This is a Request for Quotation (RFQ) for HVAC preventative maintenance services at National Weather Service facilities in Mount Holly, New Jersey and Fort Dix, New Jersey. The contract is not a small business set-aside and is issued as a firm-fixed-price service contract with a base year and four option years.
The scope of work includes quarterly preventative maintenance on HVAC equipment, control systems, variable frequency drives (VFDs), and water filtration systems at one Weather Forecast Office (WFO), one Maintenance Annex, and one NEXRAD radar location. Specific services include servicing heat pumps and condensing units (quarterly calibration and lubrication; semi-annual coil cleaning; annual refrigerant pressure checks and belt replacement), fans and air handling units (quarterly belt tensioning and lubrication; semi-annual filter changes and coil cleaning; annual coil inspection and drain pan cleaning), self-contained BARD wall-mount HVAC units (semi-annual filter and coil cleaning), water filter replacement (annually), humidifier cylinder replacement (annually), instant water heater flushing (annually), and battery replacement for controllers and VFDs (annually). The contractor must also provide unscheduled emergency repair services with a 4-hour response time during normal business hours (8:00 AM–5:00 PM EST, Monday–Friday) and an 8-hour response time outside normal hours, with 24-hour availability. The contract period runs from September 18, 2026 through September 17, 2031, including a one-year base term and four one-year option periods. Quotations must be submitted by August 10, 2026 at 12:00 PM EDT to Jamie.Rosales@noaa.gov. Award will be made to the responsible offeror with the lowest price that meets technical acceptability and past performance criteria. Pricing must include all labor, materials, equipment, transportation, and applicable federal, state, and local taxes. The contractor must employ EPA Section 608 Certified HVAC technicians, comply with NFPA 70E and OSHA standards, and maintain comprehensive sexual assault and harassment prevention training per NOAA policy. Contractor employees must wear identification badges, sign in/out daily, and comply with all Department of Commerce facility security and safety regulations. The Government will handle invoices per the Prompt Payment Act and requires electronic payment submission through the Invoice Processing Platform.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1305M326Q0383_Amd_0001.pdf | ||
| Attachment_6B_142010-26-0151.pdf | ||
| Attachment_9_142010-26-0151.pdf | ||
| Attachment_8B_142010-26-0151.pdf | ||
| Attachment_7B_142010-26-0151.pdf | ||
| Wage_Determination_2015-4191_Burlington.txt | TXT text file | |
| Attachment_7A_142010-26-0151.pdf | ||
| Attachment_10_142010-26-0151.pdf | ||
| Attachment_2_142010-26-0151.pdf | ||
| Attachment_4_142010-26-0151.pdf | ||
| Attachment_6A_142010-26-0151.pdf | ||
| Attachment_3_142010-26-0151.pdf | ||
| Attachment_1_142010-26-0151.pdf | ||
| Attachment_5_142010-26-0151.pdf | ||
| Attachment_8A_142010-26-0151.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6/1995)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NUMBER
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
c. CITY
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
732 WOODLANE ROAD
WAD-OAR
325 BROADWAY, SOU6
BOULDER CO 80305
1305M326Q0383
JAMIE ROSALES
PHILADEL WFO (MT. HOLLY) NJ
08060
07/31/2026
08/10/2026 1200 MD
MT. HOLLY
NJ
1 46
1305M326Q0383 BASE
Section II - Supplies or Services and Price/Costs Section III - Description/Specifications Section IX - Contract Clauses Section X - List of Attachments Section XII - Instructions, Conditions, and Notices
Section II - Supplies or Services and Price/Costs
CLIN List
Item Number Description Quantity Unit Unit Price Amount
0001 4 QF
BASE YEAR - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Quarterly HVAC preventative maintenance at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work. Period of Performance 09/18/2026 through 09/17/2027.
Award Type: Firm-fixed-price
0002 2 JA
BASE YEAR - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Semi-annual HVAC preventative maintenance at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2026 through 09/17/2027.
Award Type: Firm-fixed-price
BASE YEAR - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work.
Period of Performance 09/18/2026 through 09/17/2027. Please provide an hourly rate.
Award Type: Firm-fixed-price
BASE YEAR - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2026 through 09/17/2027. Please provide an hourly rate.
Item Number Description Quantity Unit Unit Price Amount
Award Type: Firm-fixed-price
1001 4 QF
OPTION YEAR 1 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Quarterly HVAC preventative maintenance at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work. Period of Performance 09/18/2027 through 09/17/2028.
Award Type: Firm-fixed-price
(Option Line Item)
1002 2 JA
OPTION YEAR 1 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Semi-annual HVAC preventative maintenance at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2027 through 09/17/2028.
Award Type: Firm-fixed-price
(Option Line Item)
OPTION YEAR 1 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work.
Period of Performance 09/18/2027 through 09/17/2028. Please provide an hourly rate.
Award Type: Firm-fixed-price
(Option Line Item)
OPTION YEAR 1 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance
Item Number Description Quantity Unit Unit Price Amount
09/18/2027 through 09/17/2028. Please provide an hourly rate.
Award Type: Firm-fixed-price
(Option Line Item)
2001 4 QF
OPTION YEAR 2 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Quarterly HVAC preventative maintenance at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work. Period of Performance 09/18/2028 through 09/17/2029.
