SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

ES-21-00351

AAQ-722 DIVERSIFIED FRANCHISE ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ0722-AFN

OKLAHOMA CITY OK 73125

FAA, Mike Monroney Aeronautical Center

Attn: Amanda Garen, AAQ-722 6500 S. MacArthur BLVD. BLDG 014-AHQ, RM 233A Oklahoma City, OK 73169

Amanda Garen 405-954-7839 x

03/09/2021 58

PURCHASE REQUEST NO.

6973GH-21-R-00057

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

* Proposals are due on April 8, 2021 at 5:00 pm CST. Proposals will not be accepted after this timeframe.

* This acquisition is Set Aside for Total Small Business.

* The estimated price range of this procurement is $130,000 - 230,000.

* Please see the Scope of Work titled "Replace R/W 05R (RDU) and 23L (LEI) MALSR

Shelters Morrisville, NC", 10/28/2020, 4 pages.

* Please see the Specifications titled "R/W 23L and R/W 05R MALSR Shelter

Replacements LEI MALSR/RDU MALSR-Morrisville, NC", May 2020, 71 pages.

* Please see the Construction Drawings for the RDU/MALSR 23L - Raleigh, NC Runway

23L MALSR Shelter Replacement, 10-7-2019, 9 pages.

* Please see the Construction Drawings for the RDU/MALSR - Raleigh NC Runway 05R

Continued ...

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

15 90 calendar days and complete it within ________________ ________________ calendar days after receiving x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

Amanda J Garen Highlight

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

AAQ-722 DIVERSIFIED FRANCHISE ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ722-AFN

OKLAHOMA CITY OK 73125

Janice K. Hammonds

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Continued...

X

Amanda J Garen Highlight

Amanda J Garen Highlight

Amanda J Garen Highlight

Amanda J Garen Highlight

Amanda J Garen Highlight

Amanda J Garen Highlight

Amanda J Garen Highlight

Amanda J Garen Highlight

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 58

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6973GH-21-R-00057

(A) (B) (C) (D) (E) (F)

MALSR Shelter Replacement, 9-26-2019, 9 pages.

Delivery: 90 Days After Notice to Proceed

Delivery Location Code: 7694574M

7694574M

694574 DOT FAA

RALEIGH SSC

1000 SAWYER CIR

MORRISVILLE NC 275607688 US

FOB: Destination

JCN: 1704175 LEI MALSR SHELTER REPLACEMENT,

RALEIGH, NC

00001 The contractor is responsible for furnishing all materials (8' x 16' DUPONT shelter will be provided as Government Furnished Material), equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision necessary to remove and replace the existing fiberglass MALSR equipment shelter near

LEI runway 23L at the Raleigh-Durham

International Airport in Morrisville, NC in accordance with the applicable drawings, scope of work, specifications and conditions of the contract.

Electronic & IT: 03

JCN:1704176 RDU MALSR SHELTER REPLACEMENT,

RALEIGH, NC

00002 The contractor is responsible for furnishing all materials (8' x 16' DUPONT shelter will be provided as Government Furnished Material), equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision necessary to remove and replace the existing fiberglass MALSR equipment shelter near

RDU runway 05R at the Raleigh-Durham

International Airport in Morrisville, NC in accordance with the applicable drawings, scope of work, specifications and conditions of the contract.

Electronic & IT: 03

Section A - Solicitation Index

The Federal Aviation Administration (FAA) herewith solicits competitive proposals from small businesses through the use of this Screening Information Request (SIR) for the award of a Firm Fixed Price (FFP) construction contract.

This SIR consists of the following Parts/Sections:

Part I - The Schedule Section A: Solicitation Index Section B: Supplies or Services and Prices/Costs (Pricing Schedule) Section C: Description/Specifications/Work Statement Section D: Packaging and Marking Section E: Inspection and Acceptance Section F: Deliveries or Performance Section G: Contract Administration Data Section H: Special Contract Requirements

Part II - Contract Clauses Section I: Contract Clauses

Part III - List of Documents, Exhibits, and Attachments Section J: List of Documents, Exhibits, and Attachments

Part IV - Representations and Instructions Section K: Representations, Certifications and Other Statements of Bidders Section L: Instructions, Conditions, and Notices to Bidders Section M: Evaluation Factors for Award *

* Attachments located after end of Section M.

The remainder of this page has been intentionally left blank.

Section B - Supplies or Services/Prices

The contractor shall furnish all labor, tools, materials, and equipment required to perform the work identified within the Specifications and Construction Drawings along with other information described herein. All work performed and all materials and equipment used will be subject to approval by the Contracting Officer Representative (COR) and the Contracting Officer (CO). This shall include but not be limited to inspection, scheduling, reporting, and/or submittals.

ITEM NO. DESCRIPTION TOTAL AMOUNT

0001 All work associated with the removal and replacement of the

MALSR fiberglass equipment shelter on LEI runway 23L at the Raleigh Durham International Airport (LEI), Raleigh, NC in accordance with the specifications, scope of work and the construction drawings. $ _________________

0002 All work associated with the removal and replacement of the MALSR fiberglass equipment shelter on RDU runway 05R at the Raleigh Durham International Airport (LEI), Raleigh, NC in accordance with the specifications, scope of work and the construction drawings. $ _________________

Total Amount $ _________________

The remainder of this page has been intentionally left blank.

Amanda J Garen Highlight

Amanda J Garen Highlight

Amanda J Garen Highlight

Section C - Description/Specifications

C.1 SCOPE OF WORK

The contractor is responsible for accomplishing all items of work in accordance with the applicable drawings, specifications and attachments. Additional labor, materials, equipment, and/or appurtenances not specifically detailed or specified, but required to complete the project, shall be provided by the contractor as an integral part of the scope of work specified. All work performed and any materials and equipment used will be subject to approval by the Contracting Officer Representative (COR) and Contracting Officer (CO). This shall include but not be limited to testing, inspection, scheduling, reporting, and submittals.

C.2 SPECIFICATIONS AND/OR DRAWINGS

The following scope of work, specifications, and construction drawings are applicable to this acquisition.

* Please see the Scope of Work titled "Replace R/W 05R (RDU) and 23L (LEI) MALSR Shelters Morrisville, NC", 10/28/2020, 4 pages.

* Please see the Specifications titled "R/W 23L and R/W 05R MALSR Shelter Replacements LEI MALSR/RDU MALSR-Morrisville, NC", May 2020, 71 pages.

* Please see the Construction Drawings for the RDU/MALSR 23L - Raleigh, NC Runway 23L MALSR Shelter Replacement, 10-7-2019, 9 pages.

* Please see the Construction Drawings for the RDU/MALSR - Raleigh NC Runway 05R MALSR Shelter Replacement, 9-26-2019, 9 pages.

C.3 Bid vs. Offer References to the terms "bid", "bidder", etc. throughout the specification are intended to refer to "offer", "offeror".

Clause List

AC4548 EMERGENCY SITUATIONS AND EXERCISES DURING CONTRACT PERFORMANCE (JUL

2015)

(a) Emergency situations and exercises are temporary exceptions to the prohibition of contractor personnel not being subject to the direction and control of Government personnel when performing non-personal contract services in FAA facilities.

(b) All contractor personnel at a FAA work site or facility during an actual emergency shall conform to the procedures posted or directed by FAA officials responsible for emergency response at that site or facility. Such officials include evacuation wardens/monitors, security personnel, Emergency Readiness Officers, management, etc.

(c) Contractor personnel shall participate in all emergency exercises, including evacuations, as part of performance under this contract. On rare occasions and based on advance arrangements that are then announced at the time of an exercise, contractor personnel will be excused from evacuations.

(d) Contractor management/supervisors shall ensure that each contractor employee assigned work in FAA facilities possesses a general awareness of emergency and evacuation procedures at all locations where the employees might be during an emergency or exercise. Information on emergency procedures may be requested from the Contracting Officer’s Representative (COR) or a designated FAA contact point at the work site.

Section D - Packaging and Marking Clause List

There are no applicable Section D clauses.

