This is a final design plan document for dike rehabilitation at the Fort Eustis Dredge Material Management Area (FEDMMA) in Newport News, Virginia. The document consists of architectural and engineering drawings prepared by the US Army Corps of Engineers, Norfolk District, with an issue date of December 3, 2025, and final project status.
The plans detail comprehensive construction requirements for raising and rehabilitating disposal site berms from the current elevation of 34 feet to 36 feet, including regrading of the existing access road. Key design elements include: clearing and grubbing of a 5-foot perimeter around the proposed dike footprint; excavation and blending of existing dredged material within the placement area to achieve satisfactory soil specifications for dike construction; construction of a new spillbox with associated piping infrastructure (extension of existing 24-inch corrugated metal pipes); relocation of two existing spillboxes 50-60 feet into the disposal site; dike slope configurations of 3.0:1 (horizontal:vertical) on interior slopes and 4.0:1 on exterior slopes; installation of erosion control measures including silt fence and temporary seeding; and construction of an access road with specific grading profiles. The design incorporates eight geotechnical borings, cone penetration tests, and vane shear tests to characterize subsurface conditions. The spillbox structural details specify A36 structural steel, galvanized hardware, 4,000 PSI concrete foundations, and welding per AASHTO and AWS D1.1 standards. Cumulative earthwork volumes indicate approximately 63,400 cubic yards of fill material required across the dike alignment. The project site encompasses approximately 62.8 acres within the dredged material placement area, with detailed engineering specifications for equipment operation, soil verification protocols, and temporary construction entrance requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
NORFOLK DISTRICT
FORT EUSTIS DREDGE MATERIAL
MANAGEMENT AREA (FEDMMA)
PLANS FOR DIKE REHABILITATION
FORT EUSTIS, NEWPORT NEWS VIRGINIA
XXX
XXX
2025-12-03
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:5
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers ®
G-001
C O
VE
R
S H
EE
T, IN
D
EX
O
F D
R
AW
IN
G
S, VI
C
IN
IT
Y, A N
D L
O C
AT
IO
N M
AP
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL
RECOMMENDATION AND APPROVAL OF ALL DRAWINGS IN
THIS SET AS INDICATED ON INDEX TO DRAWINGS.
NORFOLK, VIRGINIA
DEPARTMENT OF THE ARMY
NORFOLK DISTRICT, CORPS OF ENGINEERS
CHIEF, ENGINEERING DIVISIONCHIEF, DESIGN BRANCH
RECOMMENDED:
SUBMITTED: APPROVED:
ENGINEERING BRANCH DESIGN LEAD
MATHEWS
COUNTY
CHESAPEAKE
BAY
ATLANTIC
OCEAN
FISHERMANS
ISLAND
CAPE
CHARLES
ISLE
OF
WIGHT
GLOUCESTER
COUNTY
YORK RIVER
YORK COUNTY
NEW
PORT
NEW
S
JAM
ES RIVER
SUFFOLK
PORTSMOUTH
VIRGINIA
NORTH CAROLINA
CHESAPEAKE
VIRGINIA
BEACH
76° 10'
POQUOSON
HAMPTON
NORFOLK
CAPE
HENRY
US
H
W Y
37° 00'
I-64
US HWY
I-6
I-64
HRBT
I-64
C
BB
T (H
W Y
R E
V I
R S
E M
A J
HA
RR
IS
ON
R D.
BACK RIVERRD.
MULBERRY IS.
RD.
TAYLOR AVE.
MILITARY
FORT EUSTIS
RESERVATION
VICINITY MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
PLAN
NORTH
PLAN
NORTH
LOCATION
OF WORK
INDEX OF DRAWINGS
SHEET
ID SHEET TITLE
G-001 COVER SHEET, INDEX OF DRAWINGS, VICINITY, AND LOCATION MAP
G-002 GENERAL NOTES SHEET
VH-101 EXISTING CONDITIONS SHEET
VH-102 DEMOLITION PLAN SHEET
VH-103 BORING LOCATION AND BORROW AREA SHEET
VH-104 DIKE LAYOUT PLAN SHEET
VH-105 DIKE GRADING PLAN SHEET (1)
VH-106 DIKE GRADING PLAN SHEET (2)
VH-107 EROSION CONTROL PLAN SHEET (1)
VH-108 EROSION CONTROL PLAN SHEET (2)
S-301 EROSION CONTROL DETAILS SHEET
VH-301 DIKE CAUSEWAY AND SPILLBOX SECTIONS SHEET (1)
VH-302 DIKE CAUSEWAY AND SPILLBOX SECTIONS SHEET (2)
VH-303 DIKE CAUSEWAY AND SPILLBOX SECTIONS SHEET (3)
S-302 SPILLBOX DETAILS SHEET (1)
S-303 SPILLBOX DETAILS SHEET (2)
S-304 SPILLBOX DETAILS SHEET (3)
S-305 SPILLBOX DETAILS SHEET (4)
VH-304 ACCESS ROAD SECTIONS AND PROFILE SHEET
FT EUSTIS
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:5
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
G-002
G
EN
ER
AL
N O
TE
S
SH
EE
T
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
NOTES:
BENCHMARKS
ELEVATION
CE "THIRD, 2001"
BENCHMARK
+9.23'
CE "PORT, 2001" +8.08'
CE "PMI-5, 2003" +8.66'
DATA FOR DATUM DIAGRAM WAS DETERMINED BY THE NGS OPUS NAVD88 SOLUTION AND
NOAA V DATUM ONLINE PROGRAM V 4.2.2 ON 7/7/2022 AT GAUGE SITES.
MEAN LOWER LOW WATER, 1983-2001 NATIONAL TIDAL DATUM EPOCH, WAS DETERMINED BY
THE NOAA V DATUM ONLINE PROGRAM V 4.2.2 AT SKIFFES CREEK ON THE JAMES RIVER AT
FORT EUSTIS VA.
ELEVATIONS ARE IN FEET REFERRED TO NOS MLLW AND WERE TAKEN ON 13 THROUGH 30
SEPTEMBER & 01 AUGUST 2024.
MEAN RANGE OF TIDE IS 2.24 FEET AT SKIFFES CREEK, BASED ON NOAA VDATUM PROGRAM.
NORTH AMERICAN VERTICAL DATUM OF 1988, NAVD88 WAS DETERMINED BY A 5 HOUR OPUS
GPS SESSION ON CE TIDAL BENCHMARK "THIRD, 2001" PIO BBDL92 ON 6/14/2022 AND IS 1.49'
ABOVE NOS MLLW 83-01 BASED ON GEOID18.
COORDINATES ARE IN U.S. SURVEY FEET, REFERRED TO THE VIRGINIA STATE PLANE
COORDINATE SYSTEM, SOUTH ZONE AND ARE BASED ON NORTH AMERICAN DATUM OF 1983.
BACKGROUND IMAGERY: VIRGINIA BASE MAPPING PROGRAM 2021 IMAGERY.
THIS MAP CONTAINS NO BOUNDARY OR PROPERTY LINE DATA AND IS NOT INTENDED TO BE
USED FOR PROPERTY TRANSFER.
AREA INSIDE DREDGED MATERIAL PLACEMENT AREA COMPUTED FROM INSIDE TOP OF BERM
= 62.8± ACRES
ELEVATIONS ARE RELATIVE TO
NOS MLLW, 1983-2001 NTDE
- LEGEND -
2.24' RANGE
0.16'
1.49'
NOS MLW
NOS MHW
NAVD 88
DATUM DIAGRAM
(NOT TO SCALE)
NOS MLLW,
1983-2001 NTDE
INV INVERT
CORRUGATED PIPE
MEAN LOW LOWER WATER
MEAN LOW WATER
NATIONAL OCEAN SERVICE
ELEVATION
MEAN HIGH WATER
NOS
MLW
MHW
MLLW
CP
EL.
ABBREVIATIONS
EXISTING MIN0R CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED DIKE SLOPE
SF SILT FENCE
NORTH AMERICAN VERTICAL DATUMNAVD
VOLUMEVOL
OFFSETOFF.
.17
.18
.19 .20
.20
.22
.27
.28
.36 .38
.48
.56
.64
.73
.85
.17
.17
.20
.22
.23
.25
.29
.29.30
.34
.39
.57
.61
.62
.64
.64
.67
.68
.70
.72
.73
.74 .89
.92
.98
.106
.153
.161
.162
.170
.192
.205
.209
.225
.271 .272
.272
.272
.273
.275
.276
.278
.278
.281
.289
.292
.292
.293
.301
.313
.332
.334
.334
.22
.24 .38
.40
.43
.49 .67
.68
.69 .71
.72
.75
.76 .76
.83
.83
.84
.84
.84
.84
.87
.91
.126
.144
.196
.211
.214
.239
.271
.274
.277
.277
.279
.280
.280
.283
.285
.290
.291 .291
.292
.292
.293 .299 .303
.320
.331
.332.334
.24 .30.34
.60
.76 .76
.78
.85
.89
.94 .98
.122
.125
.137.139
.182 .192
.201
.256
.262
.271
.271
.272
.274
.278
.296
.299
.300
.301 .303
.304.306
.310
.329.331 .331
.332
.333
.334
.334
.335
.337 .339
.342
.24
.24
.24
.30
.41 .41
.80
.84
.86
.90
.91
.92
.95 .95
.106
.169
.170 .182
.184 .209
.210
.224
.272
.276
.278 .278
.279 .287
.289
.291
.296 .297
.297
.300
.304
.307
.308
.334
.335
.336
.338
.341
.25
.29
.32.36
.39
.53
.60
.74.80 .89
.89
.93
.98
.98
.103
.104
.157
.220
.224
.239
.251
.270
.270
.285
.286
.291 .298
.299
.306
.306
.307
.310
.316
.319
.333
.334
.00
.00
.00
.00
.22
.23
.26
.30
.33
.40
.42
.47
.54
.55
.56
.58
.60
.68
.74
.74
.78
.85
.85
.89
.89
.89
.90
.115
.116 .125
.131
.149
.199
.208
.238
.238
.254
.255
.263
.272
.275
.278
.279
.280
.281
.283
.285
.286
.286
.286
.286
.288
.289
.290
.290
.291
.292
.292
.294
.296
.300
.301
.305
.307
.308
.313
.00
.00
.20
.28
.32 .46
.57
.119
.120
.126 .128
.200
.270
.270
.272
.272
.272
.273
.276
.279
.280
.280
.283
.284
.288
.290
.295
.296
.333
.19 .29 .30
.38
.81
.86
.93 .109
.122
.132
.192
.221
.271
.274
.274
.276 .284
.289
.308
.333
.26 .36
.47 .52.53
.61
.77
.82 .88
.91
.110 .145
.216
.239.242
.270
.270
.276
.276
.280
.282
.305
.332 .27
.28
.32
.71
.82
.82
.84
.86
.86
.93
.165
.193
.200
.211
.253
.274
.276
.276
.279
.294
.310
.332
.11
.18
.19
.59
.61
.69
.70
.85
.109
.200
.242
.276
.277
.280
.280
.282
.306
.333
.334
.20 .24 .39
.48
.51 .52
.71
.80
.84
.118
.156
.162
.172
.178
.188
.240
.276
.277
.277
.278
.280
.281
.282
.282
.282
.284
.285
.290
.290
.291
.291
.291
.295
.300
.308
.332
.08
.18
.19
.19
.23
.24
.25 .27
.28
.38
.49
.49
.51
.51
.53
.53
.54
.58
.60
.64
.68
.96 .135
.150
.172
.197 .232
.234
.278
.279
.280
.281
.282
.282 .292
.331
.334
.335
.26
.47
.50
.66 .71
.173
.219
.232
.273 .274
.276
.278
.307
.313
.336
.28
.35 .37
.39
.40
.40
.42
.50 .55
.61 .65
.66
.69
.70
.71
.72
.72
.96
.117
.128
.139
.166
.202
.209
.216
.220
.234
.237
.238 .268
.275
.275
.276
.276
.276
.277
.279
.279
.279
.287
.291
.291
.332
.333
.333
.334
.335
.335
.335
.336
.19
.29
.30
.30
.33
.33 .35
.38
.38
.38
.39
.40
.40
.46 .48
.55 .58
.60
.61
.61
.67
.67
.68
.70
.70
.76
30208
22030
CP
CP
.143
.231
.75
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:1
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-101
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
SH
EE
T
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
NOTES:
SEE SHEET G-002 FOR SURVEY INFORMATION.
150' 300'0
PLAN
NORTH
HA
RR
IS
O
N
RO
AD
TAYLOR AVE
PATCH ROAD
MULBERRY IS
LAND ROAD
W
ILSON AVE
LEGEND:
NO SURVEY DATA COVERAGE
WITHIN THIS AREA.
DREDGED MATERIAL
TURN AROUND AREA
24" DOUBLE INSULATED
CORRUGATED METAL
INV=1.29
INV=2.76
SPILL BOX
DISCHARGE PIPE
INV=2.10
SPILL BOX
DISCHARGE PIPE
24" DOUBLE INSULATED
CORRUGATED METAL
INV=1.74
WOODEN
WALKWAY
WOODEN
WALKWAY
CP
CP
8 10 12
150' 300'0
PLAN
NORTH
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:2
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-102
D
EM
O
LI
TI
O
N
PL
AN
SH
EE
T
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
NOTES:
1. CONTRACTOR WILL REMOVE AND DISPOSE OF ALL DEMOLITION
ITEMS OFF PROPERTY FOLLOWING ALL LOCAL, STATE AND
FEDERAL REGULATIONS. GRUBBED MATERIAL CAN BE DISPOSED
OF WITHIN THE PLACEMENT SITE.
SHEET NOTES:
CLEAR AND GRUB THE FOOTPRINT OF THE PROPOSED DIKE
AND 5 FEET BEYOND.
REMOVE EXISTING WALKWAY AND HAND RAILING, AND REMOVE
EXISTING SPILLBOX ABOVE GRADE.
LEGEND:
LIMITS OF CLEARING AND GRUBBING.
HA
RR
IS
O
N
RO
AD
TAYLOR AVE
PATCH ROAD
MULBERRY IS
LAND ROAD
W
ILSON AVE
DREDGED MATERIAL
TURN AROUND AREA
24" DOUBLE INSULATED
CORRUGATED METAL
INV=1.29
INV=2.76
SPILL BOX
DISCHARGE PIPE
INV=2.10
SPILL BOX
DISCHARGE PIPE
24" DOUBLE INSULATED
CORRUGATED METAL
INV=1.74
WOODEN
WALKWAY
L70
L6
L68
L6
L6
L6
L6
C62
C61 L62 L61
L60
L58
L59 L91
L90
L8
L88
L87
L8
L85
L8
L8
L8
L81
L80
L79
L78
L7
L7
L75
L74
L73
L72 L71
TP-1139-01
TP-1139-02
TP-1139-03
TP-1139-04
TP-1139-05
TP-1139-06
TP-1139-07
TP-1139-09
TP-1139-08
TP-1139-11
TP-1139-12
TP-1139-13
DH-1139-01/CPT-1139-01/DMT-1139-01
DH-1139-08/CPT-1139-08/DMT-1139-05
DH-1139-07/CPT-1139-07/DMT-1139-04
DH-1139-06/CPT-1139-0626
TP-1139-10
DH-1139-04/CPT-1139-04
L6
DH-1139-03/CPT-1139-03
DH-1139-02/CPT-1139-02/DMT-1139-02
30208
22030
VST-1139-02
VST-1139-03
VST-1139-01
DH-1139-05/CPT-1139-05/DMT-1139-03
VANE SHEAR TEST
NAME
TP-1139-01
TP-1139-02
TP-1139-03
TP-1139-04
TP-1139-05
TP-1139-06
TP-1139-07
TP-1139-08
TP-1139-09
TP-1139-10
TP-1139-11
TP-1139-12
TP-1139-13
NORTHING
3,584,057.34
3,583,857.84
3,583,680.43
3,583,665.43
3,583,939.43
3,584,032.93
3,584,275.77
3,584,631.82
3,584,921.90
3,585,052.82
3,584,654.28
3,584,201.37
3,584,039.60
EASTING
12,035,396.56
12,035,234.54
12,035,393.15
12,035,676.89
12,035,619.73
12,035,742.36
12,035,717.37
12,035,845.23
12,035,984.09
12,035,955.22
12,036,257.64
12,036,371.69
12,036,124.58
GEOTECHNICAL BORINGS
NAME
DH-1139-01/CPT-1139-01/DMT-1139-01
DH-1139-02/CPT-1139-02/DMT-1139-02
DH-1139-03/CPT-1139-03
DH-1139-04/CPT-1139-04
DH-1139-05/CPT-1139-05/DMT-1139-03
DH-1139-06/CPT-1139-06
DH-1139-07/CPT-1139-07/DMT-1139-04
DH-1139-08/CPT-1139-08/DMT-1139-05
NORTHING
3,583,100.85
3,583,806.99
3,584,517.74
3,585,162.63
3,585,860.82
3,585,415.18
3,584,593.51
3,583,765.73
EASTING
12,035,434.53
12,035,199.97
12,035,756.74
12,035,922.88
12,036,302.22
12,036,723.05
12,037,224.06
12,036,462.72
VANE SHEAR TEST
NAME
VST-1139-01
VST-1139-02
VST-1139-03
NORTHING
3,583,770.97
3,585,811.62
3,585,405.15
EASTING
12,035,244.66
12,036,280.63
12,036,689.65
BORROW AREA: LINE TABLE
LINE #
L58
L59
L60
L61
L62
L63
L64
L65
L66
L67
L68
L69
L70
L71
L72
L73
L74
L75
L76
L77
LENGTH
238.67'
144.41'
526.30'
13.97'
22.72'
50.12'
178.99'
350.15'
114.33'
63.62'
107.15'
109.77'
119.80'
102.83'
5.38'
69.28'
61.06'
53.95'
63.83'
78.87'
DIRECTION
S75° 04' 26.92"E
S81° 24' 34.88"E
S16° 33' 22.47"W
S41° 03' 47.00"E
S17° 25' 30.19"W
S32° 49' 47.88"W
S10° 29' 43.72"W
S21° 20' 24.87"W
S21° 50' 22.03"W
S10° 57' 22.47"W
S24° 18' 50.19"E
S04° 43' 35.38"E
S25° 12' 17.14"W
N24° 06' 23.50"W
N34° 20' 11.04"W
N51° 58' 44.79"W
N34° 47' 22.52"W
N30° 52' 01.49"W
N04° 28' 29.02"W
N09° 17' 46.35"W
BORROW AREA: LINE TABLE
LINE #
L78
L79
L80
L81
L82
L83
L84
L85
L86
L87
L88
L89
L90
L91
LENGTH
70.29'
49.24'
92.54'
187.22'
170.62'
197.38'
89.37'
170.91'
167.09'
211.40'
403.16'
318.29'
241.81'
224.23'
DIRECTION
N34° 14' 19.14"W
N27° 02' 44.91"W
N57° 41' 22.01"W
N58° 16' 53.03"W
N19° 15' 47.73"W
N05° 49' 50.88"W
N38° 37' 23.60"E
N30° 05' 58.32"W
N09° 47' 28.79"W
N53° 28' 22.38"E
N74° 13' 42.27"E
N03° 39' 55.50"E
N57° 44' 36.00"E
S78° 04' 49.96"E
BORROW AREA: CURVE TABLE
CURVE #
C61
C62
LENGTH
139.06'
341.49'
RADIUS
83.48'
226.10'
DELTA
095°26'34"
086°32'20"
CH LENGTH
123.53'
309.95'
CH BEARING
S65° 50' 48.58"W
S60° 13' 53.30"W
150' 300'0
PLAN
NORTH
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:3
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-103
BO
R
IN
G
L O
C
AT
IO
N
AN
D
B O
R R
O W
A R
EA
SH
EE
T
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
NOTES:
1. MAINTAIN A MINIMUM DISTANCE OF 20' BETWEEN THE TOP OF THE BORROW
AREA EXCAVATION AND THE TOE OF THE NEW PERIMETER DIKE.
2. SEE SHEET G-002 FOR SURVEY INFORMATION.
LEGEND:
LIMITS OF BORROW AREA
GEOTECHNICAL BORINGS
TEST PITS
VANE SHEAR TEST POINTS
HA
RR
IS
O
N
RO
AD
TAYLOR AVE
PATCH ROAD
MULBERRY IS
LAND ROAD
W
ILSON AVE
-1+00
-2+00
-3+00
-4+00 -4+71.03
L3
L3
L38
L39
L40
L4
L42
L4
L44
L4
L48
L49
L50 L51
L52
L53 L54 L55
L56
L5
C55 C56
C57 C58
C59C
C37
C
C
C40C41
C
C43
C44
C45
C46
C4
C48
C49
C50
C51
C52
C53
C54
L3
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+0024 +0
+0
+0
+0
28+00
29+00
30+00
31+00
32+00
33+00
34+00
+0
+0
37+00
38+00
+0
040+0041+0042+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00
59+0060+0061 +0
62+00
63+00
64+00
65+00
66+00
67+00
68+00
69+00
70+00
+0
+0
+0
+0
0 75+00
CP
CP
8 10 12
L45
L4
ALIGNMENT: DIKE RAISING
NUMBER
C37
C38
C39
C40
C41
C42
C43
C44
C45
C46
C47
C48
C49
C50
C51
C52
C53
C54
L35
L36
L37
L38
L39
L40
L41
L42
L43
L44
L45
L46
L47
L48
L49
L50
L51
LENGTH
264.00'
205.71'
228.42'
317.09'
160.33'
269.27'
115.38'
240.38'
266.47'
257.01'
121.07'
168.95'
286.97'
226.11'
47.47'
184.06'
118.16'
47.32'
185.43'
131.18'
605.90'
191.18'
665.78'
307.56'
360.02'
186.42'
296.73'
157.72'
53.63'
5.15'
660.00'
47.34'
35.26'
43.18'
66.76'
RADIUS
392.50'
247.50'
358.56'
194.92'
99.57'
187.26'
229.91'
1120.77'
1243.25'
1280.65'
154.52'
119.49'
253.74'
307.50'
187.18'
2130.15'
126.06'
52.50'
LINE/CHORD DIRECTION
S45° 53' 20.03"W
S06° 20' 25.14"W
S04° 40' 58.41"W
S59° 09' 21.92"W
S67° 05' 04.63"W
S18° 02' 52.42"E
S71° 59' 55.60"E
N54° 45' 11.40"E
N64° 12' 08.19"E
N62° 53' 31.70"E
N28° 10' 11.58"E
N37° 28' 02.71"W
N39° 48' 13.10"W
N25° 38' 38.02"W
N40° 51' 38.47"W
N34° 53' 28.27"W
N66° 46' 13.80"E
N80° 09' 40.54"W
S27° 19' 29.92"W
S17° 25' 29.05"E
S17° 07' 40.34"W
S56° 14' 45.72"E
N57° 58' 12.49"E
N54° 21' 44.87"E
N08° 33' 10.37"E
N72° 14' 15.32"W
N04° 55' 52.88"W
N46° 16' 53.63"W
N45° 21' 32.80"E
N39° 38' 52.57"E
S22° 12' 06.70"W
S64° 57' 43.29"W
S61° 55' 37.03"W
S72° 24' 50.99"W
N36° 16' 44.17"W
ALIGNMENT: ACCESS ROAD
NUMBER
C55
C56
C57
C58
C59
C60
L52
L53
L54
L55
L56
L57
LENGTH
111.11'
94.17'
26.86'
23.78'
12.42'
2.98'
32.16'
17.86'
24.85'
28.99'
27.63'
68.22'
RADIUS
191.01'
91.91'
200.00'
194.11'
194.11'
194.11'
LINE/CHORD DIRECTION
S67° 32' 52.91"W
S59° 18' 33.87"W
S36° 16' 10.38"W
S43° 37' 37.14"W
S48° 58' 08.46"W
S51° 14' 28.01"W
S32° 25' 18.06"W
S40° 07' 02.70"W
S47° 08' 11.57"W
S50° 48' 05.36"W
S51° 40' 50.65"W
S35° 41' 29.42"W
150' 300'0
PLAN
NORTH
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:4
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-104
D
IK
E
LA
YO
U
T
PL
AN
SH
EE
T
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
NOTES:
SEE SHEET G002 FOR SURVEY INFORMATION.
HA
RR
IS
O
N
RO
AD
TAYLOR AVE
PATCH ROAD
MULBERRY IS
LAND ROAD
L3
L40
L4
L42
L4
L44
L48
L49
L50
L51
VH105
VH106
C37
C
C
C40C41
C4
C48
C49
C50
C51
C52
C54
L3
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
+0
+0
+0
+0
28+00
29+00
30+00
31+00
32+00
33+00
34+00
+0
+0
37+00
38+00
+0
040+00
41+00
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
50+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00
59+0060+0061 +0
62+00
63+00
CP
CP
CP
CP
L4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
PLAN
NORTH
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:4
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-105
D
IK
E G
R
AD
IN
G
PL
AN
S H
EE
T
(1
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
NOTES:
SEE SHEET G-002 FOR SURVEY INFORMATION.
1. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE START OF ANY
GRADING.
2. THE CONTRACTOR SHALL CLEAR ALL PHRAGMITES, VEGETATION, SHRUBS, AND
TREES FROM WITHIN THE FOOTPRINT OF THE NEW DIKE.
3. EXCAVATION WITHIN CONTAINMENT AREA SHALL NOT BE STEEPER THAN THE
INTERIOR SLOPE OF THE DIKE 1.5:1 (H:V)
4. CONTRACTOR SHALL VERIFY THAT BLENDED SOIL MEETS THE REQUIREMENTS OF
SATISFACTORY MATERIAL EVERY 1,000 CY OR FRACTION THEREOF PRIOR TO
PLACEMENT IN ACCORDANCE WITH SPEC 31 00 00.
5. SEE CROSS-SECTIONS ON SHEETS VH-301 AND VH-302 FOR FINAL GRADES.
6. CONTRACTOR SHALL EXCAVATE EXISTING MATERIAL WITHIN DISPOSAL FACILITY
AND BLEND SOIL DEPOSITS TO ACHIEVE SATISFACTORY MATERIAL FOR DIKE
CONSTRUCTION. REFER TO SPECIFICATIONS FOR SOIL REQUIREMENTS AND
VERIFICATIONS.
7. CONTRACTOR SHALL CUT/FILL AND REGRADE AS REQUIRED TO WITHIN
CONTAINMENT AREA TO PROVIDE PROPER DRAINAGE TO THE SPILLBOX AFTER
DIKE CONSTRUCTION AND EXCAVATION OPERATIONS ARE COMPLETE.
8. DUE TO THE METHOD OF PLACEMENT OF DREDGED MATERIAL WITHIN
CONTAINMENT AREA THE CONTRACTOR SHOULD EXPECT THAT EQUIPMENT WITH
LOW GROUND CONTACT PRESSURE WILL BE REQUIRED TO FACILITATE WORK.
100' 200'0
E10
VH-301
J17
VH-301
KEY NOTES:
CONSTRUCT NEW SPILLBOX. SEE SHEETS S-302 THROUGH S-305.
EXTEND EXISTING 30" CMP TO NEW SPILLBOX.
EXISTING SPILLBOX 1
INVERT IN= 2.10'
24" DOUBLE INSULATED
CORRUGATED METAL
INVERT OUT = 1.74'
TAYLOR AVE
PATCH ROAD
MULBERRY ISLAND ROAD
-1+00-2+00
-3+00
-4+00
-4+71.03
L3
L38
L39
L40
L4
L42
L4
L52
L53
L54
L55 L56
L5
C55 C56
C57 C58
C59 C60
VH105
VH106
C40C41
C
C43
C44
C45
C46
C4
C48
C49
C53
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
+0
+0
+0
+0
28+00
29+00 50+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00
59+0060+0061 +0
62+00
63+00
64+00
65+00
66+00
67+00
68+00
69+00
70+00
+0
+0
+0
+0
75+00
CP
CP
8 10 12
L45
L4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
PLAN
NORTH
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:5
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-106
D
IK
E G
R
AD
IN
G
PL
AN
S H
EE
T
(2
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
100' 200'0
M10
VH-304
NOTES:
SEE SHEET G-002 FOR SURVEY INFORMATION.
1. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE START OF
ANY GRADING.
2. THE CONTRACTOR SHALL CLEAR ALL PHRAGMITES, VEGETATION, SHRUBS, AND
TREES FROM WITHIN THE FOOTPRINT OF THE NEW DIKE.
3. EXCAVATION WITHIN CONTAINMENT AREA SHALL NOT BE STEEPER THAN THE
INTERIOR SLOPE OF THE DIKE 1.5:1 (H:V)
4. CONTRACTOR SHALL VERIFY THAT BLENDED SOIL MEETS THE REQUIREMENTS
OF SATISFACTORY MATERIAL EVERY 1,000 CY OR FRACTION THEREOF PRIOR TO
PLACEMENT IN ACCORDANCE WITH SPEC 31 00 00.
5. SEE CROSS-SECTIONS ON SHEET VH-301, VH-302, VH-303, AND VH-304 FOR FINAL
GRADES.
6. CONTRACTOR SHALL EXCAVATE EXISTING MATERIAL WITHIN DISPOSAL FACILITY
AND BLEND SOIL DEPOSITS TO ACHIEVE SATISFACTORY MATERIAL FOR DIKE
CONSTRUCTION. REFER TO SPECIFICATIONS FOR SOIL REQUIREMENTS AND
VERIFICATIONS.
7. CONTRACTOR SHALL CUT/FILL AND REGRADE AS REQUIRED TO WITHIN
CONTAINMENT AREA TO PROVIDE PROPER DRAINAGE TO THE SPILLBOX AFTER
DIKE CONSTRUCTION AND EXCAVATION OPERATIONS ARE COMPLETE.
8. DUE TO THE METHOD OF PLACEMENT OF DREDGED MATERIAL WITHIN
CONTAINMENT AREA THE CONTRACTOR SHOULD EXPECT THAT EQUIPMENT
WITH LOW GROUND CONTACT PRESSURE WILL BE REQUIRED TO FACILITATE
WORK.
MULBERRY IS
LAND ROAD
VH107
VH108
22030
CP
CP
CP
CP
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSF
SF
SF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:0
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-107
ER
O
SI
O
N C
O N
TR
O
L
PL
AN
S
H
EE
T (1
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
100' 200'0
PLAN
NORTH
EROSION AND SEDIMENT CONTROL LEGEND EROSION & SEDIMENT CONTROL NOTES:
SF
SILT FENCE
(VSMH Version 1.1, C-PCM-04) SF
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE MINIMUM STANDARDS AND
SPECIFICATIONS OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK (CURRENT EDITION).
2. THE CONTRACTOR SHALL APPLY PERMANENT OR TEMPORARY SOIL STABILIZATION TO ALL DENUDED OR DISTURBED AREAS WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE OUTSIDE OF THE DREDGE PLACEMENT AREA OF THE SITE. SOIL STABILIZATION MUST ALSO BE APPLIED TO DENUDED OR DISTURBED AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WHICH WILL REMAIN UNDISTURBED FOR LONGER
THAN 14 DAYS.
3. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES AND CLEANUP OF SEDIMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR
AND SHALL BE MADE IMMEDIATELY.
4. STOCK PILES OF SOIL AND OTHER ERODIBLE MATERIALS OUTSIDE OF THE DREDGE PLACEMENT AREA SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION STOCKPILES ON SITE AS WELL AS FOR
MATERIALS TRANSPORTED FROM THE PROJECT SITE.
5. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH. DISCHARGE IN A MANNER THAT DOES NOT ADVERSELY AFFECT OFF-SITE
PROPERTY OR STORM DRAINAGE SYSTEMS.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED NECESSARY BY THE
LAND DISTURBANCE PERMITTING AGENCY.
7. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES SHALL BE REMOVED WITHIN 30
DAYS.
8. ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
9. ALL EROSION AND SEDIMENT CONTROL MEASURES INDICATED ON THIS PLAN ARE THE MINIMUM REQUIRED.
THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENT CONTROL AS DETERMINED BY THE PERMITTING
AUTHORITY.
10. ALL SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND DISTURBING ACTIVITY, AND SHALL BE MADE FUNCTIONAL PRIOR TO THE UPLAND
LAND DISTURBANCE.
11. TEMPORARY CONSTRUCTION ENTRANCES SHALL BE MAINTAINED TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO PAVED OR IMPROVED SURFACES, WHERE SEDIMENT IS TRACKED ONTO PAVED SURFACES, THE SEDIMENT SHALL BE REMOVED BY SHOVELING OR SWEEPING AND TRANSPORTED TO A
SEDIMENT CONTROL DISPOSAL AREA.
12. CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO CONTROL DUST INCLUDING (BUT NOT LIMITED TO) USE OF WATER, LIMITING THE NUMBER OF VEHICLES ALLOWED ON SITE, MINIMIZING THE OPERATING SPEED
OF ALL VEHICLES, OR PROVIDING OTHER ACCEPTABLE CONTROL MEASURES.
13. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED, THAT IN THE OPINION OF THE PERMITTING AUTHORITY HAS BEEN ACHIEVED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH
TO SURVIVE AND WILL INHIBIT EROSION.
SF
SF
SF
SF
S-301
H5
TAYLOR AVE
PATCH ROAD
MULBERRY ISLAND ROAD
W
ILSON AVE
DREDGED MATERIAL
TURN AROUND AREA
24" DOUBLE INSULATED
CORRUGATED METAL
INV=1.29
INV=2.76
SPILL BOX
DISCHARGE PIPE
INV=2.10
SPILL BOX
DISCHARGE PIPE
24" DOUBLE INSULATED
CORRUGATED METAL
INV=1.74
WOODEN
WALKWAY
VH107
VH108
22030
CP
CP
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:0
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
VH-108
ER
O
SI
O
N C
O N
TR
O
L
PL
AN
S
H
EE
T (2
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
PLAN
NORTH
100' 200'0
CE
CE
EROSION AND SEDIMENT CONTROL LEGEND
TEMPORARY CONSTRUCTION ENTRANCE
(VSMH VERSION 1.1, C-SCM-03)
SF
SILT FENCE
(VSMH VERSION 1.1, C-PCM-04) SF
SF
SF
SF
S-301
H11
S-301
H5
MULBERRY IS
LAND ROAD
W
ILSON AVE
24" DOUBLE INSULATED
CORRUGATED METAL
INV=1.29
INV=2.76
SPILL BOX
DISCHARGE PIPE
WOODEN
WALKWAY
DREDGED MATERIAL
TURN AROUND AREA
TS
TEMPORARY SEEDING
(VSMH STD.)
TS
TS
S-301
H17
6" MIN.
70' MIN.
PAVEMENT
EXISTINGEXISTING
GROUND
EXISTING
GROUND
' M
IN
OPERATION
OF INGRESS AND EGRESS
* MUST EXTEND FULL WIDTH
COARSE AGGREGATE
VDOT #1, #2, OR #3
70' MIN.
PAVEMENT
EXISTING
' M
IN
' M
IN
10' MIN.
3" MIN.
3" MIN.
12' MIN.
SIDE ELEVATION
PLAN VIEW
SECTION C-C
C
C
GALV. STEEL FENCE POST,
DRIVEN MIN. 24" INTO GROUND
48" MIN. 2.5" DIA.
4"x4" TRENCH
FLOW
2" MIN
FILTER
CLOTH
10' MAX. C TO C
18" MIN
4" MIN
EMBEDDED
IN GROUND
UNDISTURBED
OVERLAPPED BY 6" AND FOLDED.
'BULGES' DEVELOP IN THE SILT FENCE.
1. FILTER CLOTH TO BE FASTENED SECURELY WITH TIES AT TOP AND MID SECTION.
2. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE
3. A 4" WIDE BY 4" DEEP TRENCH SHALL BE EXCAVATED UPSLOPE OF SILT FENCE.
4. BURY FILTER CLOTH A MIN. OF 8" IN TRENCH. BACKFILL AND COMPACT TRENCH.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN
6. POSTS SHALL BE 4' MIN. STANDARD V OR T SECTION, MIN. WEIGHT= 3 LBS/FOOT.
7. FILTER CLOTH SHALL MEET LATEST VESCR SPECIFICATIONS FOR SILT FENCE.
24" MIN
8" OF FILTER CLOTH
(LAYERED IN TRENCH)
NOTES:
FILTER CLOTH
GROUND
FILTER CLOTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:1
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
S-301
ER
O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
S
H
EE
T
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
H17 NOT TO SCALE
TEMPORARY SEEDING SCHEDULE
TABLE 3.31-B
ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS
MULCHING
A. SEEDING MADE IN FALL FOR WINTER COVER AND DURING HOT DRY
SUMMER MONTHS SHALL BE MULCHED IN ACCORDANCE WITH MULCHING,
STD. & SPEC. OF THE VIRGINIA EROSION & SEDIMENT CONTROL
HANDBOOK, THIRD EDITION 1992.
MAINTENANCE
A. IRRIGATION - IF SOIL MOISTURE IS DEFICIENT. SUPPLY NEW SEEDINGS AND
PLANTINGS WITH ADEQUATE WATER FOR PLANT GROWTH UNTIL THEY ARE
FIRMLY ESTABLISHED.
B. REPAIR - INSPECT ALL AREAS FOR PLANTING FAILURES AND MAKE
NECESSARY REPAIRS.
SPECIES
50/50 MIX OF ANNUAL
RYEGRASS (LOLIUM
MULTI-FLORUM) & CEREAL
(WINTER) RYE (SECALE
CEREALE)
ANNUAL RYEGRASS
(LOLIUM MULTI-FLORUM)
GERMAN MILLET (SETARIA
ITALICA)
SEEDING RATE (LBS./ACRE)
50 - 100
60 - 100
J12
VH-107 SCALE: NTS
SILT FENCE DETAILH5
VH-108
N6
A3
VH-108 SCALE: NTS
TEMPORARY STONE CONSTRUCTION ENTRANCEH11
TSCE
SF
VH-108
A3
5+00
-20
-20
0 20 40 60 800-20-40-60
10+00
-20
-20
0 20 40 60 80 1000-20-40-60
15+00
-20
-20
0 20 40 60 800-20-40-60
20+00
-20
-20
0 20 40 60 800-20-40-60
23+69.71
-20
-20
0 20 400-20-40-60-80
30+00
-20
-20
0 20 40 60 80 1000-20-40-60
39+12.59
-20
-20
0 20 40 600-20-40-60-80
0+00
-20
-20
0 20 40 60 800-20-40-60
3.0:1 4.0:1
3.0:1 4.0:1
1.5:1
.0
0'
INVERT
2.76'INVERT 15.5'
.0
0'
INVERT 2.1
INVERT 15.5'
0.72% SLOPE
PROPOSED SURFACE
SEE SPECIFICATIONS
FOR COMPACTION
EL. 38.50
O
FF
.1
EL
. 3
6.
EXISTING
24" CP
EXISTING
24" CP
PROPOSED SURFACE
SEE SPECIFICATIONS
FOR COMPACTION
O
FF
.5
EL
. 3
6.
7.50'
7.50'
7.50'
7.50'
7.50'
7.50'
7.50'
7.50'
EL. 36.00 EL. 36.00 EL. 36.00
EL. 36.00 EL. 36.00 EL. 36.00
EL. 36.00 EL. 36.00
3.0:1 4.0:1
3.0:1 4.0:1
3.0:1 4.0:1
O
FF
.9
EL
. 2
7.
49 OFF. 0.00
EL. 36.00
O
FF
. 1 7.
EL
. 3 3.
1.5:1 4.0:1
3.0:1 4.0:1
3.00% SLOPE (+/- 1%)
3.00% SLOPE (+/- 1%)
O
FF
.9
EL
. 2
7.
10 OFF. 0.00
EL. 36.00
O
FF
. 1 7.
EL
. 3 3.
O
FF
.9
EL
. 2
8.
O
FF
. 1 7.
EL
. 3 3.
O
FF
. 0 .0
EL
. 3 6.
O
FF
.5
EL
. 2
7.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 7.
EL
. 3 3.
O
FF
.9
EL
. 2
7.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 6.
EL
. 3 3.
4.0:1
O
FF
.9
EL
. 2
6.
O
FF
0.
EL
. 3 6.
O
FF
. 1 8.
EL
. 3 3.
O
FF
.1
EL
. 2
7.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 7.
EL
. 3 3.
O
FF
.5
EL
. 2
7.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 7.
EL
. 3 3.
PLACE STOP LOGS AT
THE GREATER OF 30 FT
OR EXISTING DREDGE
MATERIAL ELEVATION.
PLACE STOP LOGS AT
THE GREATER OF 30 FT
OR EXISTING DREDGE
MATERIAL ELEVATION.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0 VH-301
D
IK
E C
AU
SE
W
AY
AN
D
S
PI
LL
BO
X
SE
C
TI
O N
S
SH
EE
T
(1
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
LEGEND:
FILL, SUITABLE FILL MATERIAL TO ADD
SHEET NOTES:
REMOVE EXISTING WALKWAY AND HAND RAILING, AND REMOVE EXISTING
SPILLBOX ABOVE GRADE.
INSTALL NEW SPILLBOX, WALKWAY AND HAND RAILING, SEE STRUCTURAL
SHEETS.
TAP FROM EXISTING 24" CP INVERT TO NEW SPILLBOX, SEE STRUCTURAL
SHEETS. PREPARE BOTTOM FOR PIPE PER THE PROJECT SPECIFICATIONS.
FILL ANNULAR SPACE OF EXISTING SPILLBOX WITH FLOWABLE FILL.
E15
VH-105 SCALE: AS SHOWN
SECTIONJ17
N9
VH-105 SCALE: AS SHOWN
SECTIONE10
40+00
-20
0 20 40 60 80 1000-20-40-60-80-100
45+00
-20
-20
0 20 40 60 80 1000-20-40-60-80-100
50+00
-20
-20
0 20 40 60 80 1000-20-40-60-80-100
55+00
-20
-20
0 20 40 60 80 1000-20-40-60-80-100
60+00
-20
-20
0 20 40 60 80 1000-20-40-60-80-100
65+00
-20
-20
0 20 40 60 80 1000-20-40-60-80-100
3.0:1 4.0:1
3.0:1 4.0:1
3.0:1 4.0:1
7.50'
7.50'
7.50'
7.50'
7.50'
3.0:1 4.0:1
O
FF
.9
EL
. 2
5.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 8.
EL
. 3 3.
3.0:1 4.0:1
O
FF
.8
EL
. 2
5.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 8.
EL
. 3 3.
O
FF
.4
EL
. 2
9.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 7.
EL
. 3 3.
7.50'O
FF
.8
EL
. 2
8.
O
FF
. 0 .5
EL
. 3 6.
O
FF
. 1 8.
EL
. 3 3.
O
FF
.6
EL
. 3
3.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 6.
EL
. 3 3.
O
FF
.8
EL
. 2
7.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 7.
EL
. 3 3.
3.0:1
4.0:1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0 VH-302
D
IK
E C
AU
SE
W
AY
A N
D
SP
IL
LB
O X
SE
C
TI
O
N S
SH
EE
T (2
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
70+00
-20
0 20 40 60 80 1000-20-40-60-80-100
75+00
-20
-20
0 20 40 60 80 1000-20-40-60-80-100
TOTAL VOLUME: CUBIC YARDS
STATION
0+00.00
5+00.00
10+00.00
15+00.00
20+00.00
23+69.71
30+00.00
39+12.59
40+00.00
45+00.00
50+00.00
55+00.00
60+00.00
65+00.00
70+00.00
75+00.00
CUT AREA
0.00
0.00
0.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
FILL AREA
157.28
179.79
183.38
181.20
189.04
580.27
167.81
635.97
239.40
227.27
181.12
147.10
50.73
168.72
209.34
198.88
CUT VOL
0.00
0.00
5.88
5.84
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
FILL VOL
0.00
3140.42
3364.42
3370.49
3377.87
4919.24
8982.08
13117.04
1058.50
4268.37
3759.07
3049.44
1851.67
2005.58
3454.80
3673.34
CUMULATIVE CUT VOL
0.00
0.00
5.88
11.72
11.72
11.72
11.73
11.74
11.74
11.74
11.74
11.74
11.74
11.74
11.74
11.76
CUMULATIVE FILL VOL
0.00
3140.42
6504.84
9875.34
13253.21
18172.45
27154.53
40271.57
41330.07
45598.44
49357.51
52406.94
54258.61
56264.19
59719.00
63392.33
NET VOL
0.00
-3140.42
-6498.96
-9863.62
-13241.49
-18160.73
-27142.80
-40259.83
-41318.33
-45586.70
-49345.76
-52395.20
-54246.87
-56252.45
-59707.25
-63380.57
3.0:1 4.0:1
7.50'
10.50'O
FF
.1
EL
. 2
7.
O
FF
. 0 .0
EL
. 3 6.
O
FF
. 1 7.
EL
. 3 3.
3.0:1 4.1:1
O
FF
.7
EL
. 2
7.
O
FF
. 3 1.
EL
. 3 1.
O
FF
. 2 .9
EL
. 3 6.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0 VH-303
D
IK
E C
AU
SE
W
AY
A N
D
SP
IL
LB
O X
SE
C
TI
O
N S
SH
EE
T (3
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:3
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
S-302
SP
IL
LB
O
X D
ET
AI
LS
SH
EE
T
(1
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
8'-0"
32 SF CONC. BASE
8' -0
4' -1
3 8"
ANCHOR LUG-TYP
SEE ANCHOR LUG DETAIL,
SECTION L8 SHT. S-305
4' -0
24" PE PIPE STUB TO
FIT SNUG OVER ROLLED
1/4" PLATE
18" TYP ANCHOR BOLTS
(8 REQ'D) 3/4" NOM. DIA.
W/ NUTS AND WASHERS
LADDER NOT SHOWN, SEE DETAIL SHT. S-305
LADDER NOT SHOWN, SEE DETAIL SHT. S-305
24" MARINE MATTRESS
2' -0
5'-0"
8' -0
1' -7
2'-013 16"
LADDER NOT SHOWN, SEE DETAIL SHT. S-305
SEE NOTE
SECTION L16 SHT. S-303
PL 1/2" SEE SECTION G4
SHT. S-304
Z.
T.
W
C .P
.O
S-303
L16
S-302
E17
S-304
L4
S-303
L5
S-303
D11
K10
S-302 SCALE: 1"=1'-0"
SECTIONE17
SCALE: 1"=1'-0"
8FT. UPPER SECTIONS (3 REQ'D) ELEVATIONL17
SCALE: 1"=1'-0"
BASE SECTION SIDE ELEVATIONH7 GEOTEXTILE FILTER CLOTH
L3.5X3.5X3
8 (TYP)
C5X9 (TYP)C5X9 (TYP)
ST5X17.5
L3.5X3.5X3
4' -1
5 8"
(TYP)
3/8
TYP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:3
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
S-303
SP
IL
LB
O
X D
ET
AI
LS
SH
EE
T
(2
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
6"
1'-0"
4'-11"
4'-1"
4' -1
1"
4' -1
R O
LL
/4 " P
L
TO
F
IT
IN
SI
D E
O F
D
IA
. P E
(T
EM
PL
AT
E)
DRILL EIGHT 3/4" DIA.
HOLES-THRU EVENLY
SPACED, BOLT TO PE
W/ 3/4" NOM. DIA. BOLTS
1'-4" 1'-5" 1'-4"
1' -4
1'
-4
1' -5
1/2" PL ANCHOR
LUG (TYP)
SEE ANCHOR LUG DETAIL
SECTION L8 SHT. S-305
4'-1"
4'-11"4'-11"
4' -1
1"
4' -1
8'-0" CONCRETE BASE
ST 5x17.5 (TYP)
1'-4" 1'-5" 1'-4"
L3.5x3.5x3
8" (TYP)
8"
1' -4
3 8"
LADDER SEE DETAIL
SHT. S-305
2"x3/4" BAR
4 PER SIDE
WELD CONT. TO
ST5X17.5 ON ALL EDGES
FACE OF ST SECTION TO BE MADE
FLUSH WITH INSIDE FACE OF
CHANNEL
NOTCH FLANGE OF C5X9 TO
CLEAR ST SECTION. WELD ALL
AROUND. TYP.
8"
C5x9 (TYP)
C5x9 (TYP)
4' -1
5 8" 4'-15
8"
TYP
5/16
8' -0
" C O
N C
. B
AS
E
Z.
T.
W
C .P
.O
K17
S-302 SCALE: 1"=1'-0"
SECTIONL5
L7
S-302 SCALE: 1"=1'-0"
SECTIONL16
G7
S-302 SCALE: 1"=1'-0"
SECTIOND11
S-304
G4
S-304
J11
L3.5X3.5X3
8 (TYP)
ST5X17.5 (TYP)
L3.5X3.5X3
8 (TYP)
1'-0"
S-304
J17
S-305
D8
S-304
M11
TYP
1/4
TYP
1/4
C5x9 (TYP)
L3.5x3.5x3/8"
GRIND CORNER TO FIT
SEE DETAIL N17
SHT S-304
1/4
TYP
C5x9
HOR. C5x9
L3.5x3.5x3/8"
TYP
1/4TOP
TYP
3/16
BOT. AND SIDES
TYP
1/4
C5x9
ST SECTION, CORNER BRACES NOT SHOWN
FOR CLARITY
TYP
1/4
TYP
1/4
1" CHAMFER
1/4" PL SEE
SECTION L16
SHT S-303
CJP
L3.5x3.5x3/8"
1/4
C5X9
CJP
TYP
CJP
1/4
TYP
TYP
CJP
1/4 1/4
CJP
L3.5x3.5x3/8"C5x9
C5x9
1/4
TYP1/4
C5x9
1" NOM. DIA. BOLTS
C5x9
CJP
1/2" PL (TYP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:5
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
S-304
SP
IL
LB
O
X D
ET
AI
LS
SH
EE
T
(3
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
Z.
T.
W
C .P
.O
L15
S-302 SCALE: 3"=1'-0"
SECTIONL4
S-304
D11
L14
S-303 SCALE: 3"=1'-0"
SECTIONG4
E9
S-303 SCALE: 3"=1'-0"
TYP. DETAILJ11
H4
S-304 SCALE: 3"=1'-0"
SECTIOND11
K4
S-303 SCALE: 3"=1'-0"
TYP. DETAILJ17
SCALE: 3"=1'-0"
TYP. DETAILN17M14
S-303 SCALE: 3"=1'-0"
TYP. DETAILM11
2"
5"
3"
11 2"
1 3/4" DIA. HOLE
1/2" PL (TYP)
CJP
WELD AT 45° BETWEEN
CORNER CHANNELS
TYP
1/4
TYP
1/4
TYP
1/4
NOTCH AND CHAMFER ANGLE
TO FIT CONT. ST SECTION
1/4
5"
6" 1'
6" 1'
6" 1'
6"
2"
1" ELEVATION AT BASE
OF 8' SECTION
3"
3"
3"
6" 6"
6" 1" DIA. BAR RUNG
17-7/8" LONG
3/4" x 2" FLAT BAR (TYP).
DRILL FOR RUNGS
3/4" x 2" BAR (TYP)
4 PER SIDE
TYP
3/8
3/8
TYP
PROVIDE TWO SECTIONS
3/4"x2"x4' LONG FLAT BAR
ATTACHED AS SHOWN
FASTEN BAR EXTENSIONS
WITH FOUR 3/4" NOM. DIA.
BOLTS PER 8' SECTON.
TIGHTEN SNUG
1"
EL. AT TOP OF 8'
SECTION
WHEN ASSEMBLED TOGETHER, BAR
EXTENSIONS ON TOPMOST 8' SECTION ONLY
ARE TO BE REVERSED AND BOLTED UPRIGHT
AS SHOWN.
3/8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
T:
\F
\F
ED
M M
A\
SK
U .2
4-
-0
1.
PS
_2 \S
KU
.2
4-
-0
1.
PS
-6 5_
2\
SK
U .2
4-
-0
1.
PS
.D W
G 2:
:5
PM
/2
6/
AE
C _B
&W .S
TB
E4
TO
N
JK
W
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
S-305
SP
IL
LB
O
X D
ET
AI
LS
SH
EE
T
(4
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
NOTES:
1. STRUCTURAL STEEL SHALL BE A36
2. ANCHOR BOLTS, BOLTS, NUTS, ETC SHALL BE
GALVANIZED A307 STEEL, UON.
3. WELDING SHALL BE IN ACCORDANCE WITH
AASHTO AND AWS D1.1. WELDERS SHALL BE
CERTIFIED AND SUBMITTED FOR GOV APPROVAL
UNDER AWS D1.1.
4. WELDS SHALL BE A CONTINUOUS FILLET WELD
1/16" LESS THAN THE THICKNESS OF THE BASE
MATERIAL, UON.
5. CONCRETE SHALL HAVE A MINIMUM 28 DAY
STRENGTH OF 4000 PSI WITH A W/C RATIO OF 0.40.
6. ALL CONCRETE SHALL BE IN ACCORDANCE WITH
ACI 301.
7. WOOD STOP LOGS SHALL BE NOMINAL 4X4,
MINIMUM #2 CONSTR. GRADE SOUTHERN PINE
TIMBERS.
8. PLACE STOP LOGS AT THE GREATER OF 30 FT OR
EXISTING DREDGE MATERIAL ELEVATION.
9. UPPER SECTIONS ARE TO BE FASTENED TO LOWER
SECTIONS SECURELY USING 1" NOM. DIA. BOLTS
AT CONNECTION PLATES PROVIDED.
Z.
T.
W
C .P
.O
SCALE: 3"=1'-0"
ANCHOR LUG DETAILL8
K16
S-303 SCALE: 3"=1'-0"
TYP. DETAILD8
SCALE: 1"=1'-0"
LADDER DETAILF14
-0+50
0 200-20
-1+00
0 200-20
-1+50
0 200-20
-2+00
0 200-20
-2+50
-20
-20
0 200-20
-3+00
-20
-20
0 200-20
-3+50
-20
-20
0 200-20
-4+00
-20
-20
0 200-20
-4+50
-20
-20
0 200-20
-4+71.03
-20
-20
0 200-20
EL. 8.70
15.00'
EL. 8.64
15.00'
EL. 8.64
15.00'
EL. 9.92
15.00'
EL. 13.82
15.00'
EL. 19.36
15.00'EL. 24.91
15.00'
OFF. -19.41
EL. 27.89
OFF. -18.59
EL. 33.23
EL. 30.45
15.00'
EL. 35.39 EL. 36.00
OFF. -22.23
EL. 31.53
24.03'
OFF. -24.45
EL. 31.76
EL. 36.00
21.77'
7.50' 7.50'
7.50'
7.50'
7.50'
7.50'
7.50'
7.50' 7.50' 7.50'
TOTAL VOLUME: CUBIC YARDS
STATION
-0+50.00
-1+00.00
-1+50.00
-2+00.00
-2+50.00
-3+00.00
-3+50.00
-4+00.00
-4+50.00
-4+71.03
CUT AREA
0.00
1.03
54.47
210.36
28.13
0.08
1.02
0.25
0.00
0.10
FILL AREA
192.72
163.74
108.59
0.44
0.00
3.56
2.28
1.43
3.64
0.29
CUT VOL
0.00
1.06
54.31
246.37
224.48
26.20
1.02
1.18
0.23
0.04
FILL VOL
0.00
310.76
208.92
107.06
0.36
3.26
5.37
3.42
4.72
1.53
CUMULATIVE CUT VOL
0.00
1.06
55.37
301.74
526.23
552.42
553.44
554.62
554.85
554.89
CUMULATIVE FILL VOL
0.00
310.76
519.68
626.75
627.11
630.37
635.74
639.16
643.88
645.41
NET VOL
0.00
-309.71
-464.32
-325.01
-100.88
-77.95
-82.30
-84.54
-89.03
-90.52
4.00:1
4.00:1
4.00:1 4.00:1
4.00:1
-0+20 -0+40 -0+60 -0+80 -1+00 -1+20 -1+40 -1+60 -1+80 -2+00 -2+20 -2+40 -2+60 -2+80 -3+00 -3+20 -3+40 -3+60 -3+80 -4+00 -4+20 -4+40 -4+60 -4+71
9.00:1
L 43.88'
PV
C
S
TA
0+
.0
EL
. 3 6.
PV
T
ST
A.
-1 +2
1.
EL
. 3
3.
57G1 0.00%
G2 -11.09% e 0.61'
G1 -8.65% G2 -3.05% e 0.31'
PV
C
S
TA
3+
.2
EL
. 1 2.
PV
T
ST
A.
-3 +5
8.
EL
. 9
.5
L 43.79'
Horizontal
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0
VH-304
AC
C
ES
S
R O
AD
SE
C
TI
O N
S
AN
D P
R O
FI
LE
SH
EE
T
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
XX
X
-1 2-
AN
SI
D
XX
X
FO
R
T
EU
ST
IS
D R
ED
G
E M
AT
ER
IA
L
M
AN
AG
EM
EN
T
AR
EA
(F
ED
M M
A)
PL
AN
S
FO
R
D
IK
E R
EH
AB
IL
IT
AT
IO
N
FO
R T
EU
ST
IS
, N
EW
PO
R T
N
EW
S
VI
R G
IN
IA
PR
O
JE
C
T
ST
AT
U
S
FI
N
AL
SK
U
.2
4-
-0 1.
PS
M . L
O
PE
Z R
IV
ER
A
A.
T
IE
R
N
EY
/J . W
IL
LI
AM
S
R . M
C
EL
H
IN
N Y/
M .D
.M
R . M
C
EL
H
IN
N Y/
M .D
.M
20' 40'0
ACCESS ROAD SECTIONS
VERTICAL SCALE
HORIZONTAL SCALE
20' 40'0
0 5' 10'
VERTICAL SCALE
HORIZONTAL SCALE
LEGEND:
CUT, EXISTING GRADE TO REMOVE.
FILL, SUITABLE FILL MATERIAL TO ADD
B3
VH-106
ACCESS ROAD PROFILEM10
File details come from the government source that posted it. Updated .