Award Type: Firm-fixed-price
(Option Line Item)
2002 2 JA
OPTION YEAR 2 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Semi-annual HVAC preventative maintenance at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2028 through 09/17/2029.
Award Type: Firm-fixed-price
(Option Line Item)
OPTION YEAR 2 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work.
Period of Performance 09/18/2028 through 09/17/2029. Please provide an hourly rate.
Award Type: Firm-fixed-price
(Option Line Item)
OPTION YEAR 2 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the
Item Number Description Quantity Unit Unit Price Amount
Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2028 through 09/17/2029. Please provide an hourly rate.
Award Type: Firm-fixed-price
(Option Line Item)
3001 4 QF
OPTION YEAR 3 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Quarterly HVAC preventative maintenance at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work. Period of Performance 09/18/2029 through 09/17/2030.
Award Type: Firm-fixed-price
(Option Line Item)
3002 2 JA
OPTION YEAR 3 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Semi-annual HVAC preventative maintenance at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2029 through 09/17/2030.
Award Type: Firm-fixed-price
(Option Line Item)
OPTION YEAR 3 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work.
Period of Performance 09/18/2029 through 09/17/2030. Please provide an hourly rate.
Award Type: Firm-fixed-price
(Option Line Item)
Item Number Description Quantity Unit Unit Price Amount
OPTION YEAR 3 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2029 through 09/17/2030. Please provide an hourly rate.
Award Type: Firm-fixed-price
(Option Line Item)
4001 4 QF
OPTION YEAR 4 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Quarterly HVAC preventative maintenance at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work. Period of Performance 09/18/2030 through 09/17/2031.
Award Type: Firm-fixed-price
(Option Line Item)
4002 2 JA
OPTION YEAR 4 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for Semi-annual HVAC preventative maintenance at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2030 through 09/17/2031.
Award Type: Firm-fixed-price
(Option Line Item)
OPTION YEAR 4 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Weather Forecast Office (WFO) and Maintenance Annex in Mount Holly, NJ in accordance with the Statement of Work.
Period of Performance 09/18/2030 through 09/17/2031. Please provide an hourly rate.
Item Number Description Quantity Unit Unit Price Amount
Award Type: Firm-fixed-price
(Option Line Item)
OPTION YEAR 4 - Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for unscheduled emergency repairs at the Next Generation Weather Radar (NEXRAD) site in Fort Dix, NJ, Fort Dix (U.S. Army Military Base) in accordance with the Statement of Work. Period of Performance 09/18/2030 through 09/17/2031. Please provide an hourly rate.
Award Type: Firm-fixed-price
(Option Line Item)
Section III - Description/Specifications
STATEMENT OF WORK SOW
HVAC PREVENTATIVE MAINTENANCE SERVICES
1.0 GENERAL
1.1 BACKGROUND
The National Weather Service (NWS) Eastern Region (ER) has a requirement for HVAC (Heating, Ventilation and Air Conditioning) Preventative Maintenance Services. This includes equipment, control systems, variable frequency drives (VFDs), and water filtration at select Weather Forecast Offices (WFO), Maintenance Annexes, and Next Generation Radar (NEXRAD) locations.
The NWS ER provides critical weather forecasts and warnings for the eastern portion of the United States, including adjacent waters and ocean areas, for the protection of life and property and the enhancement of the national economy. This Weather Forecast Office (WFO) and Next Generation Radar (NEXRAD) locations are used to make timely meteorological observations which aids in this effort. These locations operate 24x7 with staffing and critical equipment to provide the forecasts and warnings.
Preventive maintenance is a strategy in which maintenance work is performed ahead of time to prevent asset failures that can result in downtime, safety issues, and shutdowns. Preventive maintenance boosts uptime, reduces costs, and simplifies labor, part, and resource planning for maintenance planners.
Preventive maintenance is a powerful strategy for maximizing asset lifespan and optimizing production, labor, and resource efficiency across NWS facilities. Scheduling of preventive maintenance is to prevent failures and shutdowns.
The purpose of this contract is to maintain HVAC and associated equipment, replace control system and VFD batteries, and replace humidification cylinders and water filters. In order to ensure continuity of operations, maintain environmental setpoints for personnel and equipment, and prevent asset failures, we require a planned maintenance schedule per industry standards. Specifically, the contract involves:
- HVAC Maintenance: routine servicing of equipment to maximize asset lifespan and prevent downtime.
- Battery Replacement: replacing batteries for control systems and VFDs to maintain system programming logic during electrical disruptions.
- Filtration: replacing humidification cylinders and water filters at designated locations.
1.2 SCOPE
1.2.1 The scope of this contract is to perform preventative maintenance at one (1) WFO, (1) Maintenance Annex, and one (1) NEXRAD location.
The preventative maintenance work includes: a scheduled service (performed quarterly or as noted) at the component level for HVAC equipment which includes all internal parts/components (filters, belts, etc.), plus associated fire alarm, smoke, and heat or CO/CO2 detectors. In addition, this scheduled service includes humidity controls and cylinders, system backup batteries (control systems & VFDs) and water filter replacements. All HVAC equipment shall be serviced and maintained under this agreement including, but not limited to, the following: Air Handler Units, Electronic Duct Heaters, Condensing Units, Humidifier Systems, Heat Pumps, VAV Boxes, Dampers and Louvers, Exhaust Fans, Control Systems including sensors, transmitters, Differential Pressure Switches and all other components.