Section E - Inspection and Acceptance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (APR

1996) https://fast.faa.gov/contractclauses.cfm

Section F - Deliveries or Performance

F.1 WORKING HOURS

Work shall begin no earlier than 7:00 A.M. each morning, Monday through Friday, and shall end at 3:30 P.M. All work shall be based on a standard 8 - hour workday amounting to a total of 40 hours/week. Ten (10) hour days will be acceptable if coordinated and approved by the COR. No work is allowed on weekends and Federal holidays unless approved by the COR and CO in writing and as identified in contract documents. No overtime will be allowed. Deviation from this work schedule may be discussed prior to the Notice to Proceed date during the Pre- Construction Conference.

Any work that will, or may, cause loss of power to the ATCT facility must be scheduled and coordinated with the COR and the CO. This may require the contractor to perform some of the work at night. Any deviation from this work schedule shall be submitted to the COR & CO for approval.

All work beyond normal work hours shall be requested in writing to the COR 24 hours in advance. Approval of the request shall be allowed at the COR's discretion. During construction, if the contractor plans to stop work, the contractor shall notify the COR at least 24 hours prior to that time. The contractor shall notify the COR 48 hours in advance in order to reschedule any on site activity after stopping work.

The contractor will report & coordinate each day’s work in advance with the COR/Resident Engineer.

The contractor will not be allowed access to the site without the COR/Resident Engineer on site.

F.2 UTILITY OUTAGES AND SHUTDOWN

All preparatory work shall be completed by the Contractor prior to shutdown/cutover to minimize downtime. The requested time and date of utility outages and shutdown and cutover shall be approved by the COR/RE and CO a minimum of seven working days in advance of the requested shutdown or cutover. FAA personnel will perform the actual shutdown/cutover of systems that affect operations.

Outages affecting FAA operations are required to be accomplished at night, on weekends or designated government holidays. COR/RE review is required before any interruption. Prior to any outage or shutdown, seven (7) working days notification must be made to coordinate scheduling of any work to be performed during any hours.

F.3 TEMPORARY SERVICES AND FACILITIES

Contractor shall provide and pay for all temporary services and facilities as specified below and as necessary for the proper and expeditious execution of the work. The Contractor shall make, or have made, all connections to existing services and sources of supply as necessary and/or indicated and pay all charges for same. Contractor shall provide all labor, materials, equipment and appurtenances necessary for the completion of the identified project. All work under this section shall comply with applicable laws, rules, regulations, codes, ordinances and orders of all federal, state and local authorities having jurisdiction for the safety of persons, materials and property. The Contractor shall remove all such temporary installations and connections when no longer necessary for the project work.

Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.1-11 GOVERNMENT DELAY OF WORK (APR 1996)

3.10.1-24 NOTICE OF DELAY (MAR 2009)

3.11-34 F.O.B. DESTINATION (APR 1999)

3.2.2.8-5 LIQUIDATED DAMAGES - CONSTRUCTION (OCT 2019)

(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor must pay to FAA as liquidated damages, the sum of $506.15 for each day of delay.

(b) If FAA terminates the Contractor's right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work, together with any increased costs to FAA in completing the work.

(c) If FAA does not terminate the Contractor's right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted.

(End of clause)

AC1817 ACCELERATED DELIVERY (JAN 1997)

Any Schedule for delivery or performance may be expedited at the contractor's option, if without additional expense to the Government.

Section G - Contract Administration Data Clause List

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 10 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

(End of clause)

AC0135 INVOICING PROCEDURES - GENERAL (JAN 2017) *R

(a) In addition to the requirements set forth at AMS Clause 3.3.1-17, Prompt Payment, for the submission of a proper invoice, the contractor shall submit a separate invoice for (1) each month of performance of services, or (2) those items of supplies furnished, as follows:

(1) The original to: 9-AMC-AMZ-FAA-APInvoices@faa.gov (e-mail Preferred) or mail to:

DOT/FAA AMK-311/314

P.O. Box 25710 Oklahoma City, OK 73169-0710

(2) One Copy to Janice Hammonds at janice.hammonds@faa.gov (e-mail Preferred) or mail to:

FAA, Mike Monroney Aeronautical Center Attn: Janice Hammonds, AAQ-722 6500 S. MacArthur Blvd.

mailto:9-AMC-AMZ-FAA-APInvoices@faa.gov mailto:janice.hammonds@faa.gov

Bldg. 014-AHQ, Room 233A Oklahoma City, OK 73169

(3) One Copy to Amanda Garen at amanda.j.garen@faa.gov (e-mail Preferred) or mail to:

FAA, Mike Monroney Aeronautical Center Attn: Amanda Garen, AAQ-722 6500 S. MacArthur Blvd.

