L_(Instructions to Offeror).pdf
PDF 186 KB Posted
- Attached to
- SPEAR Beam Position Monitors (BPMs)
- Solicitation number
- SLAC_RFP369851_(AT)
- Issued by
-
Department of Energy Office of Science
About this file
This document is Section L (Instructions to Offerors) for a Firm Fixed Price Subcontract for Beam Position Monitors (BPMs) to be awarded by SLAC (Stanford Linear Accelerator Center) on behalf of the U.S. Department of Energy. Proposals are due by Friday, December 4, 2026, at 5:00 PM PST and must be emailed to Subcontract Administrator Astrid Torres at astridt@slac.stanford.edu. The solicitation requires offerors to deliver 56 BPMs no later than 7 months from award and the remaining BPMs with fast orbit feedback and interlock applications no later than 8 months from award. NAICS code 334516 (Analytical Laboratory Instrument Manufacturing) applies. Offerors must register with the System for Award Management (SAM), except foreign entities, and must comply with E-Verify requirements per FAR 52.222-54. Proposals must remain valid for 90 days from the due date and for one year from initial award.
Proposals must be submitted in two separate volumes: Volume I (Technical Proposal, 35-page maximum) addressing factors including orbit calculations, automatic calibration, masking, bunching, system interface requirements, orbit stability, orbit interlock, fast orbit feedback, testing requirements, onsite training and commissioning, software maintainability and operability, power and safety, and warranty; and Volume II (Business Proposal, unlimited pages) addressing price, financial standing, compliance to terms and conditions, delivery schedules, and performance capabilities demonstrating prior experience delivering BPMs to light source accelerator facilities. Offerors must submit required forms including Section A (Subcontract Award Form), Section B (Supplies & Services with firm fixed prices), Section J (IIPP, Insurance Certificate, Small Business Plan), Section K (Representation and Certification Supplement and Buy American Act Certification), Dun and Bradstreet reports, and Technical and Business Acceptance Criteria Matrix. SLAC intends to award without discussions but reserves the right to conduct discussions if deemed necessary. All cost and price proposals must include price certification such as published price lists, redacted invoices, or redacted quotes. Questions and clarifications must be submitted by November 30, 2026, using the designated form.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section L - Instructions to Offerors (ITO)
1. GENERAL INFORMATION
Section L – Instructions to Offerors for Firm Fixed Price Subcontract provides general guidance for preparing proposals and specific instructions on the proposal's format and content. The Offeror's proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. The proposal shall be compliant with the requirements as stated in the Specification. Non-conformance with the instructions provided in this ITO may result in an unfavorable proposal evaluation.
Proposals must be valid for ninety (90) days from the proposal due date. The Offeror shall make a clear statement in its proposal cover letter utilizing the following language, “The undersigned agrees that this offer is valid for ninety (90) days and shall furnish any or all items upon which prices are offered at the price set opposite each item, and that will remain valid for one year from the initial award, delivered via email (at the designated point(s), within the time specified in the schedule.”
Proposals are due no later than Friday, December 4, 2026, at 5:00pm PST and shall be addressed and emailed to the Subcontract Administrator, Astrid Torres at astridt@slac.stanford.edu.
Proposals shall be submitted on the forms furnished or copies thereof and must be manually or electronically signed. If erasures or other changes appear on the forms; the person signing the proposal must initial each erasure or change.
Point of Contact: The Subcontract Administrator is the sole point of contact for this acquisition. Address any questions or concerns you may have to the Subcontract Administrator at email:
astridt@slac.stanford.edu. All exchanges of source selection information between SLAC and Offerors will be controlled by the Subcontract Administrator.
Cost/Price Reasonableness and Realism: Unrealistically low or high proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from consideration either on the basis that the Offeror does not understand the requirements, or has made an unrealistic offer. Offers should be sufficiently detailed to demonstrate their reasonableness. The burden of proof for credibility of proposed costs/prices rests with the Offeror. The Offeror’s Cost/Price proposal consists of the firm fixed price to deliver the products required as set forth in the solicitation and must be prepared in a manner that is current, accurate, and responsive to the RFP.
SLAC intends to award without discussions with respective Offerors. SLAC, however, reserves the right to conduct discussions if deemed in its best interest.
Marking of Proprietary/Confidential Information. Offerors shall properly mark and identify with a restrictive legend or information markings on pages of the proposal that contain proprietary/ confidential information.
For Offeror to be eligible for a subcontract award with SLAC and the U.S. Department of Energy (DOE), Offeror shall be registered with the System for Award Management (SAM), the Official U.S.