This preventive maintenance program includes all HVAC equipment and associated equipment.
The selected locations under this contract are as follows:
- Mount Holly, NJ
- Fort Dix, NJ
1.2.2 Any standard industry preventative maintenance activities not specifically mentioned to be addressed herein or included in the manufacturer’s maintenance manual, but for which are obviously necessary to ensure 24x7 equipment operation or for work which comes within the intent of this contract, is to be included as though specified.
1.2.3 The type of equipment and work procedures varies between locations. The equipment by location is as follows:
WFO location:
- TRANE Condensing Units
- CARRIER Air Handling Units
- NORTEC Humidifier
- SIEMENS Talon Supervisory Control System o Compact Controller o VFDs o Damper Actuators
- EEMAX Instant Water Heater
- BARD 6.0 Ton 460V Wall Mount HVAC Units
- BARD Lead/Lag Controller
- NORTEC Humidifier Maintenance Annex location:
- COLEMAN Condensing Unit
- COLEMAN Indoor Unit
- NAVIEN Instant Water Heater
NEXRAD location:
- BARD 6.0 Ton 208V Wall Mount HVAC Units
- BARD 3.0 Ton 208V Wall Mount HVAC Unit
- BARD Lead/Lag Controller
Additional details of the specific equipment at each location is provided in Section 4.3 PLACE OF PERFORMANCE AND Section 4.6 EQUIPMENT SCHEDULE.
1.3 OBJECTIVE
The objective is to provide 100% reliable operation of all equipment, associated equipment and components through a scheduled preventative maintenance service plan.
The HVAC preventative maintenance service plan will be an annual plan performed on a quarterly basis or as noted to ensure all equipment is operating within factory specifications and performs as designed.
The HVAC preventive maintenance plan is a set of regular scheduled inspections and preventative maintenance services performed on HVAC systems and associated equipment to ensure the system(s) and equipment run efficiently, lasts longer, and does not need expensive repairs or replacement.
Other planned tasks are to ensure 100% reliable operation of systems and/or equipment.
1.4 APPLICABLE DOCUMENTS
1.4.1 COMPLIANCE DOCUMENTS
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
NFPA 70E, Standard for Electrical Safety in the Workplace (National Fire Protection Agency 2024)
29 CFR 1910, Occupational Safety and Health Standards and 29 CFR Part 1926 (Occupational Safety and Health Administration 1970)
ASHRAE Standard 15-2022, Safety Standard for Refrigeration Systems Applications (American Society of Heating, Refrigerating and Air-Conditioning Engineers 2022)
2.0 SPECIFIC REQUIREMENTS AND TASKS
All prospective bidders are encouraged to request a site visit to clarify the actual scope of work to be performed under this contract. Failure of a bidder to arrange a site visit shall not constitute grounds for a later claim against the Government. A pre-proposal site visit to the location is encouraged, but NOT a requirement in order to respond to this request for proposal. Any contractor request for a site visit must be coordinated in advance with the Government by contacting the Contracting Officer (CO) directly. The CO will notify the Technical Point of Contact (TPOC). The TPOC will coordinate a site visit for prospective bidders with the Local Point of Contact (LPOC).
The contractor is to supply all needed ladders, stepladders, flashlights and any other required miscellaneous equipment during the site visit for their own use.
The contractor shall evaluate existing conditions on-site prior to any work being performed. The contractor is to perform a visual inspection of all HVAC equipment and associated equipment and site conditions prior to the start of work (including submittals and ordering materials); field verification will take precedence over any discrepancy within the Statement of Work. The TPOC is to be contacted and briefed prior to starting any work. The contractor is not to make any modifications to Government owned equipment under this contract without advance approvals.
The contractor shall provide the labor, tools, supplies, materials, transportation, services, and supervision required to perform all work outlined in this Statement of Work (SOW).
The contractor shall provide signed typewritten copies of all reports to the Technical Point of Contact (TPOC), as outlined in Section 9.0 DELIVERABLES.
If there are discrepancies in this document, the Contactor shall ask for clarification from the TPOC prior to bid. If no clarification is requested, the Contracting Officer’s (CO) judgement shall rule.
The contractor shall discuss their sequence of work with the Local Point of Contact (LPOC) to ensure when HVAC equipment can be taken off-line, and minimize the time equipment remains off-line. Also, the LPOC will make all internal notifications to those affected by any planned tasks. Only one (1) HVAC system can be worked on at any given time.
The NWS has no designated area to store maintenance materials onsite at any location.
The NWS has no designated area to store any hazardous or flammable chemicals used in the course of the contractor’s work tasks and these are never to be left on site.
The contractor shall clean up all work areas at the end of each day.
2.1 HVAC PREVENTATIVE MAINTENANCE TASKS
2.1.1 Heat Pumps and A/C Condensing Units
Quarterly (4x)
- Lubricate bearings and compressor.
- Calibrate all safety/operating controls.
- Check condition of condenser coils, perform addition cleaning.
- Check all operating conditions and make adjustments.
Semi-Annually (2x)
- Calibrate thermostats.
- Check condition of condenser coils; clean coils two (2) times per year. Plan cleaning activities near Spring timeframe, and then again mid-season or later.
- Provide status of coil condition in Field Activity Report.
- Check and record temperature differences across the condenser and evaporator coils.
Annually (1x)
- Install gauges and record refrigerant pressures.
- Check and tighten all electrical connections.
- Check and record compressor voltage and running amps.
- Check and record super heat temperature.
- Check and record sub-cooling temperature.
- Check condition of blower wheels and drive belts; replace and re-tension belts.
- Leak test refrigerant circuits.
2.1.2 Fans and Air Handling Units
Quarterly (4x)
- Re-tension belts and sheaves.
- Check motor mounts and vibration pads; check for excessive vibration or noise. Check motor operating conditions. Note findings to customer.
- Inspect electrical connections and conductors. Note findings to customer.
- Lubricate and adjust associated dampers, motors and linkage.
- Check all fan operations. Note findings to customer.
- Check heating and cooling coils. Note findings to customer.
- Lubricate fan and motor bearings per manufacturer’s recommendation.
- Check and tighten locking collars and bolts; torque per manufacturer’s specifications.
- Check coils, perform addition cleaning.
- Check all operating conditions and make adjustment.
- Check pleated air filters. Note findings to customer.
Semi-Annually (2x)
- Tighten all nuts and bolts.
- Change pleated air filters.
o AHUs 1, 2 & 3
- Follow manufacturer’s recommendation for replacement schedule; adjust replacement frequency (if manufacturer recommends a more frequent replacement) or if field conditions dictate replacement.
Each location’s equipment operates on a different run cycle due to its physical location and/or local weather conditions.
- Provide status of filter condition and/or replacement in Field Activity Report.
- Check motor operating conditions. Note findings to customer.
- Check and clean fan blades.
- Adjust fan belt tension.
Annually (1x)
- Check condition of AHU evaporator coils; inspect and clean coils one (1) time per year.
- Provide status of coil condition in Field Activity Report.
- Inspect and clean condensate drain pans and piping to ensure proper drainage; clean drains and drain pans annually, and each additional site visit if required.
- Humification Cylinders (canisters); see section 2.1.6
- Clean external surfaces.
- Inspect for leaks. Note findings to customer.
- Replace all belts annually. Adjust fan belt tension.
- Inspect operating and safety controls. Note findings to customer.
2.1.3 Self Contained Package Units (BARD Wall Mount HVAC Units)
NOTE: all locations with redundant wall mount HVAC units require 24x7 availability of the backup equipment.
Semi-Annually (2x)
- Change pleated air filters.
o BARD Wall Mount HVAC Units
- Follow manufacturer’s recommendation for replacement schedule; adjust replacement frequency (if manufacturer recommends a more frequent replacement) or if field conditions dictate replacement.
Each location’s equipment operates on a different run cycle due to its physical location and/or local weather conditions.
- Clean washable aluminum filter for the economizer. This filter requires washing and drying semi-annually.
- Check condition of condenser coils; clean coils two (2) times per year. Plan cleaning activities near Spring timeframe, and then again mid-season or later. Coordinate activity with TPOC and LPOC.
- Provide status of coil condition in Field Activity Report.
- Provide status of filter condition and/or replacement in Field Activity Report.
- Inspect condensate drain piping semi-annually to ensure proper drainage; clean blockages.
- Inspect refrigerant piping and fittings for leaks. Note findings to customer.
- Check motor operating conditions. Note findings to customer.
- Check and clean fan blades.
- Verify sequence of operation for Lead/Lag controller interface between units. Note: redundant wall mount HVAC units require 24x7 availability, each serves as backup equipment.
2.1.4 Additional HVAC Equipment tasks
Annually (1x)
- Replace all fan belts. Adjust belt tension.
- Inspect condition of evaporator coils. Note findings to customer.
- Lubricate fan motor bearings per manufacturer’s recommendations.
- Check and tighten locking collar bolts; torque per manufacturer’s specifications.
- Check compressor oil pressure and level. Note findings to customer.
- Check compressor amperage draw with ammeter and record readings.
- Check and record compressor motor windings with a megohm meter.
- Install pressure gauges and check and record refrigerant pressures.
- Check operation of heating section at the beginning of each heating season.
- Check vessel connections for leaks. Note findings to customer.
- Check condenser and receiver relief valves for leaks. Note findings to customer.
- Check refrigeration systems and piping for problems. Note findings to customer.
- Calibrate pressure gauges and thermometers.
- Check safety controls for proper settings and operation. Note findings to customer.
- Check and tighten electrical connections.
- Monitor compressors to determine integrity of motor windings and record readings.
- Change oil filters and clean strainers.
- Check oil heaters and controls. Note findings to customer.
- Remove condenser heads and brush/clean tubes, re-install.
- Inspect condensers for signs of corrosion. Note findings to customer.
- Check evaporator coils. Clean.
- Clean inlet vanes/linkage and IGV ring.
- Verify proper operation of inlet vane assembly. Note findings to customer.
- Inspect fan motor control. Note findings to customer.
- Inspect and clean condensate drain pans and piping to ensure proper drainage; clean drains and drain pans.
- Tighten set screws on fan assembly locking collar; torque per manufacturer’s specifications.
2.1.5 Water Filter(s) WFO Equipment Room and Mezzanine Level
Annually (1x)
- Check for leaks and provide corrective action to resolve field condition.
- Replace filter cartridges.
- Provide status of water filter condition in Field Activity Report.
2.1.6 Humidifier Cylinders (canisters) WFO Equipment Room and Mezzanine Level
Annually (1x)
- Check for leaks and provide corrective action to resolve field condition.
- Replace humidification cylinders.
- NOTE: Humidification System requires draining and securing it from operation during summer months when air conditioning is in use.
- Provide status of cylinder condition in Field Activity Report.
2.1.7 Instant Water Heaters
Annually (1x)
- Clean.
- Full flush.
- Follow manufacturer recommendations.
2.1.8 Batteries for Controllers and VFDs
Annually (1x)
- Inspect and replace batteries.
2.1.9 The contractor is to advise both the TPOC and LPOC of any deficiencies noted during the above inspections and make recommendations to correct the deficiencies. This includes recommended repairs to replace either failing or failed components which were noticed during their visit.
2.2 SCHEDULING
The scheduling for this contract shall coordinate with Spring, Summer, Fall, and Winter periods.
Additional visits may be required within these three (3) month windows.
Site visits and preventative maintenance tasks/activities shall be performed: quarterly on all identified building HVAC equipment located at a WFO.
Site visits and preventative maintenance tasks/activities shall be performed: semi-annual on all BARD Wall Mount units (WFOs and NEXRADs).
2.3 UNSCHEDULED EMERGENCY REPAIRS
2.3.1 The contractor shall provide qualified service personnel and parts to provide non-routine, unscheduled emergency repairs as necessary to sustain continuous operation of HVAC equipment at these buildings. Estimates shall be provided to the TPOC for review.
Unscheduled emergency repairs will be invoiced, and include labor, parts, and components required to troubleshoot, diagnose or repair faulty equipment. Emergency repairs shall not exceed the amount(s) listed within the schedule of the contract without the written authorization of the Contracting Officer.
2.3.2 The contractor shall provide a 24-hour telephone number and respond within four (4) hours of any call for service. Normal working hours are 8:00 AM to 5:00 PM Eastern Time, Monday thru Friday, excluding federal holidays. The WFO is a 24/7 working environment, and the contractor shall provide a four (4) hour response time during normal working hours, and an eight (8) hour response time outside of normal working hours for any other needed unscheduled repairs.
2.4 REFERENCE DOCUMENTS
The following documents may be helpful to the contractor in performance of their work:
- ATTACHMENT 1: TRANE condensing units o Operation & Maintenance Manuals
- ATTACHMENT 2: CARRIER air handling units o Operation & Maintenance Manuals
- ATTACHMENT 3: NORTEC HUMIDIFER
o Operation & Maintenance Manuals
- ATTACHMENT 4: BARD wall mount HVAC o Application Guide and Technical Product Overview
- ATTACHMENT 5: BARD Lead/Lag Controller o Installation Instructions and Replacement Parts List
- ATTACHMENT 6A: SIEMENS Talon Controller o Operation and Troubleshooting Manual
- ATTACHMENT 6B: SIEMENS Talon Controller o Technical Sheets
- ATTACHMENT 7A: SIEMENS Damper Actuators o Installation Instructions and Parts List
- ATTACHMENT 7B: SIEMENS Damper Actuators o Technical Instructions
- ATTACHMENT 7: SIEMENS Talon Controller o Operation and Troubleshooting Manual
- ATTACHMENT 8A: NAVIEN NPE Water Heater o Operation and Troubleshooting Manual
- ATTACHMENT 8B: NAVIEN Water Heater Controller o Installation Instructions and Programming
- ATTACHMENT 9: Instant Mini Tank Water Heater o Installation and Maintenance Instructions
- ATTACHMENT 10: Photos o Equipment Name Plate Data Information
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
3.1.1 The contractor shall provide qualified personnel to perform all of the requirements specified in this SOW.
3.1.2 HVAC Technicians shall hold a professional certification that confirms they're skilled in the fundamentals of heating and refrigeration or in special HVAC topics.
3.1.3 Qualification of Field Service personnel: each worker shall be licensed, trained and certified as a HVAC Technician.
3.1.4 HVAC technician(s) must have a valid HVAC refrigerant license, formally known as the EPA Section 608 Certification, which is federally mandated for any technician who maintains, services, repairs, or disposes of equipment that could release refrigerants into the atmosphere.
3.1.5 All HVAC Technicians and any other workers on-site must be trained in lockout / tagout (LOTO) procedures.
3.1.6 Field Service personnel shall be trained in NFPA 70E, OSHA 29 CFR 1910 and the proper use of
PPE.