Bldg. 014-AHQ, Room 233A Oklahoma City, OK 73169

(4) One copy to the assigned COR (e-mail Preferred) on the contract

(b) Each invoice shall highlight the following information:

(1) Contract number and applicable Delivery Order number.

(2) Noun description of services and/or supplies, including applicable line item number(s) and quantity(s) that were provided.

(3) Extended totals for invoiced quantities.

(4) Invoice Date

(5) Invoice Number

(c) All contractors invoicing services to the FAA in labor hours shall maintain on file, and submit when required for verification or audit, certified time logs showing a daily start and ending work times, the daily total of productive hours charged to the contract, a daily entry for any non-productive work-hours and cumulative totals for each pay period.

AC1227 RELEASE FORM (JAN 1997)

The contractor will be required to execute Contractor's Release Form DOT F 4220.4 (2-71) prior to final payment under the contract. (Note: A copy of Form DOT F 4220.4 (2-71) is attached hereto for information purposes.)

AC1401 IDENTIFICATION/DELIVERY OF GOVERNMENT PROPERTY (JAN 1997) *R

The Government Furnished shelters will be delivered to the site during the first week of construction by the manufacturer, DuPont. Delivery Dates for GFM will be provided to the contractor at the pre-construction meeting. Lifting Rings are provided in the shelters ski channels for crane loading and off-loading by the contractor.

Spreader bars shall be used between the lifting cables. The contractor needs to provide adequately sized equipment to lift and load, transport, and lift and off-load the shelters. The use of a forklift for this purpose will not be permitted. All fees, permits, rentals etc. for transportation shall be included in the bid. The contractor should inspect the shelters and contents prior to beginning the process of transporting the shelters. The contractor should notify the RE/COR of any damage to the shelters prior to beginning the process of transporting the shelters. The contractor should confirm that the shelters contents are secured prior to beginning the process of transporting. Once the process of transporting the shelters has begun, the contractor shall assume responsibility for the shelters and its contents until final acceptance by the FAA.

mailto:amanda.j.garen@faa.gov

Identification Acquisition:

for Runway 23L Shelter Replacement Government Furnished Property (GFM) Item Quantity

* 8' x 16' DuPont Fiberglass Shelter 1 for Runway 05R Shelter Replacement Government Furnished Property (GFM) Item Quantity

* 8' x 16' DuPont Fiberglass Shelter 1

AC2916 PAYMENT PROCEDURES (JUL 1997) *R

(a) The contractor shall submit original invoices, including applications for installment payments, directly to:

FAA, Mike Monroney Aeronautical Center Financial Operations Division (AMZ-100) P.O. Box 25710 Oklahoma City, OK 73125-4913

(b) Payment for work performed or items furnished under this contract is subject to approval by the Contracting Officer. The contractor shall submit 1 copies of all invoices, including applications for installment payments, to:

FAA, Mike Monroney Aeronautical Center Attn: Janice Hammonds, AAQ-722

6500 S. MACARTHUR BLVD.

BLDG 014-AHQ, ROOM 233A

OKLAHOMA CITY, OK 73169

(c) Each invoice, including applications for installment payments, must reflect the contract number, delivery order number, and a description of the work, services, or items being invoiced.

Section H - Special Contract Requirements

H.1 PERMITS AND RESPONSIBILITIES

The Contractor shall obtain and pay fees for permits, licenses, or certificates required by Federal, State and City/Town officials as necessary to perform the work, prior to starting construction, and in a timely manner to avoid delays in starting the job. The Contractor shall abide by all requirements dictated by the municipality for such permits without any additional cost.

H.2 ACCIDENT AND FIRE REPORTING

a) The Contractor shall report to the CO any accident or fire occurring at the site of the work which causes:

1) A fatality or as much as one lost workday on the part of any employee of the Contractor or subcontractor at any tier;

2) Damage of $1,000 or more to Federal property, either real or personal;

3) Damage of $1,000 or more to Contractor or subcontractor owned or leased motor vehicles or mobile equipment; or

4) Damage for which a contract time extension may be requested.

b) Accident and fire reports required by paragraph (a) above shall be accomplished by the following means:

1) Report immediately by telephone to the Contracting Officer (CO) or his/her authorized representative and shall be confirmed by email or facsimile transmission within 24 hours to the Contracting Officer. Such email or facsimile transmission shall state all known facts as to extent of injury and damage and as to cause of the accident or fire.

2) Accident and fire reports required by paragraph (a) above may be reported by the Contractor using a state, private insurance carrier, or Contractor accident report form which provides for the statement of:

(i) The extent of injury; and

(ii) The damage and cause of the accident or fire. Such report shall be mailed or otherwise delivered to the

Contracting Officer within 48 hours of the occurrence of the accident or fire.

c) The Contractor shall assure compliance by subcontractors at all tiers with the requirements of this clause.

Clause List

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

AC1231 NOTIFICATION REQUIREMENTS WHEN FRIABLE ASBESTOS MATERIAL IS

REMOVED/DISTURBED (JAN 1997)

(a) Prior to any planned and/or scheduled disturbance of friable asbestos material, mainly CAFCO ceilings, the contractor shall present a written plan to the Contracting Officer. The plan shall include, but not be limited to, location, type facility, size of area to be disturbed or removed, method of containment to be used, disposal procedures, clean-up procedures, number of employees involved, protective clothing/equipment to be used, the date and time removal/disturbance is planned and any other information requested by the Contracting Officer. The contractor shall not proceed with any removal or disturbance of friable asbestos material without written approval from the Contracting Officer.

(b) If during the performance of the contract the contractor inadvertently disturbs friable asbestos material, mainly CAFCO ceilings, the contractor shall immediately cease operations and notify the Contracting Officer. The contractor shall remain at the site of disturbance for the Contracting Officer's instructions.

AC4555 NOTICE OF CONTRACTOR TESTIMONY (SEP 2006)

(a) The contractor shall notify the Contracting Officer promptly in writing of its intention, or the intention of its employees, subcontractors of any tier, or subcontractor employees, either voluntarily or under compulsion of competent authority, to provide sworn testimony on any matter related to or arising under the work required by and/or performed under, this contract. Such written notification at a minimum shall consist of the date and time of the testimony, identification of the court, board, or other body before which the testimony is made, the nature of the testimony to be given to the extent it is known at the time of this report, the nature of the contractor’s involvement in the proceeding and any other circumstances related to the work performed under or related to the contract and the proceeding in which the testimony will be taken.

(b) The contractor shall include the substance of this clause, including this paragraph (b), in all subcontracts executed under this contract and shall require all subcontractors to provide the required report to the contractor.

AC4557 STRIKES OR PICKETING

Notwithstanding any other provision hereof, the Contractor is responsible for delays arising out of labor disputes, including but not limited to strikes, if such strikes are reasonably avoidable. A delay caused by a strike or by picketing which constitutes an unfair labor practice is not excusable unless the Contractor takes all reasonable and appropriate action to end such a strike or picketing, such as the filing of a charge with the National Labor Relations Board, the use of other available Government procedures, and the use of private boards or organizations for the settlement of disputes.

Section I - Contract Clauses Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JUL 2018)

3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)

3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004) -

ALTERNATE I (JAN 2021)

3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2004)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)

3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2004)

3.2.2.3-48 OTHER CONTRACTS (MAR 2009)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (JUL 2004)

3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)

3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2004)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2004)

3.2.2.3-58 LAYOUT OF WORK (MAR 2009)

3.2.2.3-59 ORGANIZATION AND DIRECTION OF THE WORK (JUL 2004)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)

3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2004)

3.2.2.3-67 SPECIAL PRECAUTIONS FOR WORK AT OPERATING AIRPORTS (JUL 2004)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (OCT 2019)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2019)