Government system that consolidated the capabilities of CCR/FedReg, ORCA, and EPLS. There is NO fee to register for this site. Entities may register at no cost directly at the SAM website:
httSCA://sam.gov/content/home?api_key=ROEXk2SBBROUbVQ4L38wSJsGEvZ3oWtLxva9h0zV
** SAM.gov registration is not required for foreign entities.
mailto:astridt@slac.stanford.edu.
mailto:astridt@slac.stanford.edu.
https://sam.gov/content/home?api_key=ROEXk2SBBROUbVQ4L38wSJsGEvZ3oWtLxva9h0zV
The following documents must be completed and submitted with your proposal.
1. Section A – Subcontract Award Form
2. Section B – Supplies & Services
3. Section J – IIPP
4. Section J – Insurance Certificate
5. Section J – Small Business Plan
6. Section K – Representation and Certification Supplement (Domestic or International)
7. Section K – Buy American Act Certification
8. Section L – Technical and Business Acceptance Criteria Matrix
9. Dun and Bradstreet report.
The Procurement shall be performed in accordance with the documents set forth below.
1. Section C – Specification
2. Section D – Shipping Section
3. Section E – Inspections Acceptance
4. Section F – Deliveries Performance
5. Section G – Terms and Conditions
6. Section H – Special Terms and Conditions
7. Section J – List of attachments
8. Section L – Instructions to Offerors
9. Section M – Evaluation Factors
Section L – Offeror’s Request for Clarifications - Any questions by the Offerors regarding the solicitation prior to the proposal due date shall be submitted to the Subcontract Administrator using the form Section L
- Offeror’s Request for Clarifications
Questions/clarification must be submitted no later than November 30, 2026.
Section L – Technical and Business Acceptance Criteria Matrix should be completed and submitted with your proposal to ensure all requirements are included in your proposal package.
The following requirements apply to this procurement and any resultant Purchase Order:
• The assigned North American Industry Classification System (NAICS) code for this solicitation is 334516 -Analytical Laboratory Instrument Manufacturing.This code reflects the principal purpose of the supplies or services being acquired under this solicitation. Offerors are responsible for ensuring their SAM.gov registration accurately reflects the stated NAICS code.
• E-Verify as required by FAR 52.222-54, “Employment Eligibility Verification” (July 2012) applies to this procurement
SLAC will not be liable for any expense incurred in preparing any supplier’s response nor for any expense for materials or services not funded on this subcontract.
2. PREPARATION OF PROPOSALS
Volume I must contain the following information but not contain any pricing information. All pricing information shall be submitted in Volume ll – Business Proposal. Proposals will be evaluated based on key evaluation factors thereunder.
Volume I – Technical Proposal (35 page maximum)
Cover Sheet The cover sheet should include:
• Project Title: RFP_369851(AT)_BPMs
• Volume I - Technical Proposal
• Date of submission
• Subcontractor Name
• Contact information
Factor 1 – Technical Factors
The Offeror shall submit a proposal package that will demonstrate the product’s ability to meet technical specifications addressed in the SOW.
1. Orbit Calculations (SOW 2.1)
The proposal shall include validation that the product will provide the orbit calculations as stated in the Statement of Work (SOW) section 2.1, which includes turn-by-turn, 10 kHz, and 10 Hz data streams with proper triggering and filtering.
2. Automatic Calibration (SOW 2.2) The proposal shall include validation that the product can automatically calibrate the 4 input channels as stated in the SOW, section 2.2.
3. Masking (SOW 2.3) The proposal shall include validation that the product can mask portions of the ADC stream in each channel as stated in the SOW, section 2.3.
4. Bunching (SOW 2.3) The proposal shall include validation that the product can measure two separate bunches in a turn as stated in the SOW, section 2.3.
5. System Interface Requirements (SOW 3.0) The proposal shall include validation that the product will provide inputs and interfaces as stated in the SOW, section 3.0.
6. Orbit Stability Requirements (SOW 4.0) The proposal shall include validation that the product meets the orbit stability requirements as stated in the SOW, section 4.0.
7. Orbit Interlock Requirements (SOW 5.0) The proposal shall include validation that the product meets interlock requirements as stated in the SOW section 5.0.
8. Fast Orbit Feedback (SOW 6.0 The proposal shall include validation that the product will provide the fast orbit feedback requirements as stated in the SOW section 6.0.
9. Testing Requirements (SOW 7.0) The proposal shall include validation that the offeror shall provide their factory acceptance test (FAT) to SLAC for approval as stated in the SOW, section 7.0.
10. Onsite Training and Commissioning (SOW 7.4) The proposal shall include onsite training at SLAC as stated in the SOW, section 7.4.
11. Software Maintainability and Operability (SOW 8.1 and 8.2) The proposal shall include validation that the product provides professional software and EPICS support and identify terms of maintainability as stated in the SOW, section 8.1 and 8.2.
12. Power and Safety (SOW 8.3) The proposal shall include validation that BPM electronics use standard 120V, 60Hz power.
13. Warranty (SOW 8.4) The proposal shall include a warranty which covers at least the first two years after delivery, as stated in the SOW, section 8.4.
