About this file
This is a Statement of Work (SOW) for Beam Position Monitors (BPMs) for an Orbit Stability Upgrade Project at SPEAR, dated November 16, 2026. SLAC seeks to procure 104 BPMs with integrated fast orbit feedback (FOFB) and orbit interlock capabilities for the SPEAR storage ring at SSRL/SLAC. The BPM system must support 45-degree button geometry with configurable 45 or 90-degree capability, employ 16-bit ADCs at 125 MSa/s or better with 476 MHz bandwidth, and implement orbit calculations using specified difference-over-sum formulas for X, Y, Q, and Sum parameters. The electronics must provide turn-by-turn (TBT) orbits with selectable frequency domain processing (FDP) or time domain processing (TDP), 10 kHz fast acquisition (FA) data, and 10 Hz slow acquisition (SA) data, all accessible through EPICS with waveform capabilities of at least 100k points (preferably 1M configurable points).
The system must deliver automatic calibration capabilities using RF switching or pilot tone methods with long coax cable inclusion options, ADC masking functionality for selective bunch processing, and simultaneous measurement of two individual bunches with half-turn spacing. Performance requirements specify turn-by-turn RMS of 1 µm, 0.2 µm RMS for 0.01-1 kHz frequency range, and peak-to-peak drift limits of 0.5 µm per hour, 1 µm per day, and 5 µm per seven days during 500 mA user operations. The orbit interlock must calculate position and angle between BPM pairs using diamond calculations with fault detection for saturation and stale data, outputting within 1.5 milliseconds via differential LEMO connectors. The FOFB system requires 10 kHz realtime orbit data streaming with sub-40 microsecond communication latency, standard PID gain support for singular values, and loop shaping filters. Delivery requires 56 BPMs within 7 months and remaining units with FOFB and interlock applications within 8 months of purchase award. The vendor must provide EPICS IOCs, detailed Factory Acceptance Test procedures, two onsite training and commissioning visits (with two optional additional visits), Linux-based operating system support, EPICS version 7 compatibility, complete source code for FOFB and interlock code, and a minimum 2-year warranty covering hardware repair, software updates, and customer support.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Beam Position Monitors (BPMs) for
Orbit Stability Upgrade Project at SPEAR November 16, 2026
Fig. 1. A typical arc sector at SPEAR (18 sectors). BPM Buttons are located at the six small dots in the bottom drawing.
1.0 Introduction
A Beam Position Monitor (BPM) is a vital diagnostic device used in particle accelerators and beamlines to measure the transverse position (center of mass) of a charged-particle beam inside a vacuum chamber. This document specifies the BPM requirements to support the orbit stability upgrade project on the SPEAR storage ring at SSRL/SLAC. These requirements impact hardware, firmware, and software. SLAC seeks to purchase 104 BPMs that meet these requirements from a supplier that has a proven track record in providing BPMs to light sources and has experience with providing fast orbit feedback systems and orbit interlocks.
2.0 Orbit Calculations Methods, Calibration, and ADC Masking Requirements The orbit calculations must support the 45-degree button geometry used at SPEAR. Ideally, the electronics would be configurable for 45 or 90 degree button geometry.
The button voltage to position calculations are the following.
X = Kx * (A + D) - (B + C) / (A + B + C + D) Y = Ky * (A + B) - (C + D) / (A + B + C + D) Q = (A + C) - (B + D) / (A + B + C + D) S = A + B + C + D
Where, A, B, C, D are a measure of the voltage magnitude of each of the buttons.
And Kx and Ky are configurable gains which convert the difference-over-sum calculation to position. The A, B, C, and D magnitudes typically come from 16-bit, 125 MSa/s ADCs (or better) with a bandwidth that includes 476 MHz. However, the specification is only based on orbit measurement performance. Since the SPEAR storage ring is approximately 781ns in circumference, there will be 88 ADC samples per turn for a ~112 MSa/s ADC. More samples per turn and faster processing are of course preferable.
During user operations at SPEAR, the signal at the input to the BPM electronics will be similar to the signal shown in Fig. 2 which was measured using a Tektronix scope.
Fig. 2. The button voltage for a typical fill pattern at SPEAR during user operations as measured by a 2.5GHz bandwidth (25GHz sample rate) MSO64 Tektronix scope. Each bunch is about 1.8 mA for a total current of 500 mA.
In order to capture the magnitude of the impulse response from the beam (single bunch being the most difficult case) with modest sampling rate ADCs, the signal as shown in Fig. 2 needs to be stretched. The bandpass filter bandwidth in the BPM front-end should be made wide enough to ring for about one half a turn – about 25 MHz. If the filter is too narrow and it rings beyond a turn, then it’s not a true turn-by-turn BPM. If it’s too wide, then the signal doesn’t ring long enough for a typical 125 MSa/s ADC to accurately capture and it likely doesn’t properly fit in the Nyquist band of the ADC (phase sensitivity can also be an issue). Of course the actual sample rate will vary by the requirement to have an integer number of samples per turn. Hence, the ADC sample clock must also track the revolution clock which will be provided as an input.
2.1 Orbit Calculation Methods
○ Turn-By-Turn (TBT) orbits come from processing 1-turn of ADC data. Provide an option to choose between time and frequency domain processing.
■ Frequency Domain Processing (FDP) uses only the magnitude of the RF revolution harmonic (476 MHz at SPEAR) for the RMS magnitude. Basically, one needs to compute one spectral line in a Fourier transform per channel.
■ Time Domain Processing (TDP) uses a button RMS calculation from the raw ADC time series for one turn. This method uses the full spectrum.
Typically, FDP processing is used more often since it avoids fill pattern dependents and improved noise levels. However, single bunch calculations may use TDP to increase the signal strength since TDP uses all the revolution harmonics and masking (see below) may require TDP processing.
○ FA – 10kHz data stream can be computed from downsampling TBT data (with filtering) or computed from many turns of ADC samples.
○ SA – 10 Hz data is typically computed by downsampling FA data with the downsample filter slightly lower than 5 Hz. SA should be EPICS PVs updated at 10 Hz (no waveform requirement).
2.2 Calibration
A method to automatically calibrate the A, B, C, D button signal to remove electronic drifts and noise is required. Typically this is accomplished using RF switching or pilot tone based methods. Calibration is often not compatible with TBT data so it must be on/off selectable.
Calibration of the Long Coax Button Cables Providing an option to include the long cables from the BPM buttons to the electronics in the calibration scheme is required.
○ For a pilot tone system, that means putting the pilot tone combiner in the tunnel next to the buttons. That is often done anyways to have good temperature stability of the combiner by taking advantage of the temperature stability of the tunnel.
○ For switching calibration systems, that requires putting the switch in the tunnel near the BPM buttons.
2.3 Masking
By default, all ADC samples collected over a turn are used in the signal processing.
Depending on the fill patterns, sometimes a gate (ADC mask) is required in the signal processing chain so that only the beam induced signal from particular bunches are included. The gated (mask) processing could improve the position resolution with single bunch or short bunch train fills. Or it can be used to remove a group of bunch from the orbit calculation.
The ability to simultaneously measure the position of two individual bunches (with a bunch spacing of half a turn, about 390ns) is also required. This requires separate independent orbit calculations with a different mask. TBT waveform data is needed for the second mask.
3.0 System Interface Requirements
The RF BPM system is part of or interfaces with several major systems at SPEAR. There are five major interfaces.
1. RF signals from the BPM pickup buttons
2. Timing system
○ Clocks and triggers (copper), and
○ MRF-compatible event system (fiber)
3. Network interfaces for setup, control and monitoring (EPICS)
4. Orbit interlocks
5. Fast orbit feedback including power supplies
Input Description
RF frequency 476.316 MHz
Harmonic Number 372
Button impedance 50 Ohms
Input signal dynamic range -70 dBm to 5 dBm
Peak Voltage Up to 20 volts over 2.1 ns Table 1. SPEAR Parameters.
3.1 RF Interface Requirement
Input Description
Input connectors SMA (female), 4 per BPM (from the buttons)
Revolution clock LEMO or SMA
Triggers (copper) LEMO or SMA (At least 2 triggers for waveform recorders)
Variable input attenuation 0 to 30 dB (in the BPM front-end, software setable)
Table 2. BPM Interface Input Requirements.
3.2 Timing and Interlock Interface Requirements
Specification
Timing interfaces (copper) TTL 3.3 voltage level
Input connectors (copper) SMA or Lemo
Input impedance 50 Ohms
Timing interfaces (fiber) Optical from the MRF timing system
Input connectors (fiber) SFP (optical) Table 3. Input Timing and Triggers Requirements.
Specification
Minimum Differential 200 mV
Max Differential value 5 V
Fault State LOW = interlock fault
Input impedance minimum 6 kohm
Output connectors Differential Lemo Table 4. Interlock Output Interface Requirements.
