-LPf4xc3TXX-O1LytM

Washington, DC 20240 any exception taken to the terms and conditions of the RFP or SOW may adversely impact the ability to award.

o Teaming Arrangements/Partnership or JV Paperwork, if applicable

SF330 Part I – Contract Specific Qualifications o Section A-D: For Section D provide a separate attachment with the organizational chart of proposed team;

o Section E: Resumes of Key Personnel Proposed for this Contract (complete one Section E for each person). The Principal Architect, any proposed Project Architect, and/or Engineers must be licensed and registered in the District of Columbia. Provide registration number and state of registration in résumé or type of certification as applicable. Indicate if licensure can be achieved by reciprocity for states where the firm’s key personnel are not currently registered.

o Section F: Example Projects (complete one Section F for each project) – provide 3-7…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .