This solicitation requests offers for repair and repainting work at a Department of Veterans Affairs parking structure. The solicitation includes specifications for demolishing and replacing roof membranes and ceilings, pressure washing exterior surfaces, applying new non-slip coatings and parking stripes, and repainting interior and exterior finishes. Offers are due by March 3, 2023 and the period of performance is 440 calendar days. The procurement is set aside 100% for SDVOSBs and will be awarded on a lowest-price basis to an offeror with a safety record and EMR rating meeting the requirements specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C26123R0012 X 02-02-2023 459-23-2-865-0001 459-19-002 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu
HI
96813 Submit electronic proposals to:
craig.armstrong2@va.gov jose.hernandez1@va.gov
Craig Armstrong` 808-835-9686 Contractor shall furnish labor and materials and perform work to repair and repaint Building 32 Parking Garage’s exterior per Statement of Work.
The work shall include demolition and replacement of roof membrane(s), refinishing exterior, new non-slip coating and new striping for parking stalls.
Place of Performance: VA Pacific Islands Health Care System (VAPIHCS) 459 Patterson Road Honolulu, HI 96819
This procurement has been 100% set aside for SDVOSB under the VISN 21 MACC Group 2 Award will be made to the responsible offeror whose offer, conforming to the RFP, will be most advantageous to the government, considering Price Only.
Bid, Performance and Payment bonds apply to this acquisition.
Site Visit Information: Thursday February 9, 2023, at 10 AM HST VA Pacific Islands Health Care System (VAPICS) 459 Patterson Road Honolulu, HI 96819
RFIs due: Wednesday February 15, 2023, by 10 AM HST.
Proposal due: Friday March 3, 2023, by 10 AM HST
NAICS 236220 Commercial and Institutional Building Construction Size Std $45 Million
Offers shall be valid for at least 30 days.
IAW VAAR 836.204: Disclosure of magnitude is between $1,000,000 and $2,000,000.
X X 52.211-10 X 10 Days
10:00 AM HST
03-03-2023 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu
HI
96813 Department of Veterans Affairs FMS VA-9(101) Financial Services Center PO Box 149971 Austin
TX
78714-9971 866-372-1141 vafscenterprisesupport@va
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 4 |
| VA Pacific Islands Health Care System (VAPICS) | 5 |
| Project No: 459-19-002 | 5 |
| Parking Structure Repair and Repaint | 5 |
| SCOPE OF WORK (SOW) | 5 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 8 |
| PER VHA DIRECTIVE 7715 (06 April 2017) - SAFETY & ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE (EMR): | 14 |
| 2.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 16 |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
VA Pacific Islands Health Care System (VAPICS) Project No: 459-19-002 Parking Structure Repair and Repaint
SCOPE OF WORK (SOW)
The Contractor shall provide complete construction services for Project No: 459-19-002, at the Parking Structure at the VA Pacific Islands Health Care System (VAPICS), located at 459 Patterson Road, Honolulu, HI 96819. Construction services shall be in accordance with the attached Drawings and Specifications.
Contractor shall furnish labor and materials and perform work to repair and repaint Building 32 Parking Garage’s exterior and interior at the VA Pacific Islands Health Care System. Exterior Insulation and Finish Systems (EIFS) refinishing will be performed along all the exterior of Building 32. Demolition and replacement of the existing membrane roofs and furred ceiling systems will be performed due to their deteriorated status. In addition, a new non-slip coating will be applied to the 4th level of the parking garage, accompanied by new stripping for parking stalls. All refinished items will match the existing finish and color of the building. Incidental vegetation trimming as required for installation of new exterior finishes. Guardrails will be repainted.
1. Contractor shall conduct Tuberculosis (TB) risk assessment and provide documentation that employee(s) have been cleared to work at VAPIHCS facility. Documentation should be sent directly to VAPIHCS
2. Construction Safety Officer. The Contractor shall coordinate with Contracting Officer Representative (COR). Work may commence during normal business hours. Normal business hours are 7:00 am to 5:00 pm weekdays Monday to Friday. There shall be no work on Federal holidays.
