L_2_BPM_Tech_Bus_Matrix.pdf

PDF 205 KB Posted

Attached to
SPEAR Beam Position Monitors (BPMs)
Solicitation number
SLAC_RFP369851_(AT)
Issued by

About this file

This document is a Technical Acceptance Criteria Matrix and Business Acceptance Criteria Matrix for a procurement of SPEAR Beam Position Monitors (BPMs) for the SLAC National Accelerator Laboratory under Requisition No. 0000369851.

The technical evaluation criteria span 13 factors organized under Factor 1 (Technical Specifications) and Factor 2 (Performance Capabilities). Technical specifications require validation that the proposed product meets detailed SOW requirements across orbit calculations with multiple data streams (turn-by-turn, 10 kHz, and 10 Hz), automatic calibration of four input channels, ADC stream masking, bunch measurement capabilities, system interface requirements, orbit stability, interlock requirements, and fast orbit feedback systems. Additional technical requirements include factory acceptance testing (FAT) approval by SLAC, onsite training and commissioning, professional software and EPICS support with identified maintainability terms, standard 120V 60Hz power specifications, and a minimum two-year warranty post-delivery. Performance capability evaluation requires demonstration of experience delivering comparable BPMs to light source accelerator facilities meeting similar technical criteria and evidence of product maturity through years on market, quality records, or certifications. Factor 3 addresses delivery milestones requiring 56 BPMs within seven months of award and remaining BPMs with fast orbit feedback and interlock applications within eight months.

The business evaluation criteria comprise Factor 4 (Price), Factor 5 (Financial Standing), and Factor 6 (Contractual and Additional Required Documents). Pricing submission requires completion of Section A (Subcontract Award), Section B (Supplies and Services with pricing and company information), and price certification documentation demonstrating best pricing through published price lists, redacted invoices, or company letterhead certification. Financial standing evaluation requires a Dun and Bradstreet report; if the SER score exceeds 6, the last three years of audited financial statements must be provided. Contractual requirements mandate acceptance or documented exceptions to SLAC Terms and Conditions, Section D shipping terms, Section K Representation and Certifications Supplement, Buy American Act Certificate, Injury and Illness Prevention Plan Acknowledgement Form, Certificate of Insurance meeting specified endorsement requirements, and a Small Business Subcontract Plan. All evaluation criteria employ a binary MEETS or DOES NOT MEET assessment framework with required justification for non-compliance determinations.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Acceptance Criteria Matrix for SPEAR BPMs REQUISITION No. 0000369851

TECHNICAL SUBMISSION REQUIREMENTS TECHNICAL EVALUATION CRITERIA EVALUATION

M=MEETS

D=DOES NOT MEET

JUSTIFICATION

(Required if Does Not Meet)

Factor 1. Technical Specifications

1. Orbit Calculations (SOW 2.1) The proposal shall include validation that the product will provide the orbit calculations as stated in the Statement of Work (SOW) section 2.1, which includes turn-by-turn, 10 kHz, and 10 Hz data streams with proper triggering and filtering.

The proposal will be evaluated to validate that the product will provide the orbit calculations as stated in the Statement of Work (SOW) section 2.1, which includes turn-by-turn, 10 kHz, and 10 Hz data streams with proper triggering and filtering.

MEETS: The proposal validates that the product will provide the orbit calculations as stated in the Statement of Work (SOW) section 2.1, which includes turn-by-turn, 10 kHz, and 10 Hz data streams with proper triggering and filtering.

DOES NOT MEET: The proposal does not validate that the product will provide the orbit calculations as stated in the Statement of Work (SOW) section 2.1, which includes turn-by-turn, 10 kHz, and 10 Hz data streams with proper triggering and filtering.

2. Automatic Calibration (SOW 2.2) The proposal shall include validation that the product can automatically calibrate the 4 input channels as stated in the SOW, section 2.2.

The proposal will be evaluated to validate that the product can automatically calibrate the 4 input channels as stated in the SOW, section 2.2.

MEETS: The proposal validates that the product can automatically calibrate the 4 input channels as stated in the SOW, section 2.2.