https://www.google.com/search?q=EPA+Section+608+Certification&rlz=1C1GCOT_enUS1158US1158&oq=hvac+refrigerant+license&gs_lcrp=EgZjaHJvbWUyCQgAEEUYORiABDILCAEQABgWGB4YsQYyCwgCEAAYFhgeGLEGMgsIAxAAGBYYHhixBjILCAQQABgWGB4YsQYyCwgFEAAYFhgeGLEGMgsIBhAAGBYYHhixBjIQCAcQABiLAxiiBBiJBRixBjITCAgQABiGAxiLAxiABBiKBRixBjITCAkQABiGAxiLAxiABBiKBRixBtIBCjEzNTY2ajFqMTWoAgiwAgHxBTetUofoJS_z8QU3rVKH6CUv8w&sourceid=chrome&ie=UTF-8&ved=2ahUKEwjR3rCxhK-SAxWULFkFHbbWLQwQgK4QegQIARAB https://www.google.com/search?q=EPA+Section+608+Certification&rlz=1C1GCOT_enUS1158US1158&oq=hvac+refrigerant+license&gs_lcrp=EgZjaHJvbWUyCQgAEEUYORiABDILCAEQABgWGB4YsQYyCwgCEAAYFhgeGLEGMgsIAxAAGBYYHhixBjILCAQQABgWGB4YsQYyCwgFEAAYFhgeGLEGMgsIBhAAGBYYHhixBjIQCAcQABiLAxiiBBiJBRixBjITCAgQABiGAxiLAxiABBiKBRixBjITCAkQABiGAxiLAxiABBiKBRixBtIBCjEzNTY2ajFqMTWoAgiwAgHxBTetUofoJS_z8QU3rVKH6CUv8w&sourceid=chrome&ie=UTF-8&ved=2ahUKEwjR3rCxhK-SAxWULFkFHbbWLQwQgK4QegQIARAB
3.1.7 Field Service personnel on-site must be trained in hazard recognition and working around operating equipment.
3.1.8 Only qualified personnel may work on electric circuit parts or equipment that has not been deenergized. NEC 70 defines “qualified person” as one who has skills and knowledge related to the construction and operation of the electrical equipment and installations and received safety training to recognize and avoid hazards involved. The qualified personnel shall be properly trained regarding working safely on energized circuits and shall be familiar with the proper use of special precautionary techniques, personal protective equipment (PPE), insulating and shielding materials and insulated tools as stated in 29 CFR 1910.333(c)(2).
3.1.9 All work shall be performed and completed in a workmanship-like manner and in accordance with the latest proven practices of the trade by thoroughly skilled and experienced workers.
3.2 PROJECT MANAGER
3.2.1 The contractor shall provide one (1) Project Manager who shall be responsible for all contractor work performed under this SOW.
3.2.2 The Project Manager shall be a single point of contact for the Contracting Officer (CO) and the Technical Point of Contact (TPOC). The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the contractor in the absence of the Project Manager, shall be provided to the Government as part of the contractor's proposal. The Project Manager and all designated alternates shall be able to read, write, speak and understand English. Additionally, the contractor shall not replace the Project Manager without prior approval from the CO.
3.2.3 The Project Manager shall be available to the TPOC via telephone between the hours of 8:00 a.m. and 5:00 p.m. EST, Monday through Friday, and shall respond to a request for discussion or resolution of any technical problems within two (2) hours of notification.
3.3 EMPLOYEE IDENTIFICATION
3.3.1 Contractor employees visiting Government facilities shall wear a Company identification badge that, at a minimum, displays the contractor’s name, the employee’s photo, the employee’s name, and badge expiration date. Contractor employees shall comply with all Government escort rules and requirements. All contractor employees shall identify themselves as contractor employees when their status is not readily apparent and shall display all identification and visitor badges in plain view above the waist at all times.
3.3.2 Contractors shall sign in and out of each location upon their arrival and departure daily.
3.4 EMPLOYEE CONDUCT
3.4.1 The contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, etc.) when visiting or working at Government facilities. The Project Manager shall ensure contractor employees understand and abide by Department of Commerce (DOC) established rules, regulations and policies concerning safety and security.
3.5 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
3.5.1 The Government may, at its sole discretion (in coordination with the CO where practical), direct the contractor to remove any contractor employee from DOC facilities for misconduct or security reasons. Removal does not relieve the contractor of the responsibility to continue providing the services required under the contract. The CO will provide the contractor with a written explanation to support any request to remove an employee.
4.0 OTHER APPLICABLE CONDITIONS
4.1 GOVERNMENT POINT OF CONTACT (POCs)
4.1.1 Name(s) of the Technical Point of Contact (TPOC) and Local Point of Contacts (LPOCs).
Point of Contact (POC) List (provided for coordination after award of contract)
4.1.2 The LPOC is assigned for site access, escort, and face to face coordination only. All contract related questions, interpretations, project coordination, technical interaction and direction shall be through the TPOC and CO only.
4.2 PERIOD OF PERFORMANCE
Base Year: 09/18/2026 through 09/18/2027 Option Year 1: 09/18/2027 through 09/18/2028 Option Year 2: 09/18/2028 through 09/18/2029 Option Year 3: 09/18/2029 through 09/18/2030 Option Year 4: 09/18/2030 through 09/18/2031
The start date is an estimate and is subject to new funding approval processes. If there is a significant delay in awarding this contract, a shortened base year Period of Performance may be utilized or an updated quote may be requested with a new 12-month base year and corresponding option years.
4.3 PLACE OF PERFORMANCE
4.3.1 The primary place of performance will be at Department of Commerce locations; commercial buildings, or a military base. NEXRAD location will be co-located with the WFO or remote.
4.3.2 The address of the Weather Forecast Office is as follows:
- National Weather Service Mount Holly, NJ
Weather Forecast Office (PHI) 732 Woodlane Road Mount Holly, NJ 08060
Note: The WFO and Maintenance Annex are on adjacent properties.
4.3.3 The address of the Maintenance Annex is as follows:
- National Weather Service Mount Holly, NJ
Maintenance Annex (PHI West) 728 Woodlane Road Mount Holly, NJ 08060
Note: This Maintenance Annex and WFO are on adjacent properties.