3. Period of performance is 440 calendar days.
4. Contractor shall maintain ADA accessible access and route to and from parking to medical facility at all times.
5. The scope of this project and the objectives of the VA are as follows:
Roofing
a. Demo existing roof system and insulation. Install new PVC roofing system.
b. Clean roof drains and gutters.
Deck
c. Demo deck coating. Install new traffic coating system.
d. Re-stripe to match existing
Finishes
e. Pressure wash and clean all existing un-painted and unfinished perimeter surfaces of the garage, per the drawings.
f. Wash and clean windows.
g. Patch and repair holes, openings and spalls as indicated in the contract.
h. Clean, prep for new paint/refinish/new EIFS exterior and interior finishes. Finishes to include: EIFS surfaces, walls, ceiling, tiles, and appurtenances as indicated in the contract.
i. Ceiling system replacement (including furring and soffit).
j. Clean, prep, and paint railings, handrails and guardrails. Notify Contracting Officer if any portion requires repair.
k. Incidental work including cutting of existing landscape to perform exterior work.
Doors and Hardware
l. Demo and replace doors & frames as noted in the drawings.
Mechanical
m. Replace grille/bird screen and repaint hood. Finishes to match existing.
Signage
n. Remove existing and replace with new signage.
Incidental Work including vegetation trimming as needed to allow for exterior/finishes scope.
6. Corner Guards:
Contractor shall remove and replace existing high impact corner guards.
Clean and prepare surface for new corner guard installation. Corner guards shall be designed to absorb and deflect vehicular impact. Shall be adhesive applied, no drilling. Corner guards shall have yellow reflective stripes for safety and visibility in dark conditions. Follow manufacturer’s permanent installation procedure.
Page 1 of Page 1 of
· Length: 48″
· Width: 4″ wings
· Color: Black and yellow reflective warning
· Qty: 72
Page 1 of Page 1 of Page 1 of
ADDITIONAL ADMINISTRATIVE ITEMS:
NARA Records Management Language for Contracts (May 2017):
https://www.archives.gov/records-mgmt/handbook/records-mgmt-language.html
RECORDS MANAGEMENT OBLIGATIONS
1. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
2. Definitions “Federal Record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
1. includes [Agency] records.
2. does not include personal materials.
3. applies to records created, received, or maintained by Contractors pursuant to their [Agency] contract.
4. may include deliverables and documentation associated with deliverables.
The following standard Items relate to records generated in executing this contract where records could possibly be created, maintained or dispositioned:
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. [FACILITY] and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [FACILITY] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.
In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [FACILITY]. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [FACILITY] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [FACILITY] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [FACILITY] policy.
8. The Contractor shall not create or maintain any records containing any non-public [FACILITY] information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The [FACILITY] owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which [FACILITY] shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]
D. Flow down of requirements to Subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
OFFER SUBMISSION:
The following documents are to be included in the solicitation submission:
1. One original completed Offer amount entered in block 17 of the SF1442 Offer page.
2. One fully completed Supplemental Price Breakdown by Division Sheet.
3. One fully completed and signed SF 1442 Offer page, acknowledgment of all amendments either via entering data in block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the SF 1442 Offer page.
4. One Documentation of Safety & Environmental Record and Documentation of Experience Modification Rate (EMR) (See below instructions).
Offerors are responsible for ensuring and verifying their price and all required documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Any exception to the terms and conditions of this request for quotation will result in a nonresponsive quotation.
OFFERS ARE TO BE SENT TO:
One email, with solicitation number and title in the subject line, of the price offer are to be sent to arrive on or before the due date/time at the following email address: craig.armstrong2@va.gov.
REQUESTS FOR INFORMATION (RFI):
To obtain clarifications and/or additional information concerning the contract requirements or specifications, submit a written RFI utilizing the RFI Form included in this Solicitation.
Email RFIs to craig.armstrong2@va.gov by Wednesday February 15, 2023, at 10:00 am HST. No questions will be answered after this date/time unless determined to be in the best interest of the Government as determined by the Contracting Officer.
RFI responses will be responded to as necessary in amendment format, which will posted/e-mailed to all concerned.
OFFER DUE DATE SCHEDULE:
All offers with the electronic copy are due by the date and time set for the receipt of offers shown in Block 13 of the SF 1442.
INSTRUCTIONS TO OFFERORS:
Offers received after Friday March 3, 2023, at 10:00 am HST may be rejected.
Any exception to the terms and conditions of this solicitation will result in a nonresponsive offer.
Failure to provide a definitive price or conditioned price will result in a nonresponsive quotation. Receipt of an Offer must be in accordance with terms and conditions of this solicitation. Offerors must acknowledge (in writing only) amendments to this solicitation, otherwise an offer may be determined nonresponsive.
The apparent successful offeror must be determined as “responsible” by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications.
SITE VISIT:
Potential Offerors are strongly urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing construction services. Failure to inspect the site shall not constitute grounds for a claim after contract award.
See Provision 52.236-27 for specific information regarding the project pre-offer site visit, which will be the only opportunity for potential Offerors to visit the site. All potential Offerors, subcontractors, and suppliers are strongly encouraged and expected to attend the pre-offer site visit.
PERFORMANCE & PAYMENT BONDS:
In accordance with FAR 28.102-1 and Contract Clause 52.228-15, offerors are reminded that any award amount over $35,000 shall require a Payment Bond (or other acceptable protection – see clause FAR 52.228-13), and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 calendar days after award.
LIQUIDATED DAMAGES: N/A
WAGE DETERMINATION APPLICABLE TO THIS PROJECT:
General Decision Number: HI20230001 PER VHA DIRECTIVE 7715 (06 April 2017) SAFETY & ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE (EMR):
To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an EMR of equal to or less than 1.0.
All contractors shall submit the following information pertaining to their past Safety & Environmental Record and EMR with their quotation.
1. SAFETY & ENVIRONMENTAL RECORD: A self-certification on company letterhead that the contractor has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.
1. EMR: All contractors shall submit information regarding their current EMR. This information shall be obtained from the contractor’s insurance carrier and be furnished on the insurance carrier’s letterhead. Must have an EMR of equal to or less than 1.0.
PRIVACY TRAINING:
All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the Contracting Officer’s Representative (COR).
TRAINING:
All employees of the general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or other relevant competency training, as determined by the COR with input from the ICRA (Infection Control Risk Assessment) team. The General Contractor’s Competent Person/Superintendent shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the Contracting Officer for review and approval prior to any work being performed. No ID badge will be issued to an employee who does not provide this documentation. There shall be no exceptions to this requirement.
PRIVACY AND CONFIDENTIALITY:
Contractors to the Department of Veteran Affairs may be unintentionally exposed to sensitive information. Information may be overheard, seen on documents or electronic devices, or observed that could potentially violate the privacy and confidentiality of our veterans, employees, volunteers, and their families. Regulations such as, but not limited to the Health Insurance Portability and Accountability Act of 1996 (HIPAA), Freedom of Information Act (FOIA) and Privacy Act of 1974 have been enacted to protect sensitive information from being improperly disclosed. Information should not be divulged or released to anyone unless specifically authorized by this contract or its’ attached documents in accordance with the contracted services. Failure to comply with applicable statutes and regulation can result in the termination of this contract and civil and criminal penalties, including fines and imprisonment. All suspected or actual breeches of privacy and confidentiality should be reported immediately to the Contracting Officer, Contracting Officer’s Representative (COR) or the Facility Privacy Officer.
The C&A requirements do not apply, and a Security Accreditation Package is not required. If the contractor opts to use a computer or computer system for processing contract documents, the requirements of FIPS 140-2 for encryption of contract documents must be met.
PLANS/SPECIFICATIONS/DRAWINGS:
Drawings and specifications are attached in electronic format to this solicitation. Contractors are responsible for downloading and printing their own plan sets. The VA will not provide hard copies of the drawings and specifications to any Contractor. Contractors are responsible for ensuring that any construction document package used for their quotation or construction is complete and up to date.
BRAND NAME OR EQUAL:
The RFP may include the salient characteristics of the “or equal” aspect for determination of what is equal to any cited brand name. See FAR 52.211-6 for “brand name or equal” information. This is an extremely long, detailed, and comprehensive RFP, including all specifications and drawings. Please note that, wherever a brand name is cited, contractor shall ensure, in any resultant contract, that any equal has the salient characteristics of the brand name. Lack of confirmation shall be grounds for Government inspection at any time and Government direction for replacement of materials or equipment by the Contractor at no increase in contract price or time.
