SKS-001-09-17_Bid_Sheet.pdf

PDF 30 KB Posted

Attached to
Construction Services for the Weis Courthouse Backfill Project, Pittsburgh, PA
Solicitation number
SKS-001-09-17
Issued by

About this file

Bid Sheet

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. SKS-001-09-17 - BID SHEET

BASE Lump Sum:__________________________

Please reference Section 01 2300 Alternates. “Alternates” is synonymous with “Options”.

OPTION 1 Lump Sum:__________________________

OPTION 2 Lump Sum:__________________________

OPTION 3 Lump Sum:__________________________

Unit Pricing

● Unit Price Item No. 1: Stabilization of Historic Tile Vault

○ Description: Additions or deletions from established assumption of historic tile stabilization included in the Alternates, according to Section 090181 “Maintenance of Historic Tile Vault.”

○ Measurement: Unit price per tile to reattach historic tiles, inclusive of materials, installation and Contractor overhead and profit.

○ Base Bid Quantity included in the Contract Documents for Alternates:

Reattachment of 15 percent of historic tiles.

● Base Bid Quantity _______________________________

● Base Bid Value _________________________________

● Unit Cost and Unit of Measure _________________/ _________________

● Unit Price Item No. 2: Hydraulic Cement Underlayment

○ Description: Additions or deletions from established assumption of hydraulic cement underlayment included in the Base Bid.

○ Measurement: Unit price per 5 gal. container to supply and install hydraulic cement underlayment material, inclusive of materials, installation and Contractor overhead and profit.

○ Base Bid Quantity included in the Contract Documents: As indicated in Drawings.

● Unit Price Item No. 3: Spray Fireproofing

○ Description: Additions from established assumption of spray fireproofing included in the Base Bid. Additions shall be identified in a post-demolition walkthrough to review existing conditions by Contractor and GSA Fire Safety personnel.

○ Measurement: Unit price per square foot to supply and install spray fireproofing, according to 078100 “Applied Fireproofing”, inclusive of materials, installation and Contractor overhead and profit.

○ Base Bid Quantity included in the Contract Documents: As indicated in Drawings.

BASE Lump Sum Components:

● Division 01 - General Requirements

● Division 02 - Existing Conditions

● Division 03 - Concrete

● Division 04 - Masonry

● Division 05 - Metals

● Division 06 - Wood, Plastics and Composites

● Division 07 - Thermal and Moisture Protection

● Division 08 - Openings

● Division 09 - Finishes

● Division 10 - Specialties

● Division 11 - Equipment

● Division 12 - Furnishings

● Division 13 - Special Construction

● Division 14 - Conveying Equipment

● Division 21 - Fire Protection

● Division 22 - Plumbing

● Division 23 - Heating Ventilating and Air Conditioning

● Division 26 - Electrical

● Division 27 - Communications

● Division 28 - Electronic Safety and Security

● Division 29 - Audio-Visual Systems

● Division 31 - Earthwork

● Division 32 - Exterior Improvements

● Historical Bronze Doors and associated components

● General Overhead & Profit

● Insurance and Bonds

File details come from the government source that posted it.