4.3.4 The address of the NEXRAD Radar Site is as follows:
- National Weather Service Mount Holly, NJ
NEXRAD Location (DIX) Fort Dix (U.S. Army Military Base) IR Training site Route 70 (between mile marker 37 & 38) Fort Dix, NJ 08640
Note 1: This radar location is remote, approximately 25 miles from WFO PHI.
Note 2: Site is located on a military installation training range.
Note 3: Contractor must be escorted by an NWS employee at all times.
Note 4: Contractor does not have to travel through the main military base security gate to enter worksite.
4.3.5 All access to remote sites will require an escort by the LPOC.
4.4 HOURS OF OPERATION
4.4.1 Contractor employees shall generally perform all work between the hours of 8:00 AM and 5:00 PM EST, Monday through Friday (except Federal holidays) unless otherwise approved by the CO, TPOC or LPOC.
4.4.2 Contractor is to plan all tasks with completion in mind; do not leave any equipment off-line at the end of day. Start/Stop of maintenance tasks shall be planned between the hours of 8:00 AM and 5:00 PM EST. Do not start work that cannot be finished within this window. Any exceptions must be approved in advance.
4.5 FEDERAL HOLIDAY SCHEDULE
Contractor agrees to observe all Federal Holidays, and any other day off work designated by Federal Statute, Executive Order, or Presidential Proclamation.
4.6 EQUIPMENT SCHEDULE
Weather Forecast Office (PHI)
- (1) TRANE model TTA18044CAB01AE Condensing Units (ACU-1)
- (1) TRANE model TTA180F400AA Condensing Units (ACU-2)
- (1) TRANE model TTA120F400AA Condensing Unit (ACU-3)
- (2) CARRIER model 39LA 1121AA1131-L Air Handling Units (AC-1, AC-2) o requires (3) 24”x24”x2” MERV 10 Pleated Air Filters per unit
- (1) CARRIER model 39LA 61AB1131-R Air Handling Unit (AC-3) o requires (2) 24”x24”x2” MERV 10 Pleated Air Filters per unit
- (1) NORTEC model EL 050 440-480V/3 Humidifier o requires (1) Nortec 605 cylinder per unit o requires (2) 3M model HF60-S water filter (or equivalent) per unit
- (1) SIEMENS Talon Supervisory Control System o (3) SIEMENS model TC24 Talon Compact Controller
- requires (1) AA (LR6) 1.5V battery per controller
- requires (1) coin cell (BR2032) 3V battery per controller o (1) SIEMENS model 12977 Controller o (2) SIEMENS model BTE005X4B012 VFD
- requires (1) 1/2AA 3.6V battery per drive o (2) SIEMENS model GMA126.1U Damper Actuators
- requires calibration and testing per location
- (1) EEMAX EMT4 Instant Water Heater
- (2) BARD model W72AA-C15ZPXXXJ 6.0 Ton 460V Wall Mount HVAC Units (PAC-1, PAC-2) o requires (1) 20”x30”x2” MERV 8 Pleated Air Filter per unit
- (1) BARD model MC-4001 BC Lead/Lag Controller
- (1) NORTEC model EL 010 220-240V Humidifier o requires (1) Nortec 202 cylinder per unit o requires (1) 3M model HF60-S water filter (or equivalent) per unit
Maintenance Annex (PHI)
- (1) COLEMAN model TC4B3622SA Condensing Unit
- (1) COLEMAN model TM9E080B12MP12A Indoor Unit o requires (1) 16”x20”x1” MERV 8 Pleated Air Filter per unit
- NAVIEN model NPE180S Instant Water Heater
NEXRAD Location (DIX)
(2) BARD model W72AA-B09ZXXX3J 6.0 Ton 208V Wall Mount HVAC Units (AC-1, AC-2) o requires (1) 20”x30”x2” MERV 8 Pleated Air Filter each unit
(1) BARD model MC-4001 BC Lead/Lag Controller
(1) BARD model W36A2-B09WXXX3J 3.0 Ton 208V Wall Mount HVAC Unit (AC-3) o requires (1) 16”x30”x2” MERV 8 Pleated Air Filter each unit
Note: There is no running water available at this site. Containerized water must be brought to this site.
The contractor shall validate all equipment in the field upon award; equipment models and field conditions shall take precedence over any discrepancy within the Statement of Work.
4.7 PROGRESS UPDATES AND FIELD ACTIVITY REPORT
4.7.1 The contractor shall issue to the COR and LPOC a brief daily verbal progress update (prior to leaving the site) summarizing all work performed, current condition of the HVAC system(s), and identification of any critical issues before leaving the customer site. Contractor shall also note any environmental concerns and off-line equipment. Contractor shall also note any environmental concerns, off-line equipment and any alarm conditions.
4.7.2 The contractor shall issue a typewritten Field Activity Report (on company letterhead) listing all tasks completed, along with any applicable notes and observations to the TPOC within three (3) business days of each site visit.
4.7.3 At the completion of all daily field work, the contractor shall remove from the area all trash, rubbish, packing material, and debris caused by its operations, leaving the job site clean.
No old parts, material, or consumables shall be left behind at the site.
4.8 ACCIDENT PREVENTION
4.8.1 Site Safety
- Any worker injuries shall be brought to the attention of the TPOC and LPOC immediately.
- Workers shall deposit soiled solvent cleaning rags and waste materials in metal containers approved for that purpose; dispose of such items off-site at end of each day’s work.