Factor 2 – Performance Capabilities
1. The BPM must be an off-the-shelf commercial item which may be configured to meet specific SOW requirements. The Offeror shall include a demonstration of performance capabilities for providing BPMs, fast orbit feedback, and fast orbit interlock systems. Performance capabilities can be demonstrated by identifying number of years product has been on the market, quality records, certifications or similar data to show maturity of product. Offerors with no performance capabilities documentation available shall receive the rating of "Technically Unacceptable".
2. The Offeror shall submit documentation of prior experience demonstrating delivery to a light source accelerator facility of at least one (1) similar/comparable BPM which met similar technical criteria, operated under similar circumstances. Offerors with no relevant past or present performance history shall receive the rating of "Technically Unacceptable".
Factor 3 – Major Milestones and Delivery Date
The Offeror shall provide in their proposal, an estimated delivery date of 56 BPMs no later than 7 months from the receipt of award and the remainder of BPMs with the fast orbit feedback and interlock applications no later than 8 months from the receipt of the award.
Volume II – Business Proposal
Cover Sheet
The cover sheet should include:
• Project Title: RFP_369851(AT)_BPMs
• Volume II – Business Proposal
• Date of submission
• Subcontractor Name, and
• Contact Information
Clearly stamp all company financial documents as “Business Sensitive”, if applicable, on any included documents.
Factor 4 – Price
1. The Offeror shall complete and submit Section A and addendums if applicable.
2. The Offeror shall submit RFP Section B with firm fixed prices for each item
3. The Offeror shall submit price certification (i.e. published price lists, redacted invoices or redacted quotes for items procured). If no price certification method listed above is available, Offeror may issue a certificate on company letterhead indicating SLAC is receiving the best price offered and provide a redacted invoice of previously sold BPMs or similar specifications or exact specifications.
Factor 5 – Financial Standing
1. The offeror shall demonstrate financial responsibleness by providing a Dun and Bradstreet report and/or other credit rating documents.
a. If the Dun & Bradstreet SER score is greater than 6, provide the last three years of audited financial statements. Financial statements are not required if SER score is 6 or below.
b. Clearly stamp all company financial documents as “Business Sensitive”, if applicable. Notify the Subcontract Administrator for instructions on submitting “Business Sensitive” documents. Do not include “Business Sensitive” material in the proposal response.
Factor 6 – Compliance to Terms and Conditions
1. Terms and Conditions Acceptance and/or Exceptions:
The Offeror’s proposal must communicate acceptance to the SLAC Terms and Conditions, as indicated in the solicitation, including all attachments, and documents. Any and all exceptions must be provided at the time of proposal submission.
2. Section D: Delivery, Shipping and Packing The offer shall identify shipping terms in proposal. Preferred shipping method is identified in Section D.
3. Section K: Representation and Certifications Offerors are to fill out, sign, and return with their proposal either a Domestic or International Representation and Certifications Supplement.
4. Section K: Buy American Act Certificate Offerors are to fill out, sign and return with proposal the Buy American Act Certificate.
5. Section J: IIPP Form
Offerors are to fill out, sign, and return with their proposal the Injury and Illness Prevention Plan Acknowledgement Form
6. Section J: Insurance Certificate
Offerors are to submit a Certificate of Insurance (COI) that meet the requirements in the Terms and Conditions including Special Provisions and Endorsements. An example is provided in Section J for reference.
7. Section J: Small Business Subcontract Plan
Offerors are to fill out, sign, and return with their proposal the Small Business Subcontract Plan
1. METHOD OF TRANSMISSION / ORGANIZATION / NUMBER OF COPIES / PAGE LIMITS:
Proposals must be submitted via email for purposes of proposal submission deadline. The Offeror shall prepare the proposal as set forth in the Proposal Organization Table. The titles and contents of the volumes shall be as defined in this table, all of which shall be within the required pages limits and with the number of copies as specified. The contents of each proposal volume are described in the ITO paragraph as noted in the table below:
PROPOSAL ORGANIZATION TABLE
Volume ITO
Section Volume Title Copies Page
Limit I 2 Technical Proposal 1 35 II 2 Business Proposal 1 None
2. LATE PROPOSALS AND MODIFICATIONS
Proposals and Modifications thereof received by email designated in the Request for Proposals after the due date and time will not be considered.
3. WITHDRAWALS OF PROPOSALS
Proposals may be withdrawn by email, addressed as instructed for the proposal, and received from the Offerors prior to award.
