2026 SOC1 Control Language updates.pdf
PDF 252 KB Posted
- Attached to
- RFP 6171 MMIS Controls Audit
- Solicitation number
- S-44300-00018176
- Issued by
- Oregon
About this file
2026 SOC1 Control Language Updates
This document contains approved control language updates for the 2026 System and Organizational Controls (SOC) 1 audit of the Oregon Health Authority's Medicaid Management Information System (MMIS), managed by incumbent contractor Gainwell, LLC. The file outlines 44 control objectives organized across nine control categories, including personnel access management, data security, segregation of duties, system outputs, production inputs, change management, IT operations, hardware/software processes, and drug rebate processes. The updates primarily reflect no changes from 2025 controls, with one notable exception: control 2.04 regarding user password requirements is scheduled for implementation on March 23, 2026, increasing the minimum password length from eight to 15 characters and reducing the change frequency from every 90 days to every 60 days. Additionally, control 6.03 regarding separate development environments includes a diagram update transition scheduled for November 2025, moving from an on-premises configuration to an AWS environment.
The controls document serves as the baseline framework for the five-year SOC Type 2 audit engagement spanning July 1, 2026 through June 30, 2031, with options to extend for two additional years. These controls establish requirements for Gainwell employees and contingent workers accessing ORXIX resources, including background investigations, HIPAA training within 30 days of access, annual recertification, and adherence to Gainwell's security policies. The document specifies technical control requirements including access request management through the Oracle Identity Management tool, quarterly user access reviews, password complexity standards, incident reporting procedures, backup and restore validation, anti-virus protection via Microsoft Intune for laptops and Crowdstrike for Windows servers, and structured change management processes across six distinct environments (Development/Model, SIT Training, UAT, SAS Production Parallel Test, Performance Test, and Conversion).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOC # Control Lanugauge from 2025 SOC1- Approved changes. P&P Suggested change for 2026 SOC1
1.01 New Gainwell employees within the reporting period and with access to ORXIX resources are subjected to a background investigation.
6.7.1 No Change
1.02 All ORXIX team members receiving new access to ORXIX resources are required to complete a HIPAA Training course within 30 days of starting on the Account and before gaining access to ORXIX resources if they have not completed the course within the past
12‐month period.
Gainwell employees and Contingent Workers that have access to Gainwell University can complete the required HIPAA Course. Contingent Workers that do not have access to Gainwell University can provide evidence of HIPAA Training from their employer (a completion certificate is preferred).
6.11.1 No Change
1.03 All staff with access to ORXIX Resources must recertify HIPAA Training annually. 6.11.1 No Change
1.04 The ISL is required to participate in at least 1 ISL Staff Meeting per month. Topics discussed include subjects such as:
• Security controls
• Privacy and security policy changes
• Security news and vulnerabilities.
6.11.2 No Change
1.05 The ISL periodically sends security awareness tips and reminders to ORXIX staff. 6.11.3 No Change
1.06 The ISL annually reviews the ORXIX Privacy and Security Policies and Procedures. 9.3 No Change
Control Objective 1:
Controls provide reasonable assurance that management has established the integrity, ethical values, and delegation of authority, as well as the processes for managing and developing people in the organization.
# Level 3 - Restricted
1.07 The Gainwell Security Policy provides multiple solutions to security breaches.
The person violating security policy may be:
• Counseled to prevent future actions,
• Required to attend/complete security training,
• Have their access further limited to prevent future security lapses, or
• Terminated from Gainwell.
6.3.4 No Change
2.01 Access requests to ORXIX resources require an access request submission in the Oracle
Identity Management tool (SRT – Security Request Tool) within the Oregon Project
Workbook. The request identifies what access is needed. Access must be approved by a designated manager.
6.6.1 No Change
2.02 A terminated user does not have access to ORXIX resources once VPN access is disabled.
When a Delete Request is submitted in the SRT it is sent to an authorized Manager for approval. Once approved, access to the ORXIX VPN for a worker that is involuntarily terminated will occur immediately by the ISL. ORXIX VPN access for workers that are voluntarily terminated is disabled within 24 business hours by the ISL. The Gainwell
ORXIX Platform team is then sent a communication from the SRT to further disable access as needed.
6.8.1 No Change
2.03 All access to ORXIX resources is recertified quarterly. This review is for User Accounts and Service accounts. The review is called the Periodic User Access Review (PUAR). The target months for the reviews are February, May, August, & November.
6.8.2 No Change
2.04 User passwords are required to be eight characters in length, must be complex, changed every 90 days, and the last 24 passwords cannot be reused.
8.7 Password Policy update is scheduled to be implemented 3/23:
User passwords are required to be 15 characters in length, must be complex, changed every 60 days, and the last 24 passwords cannot be reused.
2.05 Sign‐on violations (incorrect user IDs and passwords) are limited to three attempts before the account is locked out.
8.7 No Change
2.06 Users must contact ORXIX Support or the ORXIX Platform team to have the log‐in capability reactivated. All deactivations are automatically logged.
8.7 No Change
Control Objective 2:
Controls provide reasonable assurance that access to the MMIS data is restricted to authorized personnel and programs.
Control Objective 3:
Controls provide reasonable assurance that there is appropriate segregation of duties between transaction initiation, authorization of payment, and record keeping / reporting functions.
3.01 Personnel are granted authority to initiate specific transactions as well as to approve processing based on management approval.
8.6.4 No Change
3.02 The System Architect or designee manually monitors weekly emails containing batch changes made in Production for review to confirm file changes were approved prior to being linked to a release.
8.6.5 No Change
3.03 Discrepancies are researched to confirm whether they are authorized or not. Any unauthorized changes detected are removed and reported as a security incident.
8.6.5 No Change
4.01 Recipients (Trading Partners) are granted authority to initiate specific transactions as well as to approve processing based on management approval.
8.8 No Change
4.02 Files are transmitted through use of the Secure File Transfer Protocol (SFTP). Recipients
(Trading Partners) are defined within the initial setup and only authorized files can be transferred.
8.8 No Change
4.03 Recipients (Trading Partners) are authenticated through the use of a user ID and password.
8.8 No Change
4.04 The Gainwell Cycle Support Team monitors Electronic Data Interchange (EDI) transmissions for failures and notifies partners and takes corrective action.
8.8 No Change
4.05 Any EDI transmission failure will be researched to identify cause and determine action required to ensure successful transmission.
8.8 No Change
5.01 Recipients (Trading Partners) are granted authority to initiate specific transactions as well as to approve processing based on management approval.
11.2.4 No Change
5.02 Any change to data in production must be approved by Gainwell and OHA leadership. A data fix request form is completed by the developer and reviewed by at least one other
Gainwell technical staff member before being submitted to Gainwell and OHA leadership for approval.
11.2.4 No Change
5.03 Jobs are scheduled and initiated by IBM Workflow Scheduler (IWS) which allows the jobs to automatically start per their defined schedules.
11.2.4 No Change
Control Objective 4:
Controls provide reasonable assurance that MMIS outputs are secure and routed to the appropriate users.
Control Objective 5:
Controls provide reasonable assurance that inputs to the MMIS production environments are authorized and scheduled, and that deviations or production incidents are investigated and documented.
5.04 Any job failure follows an escalation process involving automated notifications to ensure proper personnel are notified to determine the cause of the job failure. Job failures remain in the work queue, and are monitored by the Production Environment
Operations team, until the job passes.
11.2.4 No Change
5.05 If EDI transmission fails, the Gainwell Cycle Support Team member monitoring the transmission will review the details of the failure and attempt to resolve the issue.
11.2.4 No Change
6.01 Changes made in the ORXIX production environment follow a structured change management process.
8.6 No Change
28 6.02 Changes are tracked online in the Oregon Project Workbook (PWB). 8.6.1 No Change
6.03 Separate environments have been developed for application integrity to ensure proper financial changes are implemented in the MMIS:
• Development
• Model Office (MO)
• User Acceptance Testing (UAT)
• IE MMIS UAT (IMU)
• MMIS Performance UAT
• Production
• Training
8.6.2 Prior to Nov2025 use the 2025 diagram for on-prem.
After Nov2025. Use diagram for AWS environment available.
Separate environments have been developed for application integrity to ensure proper financial changes are implemented in the MMIS:
• Dev/Mod
• SIT
•Training
• UAT
• SAS
•Prod
•Parrellel Test
• Performance Test
• Conversion
6.04 Changes are tested, reviewed, and approved in lower-level environments prior to production implementation. Some items documented as tasks may not contain actual changes to production or executions of tasks, based upon requests from the MSC tool by OHA.
8.6.1 No Change
Control Objective 6:
Controls provide reasonable assurance that the MMIS and application software development, acquisition, and maintenance activities are authorized, documented, tested, reviewed, approved, and implemented.
Control Objective 7:
Controls provide reasonable assurance that IT Operations procedures and processes exist to minimize the effect of an event of processing errors or unexcepted processing interruptions.
7.01 Critical systems are backed up daily (incremental overnight) Monday to Saturday and fully backed up weekly on Sunday night using a commercial tool. All backup processes are automated and scheduled using media management software that generates a log file for every backup executed for review of success and/or failures.
6.16.1 No Change
7.02 Periodic requests for restores assure the validity of backups. Gainwell backup and restore requests are processed through tickets entered in SNOW. The BUR team manages the tickets and can provide evidence of successful completion via SNOW ticket.
6.16.2 No Change
7.03 Gainwell Laptops:
Anti-Virus for Gainwell Laptops is managed by Gainwell Corporate and is configured in
Microsoft Intune to use Microsoft Windows Defender Anti-Virus scanning. A copy of the current configuration policy can be requested from a representative of the Intune
Team.
6.12.2 No Change
7.04 Gainwell Windows Servers:
Anti-Virus for Gainwell Windows Servers is managed by HadenGrey and uses
Crowdstrike Anti-Virus. A copy of the current configuration policy can be requested from HadenGrey.
6.12.2 No Change
Control Objective 8:
Controls provide reasonable assurance that MMIS hardware and software processes are authorized, documented, tested, reviewed, approved, and implemented.
8.01 Upon discovery of a security event or security incident, the following steps are performed:
• The individual reporting the event or incident notifies the ISL.
• The ISL works with appropriate groups (Gainwell and/or OHA) to investigate and take necessary actions.
• The ISL completes an incident report and obtains approval from Gainwell Legal and
Account Leadership to submit the incident report as appropriate to OHA.
• The ISL delivers the report to OHA as appropriate.
NOTE:
• Events and incidents regarding internal Gainwell policy are handled internally.
• Courtesy notification to OHA may occur depending on the nature of the incident.
• If the incident was caused by employee misbehavior, such as not following company policy, the employee may be subject to retraining or sanction actions as outlined in section “6.3.4 Determine Sanction”.
6.15.2 No Change
8.02 Gainwell issued Windows laptop security patching is administered by Gainwell
Corporate IT.
7.6.3 No Change
38 8.03 Manual records are kept of the patching events. 11.2.1 No Change
8.04 Patches for Gainwell managed Windows servers follow a defined process and are on a predetermined schedule:
• Following Microsoft Patch Tuesday (i.e., 2nd Tuesday of every month), the Windows
System Administrator reviews the patches released and deploys them to Development and Model Office environments.
• The patches remain in those environments for one week and are then deployed to
UAT.
• The patches remain in UAT for one week and are then deployed to Production.
• Downtime notifications are sent to affected users.
11.2 No Change
Control Objective 9:
Controls provide reasonable assurance that the drug rebate process and systems are maintained, including configurations consistent with the defined system processing and data integrity.
9.01 Rebate invoice mailing dates are recorded in the MMIS panels and used to calculate interest on late payments based on the average T‐bill rate.
11.4 No Change
9.02 A quarterly report is generated at the end of each quarterly rebate cycle to summarize the total amounts invoiced to drug manufacturers and is provided to the state.
11.4 No Change
9.03 A monthly outstanding balance report is generated and reviewed to identify and pursue outstanding rebates from manufacturers who have unpaid rebates due.
11.4 No Change
9.04 A quarterly report is generated at the end of a quarterly rebate cycle to identify discrepancies of drug product billing units versus rebate units.
Discrepancies are reviewed and unit conversions are manually updated to account for the difference in units, providing for accurate rebate utilization.
11.4 No Change
9.05 Quarterly utilization reports are sent to CMS, reviewed by CMS, and CMS returns a response in the form of a discrepancy report. The CMS discrepancy report is reviewed to ensure discrepancy errors are below 10% for acceptance.
11.4 No Change
File details come from the government source that posted it. Updated .