DOES NOT MEET: The proposal does not validate that the product can automatically calibrate the 4 input channels as stated in the SOW, section 2.2.

3. Masking (SOW 2.3) The proposal shall include validation that the product can mask portions of the ADC stream in each channel as stated in the SOW, section 2.3.

The proposal will be evaluated to validate that the product can mask portions of the ADC stream in each channel as stated in the SOW, section 2.3.

MEETS: The proposal validates that the product can mask portions of the ADC stream in each channel as stated in the SOW, section 2.3.

DOES NOT MEET: The proposal does not validate that the product can mask portions of the ADC stream in each channel as stated in the SOW, section 2.3.

4. Bunching (SOW 2.3) the product can measure two separate bunches in a turn as stated in the SOW, section 2.3.

The proposal will be evaluated to validate that the product can measure two separate bunches in a turn as stated in the SOW, section 2.3.

MEETS: The proposal validates that the product can measure two separate bunches in a turn as stated in the SOW, section 2.3.

DOES NOT MEET: The proposal does not validate that the product can measure two separate bunches in a turn as stated in the SOW, section 2.3.

5. System Interface Requirements

(SOW 3.0)

The proposal shall include validation that the product will provide inputs and interfaces as stated in the SOW, section 3.0.

The proposal will be evaluated to validate that the product will provide inputs and interfaces as stated in the SOW, section 3.0.

MEETS: The proposal validates that the product will provide inputs and interfaces as stated in the SOW, section 3.0.

validate that the product will provide inputs and interfaces as stated in the SOW, section 3.0.

6. Orbit Stability Requirements (SOW 4.0) The proposal shall include validation that the product meets the orbit stability requirements as stated in the SOW, section 4.0.

The proposal will be evaluated to validate that the product meets the orbit stability requirements as stated in the SOW, section 4.0.

MEETS: The proposal validates that the product meets the orbit stability requirements as stated in the SOW, section 4.0.

DOES NOT MEET: The proposal does not validate that the product meets the orbit stability requirements as stated in the SOW, section 4.0.

7. Orbit Interlock Requirements (SOW 5.0) the product meets interlock requirements as stated in the SOW section 5.0.

The proposal will be evaluated to validate that the product meets interlock requirements as stated in the SOW section 5.0.

MEETS: The proposal validates that the product meets interlock requirements as stated in the SOW, section 5.0.

DOES NOT MEET: The proposal does not validate that the product meets interlock requirements as stated in the SOW, section 5.0.

8. Fast Orbit Feedback (SOW 6.0) the product will provide the fast orbit feedback requirements as stated in the SOW section 6.0.

The proposal will be evaluated to validate that the product will provide the fast orbit feedback requirements as stated in the SOW section 6.0.

MEETS: The proposal validates that the product provides the fast orbit feedback requirements as stated in the SOW, section 6.0.

DOES NOT MEET: The proposal does not validate that the product provides the fast orbit feedback requirements as stated in the SOW, section 6.0.

9. Testing Requirements (SOW 7.0) the offeror shall provide their factory acceptance test (FAT) to SLAC for approval as stated in the SOW, section 7.0.

The proposal shall be evaluated to validate that the offeror shall provide their factory acceptance test (FAT) to SLAC for approval as stated in the SOW, section 7.0.

MEETS: The proposal validates that the offeror shall provide their factory acceptance test (FAT) to SLAC for approval as stated in the SOW, section 7.0.

DOES NOT MEET: The proposal does not validate that the offeror shall provide their factory acceptance test (FAT) to SLAC for approval as stated in the SOW, section 7.0.

10. Onsite Training and Commissioning

(SOW 7.4)

The proposal should include onsite training at SLAC as stated in the SOW, section 7.4.

The proposal shall be evaluated to validate that onsite training is included at SLAC as stated in the SOW, section 7.4.

MEETS: The proposal include onsite training at SLAC as stated in the SOW, section 7.4.

DOES NOT MEET: The proposal does not include onsite training at SLAC as stated in the SOW, section 7.4.