4. AMENDMENT
The right is reserved, as the interests of SLAC may require, to revise or amend the solicitation documents and drawings prior to the due date set for submission of proposals. Such revisions and amendments, if any will be announced on an “Amendment of Solicitation / Subcontract Modification” form. Copies of such amendment as may be issued will be furnished to all prospective Offerors. If the revisions and amendments are of a nature which requires material changes in quantities or proposal prices or both, the date set for submission of proposals may be postponed by such number of days, as in the opinion of SLAC will enable the Offerors to develop their proposals. In such case, the Amendment of Solicitation / Subcontract Modification form will include an announcement of the new due date for receipt of proposals.
5. EXPLANATION TO OFFERORS / OFFEROR QUESTIONS & CLARIFICATIONS
Any explanation desired by an Offeror regarding the meaning or interpretation of the Request for Proposal, drawings, specifications, etc., must be requested in writing to the attention of the Subcontract Administrator using the form, “Offeror’s Request for Clarifications.” Sufficient time must be allowed for a reply to reach the Offeror before the due date for submission of proposals. Oral clarification of requirements or instructions provided by SLAC before the award of the Subcontract will not be binding. Questions containing Offeror’s non-proprietary information and corresponding clarifications will be shared with all Offerors. Transmittal shall be sent via email in PDF format.
6. TAXES
Attention of Offerors and their prospective Sub-subcontractors is directed to the Article titled, “Federal, State and Local Taxes” of the General Terms and Conditions and to the California State Board of Equalization Regulations relating to sales of machinery and equipment for delivery under construction contracts with the United States government. However, responsibility for determination of the applicability of California State Board of Equalization Regulations shall rest solely with the Offeror, and no representation, or guarantee either expressed or implied is made by the Government or SLAC hereunder as to the application thereof.
SLAC will not reimburse Offeror for taxes as a separate line item.
7. SPECIFIED PRODUCT AVAILABILITY
Where the Technical Specifications, Statement of Work, or Drawings list a specific product, the Offerors may assume that the product is commercially available; however, availability within the required performance period may require payment, by the successful Subcontractor at no additional cost to SLAC, of premiums for expediting production or shipment. The Offerors are cautioned to confirm not only product prices but costs associated with timely acquisition of the product as required to meet performance period requirements. The Offerors are required to notify SLAC Subcontract Administrator prior to the proposal due date of any obvious product unavailability.
8. SPECIFIED PRODUCT OR METHOD COMPATIBILITY
Where the Technical Specifications, Statement of Work, or Drawings list a specific product or method, the Offerors may assume that the product or method is compatible with other requirements of the Subcontract.
The Offerors are required to notify SLAC Subcontract Administrator prior to the date set for receipt of proposals of any obvious incompatibility between a specified product or method and other requirements of the Subcontract.
9. EXCEPTIONS SLAC’S STANDARD TERMS AND CONDITIONS, PROVISIONS, AND / OR CLAUSES
Offeror must identify any exceptions to SLAC terms and conditions or exceptions to any other element of the requirements that are a part of this RFP, with their proposal. SLAC will not entertain any exceptions not identified in the proposal submission. Exceptions taken may be cause for rejection of a proposal. Inclusion of any assumptions, clarifications, exclusions or conditions may be cause for rejection of the proposal as non-responsive.
| 1. GENERAL INFORMATION |
| 2. PREPARATION OF PROPOSALS |
| Cover Sheet |
| The Offeror shall submit a proposal package that will demonstrate the product’s ability to meet technical specifications addressed in the SOW. |
| The proposal shall include validation that the product can automatically calibrate the 4 input channels as stated in the SOW, section 2.2. |
| 3. Masking (SOW 2.3) |
| The proposal shall include validation that the product can mask portions of the ADC stream in each channel as stated in the SOW, section 2.3. |
| The proposal shall include validation that the product can measure two separate bunches in a turn as stated in the SOW, section 2.3. |
| 5. System Interface Requirements (SOW 3.0) |
| The proposal shall include validation that the product will provide inputs and interfaces as stated in the SOW, section 3.0. |
| The proposal shall include validation that the product meets the orbit stability requirements as stated in the SOW, section 4.0. |
| The proposal shall include validation that the product meets interlock requirements as stated in the SOW section 5.0. |
| 8. Fast Orbit Feedback (SOW 6.0 |
| The proposal shall include validation that the product will provide the fast orbit feedback requirements as stated in the SOW section 6.0. |
| The proposal shall include validation that the offeror shall provide their factory acceptance test (FAT) to SLAC for approval as stated in the SOW, section 7.0. |
| The proposal shall include onsite training at SLAC as stated in the SOW, section 7.4. |
| The proposal shall include validation that the product provides professional software and EPICS support and identify terms of maintainability as stated in the SOW, section 8.1 and 8.2. |
| The proposal shall include validation that BPM electronics use standard 120V, 60Hz power. |
| The proposal shall include a warranty which covers at least the first two years after delivery, as stated in the SOW, section 8.4. |
File details come from the government source that posted it. Updated .