SOC 1Report- Oregon Health.pdf

PDF 1 MB Posted

Attached to
RFP 6171 MMIS Controls Audit
Solicitation number
S-44300-00018176
Issued by
Oregon

About this file

This is a System and Organization Control (SOC) 1 Type 1 Report prepared by CliftonLarsonAllen LLP, an independent service auditor, examining Gainwell Technologies' Oregon Health Authority's Medicaid Management Information System (MMIS) and Drug Rebate System for the period July 1, 2025 through June 30, 2026. The report evaluates the design and operating effectiveness of controls relevant to user entities' internal control over financial reporting for processing Medicaid claims, managing Medicaid beneficiary information and services, and calculating drug rebates. The examination was conducted in accordance with attestation standards established by the American Institute of Certified Public Accountants (AICPA) under Statement on Standards for Attestation Engagements (SSAE) No. 21. The auditors tested controls across nine control objectives, including organization and administration, logical access controls, segregation of duties, output controls, production processing, application development and maintenance, IT operations, hardware and software processes, and drug rebate system maintenance. The report notes that Gainwell uses Amazon Web Services (AWS) for cloud hosting and that certain control objectives depend on complementary subservice organization controls and complementary user entity controls assumed in the design of Gainwell's controls. The auditors' examination resulted in an unqualified opinion, finding that the description fairly presents the system and that controls were suitably designed and operating effectively throughout the examination period.

The report indicates that all tested controls operated effectively with no exceptions noted in the test results, demonstrating that Gainwell Technologies maintained appropriate safeguards over sensitive Medicaid beneficiary information, financial data, and system processing. Key controls include background investigations and HIPAA training for new employees, quarterly access recertification, password requirements of 15 characters with 60-day change intervals (as of April 7, 2026), segregation of duties in the change management process, secure file transfer protocols for outputs, automated job scheduling and monitoring, structured change management procedures across multiple environments, daily backup and restore testing, anti-virus scanning, security incident reporting procedures, and regular Windows server patching on a defined schedule. The report emphasizes that the description is prepared to meet the common needs of a broad range of user entities and their auditors, and certain aspects of the system relevant to individual user entities may not be fully detailed. The report is restricted to use by Gainwell management, user entities of the MMIS during the reporting period, and their respective auditors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Independent Service Auditors’ Report

Gainwell Technologies

Independent Service Auditors’ Report on Oregon Health Authority’s Description of Its Oregon Health Authority’s Medicaid Management System and the Suitability of the Design and Operating Effectiveness of Controls Relevant to User Entities’ Internal Control over Financial Reporting

For the Period July 1, 2025 to June 30, 2026

CliftonLarsonAllen LLP Minneapolis, Minnesota

Oregon Health Authority Table of Contents

Proprietary and Confidential

Do NOT reproduce, duplicate, or disclose without express written consent. Table of Contents

Section I. Independent Service Auditors’ Report

Section II. Gainwell Technologies’ Assertion

Section III. Gainwell Technologies’ Description of Its Oregon Health Authority’s Medicaid Management System

Section IV. Oregon Health Authority’s Medicaid Management Control Objectives and Related Controls; and CliftonLarsonAllen LLP’s Test(s) of Controls and Test(s) Results

System and Organization Control (SOC) 1 Report

Do NOT reproduce, duplicate, or disclose without express written consent. Page 1

Section I. Independent Service Auditors’ Report

CLA (CliftonLarsonAllen LLP) is an independent network member of CLA Global. See CLAglobal.com/disclaimer.

CLAconnect.com

INDEPENDENT SERVICE AUDITORS’ REPORT

Management Gainwell Technologies Irving,TX

Scope We have examined Gainwell Technologies’ (Gainwell) description of its Oregon Health Authority’s Medicaid Management system entitled, “Gainwell Technologies’ Description of Its Oregon Health Authority’s Medicaid Management System,” for processing medical claims for the State of Oregon throughout the period July 1, 2025 to June 30, 2026 (description) and the suitability of the design and operating effectiveness of the controls included in the description to achieve the related control objectives stated in the description, based on the criteria identified in “Gainwell Technologies’ Assertion” (assertion). The controls and control objectives included in the description are those that management of Gainwell believes are likely to be relevant to user entities’ internal control over financial reporting, and the description does not include those aspects of the Oregon Health Authority’s Medicaid Management system that are not likely to be relevant to user entities’ internal control over financial reporting.

Gainwell uses a subservice organization to host Oregon Health Authority’s Medicaid Management System The description includes only the control objectives and related controls of Gainwell and excludes the control objectives and related controls of the subservice organization. The description also indicates that certain control objectives specified by Gainwell can be achieved only if complementary subservice organization controls assumed in the design of Gainwell’s controls are suitably designed and operating effectively, along with the related controls at the service organization. Our examination did not extend to controls of the subservice organization, and we have not evaluated the design or operating effectiveness of such complementary subservice organization controls.

The description indicates that certain control objectives specified in the description can be achieved only if complementary user entity controls assumed in the design of Gainwell’s controls are suitably designed and operating effectively, along with related controls at the service organization. Our examination did not extend to such complementary user entity controls, and we have not evaluated the suitability of the design or operating effectiveness of such complementary user entity controls.

Service Auditors’ Responsibilities Our responsibility is to express an opinion on the fairness of the presentation of the description and on the suitability of the design of the controls to achieve the related control objectives stated in the description, based on our examination.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 3

Our examination was conducted in accordance with attestation standards established by the American Institute of Certified Public Accountants. Those standards require that we plan and perform the examination to obtain reasonable assurance about whether, in all material respects, based on the criteria in management’s assertion, the description is fairly presented and the controls were suitably designed to achieve the related control objectives stated in the description throughout the period July 1, 2025 to June 30, 2026. We believe that the evidence we obtained is sufficient and appropriate to provide a reasonable basis for our opinion.

An examination of a description of a service organization’s system and the suitability of the design of controls involves performing procedures to obtain evidence about the fairness of the presentation of the description and the suitability of the design of the controls to achieve the related control objectives stated in the description, based on the criteria in management’s assertion.

assessing the risks that the description is not fairly presented and that the controls were not suitably designed to achieve the related control objectives stated in the description.

testing the operating effectiveness of those controls that management considers necessary to provide reasonable assurance that the related control objectives stated in the description were achieved.

evaluating the overall presentation of the description, suitability of the control objectives stated in the description, and suitability of the criteria specified by the service organization in its assertion.

We are required to be independent and to meet our other ethical responsibilities in accordance with relevant ethical requirements relating to the examination engagement.

Inherent Limitations The description is prepared to meet the common needs of a broad range of user entities and their auditors who audit and report on user entities’ financial statements and may not, therefore, include every aspect of the system that each individual user entity may consider important in its own particular environment. Because of their nature, controls at a service organization may not prevent, or detect and correct, all misstatements in processing or reporting transactions processing user entities’ transactions. Also, the projection to the future of any evaluation of the fairness of the presentation of the description, or conclusions about the suitability of the design of the controls to achieve the related control objectives, is subject to the risk that controls at a service organization may become ineffective.

Description of Tests of Controls The specific controls we tested and the nature, timing, and results of those tests are listed in section IV.

Opinion In our opinion, in all material respects, based on the criteria described in Gainwell’s assertion

a. the description fairly presents the Oregon Health Authority’s Medicaid Management system that was designed and implemented throughout the period July 1, 2025 to June 30, 2026.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 4

b. the controls related to the control objectives stated in the description were suitably designed to provide reasonable assurance that the control objectives would be achieved if the controls operated effectively throughout the period July 1, 2025 to June 30, 2026, and if the subservice organization and user entities applied the complementary controls assumed in the design of Gainwell’s controls throughout the period July 1, 2025 to June 30, 2026.

c. the controls operated effectively to provide reasonable assurance that the control objectives stated in the description were achieved throughout the period July 1, 2025 to June 30, 2026, and if the subservice organization and user entities applied the complementary controls assumed in the design of Gainwell’s controls operated effectively throughout the period July 1, 2025 to June 30, 2026.

Restricted Use This report, including the description of tests of controls and results thereof in section IV, is intended solely for the information and use of management of Gainwell, user entities of Gainwell’s Oregon Health Authority’s Medicaid Management system during some or all of the period July 1, 2025 to June 30, 2026, and their auditors who audit and report on such user entities’ financial statements or internal control over financial reporting and have a sufficient understanding to consider it, along with other information, including information about controls implemented by user entities themselves, when assessing the risks of material misstatements of user entities’ financial statements. This report is not intended to be, and should not be, used by anyone other than the specified parties.

Minneapolis, Minnesota August 28, 2026

Do NOT reproduce, duplicate, or disclose without express written consent. Page 5

Section II. Gainwell Technologies’ Assertion

Do NOT reproduce, duplicate, or disclose without express written consent. Page 6

We have prepared the description of Gainwell ’s Oregon Health Authority’s Medicaid Management system entitled, “Gainwell Technologies’ Description of Its Oregon Health Authority’s Medicaid Management System,” for processing user entities’ transactions processing user entities’ transactions throughout the period July 1, 2025 to June 30, 2026 (description) for user entities of the system during some or all of the period July 1, 2025 to June 30, 2026, and their auditors who audit and report on such user entities’ financial statements or internal control over financial reporting and have a sufficient understanding to consider it, along with other information, including information about controls implemented by subservice organizations and user entities of the system themselves, when assessing the risks of material misstatement of user entities’ financial statements.

Gainwell uses a subservice organization for cloud hosting services. The description includes only the control objectives and related controls of Gainwell and excludes the control objectives and related controls of the subservice organization. The description also indicates that certain control objectives specified in the description can be achieved only if complementary subservice organization controls assumed in the design of our controls are suitably designed and operating effectively, along with the related controls. The description does not extend to controls of the subservice organization.

The description indicates that certain control objectives specified in the description can be achieved only if complementary user entity controls assumed in the design of Gainwell’s controls are suitably designed and operating effectively, along with related controls at the service organization. The description does not extend to controls of the user entities.

We confirm, to the best of our knowledge and belief, that

a) the description fairly presents the Oregon Health Authority’s Medicaid Management system made available to user entities of the system during some or all of the period July 1, 2025 to June 30, 2026 for processing their transactions processing user entities’ transactions as it relates to controls that are likely to be relevant to user entities’ internal control over financial reporting. The criteria we used in making this assertion were that the description

i) presents how the system made available to user entities of the system was designed and implemented to process relevant user entity transactions, including, if applicable,

(1) the types of services provided, including, as appropriate, the classes of transactions processed.

(2) the procedures, within both automated and manual systems, by which those services are provided, including, as appropriate, procedures by which transactions are initiated, authorized, recorded, processed, corrected as necessary, and transferred to the reports and other information prepared for user entities of the system.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 7

(3) the information used in the performance of the procedures including, if applicable, related accounting records, whether electronic or manual, and supporting information involved in initiating, authorizing, recording, processing, and reporting transactions; this includes the correction of incorrect information and how information is transferred to the reports and other information prepared for user entities.

(4) how the system captures and addresses significant events and conditions other than transactions.

(5) the process used to prepare reports and other information for user entities.

(6) services performed by a subservice organization, if any, including whether the carve-out method or the inclusive method has been used in relation to them.

(7) the specified control objectives and controls designed to achieve those objectives, including, as applicable, complementary user entity controls and complementary subservice organization controls assumed in the design of the service organization’s controls.

(8) other aspects of our control environment, risk assessment process, information and communications (including the related business processes), control activities, and monitoring activities that are relevant to the services provided.

ii) includes relevant details of changes to the service organization’s system during the period covered by the description.

iii) does not omit or distort information relevant to the service organization’s system, while acknowledging that the description is prepared to meet the common needs of a broad range of user entities of the system and their user auditors, and may not, therefore, include every aspect of the Oregon Health Authority’s Medicaid Management system that each individual user entity of the system and its auditor may consider important in its own particular environment.

b) the controls related to the control objectives stated in the description were suitably designed and operating effectively throughout the period July 1, 2025 to June 30, 2026 to achieve those control objectives if subservice organizations and user entities applied the complementary controls assumed in the design of Oregon Health Authority’s controls throughout the period July 1, 2025 to June 30, 2026. The criteria we used in making this assertion were that

i) the risks that threaten the achievement of the control objectives stated in the description have been identified by management of the service organization.

ii) the controls identified in the description would, if operating effectively, provide reasonable assurance that those risks would not prevent the control objectives stated in the description from being achieved.

iii) the controls were consistently applied as designed, including whether manual controls were applied by individuals who have the appropriate competence and authority.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 8

Section III. Gainwell Technologies’ Description of Its Oregon Health Authority’s Medicaid Management System

Do NOT reproduce, duplicate, or disclose without express written consent. Page 9

Overview of Gainwell Technologies’ Oregon Health Authority’s Medicaid Management

System This section of the report presents an overview of Gainwell Technologies’ Oregon Health Authority’s Medicaid Management Information System and Drug Rebate System (Medicaid Management System), a system of software and hardware used to process Medicaid claims, manage information about Medicaid beneficiaries and services, as well as calculate drug rebates and manage information for the Drug Rebate program. A brief introduction of the Medicaid Management Information System (MMIS) background and primary system purpose is followed by a description of controls for the portions of the Oregon Health Authority’s Medicaid Management System designed, built, or operated by Gainwell Technologies (Gainwell).

Scope of the Description The American Institute of Certified Public Accountants (AICPA) has introduced a series of three different system and organization controls (SOC) reports. This SOC 1 report was performed under Statement on Standards for Attestation Engagements (SSAE) No. 21, Attestation Standards: Clarification and Recodification, in which a service auditor reports on an examination of controls at a service organization that may be relevant to user entities’ internal control over financial reporting. AICPA SOC 1 (SSAE No. 21) reports are intended to meet the needs of management of user entities and their financial statement auditors.

This description of Gainwell Technologies’ Oregon Health Authority’s Medicaid Management System addresses only Gainwell Technologies’ Oregon Health Authority’s Medicaid Management System provided to its user entities and excludes other services provided by Gainwell. The description is intended to provide information for user entities of the Oregon Health Authority’s Medicaid Management System and their independent auditors who audit and report on such user entities' financial statements to be used in obtaining an understanding of the Oregon Health Authority’s Medicaid Management System and the controls over that system that are likely to be relevant to user entities' internal control over financial reporting. The description of the system includes certain business process controls and IT general controls that support the delivery of Gainwell Technologies’ Oregon Health Authority’s Medicaid Management System.

The specific control objectives and the controls that Gainwell has designed and implemented to achieve these control objectives are described in section IV of this report. This report does not describe controls implemented relative to other MMIS operations or systems, including those activities performed by DHS or OHA.

Organization Profile Gainwell Technologies, as contractor to the Oregon Health Authority (OHA), designed, built and operates the MMIS on behalf of OHA, who administers the Medicaid program also referred to as Oregon Title XIX (ORXIX) of the Social Security Act. Medicaid provides health care insurance for low-income residents through a federal and state partnership. Federal regulations provide a framework for each state to build a unique Medicaid program or State Medicaid Plan.

Under Section 1902 of the Social Security Act, all states must comply with some basic requirements. States must:

Serve certain mandatory populations, such as poverty-level children and low-income pregnant women Provide certain mandatory services, such as hospital care and physician services Provide services that are "sufficient in amount, duration, and scope to reasonably achieve (their) purpose,” Provide services throughout the state

Do NOT reproduce, duplicate, or disclose without express written consent. Page 10

In 2005, to meet growing system demands, OHA initiated a competitive solicitation process to design, develop, implement and maintain a system to support increasingly complex state and federal requirements for program management.

Relevant Aspects of the Control Environment, Risk Assessment Process, Information and

Communication, and Monitoring Control Environment Gainwell and OHA have established formal management information and reporting processes that enable the monitoring of activities by senior management. Various reports related to system activity and performance, customer satisfaction, new business initiatives and financial information are distributed to appropriate management personnel in each department on a periodic basis for review and follow up, if necessary.

Organization and Administration Privacy and Security Training New employees with access to ORXIX resources are subjected to a background investigation.

New Gainwell employees receiving access to ORXIX resources are required to:

Complete Gainwell HIPAA Privacy and Security Awareness course prior to being granted access to ORXIX resources.

Any existing Gainwell employee receiving new access to ORXIX resources who has not completed the Gainwell HIPAA Privacy and Security Awareness course within the past year is required to retake the course within 30 days of gaining access.

Gainwell employees that retain access to ORXIX resources are required to retake the Gainwell HIPAA Privacy and Security Awareness refresher courses annually.

Account Information Security Lead Training The ORXIX Account Information Security Lead (ISL) is required to stay current on privacy and security skills, policy changes, news, and vulnerabilities so the ISL can train ORXIX staff on privacy and security updates. The ORXIX ISL is required to attend monthly Health Care Privacy and Security Work Group (HCPSWG) meetings which provide training on security controls and information on privacy/security policy changes, news, and vulnerabilities. Attendance is tracked by HCPSWG leaders.

Periodic Reminders In addition to privacy and security training required for ORXIX staff, the ISL periodically sends security awareness tips and reminders to ORXIX staff. Topics include frequently occurring privacy/security incidents.

Background Investigations If an individual is offered a position with Gainwell, he/she is subjected to a background investigation that is used to identify any past activity that is contraindicative of the individual’s performance, integrity, or trustworthiness.

The background investigation is completed by a third-party company under contract to Gainwell that specializes in completing these investigations. A sub-contractor is also subject to the same investigation.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 11

Once employment or contracting offer is made, the individual will not be allowed to begin work on the project until both the background investigation and a drug screening are complete. Any employment agreement put in place is contingent upon favorable results from both of these investigations and no access to data, resources, or facilities will be granted until the investigations are complete.

Sanctions The Gainwell Security Policy provides multiple solutions to security breaches. The person violating security policy may be:

Counseled to prevent future actions, Required to attend/complete security training, Have their access further limited to prevent future security lapses, or Terminated from Gainwell.

Gainwell ORXIX leaders determine the extent of the violation and the potential level of impact. They may interview or discuss the action with the appropriate personnel to ascertain the intent of their actions. Based on that investigation, Gainwell ORXIX leaders will determine the overall intent and recommend the sanction to be imposed.

When a security violation is identified, the Gainwell ISL notifies the OHA Security Office. This notification is either by email, voice mail, or in person. The urgency of the notification is determined by the magnitude of the event.

In the event the employee’s actions violate civil or criminal law, corporate Gainwell will contact the appropriate law enforcement entities. All information relating to the violation will be turned over to law enforcement and Gainwell will cooperate fully with any investigation conducted by such entities.

Gainwell leaders make the final determination based on their assessment of the event and ensure that the sanction is imposed.

Documentation Review The ISL annually reviews the ORXIX Privacy and Security Policies and Procedures. Record of the review is recorded in the policies and procedures manual. The log documents when the review was performed, who performed the review, what file and version was reviewed, what changes were made to the file as a result of the review.

Management Control Gainwell has developed formal policies and procedures covering various financial and operational matters (Business Policies and Procedures Manual) and all critical aspects of employment services (Human Resources Manual) applicable to management personnel, including: hiring, training/development, performance assessments, and terminations.

Risk Assessment Process Management assesses risks that could affect its ability to provide reliable processing to its customer organizations through direct contact with employees and relationships with external parties. A security risk assessment is performed to identify potential vulnerabilities and threats to sensitive and/or critical information.

The assessment is performed once every three years and/or whenever there is a significant security incident or a change to the organizational or technical infrastructure.

A security risk reduction plan is created to address all critical risks identified in the risk assessment. The risks are accepted, reduced, or mitigated through the use of security procedures or controls.

Gainwell performs ad hoc vulnerability scanning on the MMIS using CORE Impact Pro. CORE Impact Pro serves as a vulnerability scanning tool of the operating system and supports scanning of Windows and Linux platforms.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 12

All issues identified by the vulnerability scanners are reviewed to determine if there is an actual issue that needs to be resolved or if the vulnerability identified is a false positive.

Remediation plans are developed for all vulnerabilities identified as actual issues. Remediation due dates, owners, and priority are also assigned to ensure issues are tracked and resolved in a timely manner.

Monitoring of Internal Controls Monitoring activities are accomplished through a variety of methods. External monitoring occurs in the form of tests and reports completed by Gainwell’s independent auditors as well as audits conducted by regulatory agencies and its customer organizations. The Gainwell Corporate Board of Directors, senior management and other management personnel accomplish internal monitoring by monitoring performance, quality, and controls as a normal part of their activities. Monitoring activities include reconciliation, reviews of operating performance, quality control reviews, and various management reports that measure the results of the processes involved in providing processing to customer organizations. These reports are periodically reviewed, depending upon the nature of the item being reported, by appropriate levels of management and necessary action is taken as required.

Server CPU, memory, and disk utilization for Windows and Linux servers are continuously monitored through automated infrastructure monitoring solutions. Thresholds are established for each monitored metric to support timely identification of potential issues.When a server reaches the defined threshold for a given item being monitored, System Administrators receive an email alerting them to the issue. System Administrators then take appropriate action to remediate the issue that triggered the alert.

Full-time computer operators are also responsible for monitoring, ensuring the success of production cycles, and working closely with on-call developers. Operators review the schedule for cycles during the week, ensure that cycle parameters are set up correctly (reviewing them with the on-call Developers), and monitor cycles as they run. In the event that problems are found during the execution of a cycle (either because a job fails, or a job does not run close to its expected time), contact occurs with the on-call developer or SDC as needed to resolve the problems and successfully complete the cycle.

Information and Communications The controls outlined in this report are supported through executive meetings to the staff of Gainwell as a whole. Gainwell believes that open lines of communication are the best way to enhance its ability to serve its customers, including those of its subsidiaries.

Effective communication also occurs in a broader sense throughout Gainwell. Personnel receive a clear message from Gainwell management that control responsibilities must be taken seriously. This is accomplished through management supervision and feedback. Gainwell personnel understand their duties and roles in internal control systems, as well as how their individual activities relate to the work of others. Gainwell management is receptive to employee suggestions of ways to enhance productivity, quality, or other improvements to the current products offered by Gainwell.

Control Activities Description of General Computer Controls Logical Access

New Access Access requests to ORXIX resources require an authorized submitter to initiate a request in the Oracle Identity Management tool. The authorized submitter identifies what access is needed. Access must be approved by a designated manager. Once submitted, the approver listed on the request will receive a notification to review the request and approve or deny it. Upon approval, the Gainwell ORXIX Platform team grants appropriate

Do NOT reproduce, duplicate, or disclose without express written consent. Page 13 access. If special access is requested, the request must be approved by the Gainwell ORXIX Account Delivery Manager before the request is processed. Special access includes the following:

Interchange Cycle Support DSS Cycle Support MAR Cycle Support EDMS Cycle Support Cycle Monitor Database Administrator Security Administrator Network Administrator Linux System Administrator Windows System Administrator

Once new access has been granted, the ISL sends the user instructions on how to enroll in the Gainwell HIPAA Privacy and Security course. At the end of the course, the user receives an agreement to digitally sign indicating they have read and understand the content in the course and accept their responsibility to protect recipient information (PII/PHI) in any systems they have access to.

Production User Interface (UI) Update Access Production UI update access is an additional level of special access that follows a process which primarily managed by Gainwell. This access grants a user privileged production rights (i.e., ability to update data) to the MMIS application using a Windows Active Directory account. If a Gainwell employee needs production UI update access, the request is submitted to OHA. The Gainwell ORXIX manager submitting the request acts as the approver of the request.

Modified Access If access needs to be modified, the same processes are followed depending on the modification identified. If a user requests an access modification and they have already signed the Privacy/Security agreement, they are not required to submit another signed agreement.

Terminating User Access When Gainwell personnel leave the company or move to another project and they no longer require access to ORXIX resources, the same process is followed for granting access to new users, except the requester marks the request form as a delete request.