SYSTEM FOR AWARD MANAGEMENT (SAM):
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made unless the contractor is registered. Contractors are encouraged to ensure that they are registered in SAM prior to submitting their quotation.
ADDITIONAL VETBIZ INFORMATION:
1. Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs.
2. At the time of submission of offer, the offeror must represent to the contracting officer that it is a
a. SDVOSB concern
b. Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and
c. Verified for eligibility in the VIP database.
3. A joint venture may be considered an SDVOSB or VOSB concern if;
a. At least one member of the joint venture is an SDVOSB or VOSB concern and makes the representations in paragraph (b) of this section.
b. Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement.
c. The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and
d. The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to SDVOSB concerns.
4. Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.
JOINT VENTURES: See 13 C.F.R. § 121.103 Affiliation based on joint ventures: A joint venture is an association of individuals and/or concerns with interests in any degree or proportion consorting to engage in and carry out no more than three specific or limited-purpose business ventures for joint profit over a two-year period, for which purpose they combine their efforts, property, money, skill, or knowledge, but not on a continuing or permanent basis for conducting business generally.
This means that a specific joint venture entity generally may not be awarded more than three contracts over a two-year period, starting from the date of the award of the first contract, without the partners to the joint venture being deemed affiliated for all purposes. Once a joint venture receives one contract, SBA will determine compliance with the three awards in two years rule for future awards as of the date of initial offer including price.
As such, an individual joint venture may be awarded more than three contracts without SBA finding general affiliation between the joint venture partners where the joint venture had received two or fewer contracts as of the date it submitted one or more additional offers which thereafter result in one or more additional contract awards. The same two (or more) entities may create additional joint ventures, and each new joint venture entity may be awarded up to three contracts in accordance with this section. At some point, however, such a longstanding inter-relationship or contractual dependence between the same joint venture partners will lead to a finding of general affiliation between and among them.
For purposes of this provision and in order to facilitate tracking of the number of contract awards made to a joint venture, a joint venture must be in writing and must do business under its own name, and it may (but need not) be in the form of a separate legal entity, and if it is a separate legal entity it may (but need not) be populated (i.e., have its own separate employees). SBA may also determine that the relationship between a prime contractor and its subcontractor is a joint venture, and that affiliation between the two exists, pursuant to paragraph (h)(4) of this section.
RESPONSIBILITY REQUIREMENTS:
A responsibility check will be accomplished for the apparent awardee prior to award. Checks of the VIP database (to insure apparently successful offeror is a verified Service-Disabled Veteran Owned Small Business), System for Award Management (SAM) database (Central Contractor Registration, Online Representations and Certifications, and Excluded Parties List System to insure registrations are current, valid, and no debarment records exist). Any information retrieved or received by the Government that would be cause for negative or unsatisfactory responsibility rating may result in the offeror being determined ineligible for award.
CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS:
The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for your contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.
All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting Officer’s Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.
REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER, and PROJECT MANAGER:
Any reference contained within solicitation documents, and any resultant contract, the terms Contracting Officer's Technical Representative (COTR), Contracting Officer's Representative (COR), Project Engineer (PE), Resident Engineer (RE), and Project Manager (PM), all denote the same engineering official and may be used equally and interchangeably as described by the Contracting Officer (CO).
SMOKE AND CARBON MONOXIDE MONITORING REQUIREMENTS:
Contractor, his employees, his subcontractors, and their employees shall adhere to VA, VHA, and VASNHCS Policies for smoke and carbon monoxide monitoring requirements. They are available upon request from COR.
NOTICE TO PROCEED (NTP):
A notice to proceed shall be issued after award of a fully executed contract. The NTP date and time “to be determined” after award to a successful contractor. Primary factor in determination to issue NTP shall be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents
BASIS FOR AWARD
INTRODUCTION:
This is a price only selection conducted in accordance with Federal Acquisition Regulation (FAR) Part 16.505(b), Orders under multiple-award contracts, supplemented by the Department of Veterans Affairs Acquisition Regulation (VAAR). These regulations are available electronically at https://www.acquisition.gov/ and https://www.va.gov/oal/library/vaar/
EVALUATION:
Price Only - The Government will evaluate the lowest price offer to determine if the price is fair and reasonable for the work to be performed. To be considered fair and reasonable for the work performed, the evaluators will also check for appearance of unbalanced line-item prices. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluation described above. Offers which are materially unbalanced as to prices for the basic requirement and the option quantities are not fair and reasonable. An Offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
PER VHA DIRECTIVE 7715 (06 April 2017) - SAFETY & ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE (EMR):
Contractor Certification Regarding Project:
To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an EMR of equal to or less than 1.0.
