Snow Plow Checklist 10.30.24.docx
DOCX document 28 KB Posted
- Attached to
- Sanford Armory Snow Plowing
- Solicitation number
- RFQ - 15A - 26062300000000000322
- Issued by
- York County, Maine
About this file
This is a Snow Plow Checklist document for the Sanford Armory Snow Plowing contract opportunity in Maine. The checklist appears to be a quality assurance and operational verification tool designed to ensure snow plowing services meet specified standards and requirements. The document likely outlines the essential tasks, equipment inspections, and performance metrics that contractors must complete and verify during snow removal operations at the Sanford Armory facility. The checklist serves as a standardized reference for evaluating whether snow plowing work has been executed in accordance with contract specifications, including factors such as pavement clearance, salt or sand application, equipment condition, and site safety measures.
The checklist format suggests it is intended for use by both contractors performing the work and municipal inspectors responsible for contract compliance verification. As a supporting document rather than the primary solicitation, this checklist would typically be referenced during contract performance monitoring and would help establish clear benchmarks for acceptable work quality. The document does not contain specific pricing information, award dates, contract terms, or renewal options, as those details would be contained in the main contract solicitation and award documents. This tool is essentially an operational guideline ensuring consistent, measurable performance standards throughout the snow plowing season at the designated facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfq 260623-0322 sanford snow plowing posting 4.docx | DOCX document | |
| rfq sanford snow plow bid sheet post 4.xlsx | XLSX spreadsheet | |
| sanford.pdf | ||
| rfq sanford snow plow bid sheet rev 1.xlsx | XLSX spreadsheet | |
| rfq 260623-0322 sanford snow plowing rev 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Defense, Veterans and Emergency Management – Military Bureau Evaluation of Service Tour – Snow Plowing & Sanding Checklist
Date of Tour:
Time:
Location:
Program Administrator/Designee:
Contractor:
Rating: E=Excellent G=Good (Meets Expectations) NI=Needs Improvement N/A = Not Applicable
NOTES:
1. Some tasks may not pertain to some facilities. Place N/A in the notes if not at your facility.
2. Pictures should be taken where they can be and submitted with the form.
Instructions for Evaluations
· There should be an agreed upon schedule for periodic performance evaluation tours, at a minimum of monthly.
· If additional evaluations are deemed necessary, this will be scheduled by the Program Administrator or their designee via written email notification a minimum of three (3) business days prior to requested meeting.
Contractor Performance:
· If the Contractor receives a combination of four or more negative responses to yes or no questions and Needs Improvement or Unacceptable ratings for services rated during the Evaluation of Service Tour, it will be documented as poor performance.
· The Contractor will be given two (2) weeks from the date of the Evaluation Tour to correct all issues discovered during the Evaluations of Service Tour.
· If the issues are not resolved during that timeframe the contract could be terminated due to documented poor performance with a thirty (30) day notice.
· If the Contractor receives three (3) evaluations that receive the poor performance rating for the facility, the contract could be terminated due to documented poor performance.
· Poor performance may be considered in the evaluation of a subsequent bids submitted by the Contractor.
· The Contractor will have fifteen (15) calendar days from the date notified to appeal any termination of contract decision based on the Evaluation of Services Tours.
· The appeal must be addressed to the Director of the Division of Procurement Services.
General
| Task |
| Rating |
| Notes |
When there was accumulations of two (2) inches or more of precipitation the Contractor has cleared and sanded designated areas without interruption and with reasonable diligence.
This includes all parking areas, entrances and roads if designated in contract.
Y or N
| Upon special request Contractor has cleared and sanded designated areas without interruption and with reasonable diligence |
| Y or N |
| All gates to compound are kept free of snow build up. |
| Y or N |
| When needed the contractor has returned to plow and sand multiple times, depending on the severity and duration of the storm. |
| Y or N |
| Roadways and parking lots are treated at time of plowing. |
| Y or N |
| Any time weather conditions have created unsafe parking lot and road surfaces because of an accumulation of ice, such as melting and refreezing, and wind-caused drifts, the Contractor initiated sanding/salting operations. |
| Y or N |
| Has Contractor contacted the Program Administrator for any storms that could not be completed within (6) hours after completion of the precipitation event. |
| Y or N |
All parking lots, access roads and sidewalks were reasonably cleared no later than 6:00 am.
Y or N
Contractor has returned within 24 hours of the completion of the precipitation event to clean previously occupied parking areas.
| Contractor has returned as necessary for issues such as snow falling from sections of the roof blocking the rear entrance to the assembly hall and drifting snow and/or melted snow. |
| Y or N |
| Is snow piled in specified areas only? |
| Y or N |
| No snow shall be piled up or stacked against light post or on islands or unapproved piling areas. |
| Y or N |
Gated Compounds have been completed as needed on the will-call basis (based on 4" accumulation)
Y or N
Contactors has not created drifts in front of the dumpster enclosures, fire lanes, or in front of fire hydrants.
The contractor will be responsible for removing contractor created drifts.
Y or N
| If required in contract is the movement of snow piles to snow dump being completed during daytime hours? |
| Y or N |
| The contractor has hauled and piled the snow on the concrete pad only and not pushed the snow on any grassy area or into the tree line. |
| Y or N |
Special Requirements (specific areas only) Note if your site does not have the specific category then put N/A in the notes – refer to contract if unsure.
| Task |
| Rating |
| Notes |
Bangor Flight Facility Bldg #260 is a 24/7 operation and contractor has been clearing the designated areas at any time during the day or night.
(The facility Point of Contact (POC), Program Administrator and/or the Security Guards will notify the contractor when conditions warrant snow removal and sanding.)
Y or N
Bangor RTI #700 is potentially a 24/7 operation and contractor has been clearing the designated areas at any time during the day or night, if requested.
(The facility Point of Contact (POC), Program Administrator and/or the Security Guards will notify the contractor when conditions warrant snow removal and sanding.)
Y or N
| Shoveling of walkways, handicap ramps and stairs (RTI, Camp Keyes) |
| Y or N |
Misc. Items
| Task |
| Rating |
| Notes |
| Is this a facility that is open on weekend/Holidays? |
| Y or N |
| If yes above - has Contractor and Facility POC’s been identified? |
| Y or N |
| Are all personnel on site vetted |
| Y or N |
| Has Contractor provided contact information for the call for services when needed, included gated areas? |
| Y or N |
| Has Contractor responded to all emails/phone calls within one business day? |
| Y or N |
On time requirements/End of Season Review
| Task |
| Rating |
| Notes |
| Was the Program Administrator provided photos and detailed listing of any pre-existing damage within 30 days of start of CT. |
| Y or N |
| Removal of any dirt build up from plowing activities? |
| Y or N |
| Any noted repairs to be followed up on? |
| Y or N |
| Repairs completed to any damaged lawn? |
| Y or N |
Evaluation Tour Attendees (must Sign & Date)
Facility Contact_______________________________________________________
DFE Contact__________________________________________________________
Vendor/Provider Contact_______________________________________________ Return completed sheet (pages 1-4 at least) to Ken Merrifield – DFE kenneth.r.merrifield.nfg@army.mil
File details come from the government source that posted it. Updated .