About this file

This document contains construction drawings and specifications for the repair and renovation of a VA parking structure located in Honolulu, Hawaii. Key details include renovation of the existing 200,000 square foot parking structure building to update the visual appearance, including architectural and plumbing work. Mechanical, electrical, and structural engineering services are also required. The work must comply with applicable VA standards and codes. Bids for the project are being solicited under Solicitation Number 36C26123R0012 by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The response due date and award date are not provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G Y M

AB

D

F G

H

P O O L

C

MAIN

HOSPITAL

PATTERSON RD

K R U K O W S K I R D

WARD RD

E

ARCHITECTURAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

STRUCTURAL

REID MIDDLETON

PLUMBING

MECHANICAL

INSYNERGY

728 134TH ST SW, STE 200

EVERETT, WA 98204

PHONE: (425) 741-3800

828 FORT STREET MALL STE 500,

HONOLULU, HI, 96813

PHONE: (808) 521-3773

INSYNERGY

828 FORT STREET MALL STE 500,

HONOLULU, HI, 96813

PHONE: (808) 521-3773

PROJECT INFORMATION

STATE:

JURISTICTION:

OWNER:

CODE ANALYSIS

PROJECT DESCRIPTION

THE PROPOSED DESIGN SHALL RENOVATE

EXISTING PARKING STRUCTURE BLDG 32. THIS

INCLUDES ARCHITECTURAL AND PLUMBING

RENOVATIONS REQ'D FOR A RENEWED VISUAL

LOOK TO THE STRUCTURE.

APPLICABLE BUILDING

BUILDING 32

APPROXIMATE SQUARE FOOTAGE

200,000 SF

HAWAII

HONOLULU

VA PACIFIC ISLANDS

HEALTH CARE SYSTEM

REFERENCE DOCUMENTS

APPLICABLE VA STANDARDS

DESIGN AND CONSTRUCTION PROCEDURES (PG 18-3), TOPIC 1 - CODES, STANDARDS & EXECUTIVE ORDERS

SEPTEMBER 2013

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

VERIFY WITH VA COR BEFORE PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

APPLICABLE PUBLICATIONS

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS OF CODE ENFOREMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC). THE VA

SHALL FUNCTION AS THE AUTHORITY HAVING JURISTICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION

GUIDE AND OTHER GUIDEANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL). SEE ABOVE.

INTERNATIONAL BUILDING CODE (IBC) 2018.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES PRECEDENCE OVER

IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC).

EXECUTIVE ORDER 13423: STRENGTHEING FEDERAL ENVIRONMENTAL, ENERGY AND TRANSPORTATON

MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS

SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VAMC APPROVED HARDWARE LOCKING STANDARDS

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AS REFERENCED.

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM), AS REFERENCED.

VA PACIFIC ISLANDS HEALTH CARE SYSTEM,

HONOLULU, HAWAII

BUILDING WITHIN SCOPE OF THIS PROJECT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

G-001

COVER & DRAWING INDEX

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

REPAIR VA PARKING STRUCTURE

EXTERIOR BLDG 32

VA PACIFIC ISLANDS HEALTH CARE SYSTEM,

HONOLULU, HAWAII

459-19-002

01/27/2022 EM AJ

CONSTRUCTION

DOCUMENTS

REPAIR VA PARKING STRUCTURE EXTERIOR BLDG 32

VA PACIFIC ISLANDS HEALTH CARE SYSTEM, HONOLULU, HAWAII

PROJECT #: 459-19-002

NTS

LOCATION PLAN

NTS

VICINITY MAP

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 OF 23 G-001 COVER & DRAWING INDEX

2 OF 23 GS101 ARCHITECTURAL SITE PLAN

ARCHITECTURAL

3 OF 23 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

4 OF 23 AD100 LEVEL 4 - DEMO FLOOR PLAN

5 OF 23 AD101 LEVEL 4 - DEMO ROOF PLAN

6 OF 23 AD102 LEVEL 4 - DEMO REFLECTED CEILING PLAN

7 OF 23 AE100 LEVEL PB - FLOOR PLAN

8 OF 23 AE101 LEVEL P1 - FLOOR PLAN

9 OF 23 AE102 LEVEL P2 - FLOOR PLAN

10 OF 23 AE103 LEVEL P3 - FLOOR PLAN

11 OF 23 AE104 LEVEL P4 - FLOOR PLAN

12 OF 23 AE105 ROOF PLAN

13 OF 23 AC102 REFLECTED CEILING PLAN

14 OF 23 AE201 BUILDING ELEVATIONS

15 OF 23 AE202 BUILDING ELEVATIONS

16 OF 23 AE401 ENLARGED ROOF PLANS

17 OF 23 AC411 ENLARGED REFLECTED CEILING PLANS

18 OF 23 A-501 ROOFING AND CONCRETE DETAILS

19 OF 23 A-602 DOOR SCHEDULE, TYPES & DETAILS

20 OF 23 AW001 SIGNAGE SCHEDULE & LOCATIONS

21 OF 23 AW002 IN 01.05, IN 01.10, IN 08.01

MECHANICAL

22 OF 23 MP101 OVERALL MECHANICAL ROOF PLAN, NOTES AND LEGEND

23 OF 23 MP201 ENLARGED ROOF MECHANICAL PLAN

Revisions: Date:

TRUE

NORTH

anaj Image

VHAHONTangR Callout E-Wing For Pre-Bid meeting

VHAHONTangR Callout Then Parking Structure Bldg 32 for Pre-Bid site visit. Meet on the 1st floor outside of the elevators.

File details come from the government source that posted it. Updated .