3.3 Network Interface Requirements
Monitoring and control of the BPM system must be done through EPICS. The vendor is required to provide the EPICS IOCs. There will be many EPICS process variables (PVs) associated with each BPM. Having a clear and logical PV naming scheme is required.
See sections 6.0 and 6.1 for a more detailed explanation of the different data streams.
The general requirements for providing the various date streams in EPICS are the following.
○ ADC data must be available as EPICS waveforms with at least 100k points (preferably configurable to 1M points) with a selectable hardware trigger and software trigger as a PV.
○ Turn-By-Turn (TbT) for X, Y, Sum, and Q must be available as EPICS waveforms with at least 100k points (preferably configurable to 1M points) with a selectable hardware trigger and software trigger as a PV.
○ 10 kHz or better data for X, Y, Sum, and Q must be available as EPICS waveforms with at least 100k points (preferably configurable to 1M points)with a selectable hardware trigger and software trigger as a PV. (Often called FA data for Fast Acquisition)
○ 10 Hz realtime data must be provided in EPICS for all relevant parameters.
Includes: X, Y, Sum, Q, button voltages, calibration parameters, etc. (Often called SA data for Slow Acquisition)
○ 10 kHz data to the FOFB correctors must be available as EPICS waveforms on request (PV) or on a trigger. It is required that the FOFB waveforms and the FA waveforms be lined up in time when provided through EPICS.
○ Monitoring and control of setup parameters.
○ BPM health and temperature must be available as EPICS PV at least at 1 Hz.
■ Provide a watchdog and/or an appropriate way to know if a BPM is no longer functioning properly and needs attention.
3.4 Orbit Interlock Interface Requirements
Details are provided in Section 5.0.
3.5 Fast Orbit Feedback (FOFB) Interface Requirements
The BPM and FOFB systems must work together at relatively high data rates with low lattancy so they are being procured as a combined system. Depending on the architecture, they could be separate chassis or combined into one system. One of the key features is that all the BPMs need to communicate with one another at 10 kHz (or more) with low latency in order to compute the necessary power supply setpoint changes.
Typically this is accomplished over a dedicated fiber based system. The vendor will need to work with the power supply manufacturer to develop the interface to the power supplies.
Appendix I provides an example power supply interface requirement. More details on FOFB requirements are provided in Section 6.0
4.0 Orbit Stability Requirements
The general specification for orbit stability in 3rd generation light sources is typically about 1/10 the beam size. But, of course, it depends on the beamline and bandwidth of interest.
SPEAR Beamsize (x, y)
○ Dipole: 123, 11 µm rms
○ Standard ID: 270, 6.6 µm rms
○ Chicane ID: 296, 3.6 µm rms
○ Matching ID: 249, 4.5 µm rms
From the SPEAR Accelerator website
10% of the beam size horizontally implies an orbit stability requirement of 12.3 µm rms.
10% of the beam size vertically implies an orbit stability requirement of .360 µm rms.
● BPM Electronics Drift and RMS performance During User Operations The BPM electronics need to be able to measure beam motion better than the orbit stability requirement since BPM noise gets added back to the beam with orbit feedback running. However, the rms orbit stability requirement is relaxed a bit when considering longer time periods. The required stability is specified in Table 5.
Turn-By-Turn RMS 1 µm
RMS requirement for frequency range .01 to 1 kHz .2 µm
Peak-to-Peak drift for 1 hour .5 µm
Peak-to-Peak drift for 1 day 1 µm
Peak-to-Peak drift for 7 days 5 µm https://www-ssrl.slac.stanford.edu/ssrl/web/spear3#parameters--2/
Table 5. Orbit Measurement Drift and RMS requirements : 500mA User Operations.
Note: this table is specification for the BPM electronics. The drift and vibration of the BPM buttons is not included in this table.
Note: The Brilliance+ TBT rms is about 1 µm and FA is about .1 µm at 500mA.
● Beam Current Dependence for Multi-Bunch Fills The beam current dependence is the allowed orbit offset between low current and high current operation. Since SPEAR has an orbit interlock that engages at a relatively low current, many physics studies are done at low current. However, it’s often required that the orbit at low current is nearly the same as when at high current (particularly at the 500 mA operating beam). The requirement is that the X & Y position should not change by more than 5 µm between 15 mA and 500 mA due to beam current and fill pattern changes.
● Beam Dynamic Range Both charge and fill patterns affect the signal amplitude in the front-end of the BPM electronics. Use cases for high bunch charges include: 40 mA (32 nC) Camshaft, which is an isolated bunch in the middle of a gap in the bunch train, with 276 bunches in 4 trains;
up to 60mA single bunch for AP studies; potential 500mA with 31 bunches-16mA/bunch.