11. Software Maintainability and Operability (SOW 8.1 and 8.2) The proposal shall include validation that the product provides professional software and EPICS support and identify terms of maintainability as stated in the SOW, section 8.1 and 8.2.

The proposal will be evaluated to validate that the product provides professional software and EPICS support and identify terms of maintainability as stated in the SOW, section 8.1 and 8.2.

MEETS: The proposal validates that the product provides professional software and EPICS support and identifies terms of maintainability as stated in the SOW, section 8.1 and 8.2.

validate that the product provides professional software and EPICS support or does not identify terms of maintainability as stated in the SOW, section 8.1 and 8.2.

12. Power and Safety (SOW 8.3) The proposal shall include validation that BPM electronics use standard 120V, 60Hz power as stated in SOW section 8.3

The proposal shall be evaluated to validate that BPM electronics use standard 120V, 60Hz power as stated in SOW section 8.3

MEETS: The proposal validates that BPM electronics use standard 120V, 60Hz power as stated in SOW section 8.3

DOES NOT MEET: The proposal validates that BPM electronics do not use standard 120V, 60Hz power. as stated in SOW section 8.3

13. Warranty (SOW 8.4) The proposal shall include a warranty which covers at least the first two years after delivery, as stated in the SOW, section 8.4.

The proposal shall be evaluated to validate that it includes a warranty which covers at least the first two years after delivery, as stated in the SOW, section 8.4.

MEETS: The proposal does include a warranty which covers at least the first two years after delivery, as stated in the SOW, section 8.4.

DOES NOT MEET: The proposal does not include a warranty which covers at least the first two years after delivery, as stated in the SOW, section 8.4.

Factor 2. Performance Capabilities

1. The BPM must be an off-the-shelf commercial item which may be configured to meet specific SOW requirements. The Offeror shall include with their proposal a demonstration of performance capabilities for providing BPMs, fast orbit feedback, and fast orbit interlock systems.

The Offeror will be evaluated based on whether their proposal includes a demonstration of performance capabilities for providing BPMs, fast orbit feedback, and fast orbit interlock systems.

MEETS: Proposal includes demonstration of performance capabilities.

Performance capabilities can be demonstrated by identifying number of years product has been on the market, quality records, certifications or similar data to show maturity of product.

DOES NOT MEET: Proposal does not include demonstration of performance capabilities.

2. The Offeror shall submit documentation of prior experience demonstrating delivery to a light source accelerator facility of at least one (1) similar/comparable BPM which met similar technical criteria, operated under similar circumstances

The Offeror will be evaluated based on their prior experience demonstrating delivery to a light source accelerator facility of at least one (1) similar/comparable BPM which met similar technical criteria, operated under similar circumstances

MEETS: Evidence is provided of experience with delivery to a light source accelerator facility of at least one (1) similar/comparable BPM which met similar technical criteria, operated under similar circumstances

DOES NOT MEET: Evidence is not provided of experience with delivery to a light source accelerator facility of at least one (1) similar/comparable BPM which met similar technical criteria, operated under similar circumstances

Factor 3. Major Milestones and Delivery Dates

1. The Offeror shall provide in their proposal, an estimated delivery date of 56 BPMs no later than 7 months from the receipt of award and remainder of BPMs with the fast orbit feedback and interlock applications no later than 8 months from the receipt of the award.

The Offeror’s documentation will be evaluated to confirm the Offeror’s ability to meet delivery schedule requirements.

MEETS: Estimated deliver date meets request for 56 BPMs no later than 7 months from the receipt of award and remainder of BPMs with the fast orbit feedback and interlock applications no later than 8 months from the receipt of the award.

DOES NOT MEET: Estimated deliver date does not meet request for 56 BPMs no later than 7 months from the receipt of award and remainder of BPMs with the fast orbit feedback and interlock applications no later than 8 months from the receipt of the award.

Business Acceptance Criteria Matrix for SPEAR BPMs REQUISITION No. 0000369851

BUSINESS SUBMISSION

REQUIREMENTS

BUSINESS EVALUATION CRITERIA EVALUATION

M=MEETS

D=DOES NOT MEET

JUSTIFICATION

Factor 4. Price

1. Section A – Subcontract Award

The Offeror shall complete and submit Section A and addendums if applicable.

Documentation will be reviewed for completeness

MEETS: Section A is signed and submitted. If applicable, addendums are signed and submitted.

DOES NOT MEET: Section A or addendums if applicable are not signed and submitted

2. Section B – Supplies and Services

The Offeror shall complete and submit Section B with pricing and company information

Documentation will be reviewed for completeness

MEETS: Section B submitted with pricing and company information completed.

DOES NOT MEET: Section B is not submitted with pricing and company information completed

3. Offerors are to submit a price certification (i.e. published price lists, redacted invoices or redacted quotes for items procured) or provide certification on company letterhead

Documentation will be reviewed for completeness

MEETS: Pricing is determined to be complete and reasonable.

indicating SLAC is receiving the best price offered. DOES NOT MEET: Pricing is determined to be not complete or reasonable.

Factor 5. Financial Standing

1. Financial Standing

The offeror shall demonstrate financial responsibleness by providing a Dun and Bradstreet report and/or other credit rating document.

If the Dun & Bradstreet SER score is greater than 6, the last three years of audited financial statements must be provided for review. Financial statements are not required if SER is 6 or below.

Financial reports will be evaluated

MEETS: SER Score 6 or lower OR reviewed financial statements are accepted

DOES NOT MEET: SER Score 7 or higher OR reviewed financial statements are not accepted

Factor 6. Contractual and Additional Required Documents

1. Terms and Conditions Acceptance and/or Exceptions:

The Offeror’s proposal must communicate acceptance to the SLAC Terms and Conditions, as indicated in the solicitation, including all attachments, and documents.

Any and all exceptions must be provided at the time of proposal submission.

Proposals will be evaluated for acceptance.

MEETS: Offeror confirms acceptance or has indicated exceptions for review.

DOES NOT MEET: Offeror does not confirm acceptance, did not indicate exceptions or exceptions are not acceptable.

2. Section D: Delivery, Shipping and Packing The offer shall identify shipping terms in proposal. Preferred shipping method is identified in Section D.

Offeror’s shipping terms will be evaluated

MEETS: Shipping terms are included in proposal and are acceptable

DOES NOT MEET: Shipping terms are not acceptable

3. Section K: Representation and Certifications Offerors are to fill out, sign, and return with their proposal either a Domestic or International Representation and Certifications Supplement

Representation and Certifications

MEETS: Representation and Certification Supplement is completed and signed

DOES NOT MEET: Representation and Certification Supplement is not completed, signed and submitted

4. Section K: Buy American Act Certificate

Offerors are to fill out, sign and return with proposal the Buy American Act Certificate

Buy American Act Certificate

MEETS: BAA is completed signed and submitted with proposal.

DOES NOT MEET: BAA is not completed, signed and submitted with proposal.

5. Section J: IIPP Form

Offerors are to fill out, sign, and return with their proposal the Injury and Illness Prevention Plan Acknowledgement Form

IIPP Form

MEETS: IIPP form is completed, signed and submitted

DOES NOT MEET: IIPP form is not completed, signed and submitted

Name/Title

Company Name

6. Section J: Insurance Certificate

Offerors are to submit a Certificate of Insurance (COI) that meet the requirements in the Terms and Conditions including Special Provisions and Endorsements. An example is provided in Section J for reference.

Insurance Certificate MEETS: COI meets insurance requirements and is endorsed correctly

DOES NOT MEET: COI does not meet insurance requirements or is not endorsed correctly

7. Section J: Small Business Subcontract Plan

Offerors are to fill out, sign, and return with their proposal the Small Business Subcontract Plan

Small Business Subcontract Plan Form will be evaluated for completeness and acceptance

MEETS: A Small Business Subcontract is submitted and determined acceptable

DOES NOT MEET: A Small Business Subcontract is not submitted or is determined unacceptable.

Technical Acceptance Criteria Matrix for SPEAR BPMs
REQUISITION No. 0000369851
Business Acceptance Criteria Matrix for SPEAR BPMs
REQUISITION No. 0000369851

File details come from the government source that posted it. Updated .