Access to ORXIX resources is disabled upon termination. When a Delete Request is submitted in the SRT, it is sent to an authorized Manager for approval. Once approved, access to the ORXIX Active Directory is disabled by an automated process. The Gainwell ORXIX Platform team is then sent a communication to further disable access as needed. The ISL or IDL will disable VPN access for terminated users within 24 hours. Pulse VPN access is the entry point required by Gainwell staff to RDP to hosts or to access internal applications. The user has no access to ORXIX resources once the AD and VPN access is disabled.

If the access that needs to be revoked belongs to a ‘P’ ID issued by OHA, then the user’s Gainwell Manager will submit the request to the OHA help desk (MMIS.Security-Requests@dhsoha.state.or.us). OHA will then confirm the request was submitted from an authorized Gainwell Manager and revoke the access requested.

The OHA manages the revocation of “OR” IDs.

Recertifying User Access All access to ORXIX resources is recertified quarterly. This review is for User Accounts and Service accounts. The review is called the Periodic User Access Review (PUAR). The target months for the reviews are February, May, August, & November.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 14

This effort is led by the ORXIX ISL. The process is done as follows:

The ISL initiates the Access Recertification process in the Security Access Request tool and notifies the ORXIX Leaders to begin the recertification.

Each leader reviews the list of workforce members assigned to them and confirms all of them are actively supporting the account and that their access listed for them is appropriate. If any of them are not actively supporting the account or they have inappropriate access, the leader indicates what access needs to be revoked. Otherwise the leader indicates the access should be retained.

When an ORXIX Leader completes each review, the tool will automatically submit delete requests for access the leader recorded to be revoked.

The ISL monitors the recertification process and ensures the reviews are completed in a timely manner.

Password Controls Password controls on the MMIS application follow OHA standards..

Prior to April 7, 2026, user passwords was required to be 8 characters in length, must be complex, changed every 90 days, and the last 24 passwords cannot be reused.

Effective April 7, 2026, user passwords are required to be 15 characters in length, must be complex, changed every 60 days, and the last 24 passwords cannot be reused and lock users after three failed attempts.

Sign-on violations (incorrect user IDs and passwords) are limited to three attempts before the account is locked out.

Users must contact ORXIX Support to have the log-in capability reactivated. All deactivations are automatically logged.

Self Service Password reset are available for:

Gainwell and OHA access to PWB (Project Workbook) Gainwell access to Model Office MMIS (InterChange) Gainwell read-only access to User Acceptance Testing (UAT) and Production MMIS (InterChange) Gainwell and OHA access to HTMLDB applications Password reset requests are submitted to the ORXIX Platform team for the following:

– Gainwell and OHA access to databases

– Gainwell and OHA access to Linux environments

All other password reset requests are submitted to the OHA help desk.

ORXIX Platform team members who receive password reset requests are required to verify a user’s identity before allowing the user’s authentication information to be released or reset. Requests to reset other users’ passwords are not allowed and denied by the ORXIX Platform team.

When sending a new password to a user, ORXIX Platform team members enforce the following controls:

Password sent to the user is a temporary password that can only be used once and will require the user to change their password on initial logon. The temporary password must also meet the password minimum requirements mentioned in the beginning of this section.

Passwords sent via mail or email is sent separate from user name and other information necessary to gain access such as links to an application.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 15

Passwords sent via mail or email is sent without advertising its contents. This includes no writing on the outside of an envelope to indicate it contains a password. Also, the subject line of an email containing a user’s temporary password is left blank so the email does not suggest it contains a password.

Segregation of Duties System restrictions have been implemented to enforce segregation of duties regarding transaction initiation and record keeping functions. Duties in the change management process are segregated as follows:

Role Responsibilities

Gainwell System Engineer

(SE)

Develops code changes to correct defects or add enhancements to applications.

Gainwell System Tester Tests changes made by the SEs to confirm the change is functioning as expected and does not have a negative effect on existing functionality. Performs testing in the Model Office environment.

OHA User Acceptance Tester

Tests changes that have passed system testing to confirm the change is functioning as expected and does not have a negative effect on existing functionality. Performs testing in the UAT environment.

OHA MMIS Systems Manager

Reviews list of changes scheduled to promote to production and approves/disapproves of changes before the changes are promoted.

Gainwell Promotion Team Member

Promotes changes from one environment to another.

Gainwell System Engineer

(SE)

Develops code changes to correct defects or add enhancements to applications.

Recipients (Trading Partners) are granted authority to initiate specific transactions as well as to approve processing based on management approval.

Duties are segregated to assure developers do not have access to promote changes directly to the production environment. However, limited resources result in SEs on the promotion team. To assure the development and deployment of unauthorized code to production does not occur, compensating control have been initiated. The System Architect manually monitors weekly emails containing batch changes made in Production for review to confirm files changes were approved prior to being linked to a release.

Discrepancies are researched to confirm whether they are authorized or not. Any unauthorized changes detected are removed and reported as a security incident.

Output Controls Recipients (Trading Partners) are granted authority to initiate specific transactions as well as to approve processing based on management approval. The MMIS outputs information to files that are transmitted to external entities. Files are transmitted through use of the Secure File Transfer Protocol (SFTP). Recipients (Trading Partners) are defined within the initial setup and only authorized files can be transferred. SFTP establishes a secure channel between MMIS and all recipients. The system also establishes specific rules identifying which files Trading Partners will have access to and transmits only the appropriate files to the appropriate Trading Partner. Recipients (Trading Partners) are authenticated through the use of a user ID and

Do NOT reproduce, duplicate, or disclose without express written consent. Page 16 password. The Gainwell Cycle Support Team monitors Electronic Data Interchange (EDI) transmissions for failures and notifies partners and takes corrective action. Any EDI transmission failure will be researched to identify cause and determine action required to ensure successful transmission.

Production Processing Recipients (Trading Partners) are granted authority to initiate specific transactions as well as to approve processing based on management approval. The Oregon MMIS is table driven – data is unloaded/loaded/updated to applicable tables. Although Gainwell uses some working files during batch processing, most of the work is either done directly with tables (querying for certain info) or updating or adding new records to tables. In some processes, Gainwell unloads data from certain tables, works with the files, and ultimately updates tables at the end of the process with what the cycle produced.

All access to data and tables is controlled through security software controls as described previously (Logical Access/Segregation of Duties). Any change to data in production must be approved by Gainwell and OHA leadership. A data fix request form is completed by the developer and reviewed by at least one other Gainwell technical staff member before being submitted to Gainwell and OHA leadership for approval. A data fix request form is completed by the developer and reviewed by at least one other Gainwell technical staff member before being submitted to Gainwell and OHA leadership for approval. Once approval has been granted, the data fix request form is sent to the Gainwell Cycle Support Team to be processed. Only the Gainwell Cycle Support and Promotion teams are allowed to update the production database.

Job Initiation Jobs are scheduled and initiated by IBM Workflow Scheduler (IWS) which allows the jobs to automatically start per their defined schedules. Each job has its own schedule defined in IBM Workflow Scheduler (IWS) which allows the jobs to automatically start per their defined schedules.

Job Monitoring All jobs are monitored 24x7 by the Gainwell Cycle Support Team. The team operates on shifts and monitors all jobs that are scheduled to run on their shift. Any job failure follows an escalation process involving automated notifications to ensure proper personnel are notified to determine the cause of the job failure. Job failures remain in the work queue, and are monitored by the Production Environment Operations team, until the job passes.

If EDI transmission fails, the Gainwell Cycle Support Team member monitoring the transmission will review the details of the failure and attempt to resolve the issue. If the issue cannot be resolved by the Gainwell Cycle Support Team member, they will contact a developer for further assistance.

Application Development and Maintenance Changes made in the ORXIX production environment follow a structured change management process. Changes made to ORXIX production environment include the following:

Unauthorized changes Changes that compromise the integrity of data Changes that interrupt system availability

Types of Changes The following are types of changes made in the ORXIX production environment:

Linux Batch Code Changes: Compiled, controlled, and promoted using an internally written utility (VCTL).

VCTL is a version control system that supports checking modules in and out of a common repository. It prevents two developers from making modifications to the same source module at the same time or rolling back a source module to a previous version. It also controls compilation of source programs and promotion of modules into different environments. Only authorized users have authority to promote within VCTL.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 17

Net Code Changes: Compiled, controlled, and promoted using Microsoft VBA Code Changes SQL Queries (Insert, Update, Delete, etc.)

Configuration Changes Application and Operating System Patches Emergency Changes Security Changes

Changes are tracked online in the Oregon Project Workbook (PWB). In this change management tool, the changes listed above are assigned one of the following types:

Defect: A change to correct an issue with the system when it is not operating as designed.

Change Order: An enhancement to the system that is not found in the existing system design.

Task: A change that is not a defect or a change order – a maintenance task such as cleanup of incorrect data, updating configuration settings, changing passwords, etc.

Platform Request: Submitted by a member of the Platform Team and includes restoring data, maintenance work that needs to be done on hardware that supports the system, etc.

Environments

Separate environments have been developed for application integrity to ensure proper financial changes are implemented in the MMIS.

Environments prior to Nov 2025:

Development Model Office (MO) User Acceptance Testing (UAT) Production

Environments after Nov 2025:

• Dev/Mod

• SIT

Training

• UAT

• SAS

Prod Parellel Test

• Performance Test

• Conversion

The environments are hosted in the AWS cloud.

