36C26123R0012 0001.docx

DOCX document 271 KB Posted

Attached to
Z1DA--459-23-2-865-0001 - Repair and Repaint Parking Structure (VA-23-00013854)
Solicitation number
36C26123R0012
Issued by

About this file

This document contains pre-bid questions and answers related to a solicitation from the Department of Veterans Affairs for repair and repainting work at a parking structure. Key details include that the solicitation number is 36C26123R0012 and seeks offers for Z1DA--459-23-2-865-0001 to perform repairs such as cleaning, refinishing exterior finishes, replacing doors and roofing, and applying a traffic coating system. The proposal due date was extended from March 3 to March 13, 2023 at 10:00 AM HST. Responses were provided to twenty-seven questions from potential offerors seeking clarification on scope items such as areas to be refinished, quantities of doors to replace, and disposal of wash water.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 459-19-002 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu HI 96813 To all Offerors/Bidders

36C26123R0012 03-01-2023

X X X Monday March 13, 2023 at 10:00 AM HST X The purpose of this amendment is to:

1. Post all responses to request for information (RFIs).

2. Extend the proposal due date from Friday March 3, 2023 at 10:00 AM HST to Monday March 13, 2023 at 10:00 AM HST.

3. Provide the site visit sign in sheet.

See RFI responses inserted below and 4 attachments.

All other terms and conditions shall remain unc hanged.

Jose Hernandez Contracting Officer

Pre-Bid RFI Responses Project: Fire Alarm Upgrade Construction Project #: 459-19-002 Solicitation #: 36C26123R0012

RFI 1:

On pages AE201 and AE202, keynote 1 states to “clean and prep for new EIFS acrylic finish coat over all existing-colored surfaces.” The area pointed out by this keynote is kind of vague and just points to the side of the building. I currently assume that this means that the entire exterior of the parking structure is to get EIFS. Is this correct?

Response:

Revise Color Key on AE201 and AE202 as noted below. All areas noted on elevations as P-1 and P-2 that are previously painted are to receive EIFS refinishing.

RFI 2:

Will substitute products (for example the coating on the floors) be requested by the manufacturer or the contractors?

Response:

Contractor to submit substitution request to COR for consideration. Contractor shall certify that substitution meets contract requirements. Request shall include certificates showing material of equivalency or better.

RFI 3:

Scope of work call for cleaning by pressure washing. Please confirm the VA to provide water and connection point as near as possible at the Parking Structure free of charge to the Contractor.

Response:

Contractor to coordinate use of parking structure hose bib with COR.

RFI 4:

Plans show the replacement of 6 doors (P2-Stair 3), (P3-Stair 1), (P3-Stair 2), (P4-Stair 1), (P4-Stair 2), (P4-Stair 3), but the door schedule lists 5 doors (P2-Stair 2), (P2-Stair 3), (P3-Stair 2), (P4-Stair 1), (P4-Stair 3). Please verify the quantity and openings in the scope of work.

Response:

Please see revised Sheets A-602 and AE103 dated 02/22/2023.

RFI 5:

Door hardware schedule HW-E2 call out for continuous hinge, the existing doors are butt hinges. Please confirm Response:

Per TIL, HW-E2 group includes continuous hinges.

RFI 6:

Vendor is request substituting Henry’s Pumadeq (vehicular traffic version) for the Tremco Puma system that is called out in SECTION 07 18 00 – TRAFFIC COATINGS.

The Pumadeq brochure is attached along with technical data for your review and approval Response:

The submitted attachments do not appear to indicate product system intended for substitution. Contractor to submit substitution request to COR for review. Contractor shall certify that substitution meets contract requirements. Request shall include certificates showing material of equivalency or better.

RFI 7:

Please confirm wash water generated from cleaning via pressure washing can be disposed thru existing drainage or ground around and in the parking structure without filtration other than best management practices such as biosocks around the drain and/ or drain guard.

Response:

Contractor to follow manufacturer’s instructions and must adhere to applicable EPA and NPDES construction waste regulations.

RFI 8:

Plans call out for the Parking Lot shall remain active during working hours. Please confirm work to be performed on the deck will require no vehicular access to perform demo, surface preparation and traffic coating. Please confirm the VA will allow Contractor to block parking stalls to area where construction activities are being performed. Please confirm if this has been considered.

Response:

Contractor to coordinate closure of portions of parking structure with COR. The intent of this note is to notify the Contractor that the Parking Structure and its parking services may not be closed entirely during construction.

RFI 9:

Please provide latest photos and As-Built drawings of the roof to be replaced since there was no access to look at existing condition during the site visit.

Response:

See Prebid RFI 009 Photos attached.

RFI 10:

Please confirm if the SSHO can perform other duties other than safety such as being Superintendent and/ or QC Manager if this personnel meet all qualification of these position.

Response:

CQC Manager is permitted to serve in a dual role capacity as the Contractor’s Superintendent. All requirements for both positions must be met. This person cannot cover more than one building location at a time. Site Safety & Health Officer (SSHO) role shall be a separate person.

RFI 11:

Scope of Work require to remove and reinstall 72 pcs of corner guards, please advise minimum thickness of the corner guard required and type of material since there are 2 types of existing corner guard currently installed in the parking structure.

Response:

Contractor shall furnish per product description indicated in the SOW.

RFI 12:

Traffic Coating subcontractor is confirming project cost range of $1M to $2M only. Base on previous project the material cost alone for a Traffic Coating PUMA system is about $45 to $50 per sqft range. Considering deck demo and labor for PUMA coating and other scope of work such as exterior Bldg re-painting and door replacements, this will exceed significantly the maximum range of the project cost. Will the VA still make award of the project even if it exceed the project cost range?

Response:

The price proposal (which may or may not be awarded) will be evaluated to determine the reasonableness, best value to the VA and availability of funds. Please review Specification Section 071800-4 Traffic Coating for Basis of Design Product.

RFI 13:

Spec section 09 06 00 Schedule of Finishes call out for P-1 to be manufactured by Dow Corning with color Tripler Pink #9556 and P-2 to be manufactured by BM (Benjamin Moore) with color Tripler Off White Butter Pecan #2165-70. Dow Corning manufacture paint that is ALLGUARD SILICON ELASTOMERIC COATING, please confirm if this is the type of paint that is required and confirm minimum mil thickness required. Benjamin Moore manufacture different type of paint, please advise what is required for exterior paint such as acrylic, water base,,etc..In previous project ALLGUARD SILICON ELASTOMERIC COATING was used for P-2, Dow Corning match the color of Tripler Off White Butter Pecan #2165-70. Please clarify.

Response:

Listed manufacturers in the paint finish schedule are only the manufacturer to whom the color number is related to (i.e. #2165-70 “Butter Pecan” is a Benjamin Moore color number). P-1 and P-2 are colors for EIFS refinishing (Section 07 24 00 2.3) and P-3 is the color for metal railing repainting (Section 09 91 00).

RFI 14:

Please advise the R rating for the Roof Insulation underneath the PVC Roof.

Response:

No specific R-value is required as spaces are unconditioned. Slope insulation for positive drainage to existing roof drains.

RFI 15:

For the Traffic Coating, please advise min wet and dry film thickness requirement of each coat.

Response:

Application and thicknesses of all coats are as required per traffic coating manufacturer’s written installation instructions.

RFI 16:

Please confirm painting of the interior of all elevator lobby are not required.

Response:

No elevator lobby work required unless otherwise noted.

RFI 17:

Please verify substrate below EIFS (concrete or framed)?

Response:

Substrate is generally believed to be concrete.

RFI 18:

Is EIFS patchwork/repair or total skimming?

Response:

EIFS patching at damaged area per Detail 2/AE104. All other areas noted as P-1 and P-2 to be refinished per 07 24 00 2.3 B.

RFI 19:

Does VA have a proposed phasing plan to keep traffic open or contractor to provide at time of bid to qualify bid? Can VA close the top deck down to get work done for one beneficial occupancy date and warranty date and lessen the change of a cold joint in the material?

VA’s Response:

Contractor to submit a phasing plan for approval. Full top deck closure may be considered, as necessary. Contractor is not permitted to close the Parking Structure in its entirety during construction.

RFI 20:

Sheet A-001: For pricing purposes approximately where will there be a staging area for equipment, materials, vehicles?

Response:

Contractor to coordinate/request use of available space for staging area with COR.

RFI 21:

Sheet GS101: Please verify landscape arborist not necessary for landscape trimming?

Response:

Contractor to coordinate landscape trimming with COR. The VA will provide landscape trimming; therefore Contractor arborist is not necessary.

RFI 22:

During the exterior painting work parking stalls will need to be taken up due to setup of swing scaffold, does VA see any issues to this?

Response:

Contractor to coordinate closure of portions of parking structure with COR.

RFI 23:

Sheet AD102 Key Note 1 does VA prefer to use DensGlass for the soffit repair due to durability?

Response:

Any manufacturer or product meeting the Section 09 29 00 Gypsum Board specification may be used.

RFI 24:

Assume replacing 5 doors per sheet A-602 door schedule? Sheet AD100 Key Note 1 and AE 104:Key Note 3 are discrepant for Level 4, AD100 shows 2 doors, AE103 Key Note 3 states Level P3 Stair 2 but shows 2 key note locations and AE104 shows 3 doors to be replaced.

Response:

Please see response to RFI 04.

RFI 25:

Sheet AE201 Key Note 3 states to WASH AND CLEAN ALL EXISTING WINDOWS, what is the expectation for this? On a previous job the historic building windows were cleaned, but any staining was not buffed and polished out, due to level of effort.

Response:

Clean glass and frames. Buffing and polishing not required.

RFI 26:

Sheet AE100 verify no work to be done in caged areas where material is stored i.e. pressure washing nor any run off water to damage stored material?

Response:

No work unless otherwise noted.

RFI 27:

Level P3 Stair 2 had signs of initial spalling from the roof damage. Should this repair be included in the scope as well (photos attached) Response:

Not required unless otherwise noted.

RFI 28:

There is only one spall repair noted on sheet AE102, keynote #3. Please confirm this is the only area where concrete restoration is needed.

Response:

As noted on Drawings.

See attached document: Repaint Parking - PreBid RFI 4 Response - DwgRev1.

See attached document: Repaint Parking - PreBid RFI 9 Response - Photos.

See attached document: RFI 06 attachment to question.

See attached document: Site Visit Sign-In Sheet - Parking Structure Repair and Repaint.

image1.png image2.jpeg image3.jpeg image4.jpeg