○ Single Bunch Requirements Single bunch is quite unique in that all the revolution harmonics are equal in power.
Time domain processing of TBT orbits is required to use all the harmonics which pass through the front-end bandpass filter. We would like to see BPM performance at least as good as the data shown in Fig. 4.
Fig. 4. Single bunch charge vs RMS performance. The red marker is projecting to 40pC since that is a typical injected charge level at SPEAR.
● Temperature Dependence
The low frequency stability requirements in Table 5 are typically only met with a built-in self-calibration system – either switching or calibration tone based. These systems are also subject to temperature effects. The specification for the RMS and drift performance as in Table 5 should be maintained with ambient air rack temperature variations of ±1.5 degrees C.
5.0 Orbit Interlock Requirements
A position/angle interlock is required for protection of the machine.
● An orbit interlock will calculate the angle and position of the beam between two BPMs using the calculated position of the beam and the following equations:
Fig. 5. Position and angle calculations.
Where x1, and y1 are the x and y positions at the first BPM and x2, and y2 are the x and y positions at the second BPM. These positions include x/y offsets needed to calculate the position.
● The angle and position will then be used in an interlock diamond calculation as follows:
Fig. 6. Orbit Interlock Calculation
Where xthreshold, and x’threshold are the x orbit limit values, ythreshold, and y’threshold are the y orbit limit values, and Dlimit x, Dlimit x are orbit diamond maximum values, in the range of 0 to 1.
Fig. 7. Orbit Interlock Diamond for x 1
● The orbit interlock must fault on the following conditions:
○ The orbit interlock is outside the diamonds limit
○ The ADC becomes saturated
○ The orbit data / diamond calculations stops updating
● The orbit interlock output must change states within 1.5 msec after a limit is reached. And ideally faster.
● The orbit interlock output shall stay low for at least 10 ms once triggered. A PV must provide the time of the last fault.
● The orbit interlock output must be stable at 20ma/-45dbm.
● The BPM system will be able to drive the interlock chain via copper wires.
○ BPM interlock will drive a differential pair.
○ Orbit fault output shall be active-low / fail-safe: HIGH = healthy, LOW = orbit fault.
○ Differential threshold: ±200 mV, maximum 7V
○ Input impedance minimum of 6 kOhm
● The BPM system will provide EPICS PVs to monitor the state of each interlock.
○ BPM health and stale BPM data.
○ ADC saturation
○ Heartbeat
○ Interlock status and time of the last fault (as PVs)
● The BPM system will provide a configuration controlled method to input the interlock parameters.
○ Position and angle thresholds - for both x and y
○ Distance between BPMs (L)
○ Any additional configurations parameters
○ The configuration should also be visible in EPICS via readonly PVs.
● Firmware and software must support a test plan.
6.0 Fast Orbit Feedback (FOFB) Requirements
● The BPM electronics must include a FOFB system.
○ Realtime orbit data streaming at 10 kHz, preferably configurable with higher throughput capabilities.
○ The FOFB system can be provided within the BPM chassis or separate chassis.
● Latency budget
○ BPM fast acquisition (FA) data latency depends on the averaging and filtering of the turn-by-turn data. For instance, the update period for 10 kHz is 100 µsec, so we could choose to average turn-by-turn data for that entire period or less.
○ Collecting all the BPM data (100 BPMs in X & Y) in one processor should be less than 20 µsec.
○ Computing the FOFB algorithm should be less than a few µsec.
○ Communicating the FOFB setpoint to the power supplies should be less than 15 µsec.
Note: The power supply often has relatively high latency (~50 µsec) so the BPM communication latency (ie, the delay in collecting the orbit data from all BPMs into one location) is required to be better than 40 µsec.
● The power supply setpoint will be a summation of the control system setpoint PV and the delta from the FOFB system.
● The ability to change the golden or reference orbit for the FOFB while it is running at a rate of 10Hz is required via EPICS.
● Communication to the power supply system must be at the same data rate as the orbit update rate. The communication method will depend on the particular power supply chosen.
● Standard FOFB methods for light sources must be provided.
○ Support using different PID gains for the different singular values of the BPM response matrix.
○ Provide a loop shaping filter so that the transfer function for each power supply + magnet + vacuum chamber combination can be matched.
● Waveforms for reporting the FOFB setpoints and power supplies monitor at the FOFB update rate must be provided.
● The FOFB system will provide EPICS PVs to monitor the state and performance.
○ BPM health, stale BPM data, glitch detection and mitigation.
○ ADC saturation
○ Heartbeat
○ Performance information
● The FOFB system must include a well documented configuration method.
7.0 Testing and Delivery Schedule
7.1 Customizations
The expectation is this is an off-the-shelf (catalog) item. However, if modifications are needed to meet the needs of SPEAR, then first article testing would be required well ahead of delivery.
7.2 Factory Acceptance Test (FAT)
The contractor shall submit a detailed factory acceptance test (FAT) procedure as part of the proposal. SLAC reserves the right to witness the FAT test at the contractor’s facility. FAT tests shall demonstrate compliance with the specifications. All measurements and tests shall be performed using calibrated test instruments. The contractor shall furnish all test and measurement equipment. The contractor shall submit test results for each individual BPM crate to SLAC for review and approval to ship.
7.3 Delivery Schedule
56 BPMs should be delivered to SLAC no later than 7 months from the receipt of the purchase award and the remainder of BPMs with the fast orbit feedback and interlock applications no later than 8 months from the receipt of the purchase award (ideally sooner).
7.4 Onsite training and commissioning
Due to the complexity of the system, the vendor will need to be available at the SLAC site for training and commissioning purposes. Two site visits should be included in the proposal.
One for installation and training, and one for assistance with commissioning of the system. An option for two additional visits should also be included in the proposal. SLAC reserves the right to exercise this option in the event that additional support is needed for the system to be fully operational.
8.0 Support, Maintainability, Warranty, Shipping Requirements
8.1 Software maintainability
● The vendor should identify the software/firmware/IOC to be supplied and supported by the vendor, and what SLAC is expected to maintain. This includes SPEAR specific configurations that need to be managed and version controlled at SLAC.
● The vendor must use a supported OS (Linux preferred) and EPICS (version 7 preferred) and expected compatibility/lifecycle.
● The vendor must provide a firmware/software update method and a way to identify the installed versions.
● The vendor must provide a recovery method following a software failure or chassis replacement.
● The vendor must provide the documentation needed for update, recovery, and support.
● Prefer all source code to be provided to SLAC. Source code that SLAC might need to modify in the future, for instance the fast orbit feedback and interlocking code, must be provided to SLAC.
8.2 Operability
● The product must use standard networking (Ethernet) and standard EPICS access.
● Remote/service/console access for diagnosis and recovery.
● Health/status needed to tell whether the BPM is operating and its data are valid.
● Provide restart and replacement behaviour, including bringing a spare into service.
● Provide operational alarms and archived status.
● Provide routine operator access and vendor/expert diagnostic access.
8.3 Power and Safety
● The BPM electronics should use standard 120V, 60Hz wall power.
● Non-NRTL or modified NRTL electrical hardware must be approved by a SLAC EEIP inspector.
8.4 Warranty
● 2-year minimum warranty. The warranty must include at least the following items.
○ Hardware coverage to repair or replace defective parts.
○ Software coverage for bugs, OS upgrades, and security patches.
○ Customer support
8.5 Shipping and Handling
The vendor is responsible for developing proper packaging to ensure that deliverables are not damaged during shipment.
| 1.0 Introduction |
| 2.0 Orbit Calculations Methods, Calibration, and ADC Masking Requirements |
| 2.1 Orbit Calculation Methods |
| 2.2 Calibration |
| 2.3 Masking |
| 3.0 System Interface Requirements |
| 3.1 RF Interface Requirement |
| 3.2 Timing and Interlock Interface Requirements |
| 3.3 Network Interface Requirements |
| 3.4 Orbit Interlock Interface Requirements |
| 3.5 Fast Orbit Feedback (FOFB) Interface Requirements |
| 4.0 Orbit Stability Requirements |
| ● BPM Electronics Drift and RMS performance During User Operations |
| ● Beam Current Dependence for Multi-Bunch Fills |
| ● Beam Dynamic Range |
| ○ Single Bunch Requirements |
● Temperature Dependence
| 5.0 Orbit Interlock Requirements |
| 6.0 Fast Orbit Feedback (FOFB) Requirements |
| 7.0 Testing and Delivery Schedule |
| 7.1 Customizations |
| 7.2 Factory Acceptance Test (FAT) |
| 7.3 Delivery Schedule |
| 7.4 Onsite training and commissioning |
| 8.0 Support, Maintainability, Warranty, Shipping Requirements |
| 8.1 Software maintainability |
| 8.2 Operability |
| 8.3 Power and Safety |
| 8.4 Warranty |
| 8.5 Shipping and Handling |
File details come from the government source that posted it. Updated .