SKS-001-09-17_Bid_Sheet.pdf
PDF 30 KB Posted
- Attached to
- Construction Services for the Weis Courthouse Backfill Project, Pittsburgh, PA Federal contract opportunity
- Solicitation number
- SKS-001-09-17
About this file
Bid Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Weis_Backfill_SKS-001-09-17_SF1442_-__revised_2018_11_29.pdf | ||
| Amendment_0003_2018_11_29.pdf | ||
| C201-SB_revised_-_Weis_Backfill.pdf | ||
| Amendment_0002_2018_10_25.pdf | ||
| Amendment_0001_2018_10_02.pdf | ||
| C301_-_Weis_Backfill.pdf | ||
| Scope_Narrative_Summary.pdf | ||
| C201-SB_-_Weis_Backfill.pdf | ||
| Weis_Backfill_SKS-001-09-17_SF1442.pdf | ||
| Wage_Determination_-_PA180001_09-07-2018_PA1.pdf | ||
| C101-SB_-_Weis_Backfill.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Solicitation No. SKS-001-09-17 - BID SHEET
BASE Lump Sum:__________________________
Please reference Section 01 2300 Alternates. “Alternates” is synonymous with “Options”.
OPTION 1 Lump Sum:__________________________
OPTION 2 Lump Sum:__________________________
OPTION 3 Lump Sum:__________________________
Unit Pricing
● Unit Price Item No. 1: Stabilization of Historic Tile Vault
○ Description: Additions or deletions from established assumption of historic tile stabilization included in the Alternates, according to Section 090181 “Maintenance of Historic Tile Vault.”
○ Measurement: Unit price per tile to reattach historic tiles, inclusive of materials, installation and Contractor overhead and profit.
○ Base Bid Quantity included in the Contract Documents for Alternates:
Reattachment of 15 percent of historic tiles.
● Base Bid Quantity _______________________________
● Base Bid Value _________________________________
● Unit Cost and Unit of Measure _________________/ _________________
● Unit Price Item No. 2: Hydraulic Cement Underlayment
○ Description: Additions or deletions from established assumption of hydraulic cement underlayment included in the Base Bid.
○ Measurement: Unit price per 5 gal. container to supply and install hydraulic cement underlayment material, inclusive of materials, installation and Contractor overhead and profit.
○ Base Bid Quantity included in the Contract Documents: As indicated in Drawings.
● Unit Price Item No. 3: Spray Fireproofing
○ Description: Additions from established assumption of spray fireproofing included in the Base Bid. Additions shall be identified in a post-demolition walkthrough to review existing conditions by Contractor and GSA Fire Safety personnel.
○ Measurement: Unit price per square foot to supply and install spray fireproofing, according to 078100 “Applied Fireproofing”, inclusive of materials, installation and Contractor overhead and profit.
○ Base Bid Quantity included in the Contract Documents: As indicated in Drawings.
BASE Lump Sum Components:
● Division 01 - General Requirements
● Division 02 - Existing Conditions
● Division 03 - Concrete
● Division 04 - Masonry
● Division 05 - Metals
● Division 06 - Wood, Plastics and Composites
● Division 07 - Thermal and Moisture Protection
● Division 08 - Openings
● Division 09 - Finishes
● Division 10 - Specialties
● Division 11 - Equipment
● Division 12 - Furnishings
● Division 13 - Special Construction
● Division 14 - Conveying Equipment
● Division 21 - Fire Protection
● Division 22 - Plumbing
● Division 23 - Heating Ventilating and Air Conditioning
● Division 26 - Electrical
● Division 27 - Communications
● Division 28 - Electronic Safety and Security
● Division 29 - Audio-Visual Systems
● Division 31 - Earthwork
● Division 32 - Exterior Improvements
● Historical Bronze Doors and associated components
● General Overhead & Profit
● Insurance and Bonds
File details come from the government source that posted it.