This is a Bid Schedule form (Attachment 3) for a construction contract requiring offerors to price three base contract line items (CLINs) and two optional CLINs related to dike and water management infrastructure work.

The base proposal consists of three mandatory CLINs: CLIN 0001 covers mobilization and demobilization activities; CLIN 0002 encompasses all work to raise the dike according to plans and specifications; and CLIN 0003 includes demolition and installation of a new spill box with walkway at Station 39+12.59. The optional work comprises CLIN 0004 for demolition and installation of a new spill box with walkway at Station 23+69.71 (Option 1) and CLIN 0005 for construction of an access road (Option 2). Each CLIN is priced as a lump-sum job with quantity of one. Offerors must complete the Unit Price and Amount columns for each CLIN, with subtotals calculated for base bid items and option bid items, culminating in a total amount for all bid items. All unit prices and amounts must be rounded to the nearest whole dollar.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

BID SCHEDULE

OFFEROR’S COMPANY NAME:

CONTRACT LINE-ITEM SCHEDULE

CLIN Description Qty Unit of

Issue

Unit Price dollars)

Amount ($ dollars)

Base Proposal

Base Contract

Work for this CLIN includes mobilization/demobilization, excluding bid items 0002 – 0005.

1 Job

Base Contract

Work for this CLIN all work to raise the dike as described in the plans and specification, excluding bid items 0001, 0003-0005.

Base Contract

Work for this CLIN includes demolition and installation of a new spill box with a walkway located at Station 39+12.59 and as described in the plans and specifications, excluding bid items 0001, 0002, and 0005.

SUBTOTAL AMOUNT – BASE BID ITEMS

Option 1

Work for this CLIN includes demolition and installation of a new spill box with a walkway located at 23+69.71 and as described in the plans and specifications, excluding bid items 0001,0002, 0003 and 0005.

Option 2

Work for this CLIN includes work to build an access road as described in the plans and specifications, excluding bid items 0001- 0004.

SUBTOTAL AMOUNT – OPTION BID ITEMS

TOTAL AMOUNT – ALL BID ITEMS

NOTES:

All Unit Prices and Amounts must be rounded to the nearest whole dollar.