Repaint Parking - PreBid RFI 4 Response - DwgRev1.pdf
PDF 215 KB Posted
- Solicitation number
- 36C26123R0012
About this file
This document package includes construction drawings and specifications for repair and repainting work at a Department of Veterans Affairs parking structure. The drawings show existing conditions, proposed door schedule and details, and floor plans. Specifications call for pressure washing and cleaning exterior surfaces, repainting railings and doors to match existing, and installing a new door frame and hardware. The related federal contract opportunity is solicitation number 36C26123R0012 for repairs and repainting of the parking structure at the VA Pacific Islands Health Care System in Honolulu, Hawaii, with an estimated value of $865,000. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 21.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9" 4"
2A
SAFETY GLAZING
FRAME AT CONCRETE WALLS
PLATE WELDED
TO FRAME
/2
2 1/2" MIN
CAULK ALL
AROUND
CASING BEAD
WHERE PLASTER
IS REQUIRED
CONCRETE
GROUT
PIPE SEPARATORS
WELDED TO PLATE
F.H. CSK.
EXP. BOLT
/8
5"
NEW HOLLOW METAL FRAME
WHERE OCCURS, PAINT.
EXIST. CONCRETE FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
REVISION 11 02/22/2023
A-602
DOOR SCHEDULE, TYPES &
DETAILSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
REPAIR VA PARKING STRUCTURE
EXTERIOR BLDG 32
VA PACIFIC ISLANDS HEALTH CARE SYSTEM,
HONOLULU, HAWAII
459-19-002
01/27/2022 EM AJ
CONSTRUCTION
DOCUMENTS
DOOR SCHEDULE
DOOR # LEVEL
STAIR
DOOR SIZE DOOR
TYPE
GLAZING
TYPE
FIRE
RATING
SOUND
RATING HW
MATERIAL
COMMENTSWIDTH HT THK DOOR FRAME
2.3 LEVEL P2 STAIR #3 3' - 0" 7' - 0" 0' - 1 3/4" 2A 90 MIN 2-HR - E2 METAL METAL MATCH EXISTING JAMB DEPTH.
3.2 LEVEL P3 STAIR #2 3' - 0" 7' - 0" 0' - 1 3/4" 2A 90 MIN 2-HR - E2 METAL METAL MATCH EXISTING JAMB DEPTH.
4.1 LEVEL P4 STAIR #1 3' - 0" 7' - 0" 0' - 1 3/4" 2A 90 MIN 2-HR - E2 METAL METAL MATCH EXISTING JAMB DEPTH.
4.2 LEVEL P4 STAIR #2 3' - 0" 7' - 0" 0' - 1 3/4" 2A 90 MIN 2-HR - E2 METAL METAL MATCH EXISTING JAMB DEPTH.
4.3 LEVEL P4 STAIR #3 3' - 0" 7' - 0" 0' - 1 3/4" 2A 90 MIN 2-HR - E2 METAL METAL MATCH EXISTING JAMB DEPTH.
GENERAL NOTES
1. SEE SPECIFICATION SECTION 08 71 00 - DOOR HARDWARE
FOR HW SETS.
1/4" = 1'-0"
DOOR TYPES
6" = 1'-0"
FRAME AT CONCRETE WALL DETAIL
6" = 1'-0"
DOOR TRESHOLD DETAIL
Revisions: Date:
Revision 1 Date 1
UP
G
F
E
D
C
B
A
9 10 11 12 13 14 15 16
H
I
J
K
L
M
N
AE201
AE201
AE2022
AE201
AE202
AE202
" / 1
'-0
" / 1
'-0
18' - 4"
28' - 0"
18' - 0"
18' - 0"
28' - 0"
18' - 4"
' - 0
' - 0
' - 0
' - 0
' - 0
' - 0
' - 4
28' - 0" 28' - 0" 28' - 0" 28' - 0" 28' - 0" 18' - 4"
P3 LOBBY
OFFICE
STAIR 1
STAIR 3
STAIR 2
EXISTING OFFICE, NO WORK
PARKING STALL
ADA PARKING STALL
EXISTING DOOR TO REMAIN
NEW DOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
REVISION 11 02/22/2023
AE103
LEVEL P3 - FLOOR PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
REPAIR VA PARKING STRUCTURE
EXTERIOR BLDG 32
VA PACIFIC ISLANDS HEALTH CARE SYSTEM,
HONOLULU, HAWAII
459-19-002
01/27/2022 EM AJ
CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
LEVEL P3 - FLOOR PLAN
PROJECT
NORTH
PRESSURE WASH AND CLEAN ALL EXISTING UN-PAINTED
OR UN-FINISHED SURFACES AT PERIMETER OF GARAGE.
SEE ELEVATIONS FOR PREP AT FINISHED SURFACES.
TYP STAIRS ALL LEVELS: CLEAN AND PREP ALL RAILINGS,
HANDRAILS, AND GUARDRAILS FOR NEW PAINT TO MATCH
EXISTING.
INSTALL NEW DOOR FRAME AND HARDWARE AT LEVEL P3
STAIR 2.
KEY NOTES (THIS SHEET ONLY)
LEGEND
Revisions: Date:
Revision 1 Date 1
| Sheets |
| A-602 - DOOR SCHEDULE, TYPES & DETAILS |
| AE103 - LEVEL P3 - FLOOR PLAN |
File details come from the government source that posted it. Updated .