All Offerors shall submit the following information pertaining to their past Safety & Environmental Record and EMR with their offer.
1. SAFETY & ENVIRONMENTAL RECORD: A self-certification on company letterhead that the contractor has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.
2. EMR: All Offerors shall submit information regarding their current EMR. This information shall be obtained from the Offerors’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror shall submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.
| 2020 |
| 2021 |
| 2022 |
Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)
Number of violations from EPA within the last 3 years. Please attach explanation for any violations.
Company’s Current Insurance Experience Modification Rate (EMR) = (Note: Contractor must support the EMR with a signed letter from Insurance Carrier on their letterhead.)
Signature:
Print Name: ____________________________________________________ Page 1 of Page 1 of
DIVISION CONSTRUCTION COSTS
Title: Parking Structure Repair and Repaint
SOLICITATION: 36C26123R0012 PROJECT: 459-19-002
Provide Complete Divisional Cost Break-Out for Complete Project
*If necessary, add additional lines for each Division applicable to this project.
**This document is to be used only for price analysis
| REF |
| DESCRIPTION |
| TOTAL |
00000
| DIVISION 0-SPECIAL SECTIONS |
| $ |
| 01000 |
| DIVISION 1-GENERAL REQUIREMENTS |
| $ |
| 02000 |
| DIVISION 2-EXISTING CONDITIONS |
| $ |
03000
| DIVISION 3-CONCRETE |
| $ |
04000
| DIVISION 4-MASONRY |
| $ |
05000
| DIVISION 5-METALS |
| $ |
| 06000 |
| DIVISION 6-WOOD AND PLASTIC |
| $ |
07000
| DIVISION 7-THERMAL AND MOISTURE PROTECTION |
| $ |
08000
| DIVISION 8-DOORS AND WINDOWS |
| $ |
09000
| DIVISION 9-FINISHES |
| $ |
10000
| DIVISION 10-SPECIALTIES |
| $ |
11000
| DIVISION 11-EQUIPMENT |
| $ |
12000
| DIVISION 12-FURNISHINGS |
| $ |
13000
| DIVISION 13-SPECIAL CONSTRUCTION |
| $ |
14000
| DIVISION 14-CONVEYING EQUIPMENT |
| $ |
21000
| DIVISION 21-FIRE SUPPRESSION |
| $ |
22000
| DIVISION 22-PLUMBING |
| $ |
23000
| DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING |
| $ |
26000
| DIVISION 26-ELECTRICAL |
| $ |
27000
| DIVISION 27-COMMUNICATIONS |
| $ |
28000
| DIVISION 28-ELECTRONIC SAFETY AND SECURITY |
| $ |
31000
| DIVISION 31-EARTHWORK |
| $ |
32000
| DIVISION 32-EXTERIOR IMPROVEMENTS |
| $ |
33000
| DIVISION 33-UTILITIES |
| $ |
34000
| DIVISION 34-TRANSPORTATION |
| $ |
SUB TOTAL:
OTHER
BONDS AND INSURANCE
OVERHEAD
PROFIT
TOTAL
| _______________________________________________ | ___________ |
| (Signature and Typed Name of Authorized Representative) | Date |
(Title of Authorized Representative)
2.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— Thursday February 9, 2023 at 9:30 am HST
(c) Participants will meet at— VAPICS 459 Patterson Rd, Honolulu, HI 96819 Wing E Rm 1-C106 (End of Provision)
ATTACHMENT
See attached document: 459-19-002 100 CD - Specifications - rev2.
See attached document: 459 19 002 Construction Set Drawings.
See attached document: Site Map.
See attached document: Request for Information (RFI) - Parking Structure Repair and Repaint.