- Contractor shall apply lockout/tagout (LOTO) procedures to the equipment’s power source when applicable.
- Contractor shall not release refrigerant into the atmosphere.
- Contractor tools that exhaust fumes cannot be located near building intakes while in use.
- The contractor shall provide and maintain work environments and procedures which will:
o Safeguard the public and Government personnel, property, materials, supplies and equipment exposed to contractor operations and activities.
o Utilize appropriate safety barricades and signage.
5.0 GOVERNMENT TERMS & DEFINITIONS
CFR Code of Federal Regulations CO Contracting Officer COR Contracting Officer Representative DOC Department of Commerce EPA Environmental Protection Agency LOTO Lockout / Tagout LPOC Local Point of Contact NEXRAD Next Generation Weather Radar NOAA National Oceanic and Atmospheric Administration NWS National Weather Service OEM Original Equipment Manufacturer P/N Part Number POC Point of Contact
RDA Radar Acquisition Data RADAR Radio Detection and Ranging SOW Statement of Work TPMS Transition Power Maintenance Shelter TPOC Technical Point of Contact WFO Weather Forecast Office
6.0 GOVERNMENT FURNISHED RESOURCES
6.0.1 The Government will provide the contractor with access to the job site as necessary for performance of the work.
6.0.2 The Government will provide the contractor with electrical outlets for power tools use.
6.0.3 The Government will provide the contractor with any known system deficiencies prior to the site visit.
7.0 CONTRACTOR FURNISHED PROPERTY
The contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.
8.0 GOVERNMENT ACCEPTANCE PERIOD
8.0.1 The TPOC will review deliverables prior to acceptance and provide the contractor with notification via electronic mail that provides documented reasons for non-acceptance.
8.0.2 The CO will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the contractor’s accepted proposal. In the event of a rejected deliverable, the contractor will be notified in writing by the CO of the specific reasons for rejection.
8.0.3 The CO will have three (3) business days to review deliverables and make comments. The contractor shall have seven (7) business days to make corrections and re-deliver.
9.0 DELIVERABLES
9.0.1 The contractor shall leave worksite(s) in a clean condition.
9.0.2 The Project Manager shall provide Field Activity Report(s) to the TPOC via electronic mail.
9.0.3 The contractor shall return the HVAC systems to operational status upon completion of all work.
Systems shall not to be left off-line with the exception of equipment failure which requires repair or replacement.
APPENDICES
The following documents may be helpful to the contractor in performance of their work:
- ATTACHMENT 10: Photos o Equipment Name Plate Data Information
*** END ***
Section IX - Contract Clauses
Clauses Incorporated by Reference Clause Number Clause Title
52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)
52.204-9 Personal Identity Verification of Contractor Personnel.
(JAN 2011)
52.204-13 SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE.
(OCT 2018) (Deviation JAN 2026)
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED,
SUSPENDED, PROPOSED FOR DEBARMENT, OR
VOLUNTARILY EXCLUDED. (JAN 2025) (Deviation JAN 2026)
52.209-10
PROHIBITION ON CONTRACTING WITH INVERTED
DOMESTIC CORPORATIONS. (NOV 2015) (Deviation JAN 2026)
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV
2020) (Deviation JAN 2026)
52.222-3 Convict Labor. (JUN 2003)
52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND
REMEDIES. (JAN 2025) (Deviation JAN 2026)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES.
(JUN 2020) (Deviation JAN 2026)
52.222-41 Service Contract Labor Standards. (AUG 2018)
52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts). (AUG 2018)
52.222-50 COMBATING TRAFFICKING IN PERSONS. (OCT 2025)
(Deviation JAN 2026)
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (JAN 2022)
52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2022)
52.222-90 Addressing DEI Discrimination by Federal Contractors ((DEVIATION April 2026))
52.223-12
MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF
REFRIGERATION EQUIPMENT AND AIR CONDITIONERS.
(MAY 2024) (Deviation JAN 2026)
52.223-23 SUSTAINABLE PRODUCTS AND SERVICES. (MAY 2024)
(Deviation JAN 2026)
52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving. (MAY 2024)
52.232-18 Availability of Funds. (APR 1984)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business
Clause Number Clause Title Subcontractors. (MAR 2023)
52.233-3 PROTEST AFTER AWARD. (AUG 1996) (Deviation JAN 2026)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM.
(OCT 2004) (Deviation JAN 2026)
52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)
52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS. (Deviation
JAN 2026)
52.244-6
SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES. (OCT 2025) (Deviation JAN 2026)
1352.201-70 Contracting Officer's Authority. (MAR 2010) 1352.209-73 Compliance with the laws. (APR 2010) 1352.209-74 Organizational conflict of interest. (APR 2010)
Standard Language UTILIZATION OF FEDCONNECT FOR CONTRACT ADMINISTRATION
The Department of Commerce will utilize the FedConnect® web portal in administering this award. The contractor must be registered in FedConnect® and have access to the FedConnect® website located at https://www.fedconnect.net/Fedconnect/. For assistance in registering or for other FedConnect® questions please call the FedConnect® Help Desk at (800) 899-6665 or email at support@fedconnect.net. There is no charge for registration in or use of FedConnect®.
RFO 52.212-4 TERMS AND CONDITIONS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES. (NOV 2023) (Deviation JAN 2026)
(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.
3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .