The provided document is a set of contract area slope and unit maps for the RIM Reforestation Phase 4 Mechanical Site Prep Contract, specifically Item 2, for the Stanislaus National Forest Groveland Ranger District. The maps detail multiple site preparation units across different areas, with each map focusing on a specific unit (such as BB028, BB038, BB041, BB049, BB057, W007, Y002C, Y008, Y010, Y011, Y014, Y015, Y016, Y018, Y019, Y022, Y025, Y027, Z007a, Z007b, Z012, and Z015). The maps illustrate the site preparation units with color-coded areas representing different slope percentages (0-35%, 35-45%, and >45%), and include detailed information on limited operating periods (LOPs), streamcourse protections, potential water sources, and areas with threatened, endangered, and sensitive plants.

The maps provide comprehensive spatial information for mechanical site preparation, highlighting specific environmental considerations such as slope gradients, streamcourse protections, and sensitive areas. Each unit map includes a legend detailing site prep units, different operating periods, existing transportation systems, other ownership boundaries, and protection zones for various environmental features. The maps are part of a larger reforestation effort in the Stanislaus National Forest, specifically the Groveland Ranger District, with precise geographical annotations and unit identifiers. The maps are dated 8/28/2024 and emphasize that landlines and symbol locations are approximate, suggesting flexibility in the exact boundaries and implementation of the site preparation work.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BB049

Y008

Y025

BB041

Y010

Y011

Y018

Y014 Y015

Y016 Y002C

BB057

W007

Y019

Y027

Z007a Z015

Z012

BB038

Y022

Z007b

BB028

&3

&3

&3

&3

&3

&3

&3

North Fork Mokelumne River

Middle Fork Stanislaus

Sou th

F or k Sta ni sla us River

Sonora

Murphys

Groveland

Twain Harte

Bear Valley

Arnold

Strawberry

!¬4

!¬801

!¬021!¬94

!¬94

!¬4 N or th F or k

S ta ni sl au s

R iv er

South Fork

M ok elumne River

Tu ol um ne

R iv er

Nor th

F or k

Tuolumne River

C la ve y

R iv er

Cherry Reservoir

Spicer Reservoir

Donnell Reservoir

Beardsley Reservoir

Pinecrest Reservoir

Yosemite National Park

Yosemite National Park

Calaveras Big Trees State Park

C a l a v e r a s R a n g e r D i s t r i c t

S u m m i t R a n g e r D i s t r i c t

M i - W o k R a n g e r D i s t r i c t

G r o v e l a n d R a n g e r D i s t r i c t

Site Prep Units

Percent Slope 0 - 35%

35 - 45%

<45%

TRT SZ 8/28/2024

Landlines & Symbol Locations Are Approximate

0 1 20.5

Miles

Contract Area Map - Slope Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2

N

Falls T u o l u m n e

BM

42281 S 0 2

A

EV

X

X

ÑÕ

-1AC

<1 ac

!(BB028

CA-2

155 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.15 0.30.07

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit BB028 ê

!(PS

!(PS

!(PS

!(BB038

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit BB038

Spring

EA

!(BB041

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.07 0.130.03

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit BB041

A

S

X

X

X

!(PS

!(PS

!(PS

!(-AC!(-AC

-1AC

<1 ac

!(BB049

!(BB057

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.15 0.30.07

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit BB049

X

!(PS

!(PS

!(PS

!(BB049

!(BB057

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.06 0.120.03

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit BB057

R A N G E

S

18EV420

3600 !(W007

CA-2

61 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit W007

D

H E T C H

18E V42

X

!(Y002C

CA-2

216 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.09 0.180.04

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y002C

N

N

S

PS

S

PS

SP S

Meadow

BM

1 S 0 2

B S

A

18EV415

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

!(PS

!(PS

!(Y008

!(Y010

!(Y011

CA-2

216 ac

CA-2

155 acSite Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.06 0.120.03

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y008

1 S 0 2

B

EA

X!(PS

!(PS

!(Y008

!(Y010

!(Y011

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.07 0.130.03

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y010

B

X

!(PS

!(PS

!(Y008

!(Y010

!(Y011

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y011

!(Y018

!(Y014

!(Y015

!(Y016

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.07 0.130.03

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y014

!(Y014

!(Y015

!(Y016

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y015

4192E

C

18DC418

!(Y015

!(Y016

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y016

BM 3959

Springs

S

1 S 8 3

X

X x x x x x x

!(PS

!(PS

!(Y010

!(Y018

!(Y014

!(Y015

!(Y019

CA-2

155 ac

CA-2

155 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.1 0.20.05

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y018

1 S 8 3

!(Y018

!(Y019

CA-2

155 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y019

BM

BM

1 S 0 2

S

X

!(PS

!(PS

-1AC

<1 ac

-1AC

<1 ac

!(Y025

!(Y022

CA-2

155 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.09 0.170.04

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y022

D

D

D

D

S

P

S

BM 4236

BM

Ann

BM

1 S 0 2 S Y

S

S

X

X

X x x x x x x x x x x x x x x x xx x x x x x x x x x x x x x x x x

!(PS

!(PS

!(PS

!(PS

-1AC

<1 ac

-1AC

<1 ac

!(Y025

!(Y027

!(Y022

CA-2

61 ac

CA-2

61 ac

CA-2

61 ac

CA-2

155 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.15 0.30.07

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y025

S

P

S

Ann

S Y x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

!(PS

!(Y025

!(Y027

CA-2

155 ac

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.05 0.10.03

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Y027

18DC426

!(PS

!(PS

!(PS

!(PS

!(Z007a

!(Z012

!(Z007b

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.06 0.120.03

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Z007a

!(Z007a

!(Z007b

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.01 0.030.01

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Z007b

!(Z007a

!(Z015

!(Z012

Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Z012

!(Z015

!(Z012 Site Prep Units

LOP 3/1 through 6/30

LOP 3/1 through 8/15

LOP 3/1 through 7/9

LOP 3/1 through 8/31

LOP 2/15 through 9/15

Existing Transportation System

Other Ownership

Streamcourse Protection, (Perennial and Intermittent Streams)

Streamcourse Protection, (Ephemeral Streams)

!(PS Threatened, Endangered, and Sensitive Plants - Avoid

!xno( Noxious Weeds - Treat

!(- 1AC CA-1

!(- 2AC CA-2

Potential Water Sources

X Protection of Improvements, Survey Monuments x x Protection of Improvements, Gates, Fences, and Cattle Guards

! ! ! Protection of Improvements, Distribution Line

Protection of Improvements, Transmission Line

TRT SZ 8/28/2024 Landlines & Symbol Locations Are Approximate

0 0.04 0.080.02

Miles

Contract Area Map Stanislaus National Forest Groveland Ranger District

RIM Reforestation Phase 4 Mechanical Site Prep Contract Units

Item 2 Unit Z015

RimReforestation_Phase4_SitePrep_SlopeMap_20240828_Item_2.pdf
RimReforestation_Phase4_SitePrep_UnitMapSeries_20240828_Item_2.pdf

File details come from the government source that posted it. Updated .