3.2.5-4 CONTINGENT FEES (OCT 1996)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2019)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)

3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (JUL 2018)

3.3.1-9 INTEREST (JUL 2018)

3.3.1-16 PROHIBITION OF ASSIGNMENT OF CLAIMS (APR 1996)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (OCT

2012)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD MANAGEMENT

(JUL 2018)

3.4.1-6 ADDITIONAL BOND SECURITY (APR 1996)

3.4.1-7 NOTICE TO PROCEED (OCT 2019)

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)

3.4.1-12 INSURANCE (OCT 2019)

3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT 1996)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (JUL 2019)

3.5-1 AUTHORIZATION AND CONSENT (JAN 2019)

3.5-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JAN

2009)

3.5-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (JAN 2009)

3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2019)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-

DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (JAN 2021)

3.6.1-7 LIMITATIONS ON SUBCONTRACTING (JAN 2021)

3.6.1-15 POST-AWARD SMALL BUSINESS PROGRAM RE-REPRESENTATION (JAN 2021)

3.6.2-2 CONVICT LABOR (APR 1996)

3.6.2-9 EQUAL OPPORTUNITY (JUL 2020)

3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (JUL 2020)

3.6.2-13 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUL 2020)

3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (OCT 2018)

3.6.2-18 DAVIS BACON ACT (OCT 2018)

3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (JUL 2017)

3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2017)

3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (JAN 2019)

3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (JAN 2019)

3.6.2-23 CERTIFICATION OF ELIGIBILITY (JAN 2019)

3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (OCT 2018)

3.6.2-39 TRAFFICKING IN PERSONS (APR 2019)

3.6.2-44 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (JAN 2019)

3.6.2-46 PAID SICK LEAVE (OCT 2020)

3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (JAN 2020)

3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (JAN 2020)

3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)

3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (JAN 2020)

3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)

3.6.4-5 BUY AMERICAN - STEEL AND MANUFACTURED PRODUCTS (JUL 2010)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.4-23 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (JAN 2021)

3.9.1-1 CONTRACT DISPUTES (JAN 2020)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-8 SUSPENSION OF WORK (SEP 1998)

3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS (JUL 1996)

3.10.1-16 CHANGES AND CHANGED CONDITIONS (APR 1996)

3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.3-2 GOVERNMENT PROPERTY - BASIC CLAUSE (APR 2019)

3.10.3-2 GOVERNMENT PROPERTY - BASIC CLAUSE (APR 2019) - ALTERNATE I (OCT 2018)

3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV 1997)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT 1996)

3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)

3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)

3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)

3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(JAN 2018)

3.14-2 CONTRACTOR PERSONNEL SUITABILITY REQUIREMENTS (JAN 2019)

3.14-4 ACCESS TO FAA FACILITIES, SYSTEMS, GOVERNMENT PROPERTY, AND SENSITIVE

INFORMATION (JAN 2019)

3.2.2.3-37 NOTIFICATION OF OWNERSHIP CHANGES (JUL 2004)

(a) The Contractor (you) must notify FAA in writing within 30 days when you become aware that a change in ownership has occurred or will occur and that the change could affect the value of your capitalized assets in the accounting records, asset valuations, or cause any other cost changes.

(b) You must:

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the Contracting Officer (CO) access to the records on request;

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of your ownership changes; and

(4) Retain and maintain depreciation and amortization schedules based on the asset records maintained before each ownership change.

(c) You must include the substance of this clause in all subcontracts under this contract with a value exceeding $1,000,000 and that require cost and price data.

(End of clause)

3.2.2.3-41 PERFORMING WORK (JUL 2004)

The Contractor (you) must perform, using your own organization, work equivalent to at least 51 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.

(End of clause)

3.2.2.3-44 PHYSICAL DATA (JUL 2004)

Data and information the FAA (we, us) provides or refers to below is for the Contractor's (your) information. We are not responsible for your interpretation of or conclusions based on the data or information. Further, we do not warrant construction methodology which may be included in these documents.

(a) The descriptions of physical conditions on the drawings and in the specifications are the result of site investigations by the on-site engineer.

(b) Other relevant information it is the Contractor's responsibility to obtain weather patterns for the area, inspect the site in a manner which will provide the Contractor sufficient information concerning the site conditions in order to complete the project within the stated amount of time.

(End of clause)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009) - ALTERNATE I

(MAR 2009)

(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor (you) must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify you in writing. Any adjustment you make without the CO's determination is at your own risk and expense. From time to time the CO will provide necessary detailed drawings and other information, unless otherwise provided.

(b) Wherever in the specifications or the drawings FAA (we, our) uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. You must have a complete set of plans and specifications on site and available for our use.

(c) Where we use "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."

(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve you from performing those omitted or erroneously described details of the work. You must perform them as if fully and correctly set forth and described in the drawings and specifications.

(e) You must check all drawings we provide to you before starting work and must promptly notify the CO of any discrepancies. In general you should follow figures marked on drawings, rather than scale measurements. In general, large scale drawings have precedence over small scale drawings. You must compare all drawings and verify the figures before laying out the work. If you do not verify the figures, you will be responsible for any errors you might have avoided had you verified them.

(f) "Shop drawings" means drawings, you or any subcontractor submit to us under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials you provided to explain in detail specific portions of the work the contract requires.

FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.

(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), you must coordinate all of your offers, and review them for accuracy, completeness, and compliance with contract requirements. You must provide evidence that you approve the submittals. If you submit materials to us without this evidence, we may return them and ask you to resubmit them. The CO will indicate whether he or she approves or disapproves your offer, and if the CO does not approve it as submitted, will indicate our reasons for rejecting it. Any work done before the CO's approval is at your risk. The CO's approval does not relieve you from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).

(h) If you submittals vary from the contract requirements, you must describe the variations in writing, separate from the submittal, when you submit them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.

(i) You must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to you.

(j) You must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.

(k) When you finish the work under this contract, you must provide two (2) complete reproducible sets of all shop drawings as we finally approve them. These drawings must show all changes and revisions made up to the time you finish the work and we accept it.

(End of clause)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014) - ALTERNATE I (JUL 2004)

(a) Before beginning work, the Contractor (you) must:

(1) Perform a hazards analysis of the work specified in this contract. Consider both the site and adjacent conditions.

Identify all significant hazards. Some of the hazards you might encounter are falling from structures, tripping, electrical shock, fire, falling objects, environmental hazards, vehicular accidents, etc.

(2) Submit a safety plan for dealing with each specific hazard identified, whether you or FAA identified it.

(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding about the content and implementation of the plan.

(4) The CO or her or his representatives may require other hazards to be added to the plan. If the CO determines that your planned hazard avoidance measures are insufficient, the CO or a designated representative may require you to revise the plan. You may not begin work involving identified hazards unless you have submitted adequate plans to the CO and the CO has reviewed them. This approval does not relieve you of your liability for safe performance.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004)

The Contractor (you) must

(a) begin work under this contract within 15 calendar days after the date you receive the notice to proceed,

(b) perform the work diligently, and

(c) complete the entire work ready for use not later than 90 calandar days after notice to proceed is issued. The time allowed for completion must include final cleanup of the premises.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004) -

ALTERNATE I (JUL 2004)

The Contractor (you) must

(a) begin work under this contract within 15 calendar days after the date you receive the notice to proceed,

(b) perform the work diligently, and

(c) complete the entire work ready for use not later than 90 calandar days after notice to proceed is issued. The time allowed for completion must include final cleanup of the premises.

(d) The completion date assumes that the successful offeror will receive the notice to proceed by : to be determined.

The CO will extend the completion date by the number of calendar days after the above date that you receive the notice to proceed, except to the extent that the delay in issuing the notice to proceed results from your failure to execute the contract and give the required performance and payment bonds to FAA within the time specified.

(End of clause)

3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (JUL 2018)

(a) Definitions. As used in this clause

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)

This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.

"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the SAM database.

"System for Award Management (SAM) Database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number

(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705-5711 or via the Internet at http://fedgov.dnb.com/webform; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and ZIP Code.

(iv) Company Mailing Address, City, State and ZIP Code (if different from physical street address).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.