Migration Path A change begins by being identified and documented in PWB. Details such as participants, priority, and status are entered with the change. The change is deployed in a development/test environment by a Gainwell System Engineer (SE) who also performs unit testing to ensure the change operates as expected.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 18

Once unit testing is complete and all issues are resolved from the unit test results, the SE conducts a walkthrough of the modification to verify that the change:

Produces the desired and expected results Adheres to standards Has been properly documented

Upon completion and approval of the walkthrough, the change status is updated and assigned an MO release number. The change is deployed to the MO environment on the day scheduled for MO deployments by a Gainwell Promotion Team member. A Gainwell System Tester will perform system testing on the change in this environment to ensure the change works with other parts of the system. Changes are appropriately tested on multiple testing levels, reviewed, and approved prior to implementation.

Once system testing is complete in the MO environment and all issues are resolved from the system test results, the change status is updated and assigned a UAT release number. Once the change is approved by OHA, it is deployed to the UAT environment on the day scheduled for UAT deployments by a Gainwell Promotion Team member. An OHA User Acceptance Tester will perform user acceptance testing on the change in this environment to ensure the change works as they expect and based on OHA business processes.

Once UAT is complete and all issues are resolved from the OHA test results, the change status is updated by HA to “UAT Testing Complete” which acts as their approval to deploy to the Production environment. The completed changes in UAT will be assigned a Production release number and the OHA MMIS Systems Manager will review the list as a final approval before promoting to production. After all approvals are received, the change will be deployed to the production environment on the day scheduled for production deployments by a Gainwell Promotion Team member. The Gainwell Promotion Team member will then update the change status to reflect the promotion to Production.

After the change is promoted to Production, the change owner performs a Post Implementation Review (PIR) to verify the change was deployed and operating in Production as expected. Based on the results of the review, the PIR status will be updated appropriately by the reviewer in PWB.

Emergency Changes Emergency changes are deployed to correct critical functionality of the Production system that is down or not operating as designed and is causing significant negative impact to the business. These changes follow the same change management process as other changes with the following exceptions.

Emergency changes are:

Expedited – approvals and promotions may not occur on the typical change schedule.

Promoted to an override directory – rare and temporary. After changes in the override directory move into Production, the changes are then moved into their permanent directory, retested more thoroughly in each environment where the override code exists, then eventually deployed back to Production.

Security Changes Any changes that impact the security of the system follow the same change management process as typical change does. This ensures the change:

Does not circumvent or compromise any existing security controls Does not deny service or access to authorized individuals Meets the ORXIX security standards

Do NOT reproduce, duplicate, or disclose without express written consent. Page 19

Examples of these types of changes include:

New systems or major components of the infrastructure modified New/modified security controls New/modified security software New/modified security modules of critical applications New/modified applications that evaluate security controls compliance

IT Operations

Backup ORXIX utilizes AWS EBS Snapshots for off-site backup retention. Snapshots for EC2 instances in scope for disaster recovery are automatically replicated from the AWS West region to the AWS East region and retained for 35 days, this applies to both AWS snapshot and NetBackup backups, (NBU). All snapshot data is encrypted both in transit and at rest using AWS encryption services, and AWS does not have access to the encryption keys.

Backups in AWS are performed using snapshots, and select servers are additionally backed up through NetBackup.

AWS Snapshots

Performed on all servers.

Weekly full backups and daily incremental backups are taken.

Snapshots are reviewed each day, and any failures are rerun promptly.

Periodic restore tests are performed to verify backup integrity.

NetBackup

Performed on selected servers.

Weekly full backups and daily incremental backups are executed.

Upon completion, a status email is sent to the DBA and System Administrator indicating success or failure.

If a backup fails, the DBA reviews the issue and approves the resolution.

Periodic restore requests are performed to ensure backups remain valid.

Anti‐Virus All Gainwell laptops and Windows servers have an anti-virus scanner installed. ORXIX Linux servers do not store Windows files and, as such, are not considered vulnerable devices.

Anti-Virus scans for Gainwell Laptops is managed by Gainwell Corporate and is configured in Microsoft Intune to use Microsoft Windows Defender Anti-Virus scanning. A copy of the current configuration policy can be requested from a representative of the Intune Team.

Anti-Virus scans for Gainwell Windows Servers is managed by HadenGrey and uses Crowdstrike Anti- Virus. A copy of the current configuration policy can be requested from HadenGrey.

Do NOT reproduce, duplicate, or disclose without express written consent. Page 20

System Hardware / Software Implementation and Maintenance

Incidents A security incident means the attempted or successful unauthorized access, use, disclosure, modification, or destruction of information or interference with system operations in an information system. Examples of this include but are not limited to the following:

Unauthorized logical or physical access to or tampering with ORXIX assets (i.e., building, data, hardware, applications, documents, etc.)

Inadvertent or intentional loss or disclosure of ORXIX assets (i.e., building, data, hardware, applications, documents, etc.)

Improper, illegal, or unethical use of ORXIX assets (i.e., building, data, hardware, applications, documents, etc.)

Denial of service attack Website defacement Social engineering events Servers failing to function correctly due to natural disasters (fires, floods, earthquakes, hurricanes,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .