Construction Drawings for the RDU MALSR 23L - Raleigh NC Runway 23L.pdf
PDF 5 MB Posted
- Solicitation number
- 6973GH-21-R-00057
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader rd u -1
-c
.d g n
/0
/2
:5
:2
A
M P lo tt e d b y S
R V
C -C
E
G -E
D
O
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
IS
U
NC
LW
BP 10/07/2019 1704175
RDU-1704175-C001
N
T
IO
ENGINEERING SERVICES
INFRASTRUCTURE
MALSR
RUNWAY 23L
RALEIGH-DURHAM INTL AIRPORT
PROJECT ENGINEER MGR: ENGINEERING - CENTER A
-c
THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PLAN, ELEVATIONS AND DETAILS
RALEIGH
SCALE: 3/8" = 1'-0"
REAR ELEVATION
ANCHOR BOLT DETAIL
SCALE: 1 1/2" = DETAIL
SCALE: 1 1/2" = DETAIL
LEFT ELEVATION
NOT TO SCALE
FRONT ELEVATION
RIGHT ELEVATION
6 X 1 1/2" HOLD DOWN PLATE
SCALE: 3" = 1'-0"
FINISHED FLOOR
GRADE
CEILING
FINISHED
(2) 2x6 #2 SYP HEADERS
AND FRAME
ALUMINUM DOOR AT 12" OC
2" ROOF JOIST
2x4 STUDS
2x4 STUD
WHITE STRIPES)
PLYWOOD (ORANGE &
FIBERGLASS COATING OVER
LAYOUT
PLYWOOD
FOUNDATION
TOP OF
16'-0"
FLOOR
FINISHED
SCALE: 1 1/2" = 1'-0"
3"6"9"1' 0 1'
SCALE: 3" = 1'-0"
9"6"3"3" 0
4' 6'2'02'
6"
1"
OR APPROVED EQUAL
"ULTRA BOND 1 " EPOXY
ANCHOR BOLT USING
3/4" ALL THREAD
ACCEPTABLE TO EPOXY
ANCHOR BOLT
3/4" GALVANIZED
4"
ANCHOR BOLT
3/4" GALVANIZED
REINSTALLATION
TO SKIDS AFTER SHELTER
WELD TIE-DOWN PLATES
1/2" PLATE
GRADE BEAM
CONCRETE
14'-0"1'-0"
4'-8"4'-8"4'-8"
/1
8' X16' SUGGESTED PIER LAYOUT
(TYP. 12)
SCALE: 1/2" =1'-0"
PIER DETAIL
@ 3" O.C.
(3) #3 HOOPS
VERTICAL
(4) #7
@12" O.C.
#3 HOOPS
12" HOOP
#7 VERTICAL &
L
W
TIE-DOWN DETAIL
DOOR STOOP
NOTES
HVAC UNIT
1 TON
BEAM
S6x 12.5
TOP OF CONCRETE
PLATE
2x4 BOTTOM
1 1/2"DIA WASHERS
12" OC WITH
STEEL BOLTS AT
1/4"DIA STAINLESS
HVAC UNIT
1 TON
NO SPLICE
CONTINUOUS
PLATES
(2) 2x4 TOP
WHITE STRIPES)
(ORANGE &
PLYWOOD
COATING OVER
FIBERGLASS
2"
EXHAUST FAN
HOOD FOR
LOUVER
MOTORIZED
HOOD FOR
SAME HEIGHT AFTER BUILDING NEW FOUNDATIONS.
HEIGHT PRIOR TO REMOVAL IN ORDER TO RE-INSTALL THE SHELTER AT THE
10. SUBCONTRACTOR TO MEASURE AND RECORD SHELTER FOUNDATION'S
9. TORQUE ANCHOR BOLT NUTS TO 45 FT. LBS.
GALVANIZED NUTS AND TIE-DOWN PLATES.
8. THE SHELTER SHALL BE ANCHORED WITH SUBCONTRACTOR FURNISHED
SHELTER AND ITS CONTENTS UNTIL FINAL ACCEPTANCE BY THE FAA.
HAS BEGUN, THE SUBCONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE
TRANSPORTING. ONCE THE PROCESS OF TRANSPORTING THE SHELTER
CONTENTS ARE SECURED PRIOR TO BEGINNING THE PROCESS OF
PROCESS OF TRANSPORTING THE SHELTER. CONFIRM THAT ALL SHELTER
NOTIFY THE RE OF ANY DAMAGE TO SHELTER PRIOR TO BEGINNING THE
PRIOR TO BEGINNING THE PROCESS OF TRANSPORTING THE SHELTER.
SHALL BE INCLUDED IN THE BID. INSPECT THE SHELTER AND CONTENTS
BE PERMITTED. ALL FEES, PERMITS, RENTALS, ETC, FOR TRANSPORTATION
THE SHELTER. THE USE OF A FORKLIFT FOR THIS PURPOSE WILL NOT
EQUIPMENT TO LIFT AND LOAD, TRANSPORT, AND LIFT AND OFF-LOAD
BETWEEN THE LIFTING CABLES. PROVIDE ADEQUATELY SIZED
CRANE LOADING AND OFF-LOADING. SPREADER BARS SHALL BE USED
LIFTING RINGS ARE PROVIDED IN THE SHELTER SKID CHANNELS FOR
7. THE EQUIPMENT SHELTER IS GOVERNMENT FURNISHED MATERIAL.
FAST SET.
6. DRILL AND EPOXY ANCHOR BOLTS WITH PRO-POXIE EPOXY KIT 300
FURNISHED.
THE ANCHOR BOLTS, NUTS AND WASHERS SHALL BE SUBCONTRACTOR
BE CLEAN AND LUBRICATED. TIGHTEN THE NUT TO 45FT-LBS MINIMUM.
GALVANIZED STEEL PER ASTM A153 AND A325. EXPOSED THREADS SHALL
5. THE ANCHOR BOLTS, NUTS AND WASHERS SHALL BE HOT DIPPED
STOOP IS MORE THAN 11" ABOVE THE EXISTING GRADE.
LONG BY 9" HIGH BY 11" WIDE SHALL BE INSTALLED WHERE THE TOP OF
AWAY FROM THE SHELTER. BROOM FINISH THE STOOP. CONCRETE STEPS 5'
FINISHED FLOOR INSIDE THE BUILDING. SLOPE THE STOOP 1 PERCENT
4. THE TOP OF THE STOOP OR THE HIGHEST STEP SHALL BE LEVEL WITH THE
FINISHED.
LEVEL WITHIN 1/8 INCH. GRADE BEAM SURFACES SHALL BE TROWEL
OTHER WITHIN 1/4 INCH. INDIVIDUAL GRADE BEAM SURFACES SHALL BE
3. GRADE BEAM FOUNDATIONS SHALL BE HORIZONTALLY LEVEL WITH EACH
IS AWAY FROM FOUNDATION. MAINTAIN A DRAINAGE SLOPE OF 1/8" PER FOOT.
CONTENT. GRADING OF ROCK AND SOIL SHALL BE SO THAT ALL DRAINAGE
AND COMPACTED TO 95% OF MAXIMUM DENSITY AT OPTIMUM WATER
NOT EXCEEDING 6 INCHES. EACH LAYER SHALL BE THOROUGHLY TAMPED
2. IF FILL OR GRADING IS REQUIRED IT SHALL BE BUILT UP IN LAYERS
DAYS AFTER CONCRETE PLACEMENT.
BE 3/4 INCH. CONCRETE SHALL NOT BE LOADED FOR AT LEAST SEVEN (7)
WITH A MAXIMUM SLUMP OF 5 INCHES. MAXIMUM AGGREGATE SIZE SHALL
1. ALL CONCRETE SHALL DEVELOP 4500 PSI IN TWENTY EIGHT (28) DAYS
8 X 16 SHELTER FOUNDATION
rdu-1704175-c001
2020-08-12T14:58:48-0400
VI V HO
2020-08-12T10:02:53-0400
BRYAN B PENNAMON
-e
:3 lo tt e
P P P P P
P P
P P P P P P
PPP
NOTES:
BP 10/07/2019
GROUNDING AND POWER PLAN
1704175
NOT TO SCALEE001
MALSR LIGHTNING PROTECTION ROOF PLAN
MALSR LIGHTNING PROTECTION ROOF ELEVATION
3'-0"
RDU-1704175-E001
(TYP 6)
BASE, HARGER CUBU121
WITH ADHESIVE POINT
COPPER AIR TERMINAL
1/2" DIAx 24" LONG, HARGER P/N 32
ROOF CONDUCTOR,
LIGHTNING PROTECTION:
HOLDER (TYP)
ADHESIVE CABLE
EDGE OF ROOF
(TYP 2)
WITH BONDING PLATE
CONNECT TO #4/0
DOWN CONDUCTOR
AIR TERMINAL
AIR TERMINAL BASE
ADHESIVE CABLE HOLDER
DOWN CONDUCTOR CABLE
ADHESIVE
BONDING PLATE HARGER P/N 220
HARGER 264
HARGER 261
HARGER CUBU12I
HARGER 1224CUAT1
DESCRIPTION PART NUMBERITEM NO.
LP MATERIAL LIST
CONDUCTOR
DOWN
PLATE
BONDING
ROD
GROUND
(TYP)
HOLDER
ADHESIVE CABLE
ROOF CONDUCTOR,
LIGHTNING PROTECTION:
GRADE, (TYP)
ROD, 18" BELOW
CLAD GROUND
3/4"x 10' COPPER
GROUND PLATE
#4/0 BSDC
PANEL
DISTRIBUTION
(T Y
X
IN
(TYP 6)
WITH BASE
AIR TERMINAL
SHELTER
RWY 23L MALSR
(ETR) - EXISTING TO REMAIN
2" PVC #6 BSDC, (ETR)
MALSR MONITOR, (ETR)
12 PR #19 SHIELDED
(ETR)
HANDHOLE,
ELECTRICAL
#2 COUNTERPOISE,
FLASHER POWER, (ETR)
3 #2, 600V MALSR
FLASHER CONTROL, (ETR)
12 PR #19 SHIELDED MALSR
2" PVC, (ETR)
3W, 200A METER, (ETR)
120/240 VOLT 10
RACK, (ETR)
POWER
STAND,
METER
UTILITY USE, (ETR)
3" PVC FOR
BY POWER CO, (ETR)
INCOMING POWER,
SYSTEM, (ETR)
TO LOC & MALSR
ENCASED DUCT
4" - 4W CONCRETE
DOOR STOOP
TO LOC
CONTINUE
TO LOC
CONTINUE
MALSR POWER AND GROUNDING PLAN
2-2" PVC #6 BSDC
XFMR
15 KVA
FOUNDATION, (ETR)
3" GRAVEL ALL AROUND
MALSR SHELTER
NO DIRECT EARTH BURIAL INSTALLATIONS WILL BE PERMITTED.
12. ALL POWER AND CONTROL CABLES SHALL BE INSTALLED IN CONDUIT.
DISCONNECT SWITCH ON DISCONNECT RACK.
11. EXISTING POWER CABLES FROM SHELTER DISTRIBUTION PANEL TO
APPROPRIATE BONDING CLAMPS.
PROTECTION ROOF CONDUCTOR WITH THOMPSON #32 WIRE USING
10. THE FLIGHT CHECK ANTENNA MAST SHALL BE BONDED TO THE LIGHTNING
9. STUB OUT ALL RGS 5' BEYOND EES.
LOCALIZER EQUIPMENT SHELTER , ROUTE ABOVE CONDUITS.
MALSR EQUIPMENT SHELTER TO THE GROUND ROD ON EES SURROUNDING
8. INSTALL NEW #4/0 FROM THE GROUND ROD ON THE EES SURROUNDING
CONDUCTOR) FROM THE DISTRIBUTION PANEL TO THE GROUND ROD.
7. EXOTHERMICALLY WELD THE #2 BLACK GEC (GROUNDING ELECTRODE
COILED INSIDE THE INTERFACE BOX ASSEMBLY FOR TERMINATION BY OTHERS.
TO THE RF BULKHEAD PLATE. REMOVE INSULATION UNDERGROUND. LEAVE 5'-0"
6. EXISTING #4/0 (GREEN INSULATED WITH BRIGHT RED TRACER) FROM THE EES
GROUND PLATE AND THE EES.
BE 30% LONGER OR SHORTER THAN THE CONDUCTOR BETWEEN THE MAIN
GROUND PLATES IN THE SHELTER. THE LENGTH OF THIS CONDUCTOR SHALL
5. EXISTING #4/0 CABLE TO EES AND ROUTE IT TO THE EXISTING MULTIPOINT
CONDUCTOR.
WELDED TO THE GROUNDING ELECTRODE SYSTEM WITH #2 AWG BARE COPPER
4. ALL ENTRANCE CONDUITS INTO THE INTERFACE BOX SHALL BE EXOTHERMICALLY
WITH COPPER-TO-STEEL BIMETALLIC GROUND LUG CONNECTOR.
THE GROUND ROD. TERMINATE THE #4/0 BARE COPPER TO THE SKID
3. EXISTING, #4/0 BARE COPPER CONDUCTOR BETWEEN SHELTER SKID AND
GROUND RODS SHALL BE 3/4"x 10'-0" AND BETWEEN 2'- 6' FROM FOUNDATION.
2. EXISTING EARTH ELECTRODE SYSTEM (EES) AT MINIMUM DEPTH OF 30". ALL
BE EXOTHERMICALLY WELDED PER FAA STD 19E.
1. ALL CONNECTIONS ON GROUNDING CONDUCTORS AND GROUND RODS SHALL
NOTE 3
SEE
SEE NOTE 5
SEE NOTE 5
SEE NOTE 3
GROUND PLATE
FRAME LUG
#2 TO DOOR
rdu-1704175-e001
2020-08-13T15:16:13-0400
VI V HO
2020-08-12T10:05:01-0400
BRYAN B PENNAMON
:1
:4 lo tt e
RDU-1704175-E002
PADLOCK EYES, PAINTED WHITE, TOP
DOOR CLOSURE, THREE-POINT LATCH, BEST CORE,
YALE LOCKSET, 24" DEEP FIBERGLASS DOOR SHIELD,
HINGE KEYCOVER WITH (2) KEYS AND (1) CORE KEY
LITHONIA 4' LED WRAPAROUND VOLT 4,000 LUMENS
D-C/D0003711
NA.7
LBL4 LP840
CUSTOM
NA.
ELM2
RAB VXBR100DG
#120-2S-N1-3-06-A
RAYVOSS 200A-240V SINGLE PHASE SURGE ARRESTOR,
END 3" CLEAR OF FIBERGLASS FOR FIELD CONNECTION
NLN 200
200 AMP FUSIBLE DISCONNECT w/2-1/2" ENTRANCE
EXTRA SET OF FUSES,(NEC GROUND CONNECTED
3720 PMC T-15
5 NA. -
CSB1-20 SP 20A SWITCH, SP 20A 120-277V BRN AC SW
200 AMP. MAIN LUG 20" PANEL W/ 30 CIRCUITS, BOLT ON
BREAKERS AND #CB23 GROUND LUG KIT
SQD NQ30L2C5038
SQD MH32BE
SQD NC32SHR
1 PANEL BOARD ENCLOSURE/BOX TYPE 1 32Hx20W
SQD NC32SHRSBC DOOR IN DOOR SFC TRIM
BARD 1 TON, 1PH, 3Kw, PLEATED, BDAF, WHITE, COATED W12AAAA03XP1X3J522410 COILS, w/EXTERNAL DISCONNECT
NA. -
125V RATED QUAD RECEPTACLES, 20 AMP, BROWN,CR208952
BARD THERMOSTAT CONTROLLER
3'-0" X 6'-8" HEAVY DUTY DOOR HINGE RIGHT WITH A
DESCRIPTIONITEM#
VENDOR/PART#
EXTERIOR LIGHT WITH GLOBE AND GUARD
DUAL LIGHT EMERGENCY, 6V EMERGENCY LIGHT
1-1/2" PVC EXITS THROUGH FLOOR
CUSTOM
PHOTO CONTROL MODEL T-15
SQ. D #H224N
66L
1 6x6 WIREWAY 90 DEGREE
24 1
GS112524SP1.75 HARGER LIGHTING PROTECTION, 2 HOLE 24" GROUND STRAP25
28 1
29 1 CUSTOM
1-1/2" CONDUIT FOR GROUNDINGCUSTOM
DBI #
DUPONT1440
1 1461
BY ELECTRICAL CONTRACTOR IN FIELD) 2 FUSES SHIP LOOSE
- --13
--30 -
23 NA. - -
1-1/2" CONDUIT FOR DOOR GROUNDING2415
6"x6"x36" NM1 COMBO WIREWAY wo/KO6636GNK2720
6"x6"x24" NM1 COMBO WIREWAY wo/KO6624GNK2718
COMMERCIAL GRADE
GFI BREAKER PROTECTED DUPLEX RECEPTACLECR20
MC4001-A7474
DEEP, OPEN BACK 3 DIVIDERS (SHIP LOOSE)
ALUMINUM PANEL BOX 24" TALL X 48" WIDE X 9-1/2" D-PANEL2091
47257 PER FOOT
1/4"-20x12' PLT. RODS, 12' SECT. ZINC PLATED 8 x 14 PLEXI PLATE MAIN GROUND 8 x 14 PLEXI PLATE SUPPLEMENTAL 1/4" x 1" SS HEX HEAD BOLTS
2165-1A RED SEAL INSULATORS-1/4"
GROUND BAR BRACKET
3/8" x 1-1/2" PLATED LAG 6" x 12" x 1/4" COPPER BAR
MATERIAL LIST
QTY
7 6 5 4
23"
192"
"23"
72"28
C6
86"
43 3/4"
37"
14 1/2"
16"
5"
96"
12"
" 1
2" 2" 2" 2"
1 1/2" 1 1/2"
1/2"1/2"
16"
66"
22 1/2"
4 1/2"
1 3/8"
23"64"
23"
TE
10"
9 7/8"
29 1/2"
26 1/2"
26 1/2"
69 3/4"
11"
32" 3 1/2"
8 1/2"
6 6
24" 48" 34 3/4"
3/16"
SIDE VIEWDB1561-GROUND BAR FRONT VIEW
14 1/4"
SECTION
SKID CORNER
BRACKET DB1441-QTY2
ALUMINUM STANDOFF
RED INSULATORS DB1458 QTY12
RED INSULATORS DB1458
DB1461 OR DB1462
PROTECTION COVER
8"x 14" PLEXIGLAS
DB432-1/4"x 1/2"-QTY8
PLATED HEX HEAD BOLTS
DB4269-1"-QTY8
1/4" PLATED ROD
BAR DB1440-QTY1
6"x 12" COPPER GROUND
(20) 3/8" HOLES
(4) 5//16 MOUNTING HOLES
W/ 1 1/4" HOLE
4"x 6"x 1/4" PLATE
TS3"x 2" 1/4 GAUGE
C3 X 4.1 CHANNEL
S6X12.5 BEAM
IL
CK#10
CK#6
HOLES
FRAME-IN
FINISHED CEILING
CK#6 CK#13
CK#1 CK#1
CK#1 CK#1
CK#1
CK#8
FINISHED CEILING
SUPPLEMENTAL
IL
CK#5
CK#10
CK#2,4
MAIN
AND BY DOOR
EACH CORNER
WIRE STUDS ON
LUG FOR 4/0 AWG
COPPER GROUND
CONDUIT LEGEND
FLOOR AND WALL
CONDUIT THROUGH -
FLEX CONDUIT -
1-1/2" PVC -
1" PVC -
3/4" CONDUIT -
CONDUIT LEGEND
FLOOR AND WALL
CONDUIT THROUGH -
FLEX CONDUIT -
1-1/2" PVC -
1" PVC -
3/4" CONDUIT -
ELECTRICAL NOTES
- SEISMIC
- WIND
- LIVE ROOF
- LIVE FLOOR
ZONE 4
150 PSF
70PSF
400 PSF
FLOOR PLAN
LIFTING EYE
GROUND BAR DETAILS
GROUNDING DETAILS
BE RED.
13. ALL CIRCUIT WIRING ON LINE #1 TO BE BLACK AND LINE #2 TO
BOLTS AND NUTS.
12. GROUNDING TO HAVE SS BOLTS AND NUTS ON DOOR USE SS
11. 12 TON HEX CRIMP TO BE USED ON GROUNDING.
NOT OPERATE AT THE SAME TIME.
10. HEATER AND A/C UNIT ARE TO BE CONNECTED SO THAT BOTH, DO
BONDING MATERIAL.
ENGRAVED WITH 3/8" TEXT ATTACHED WITH WEATHER PROOF
SHADOWING PERTINENT INFORMATION MADE OF RIGID PLASTIC, AND
SHADOWING PERTINENT INFORMATION MADE OF RIGID PLASTIC, AND
9. PANE BOARD AND DISCONNECT SHALL HAVE NAME PLATES
W/ PANEL AND CIRCUIT NUMBER INDICATED.
CONDUCTORS SHALL BE IDENTIFIED AT BOTH ENDS OF CONDUCTOR
8. ALL FEEDER AND BRANCH CIRCUITS INCLUDING NEUTRAL
FLEXIBLE METAL CONDUIT IF NECESSARY.
7. FLEXIBLE NONMETALLIC CONDUIT SHALL NOT BE USED. USE
AND GROUND BAR BE BONDED TOGETHER.
PANEL BOARD. ONLY AT THE SERVICE DISCONNECT SHALL NEUTRAL
6. NEUTRAL BAR SHALL BE ISOLATED FROM THE GROUNDING BAR IN
5. HEAT SHRINK LABELING FOR ALL CIRCUITS AND ITEMS.
ENTRANCE RACEWAY SHALL BE EFFECTIVELY BONDED TOGETHER.
4. PANEL BOARD ENCLOSURE GROUNDING BAR AND SERVICE
ELECTRICAL CONTRACTOR.
3. EXTERIOR GROUNDING SYSTEM METER AND SERVICE BY THE
2. ALL 15 AND 20 AMP CIRCUITS HAVE #12 THHN WIRING.
CONDUIT. MINIMUM IS SIZE 3/4", SEE CONDUIT LEGEND.
1. ALL INTERIOR ELECTRICAL WORK IS SURFACE MOUNT IN EMT
QTY.ITEM# VENDOR #
BILL OF MATERIALS
LIGHTNING PROTECTION PKG.
NOT PART OF STANDARD PACKAGE
36 MAX TYP.
TYP
51 4 EACH
52 4 EACH
53 12 EACH
54 12 EACH
24" SOLID COPPER AIR TERMINALS
55 48 FEET
56 FEET
57 1 EACH
(2) 8
HARGER 1224CUAT
HARGER CUBU121
HARGER #CCC3
HARGER #260
28 STRAND
28 STRAND
162483
BRONZE HORIZONTAL BASE 1/2"
CABLE CUP
COPPER ADHESIVE CABLE HOLDER
DESCRIPTION
28 CONDUCTOR ROPE LAY CONDUCTOR
28 ROPE LAY FOR DOWN CONDUCTORS
250 ML PRO POXIE, EPOXY KIT 300 FAST SET
UNITS
DBI#
8 X 16 FLOOR PLAN AND ELECTRICAL DETAILS
INTERFACE
DECODER
RECEIVER
CABINET
FLASHER
BURNER
STEADY
TRANSFORMER
rdu-1704175-e002
2020-08-13T15:16:46-0400
VI V HO
2020-08-12T10:06:05-0400
BRYAN B PENNAMON
:0 lo tt e
RDU-1704175-E003
RALEIGH-DURHAM INTL AIRPORTRALEIGH
MALSR SHELTER ONE-LINE DIAGRAM
XFRM
DISTRIBUTION RACK
20A
LIGHTS 1
SPARE 3
HVAC
FAN/LOUVER 10
RECEPTACLES
SPARE
200A
RAYVOSS TVSS 200A FUSED
DISCONNECT
UTILITY
3" PVC
SECONDARY
120/240V
#2 GND THWN 60'
600V 3-1C #2CU W/1
#2 RGS PVC COATED
POWER CO
POWER BY
INCOMING
NOT TO SCALEE003
ONE-LINE DIAGRAM
200A
30A 2P
40A 2P
100A 2P
PRIMARY
15 KVA
3W, 200A
120/240 VOLT
3W, 200A
120/240 VOLT
GFCI
20A 2P
NOTES
2 3 4
2 3 4
PROTECTOR
SURGE
LIGHTS
LOAD
* CIRCUITS 19-30 BLANK
17 20
1 20
SPARE18
20 10
GFCI RECEPTACLES
HVAC
BKR
SIZE
CKT
NO
COVER: HINGED WITH HINGED LOCKABLE DOOR
PHASE
SIZENO
MOUNTING: SURFACE
NEUTRAL: 100%
VOLTAGE: 120/240V 1PH 3W 60HZ
BREAKER
MALSR PANEL
200 AMPERE
FAN/LOUVER
SPARE20
SURGE PROTECTOR
DISTRIBUTION PANEL
LOC SHELTER100
SPACE
SPACE SPACE
DISTRIBUTION PANEL
SPACE SPACE
Z
: 2
DISTRIBUTION
23L - 1 PANEL SCHEDULE
23G - 1 PANEL SCHEDULE
23L - MALSR SHELTER
LOC SHELTER
23L - MALSR PANEL SCHEDULE
MAIN:
REPLACE ANY MISSING POSITION COVERS INSIDE BREAKER PANEL.
DIRECTORY IN EACH PANEL.
CONTRACTOR TO PROVIDE A PRINTED AND LAMINATED PANEL
ONE-LINE DIAGRAM TO BE UPDATED IN CONSTRUCTION.
PERFORMED IN THAT PANEL.
PANEL 23G-1 IS SHOWN FOR REFERENCE ONLY. NO WORK WILL BE1
rdu-1704175-e003
2020-08-13T15:17:14-0400
VI V HO
2020-08-12T10:07:58-0400
BRYAN B PENNAMON
:2 lo tt e
ELEVATIONS
DISCONNECT SWITCH RACK
RDU-1704175-E004
(ETR) - EXISTING TO REMAIN
2 1
SIDE VIEW
CONDUIT HANGERS
INSTALL NEW GRS
INSTALL 2" RSC
#2 BARE CU.
INSTALL 3/4" PVC
2" RSC ELBOW
#2 BARE
3/4" PVCEXOTHERMIC WELD
#4/0
#2 BARE
2" RSC
TRANSFORMER)
(FROM
E004
CONSTRUCTION NOTE
#4/0
1. NO WORK PERFORMED ON THIS SHEET. FOR REFERENCE ONLY.
UNISTRUT RACK
STAINLESS STEEL
1" CHAMFER
CONCRETE PIER
AS REQUIRED
MODIFY EXISTING COND
IN MALSR SHELTER.
TO GS DISCONNECT SWITCH
FROM DISCONNECT SWITCH
VIA UG PULLBOX
1-#6 BSDC INSIDE 2" RSC
3-1/C #2 AND
PANEL
GRAVEL
GROUND ROD
NOT TO SCALEE004
ELEVATION - SIDE VIEW
MAIN BREAKER PANEL RACK
1-#6 BSDC INSIDE 2" RSC
3-1/C #2 AND
NOT TO SCALEE004
ELEVATION - FRONT VIEW
MAIN BREAKER PANEL RACK
HEAVY-DUTY, 200A BREAKER PANEL
120/240V, 1 PH, 3W, S/N, 2 POLE,
GRAVEL
PIER
DISCONNECT SWITCH
TRANSFORMER TO THE
2" RSC FROM THE
3-1/C #2 INSIDE
rdu-1704175-e004
2020-08-13T15:20:17-0400
VI V HO
2020-08-12T10:36:36-0400
BRYAN B PENNAMON
-g
:1 lo tt e
VICINITY MAP
44040
COVER SHEET, INDEX AND
RDU-1704175-G001
DRAWING LIST
DRAWING NO. REV. DATE DESCRIPTION
INTL AIRPORT
DURHAM
RALEIGH-
RALEIGH-DURHAM HW
RDU-1704175-E004
RDU-1704175-E003
RDU-1704175-E002
RDU-1704175-E001
RDU-1704175-C001
RDU-1704175-G004
RDU-1704175-G003
RDU-1704175-G002
RDU-1704175-G001
10/07/2019
AVIA
I
TRAT
SI
NI
MALSR SHELTER REPLACEMENT
RDU/MALSR23L - RALEIGH, NORTH CAROLINA
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
VICINITY MAP
DISCONNECT SWITCH RACK ELEVATIONS
MALSR SHELTER ONE-LINE DIAGRAM
8 x 16 x 8 FLOOR PLAN AND ELECTRICAL DETAILS
MALSR SHELTER GROUNDING AND POWER PLAN
8 x 16 SHELTER FOUNDATION PLAN, ELEVATIONS AND DETAILS
SAFETY NOTES
SAFETY AND PHASING PLAN
SCOPE OF WORK
COVER SHEET INDEX, AND VICINITY MAP
rdu-1704175-g001
2020-08-13T15:21:52-0400
VI V HO
2020-08-12T10:37:21-0400
BRYAN B PENNAMON
lo tt e
SCALE: 1" = 50'
50' 100'050'
G002
HIS/HER SUBCONTRACTOR'S FORCES.
EXPENSE, DAMAGE OF ANY KIND CAUSED BY HIS/HER, OR ANY OF
7. THE CONTRACTOR SHALL REPAIR AND REPLACE, AT HIS/HER OWN
DESIGNATED HAUL ROUTES, STAGING AREAS, AND CONSTRUCTION LIMITS.
6. ALL CONTRACTOR EQUIPMENT AND PERSONNEL SHALL BE LIMITED TO
OF THE AIRPORT OPERATIONS DEPARTMENT.
TAXIWAY, OR AIRCRAFT MOVEMENT AREA WITHOUT PRIOR APPROVAL
SUBCONTRACTOR, TO CROSS OR PROCEED ON ANY ACTIVE RUNWAY,
5. CONTRACTOR SHALL NOT ALLOW HIS/HER FORCES INCLUDING
PAINT FLAGGING OR OTHER APPROVED MEANS.
ACTIVE RUNWAY. CONTRACTOR SHALL WORK THE RSA LIMITS WITH
SUBCONTRACTORS WITHIN THE RUNWAY SAFETY AREA (RSA) OF AN
4. THE CONTRACTOR SHALL NOT ALLOW HIS/HER FORCES, INCLUDING
BETWEEN THE HOURS OF 5:30 A.M. AND 11:00 P.M.
GROUND CONTROL FREQUENCY (119.7 MHZ). THE ATCT IS OPERATIONAL
CAPABLE OF MONITORING AIRPORT TRAFFIC CONTROL TOWER (ATCT)
3. THE CONTRACTOR SHALL PROVIDE EACH CREW WITH A PORTABLE RADIO
2. AIRCRAFT OPERATIONS SHALL HAVE THE RIGHT OF WAY AT ALL TIMES.
CIRCULAR 150/5370-2E.
1. CONSTRUCTION ACTIVITIES SHALL CONFORM TO FAA ADVISORY
REMAIN CLOSED AND SECURED AT ALL OTHER TIMES.
DELIVERY OF MATERIALS OR ACCESS TO THE SITE. GATE SHALL
14. CONTRACTOR SHALL SUPPLY GATE GUARD WHENEVER GATE IS OPEN FOR
ADDITIONAL REQUIREMENTS.
WITHIN 250' OF AN ACTIVE RUNWAY. SEE SAFETY NOTES FOR
13. NO STOCKPILES, VEHICLES NOR EQUIPMENT SHALL BE PERMITTED
TO AIRPORT OPERATIONS.
BE INSPECTED AND APPROVED BY AIRPORT MANAGER PRIOR TO OPENING
SATISFACTION OF THE AIRPORT MANAGER. THE CLOSED PAVEMENT SHALL
12. ALL PAVEMENT SURFACES SHALL BE CLEANED THOROUGHLY TO THE
IN PLACE PRIOR TO STARTING WORK.
11. ALL DESIGNATED SAFETY MARKINGS AND BARRICADES SHALL BE
COVERED FOR THE DURATION OF THE CLOSURE.
ASSOCIATED WITH THE CLOSED PAVEMENTS SHALL BE SHUT OFF OR
ALL EDGE LIGHTS, GUIDANCE SIGNS, VISUAL NAVAIDS, ETC.
LEAST 48 HOURS IN ADVANCE OF RUNWAY OR TAXIWAY CLOSURES.
10. NOTAMS (NOTICE TO AIRMEN) WILL BE ISSUED BY THE AIRPORT AT
9. SEE SAFETY NOTES FOR ADDITIONAL REQUIREMENTS.
AC 150/5210-5B.
AMBER DOME TYPE LIGHT AND IDENTIFIED IN ACCORDANCE WITH
8. ALL EQUIPMENT AND VEHICLES SHALL BE FLAGGED OR HAVE FLASHING
RDU-1704175-G002
LEI
rdu-1704175-g002
2020-08-13T15:27:09-0400
VI V HO
2020-08-12T10:57:20-0400
BRYAN B PENNAMON
:4 lo tt e
SCALE: 1" = 50'
50' 100'050'
G003
HIS/HER SUBCONTRACTOR'S FORCES.
EXPENSE, DAMAGE OF ANY KIND CAUSED BY HIS/HER, OR ANY OF
7. THE CONTRACTOR SHALL REPAIR AND REPLACE, AT HIS/HER OWN
DESIGNATED HAUL ROUTES, STAGING AREAS, AND CONSTRUCTION LIMITS.
6. ALL CONTRACTOR EQUIPMENT AND PERSONNEL SHALL BE LIMITED TO
OF THE AIRPORT OPERATIONS DEPARTMENT.
TAXIWAY, OR AIRCRAFT MOVEMENT AREA WITHOUT PRIOR APPROVAL
SUBCONTRACTOR, TO CROSS OR PROCEED ON ANY ACTIVE RUNWAY,
5. CONTRACTOR SHALL NOT ALLOW HIS/HER FORCES INCLUDING
PAINT FLAGGING OR OTHER APPROVED MEANS.
ACTIVE RUNWAY. CONTRACTOR SHALL WORK THE RSA LIMITS WITH
SUBCONTRACTORS WITHIN THE RUNWAY SAFETY AREA (RSA) OF AN
4. THE CONTRACTOR SHALL NOT ALLOW HIS/HER FORCES, INCLUDING
BETWEEN THE HOURS OF 5:30 A.M. AND 11:00 P.M.
GROUND CONTROL FREQUENCY (119.7 MHZ). THE ATCT IS OPERATIONAL
CAPABLE OF MONITORING AIRPORT TRAFFIC CONTROL TOWER (ATCT)
3. THE CONTRACTOR SHALL PROVIDE EACH CREW WITH A PORTABLE RADIO
2. AIRCRAFT OPERATIONS SHALL HAVE THE RIGHT OF WAY AT ALL TIMES.
CIRCULAR 150/5370-2E.
1. CONSTRUCTION ACTIVITIES SHALL CONFORM TO FAA ADVISORY
REMAIN CLOSED AND SECURED AT ALL OTHER TIMES.
DELIVERY OF MATERIALS OR ACCESS TO THE SITE. GATE SHALL
14. CONTRACTOR SHALL SUPPLY GATE GUARD WHENEVER GATE IS OPEN FOR
ADDITIONAL REQUIREMENTS.
WITHIN 250' OF AN ACTIVE RUNWAY. SEE SAFETY NOTES FOR
13. NO STOCKPILES, VEHICLES NOR EQUIPMENT SHALL BE PERMITTED
TO AIRPORT OPERATIONS.
BE INSPECTED AND APPROVED BY AIRPORT MANAGER PRIOR TO OPENING
SATISFACTION OF THE AIRPORT MANAGER. THE CLOSED PAVEMENT SHALL
12. ALL PAVEMENT SURFACES SHALL BE CLEANED THOROUGHLY TO THE
IN PLACE PRIOR TO STARTING WORK.
11. ALL DESIGNATED SAFETY MARKINGS AND BARRICADES SHALL BE
COVERED FOR THE DURATION OF THE CLOSURE.
ASSOCIATED WITH THE CLOSED PAVEMENTS SHALL BE SHUT OFF OR
ALL EDGE LIGHTS, GUIDANCE SIGNS, VISUAL NAVAIDS, ETC.
LEAST 48 HOURS IN ADVANCE OF RUNWAY OR TAXIWAY CLOSURES.
10. NOTAMS (NOTICE TO AIRMEN) WILL BE ISSUED BY THE AIRPORT AT
9. SEE SAFETY NOTES FOR ADDITIONAL REQUIREMENTS.
AC 150/5210-5B.
AMBER DOME TYPE LIGHT AND IDENTIFIED IN ACCORDANCE WITH
8. ALL EQUIPMENT AND VEHICLES SHALL BE FLAGGED OR HAVE FLASHING
LEI
RDU-1704175-G003
SAFETY AND PHASING PLAN
rdu-1704175-g003
2020-08-13T15:23:02-0400
VI V HO
2020-08-12T11:03:01-0400
BRYAN B PENNAMON
lo tt e
SAFETY NOTES
RDU-1704175-G004
REPAIRED BY THE SUBCONTRACTOR AT NO COST TO THE OWNER.
SUBCONTRACTOR, HIS MEN OR EQUIPMENT DURING CONSTRUCTION SHALL BE
9. ANY DAMAGE TO THE EXISTING RUNWAY(S) OR TAXIWAY(S) CAUSED BY THE
DESCRIPTION OF ANY ITEM(S) ALREADY DAMAGED.
PROJECT MANAGER. THIS REPORT SHALL CONTAIN THE LOCATION AND THE
SUBCONTRACTOR SHALL PROVIDE A REPORT TO THE RESIDENT ENGINEER AND THE
AS WELL AS THE CONDITION OF THE EXISTING PAVEMENT, GRAVEL ROAD(S).
CONDITION OF ALL EXISTING RUNWAY(S), TAXIWAY(S), AND THRESHOLD LIGHTS,
8. PRIOR TO BEGINNING OF CONSTRUCTION, SUBCONTRACTOR SHALL INSPECT THE
STOPPING CONSTRUCTION ACTIVITY UNTIL THE OPERATION IS CORRECTED.
TO PROPERLY REMOVE ANY SPILLED MATERIAL MAY RESULT IN THE AIRPORT
RESULT IN THE SPILLAGE OF DEBRIS ON ROADS AND TAXIWAYS, OR THE FAILURE
MAY BE DROPPED ON ANY ROADWAY OR TAXIWAY AT ALL TIMES. OPERATIONS THAT
HIM THE MEANS TO CLEAN AND REMOVE ANY DEBRIS OR EARTH MATERIAL THAT
HIS OPERATIONS AT ALL TIMES. THE SUBCONTRACTOR SHALL HAVE AVAILABLE TO
7. THE SUBCONTRACTOR SHALL CONTROL DUST, WASTE AND DEBRIS RESULTING FROM
UNLESS OTHERWISE NOTED ON THE DRAWINGS OR SPECIFICATIONS.
6. ALL MATERIALS SHALL CONFORM TO THE STATE DOT STANDARD SPECIFICATIONS
IS RESPONSIBLE FOR REPAIRS OF ANY DAMAGE OR DETERIORATION TO SAID ROADS.
IMPROVED ROADWAYS ARE WITHIN THE DESIGN WEIGHT RANGE OF SAID ROADS AND
5. SUBCONTRACTOR TO ENSURE THAT ALL TRAFFIC OVER EXISTING OR CONSTRUCTED
THE UNDERGROUND CABLING AND FACILITIES FROM AIRPORT AND FAA.
WORK. THE SUBCONTRACTOR IS RESPONSIBLE FOR OBTAINING INFORMATION ON
4. SUBCONTRACTOR SHALL REVIEW ALL AIRFIELD UTILITIES PRIOR TO BEGINNING
MAINTAIN ACCEPTABLE LEVELS OF SAFETY.
COOPERATE FULLY TO ALLOW ORDERLY PROGRESSION OF ONGOING OPERATIONS AND TO
COORDINATE THIS WORK WITH AIRFIELD OPERATIONS. THE SUBCONTRACTOR SHALL
THE RE WILL ATTEND A WEEKLY CONSTRUCTION COORDINATION MEETING TO
THE AIRPORT AUTHORITY AND THE FEDERAL AVIATION ADMINISTRATION (FAA).
CONSTRUCTION ACTIVITIES SHALL BE CONDUCTED IN A MANNER ACCEPTABLE TO
3. THIS WORK IS IN CLOSE PROXIMITY TO ACTIVE TAXIWAYS AND RUNWAYS. ALL
ARE ACTIVE.
SAFETY AREA OR TAXIWAY SAFETY AREA WHILE THE RUNWAY(S) OR TAXIWAY(S)
EXCAVATIONS AND TRENCHES SHALL NOT BE PERMITTED WITHIN THE RUNWAY
MARKED AND LIGHTED TO THE SATISFACTION OF THE RE AND THE AIRPORT. OPEN
2. ALL OPEN EXCAVATIONS AND TRENCHES SHALL BE CONTINUOUSLY BARRICADED,
CLEANING MEASURES SHALL BE ACCEPTABLE TO THE RE AND AIRPORT MANAGEMENT.
SHALL HAVE EQUIPMENT ON-SITE IN ORDER TO CLEAN SUCH PAVEMENTS. THE
ADJACENT TO AND/OR ARE CROSSING TAXIWAYS/TAXI LANES, THE SUBCONTRACTOR
1. DURING PERIODS WHEN CONSTRUCTION EQUIPMENT AND VEHICLES ARE WORKING
SATISFACTION OF THE RE AND AIRPORT DIRECTOR.
SOILING, HYDROSEEDING, AND PLACING COCONUT MATTING COMPLETE TO THE
REPAIR OF EXISTING FACILITIES, REMOVAL OF UTILITIES, REGRADING, THE TOP
PROJECT, THE SUBCONTRACTOR SHALL RESTORE THE STAGING AREA; INCLUDING THE
MAKE PROVISIONS FOR ANY REQUIRED UTILITIES. UPON COMPLETION OF THE
PLAN AND VERIFIED DURING THE PRE-OFFER MEETING. THE SUBCONTRACTOR SHALL
7. STAGING AREA - THE SUBCONTRACTOR'S STAGING AREA WILL BE AS SHOWN ON THE
AS ANY CRITICAL OPERATIONAL AREAS FOR FUNCTIONING FAA FACILITIES.
HAUL ROUTES. STAGING AREA WILL BE PLACED CLEAR OF RSA AND TSA, AS WELL
REMAIN WITHIN THE LIMITS OF CONSTRUCTION AREA, STAGING AREA, OR
COST TO THE GOVERNMENT. ALL SUBCONTRACTOR VEHICLES AND TRAFFIC SHALL
TO HAUL ROADS, RESULTING FROM EXECUTING THIS CONTRACT, AT NO ADDITIONAL
AFTER EACH INGRESS/EGRESS. THE SUBCONTRACTOR SHALL REPAIR ANY DAMAGE
CONSTRUCTION AS DIRECTED BY THE RE. THE SUBCONTRACTOR SHALL LOCK GATE
PRE-CONSTRUCTION MEETING. ACCESS AND HAUL ROUTES MAY CHANGE DURING
BE VIA SPECIFIC ROUTE SHOWN ON THE ATTACHED PLAN AND VERIFIED AT THE
6. THE CONSTRUCTION SITE ACCESS AND HAUL ROADS: ACCESS TO THE JOB SITE SHALL
CONTROL FREQUENCY OR UNICOM.
USE AT ALL TIMES WHEN WORKING ON AIRFIELD AND TUNED TO AIRPORT GROUND
DURING CONSTRUCTION. SUBCONTRACTOR SHALL HAVE RADIO(S) AVAILABLE AND IN
ALLOW FOR AIRPORT GROUND AND AIR OPERATIONS TO CONTINUE AT ALL TIMES
5. SUBCONTRACTOR SHALL COORDINATE WITH THE RE AND AIR TRAFFIC CONTROL TO
RISK MANAGEMENT PLAN (RMP).
SAFETY RISK MANAGEMENT (SRM) DOCUMENT AND SUBCONTRACTORS APPROVED
4. THE SUBCONTRACTOR SHALL ADHERE TO REQUIREMENTS AS SET FORTH IN THE FAA
CONSTRUCTION CONTRACT APPLY.
"OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION," AND THE
3. GENERAL SAFETY CRITERIA - ALL PROVISIONS OF THE FAA AC 150/5370-2F
(DOT/FAA/ASY-300 98/001) PER FAA ORDER 5200.7A.
UNDERSTAND THE FAA AIRPORT GROUND VEHICLE OPERATIONS GUIDE
EMPLOYEES, SUBCONTRACTOR EMPLOYEES AND DELIVERY EMPLOYEES HAVE READ AND
VEHICLE(S). THE CONTRACTOR SHALL CERTIFY IN WRITING THAT ALL DRIVING
(COTR), THE RESIDENT ENGINEER (RE), OR DESIGNATED CONTRACTOR ESCORT
WITHOUT ESCORT BY THE FAA CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
MADE ON THE ACTIVE AIR OPERATIONS AREA (AOA) OR AIRCRAFT MOVEMENT AREA
2. NO MOVEMENT BY CONTRACTORS, SUBCONTRACTORS, OR DELIVERY VEHICLES SHALL BE
ANY UNAUTHORIZED PERSONNEL OR TRAFFIC ON THE SITE.
CONTRACT AND WITH LOCAL AUTHORITIES. THE SUBCONTRACTOR SHALL NOT PERMIT
COMPLY WITH ALL SECURITY CLEARANCE REQUIREMENTS OF THE CONSTRUCTION
1. SUBCONTRACTOR'S SECURITY CLEARANCE: THE SUBCONTRACTOR'S EMPLOYEES SHALL
HAULING ACTIVITIES.
CONSTRUCTION AS A RESULT OF THE SUBCONTRACTOR'S CONSTRUCTION OR
THAT FALLS ON ANY PAVEMENT OUTSIDE OF THE SUBCONTRACTOR'S LIMITS OF
THE SUBCONTRACTOR'S HAUL ROUTES AND IMMEDIATELY CLEAN UP MUD OR DEBRIS
SUBCONTRACTOR IS TO SWEEP ON A DAILY BASIS, ALL ROADWAYS THAT ARE ALONG
FIELD OR ROADWAY PAVEMENT AS A RESULT OF THE SUBCONTRACTOR'S WORK.
IS RESPONSIBLE FOR IMMEDIATE CLEANUP OF ANY DEBRIS THAT FALLS ON AIR
FROM AIRCRAFT BLAST, WIND CONDITION, OR RAINFALL. THE SUBCONTRACTOR
TREATED IN SUCH A MANNER AS TO PREVENT MOVEMENT OR EROSION RESULTING
6. AREAS OF STOCKPILED MATERIALS WITHIN THE CONSTRUCTION AREA ARE TO BE
EROSION AND SEDIMENT TRANSPORT AT ANY TIME DURING THE PROJECT.
5. THE RE MAY DIRECT THE SUBCONTRACTOR TO ADD NEW MEASURES TO CONTROL
THROUGHOUT THE CONSTRUCTION PROCESS.
GRADING OPERATIONS. THE DEVICES SHALL REMAIN IN PLACE AND BE MAINTAINED
4. THE SUBCONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES PRIOR TO BEGINNING
ACCESS AND EXIT WITH SEDIMENT CONTROL MEASURES AS APPROPRIATE.
3. SUBCONTRACTOR SHALL PROVIDE AND MAINTAIN THE STABILIZED CONSTRUCTION
ANY IMPROVEMENTS REQUIRED SHALL BE PERFORMED BY SUBCONTRACTOR.
INSPECT AND DETERMINE IF ANY IMPROVEMENTS TO THE SWPPP IS REQUIRED.
2. PRIOR TO INITIATING ANY WORK ON SITE, SUBCONTRACTOR AND THE RE WILL
EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
WITH THE STATE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND THE STATE
APPROVAL PRIOR TO BEGINNING FIELD OPERATIONS. SWPPP SHALL BE IN ACCORDANCE
PLAN (SWPPP) TO THE AIRPORT AND THE STATE AND/OR LOCAL ISSUING AUTHORITY FOR
1. IF REQUIRED THE SUBCONTRACTOR SHALL SUBMIT A STORM WATER POLLUTION PREVENTION
THE STATE AT NO ADDITIONAL COST TO THE GOVERNMENT.
OR DISTURBED SHALL BE RESET BY A PROFESSIONAL SURVEYOR LICENSED IN
NOTED OTHERWISE ON THE DRAWINGS, ANY MONUMENTS THAT ARE DAMAGED
3. THE SUBCONTRACTOR SHALL PROTECT ALL EXISTING MONUMENTS UNLESS
CONSTRUCTION IN ACCORDANCE WITH SPECIFICATION SECTION 02200.
2. THE SUBCONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES PRIOR TO
DISCREPANCIES.
SUBCONTRACTOR SHALL FIELD VERIFY AND INFORM THE RE OF ANY
1. THE EXISTING FEATURES SHOWN ARE FROM AIRPORT LAYOUT PLAN (ALP).
OR DEBRIS.
OF A LOW TO MODERATE PLASTICITY SOIL THAT IS FREE OF ORGANIC MATERIAL
ACCORDANCE WITH ASTM D1557. IF STRUCTURAL FILL IS USED, IT SHOULD CONSIST
BE UNIFORMLY COMPACTED TO AT LEAST 95% OF MODIFIED PROCTOR DENSITY IN
MOISTURE CONTENT WITHIN 3% OF THE OPTIMUM MOISTURE CONTENT. LIFT SHOULD
6. STRUCTURAL FILL OR BACKFILL SHALL BE PLACED IN 6 INCH LOOSE LIFTS AT A
LEVELING.
5. SUITABLE MATERIALS MAY BE USED AT THE SITE FOR FILL MATERIALS FOR SITE
CONTAMINATED MATERIAL CAN BE FOUND IN SPECIFICATIONS.
OFF SITE AND DISPOSED OF PROPERLY, PROCEDURES FOR HANDLING UNSUITABLE OR
4. THE SUBCONTRACTOR SHALL HAUL ALL EXCESS AND UNSUITABLE EXCAVATED MATERIAL
OR INITIATE WORK UNLESS APPROVED IN WRITING BY THE 'RE'.
WITH WORK IN THE PROBLEM AREAS. THE SUBCONTRACTOR SHALL NOT ORDER MATERIALS
PROBLEM AREAS, THE 'RE' SHALL DIRECT THE SUBCONTRACTOR ON HOW TO PROCEED
'RE' IN WRITING WITH THE RESULTS OF THIS INSPECTION. IF THERE ARE ANY
PORTION OF THE CONTRACT DOCUMENTS. THE SUBCONTRACTOR SHALL NOTIFY THE
THE SUBCONTRACTOR FROM COMPLYING WITH THE ABOVE CRITERIA OR ANY OTHER
ALIGNMENT OF THE ACCESS DRIVES OR THE NAVIGATIONAL AIDS THAT WILL INHIBIT
THAT ARE NOT REFLECTED ON THESE PLANS OR ANY OTHER ISSUES WITH THE
THE CURRENT CONDITIONS ON SITE AND DETERMINE IF THERE ARE ANY CONDITIONS
3. PRIOR TO INITIATING CONSTRUCTION, THE SUBCONTRACTOR SHALL FIELD INSPECT
MAX CHANGE PARALLEL TO EXTENDED CENTERLINE -2%
PARALLEL TO EXTENDED CENTERLINE -3%
PERPENDICULAR TO EXTENDED CENTERLINE -3%
ALLOWABLE GRADES ARE AS FOLLOWS:
2. INSIDE THE RUNWAY SAFETY AREA (STA 0+00 THRU 10+00), THE MAXIMUM
DIFFERENCE EXCEED 8.0%.
EXCEED 2.0% UNLESS MADE WITH A VERTICAL CURVE AND IN NO CASE SHALL THE
THE ALGEBRAIC DIFFERENCE IN CHANGES IN LONGITUDINAL SLOPE SHALL NOT
EXCEED 4.0% AND THE MAXIMUM LONGITUDINAL SLOPE SHALL NOT EXCEED 8.0%.
POSITIVE DRAINAGE AND DOES NOT BLOCK RUNOFF. CROSS SLOPES SHALL NOT
SHALL CONSTRUCT THE ACCESS DRIVES SUCH THAT THE FINISH GRADE HAS
1. UNLESS OTHERWISE APPROVED BY THE RE OR SHOWN HEREIN, THE SUBCONTRACTOR
GENERAL NOTES
SECURITY AND SAFETY NOTES EROSION CONTROL NOTES
SURVEY CONTROL NOTES
SEQUENCE AND COORDINATION OF CONSTRUCTION
GRADING NOTES
THE AIRPORT.
CONSTRUCTION ACTIVITY THAT ADVERSELY IMPACTS THE OPERATIONAL SAFETY OF
COTR, RE, SSC, ATCT, AND AIRPORT OPERATIONS IN THE EVENT OF A
16. SUBCONTRACTOR SHOULD HAVE ON HAND EMERGENCY CONTACT INFORMATION FOR THE
BE ISSUED BY FAA FLIGHT SERVICE IN ACCORDANCE WITH ESTABLISHED CRITERIA.
TIE-INS, WORK WITHIN AIRPORT OPERATIONS AREA, ETC.) SO THAT NOTAMS CAN
THE NECESSARY INFORMATION ON CONSTRUCTION CONDITIONS (RUNWAY CLOSURES,
15. NOTICE TO AIRMEN (NOTAMS) - THE SUBCONTRACTOR SHALL FURNISH THE RE WITH
DEPARTMENT, AND/OR 911 CITING THE AIRPORT AS THE LOCATION.
14. IN THE EVENT OF AN EMERGENCY, SUBCONTRACTOR TO CALL ONSITE FIRE
AT THE END OF THE WORK DAY OR AT TIMES WHEN NO WORK IS GOING ON.
13. ALL MATERIALS AND EQUIPMENT TO BE CLEARED FROM THE RSA, TSA, AND OFA
WHEN WORK IS PERFORMED WITHIN RSA OR TSA.
RSA, TSA, ACTIVE RUNWAYS OR TAXIWAYS. RUNWAY CLOSURE WILL BE REQUIRED
12. AT NO TIME WILL SUBCONTRACTOR'S EQUIPMENT OR CREW BE ALLOWED WITHIN THE
NO SEPARATE PAYMENT WILL BE MADE.
CLOSED. COSTS ARE CONSIDERED TO BE INCIDENTAL TO OVERALL PROJECT COST.
NIGHT, A LIGHTED "X" SHALL BE PLACED AT EACH END OF THE RUNWAY BEING
FOR AIRCRAFT AS WELL AS CONSTRUCTION OPERATIONS. FOR LANE CLOSURES AT
AND TAXIWAY CLOSURE AS DEEMED NECESSARY TO PROVIDE MAXIMUM PROTECTION
11. SUBCONTRACTOR TO PROVIDE ADEQUATE AND APPROPRIATE BARRICADES FOR RUNWAY
FRAME(S) EACH ITEM WILL BE USED TO THE RE.
THE SUBCONTRACTOR MUST SUBMIT THEIR EQUIPMENT LIST WITH THE TIME
WITH HEIGHT RESTRICTIONS, TO COMPLY WITH ALL RUNWAY AND TAXIWAY SURFACES
TAXIWAYS. SUBCONTRACTOR IS ADVISED THAT WORK WILL REQUIRE COMPLIANCE
10. THE CONTRACT REQUIRES WORK IN CLOSE PROXIMITY TO ACTIVE RUNWAYS AND
ADMINISTERED IN THE EVENT OF A RUNWAY INCURSION.
REMOVED FROM THE CONSTRUCTION SITE. A FINE OF $1 MILLION CAN BE
CONSTRUCTION USE. FAILURE TO DO SO COULD RESULT IN OFFENDERS BEING
ASSOCIATED WITH CONSTRUCTION IS TO USE ONLY AREAS SHOWN FOR
AND MAY CHANGE DURING CONSTRUCTION AS DIRECTED BY THE RE. TRAFFIC
ENFORCED. LIMITS SHALL BE DEFINED AT THE PRE-CONSTRUCTION MEETING
CONSTRUCTION WHILE ON THE CONSTRUCTION SITE. THESE LIMITS ARE STRICTLY
TRAFFIC ARE REQUIRED BY FAA RULES TO STAY WITHIN THE LIMITS OF
9. CONSTRUCTION LIMITS - ALL SUBCONTRACTOR VEHICLES AND CONSTRUCTION
POINT AT THE TERMINATION OF WORK DAY.
AT ALL TIMES. ALL MECHANICAL EQUIPMENT SHALL BE LOWERED TO ITS LOWEST
ORANGE AND WHITE CHECKERED FLAG ON HIGHEST POINT OF MECHANICAL EQUIPMENT
WHILE OPERATING INSIDE THE FENCE LINE. SUBCONTRACTOR SHALL PROVIDE AN
AIRPORT SHALL BE EQUIPPED WITH FLASHING YELLOW LIGHTS AND COMPANY SIGN
8. CONSTRUCTION VEHICLE MARKING - ALL MOTORIZED VEHICLES OPERATING ON THE
AIRPORT INFORMATION
CTAF: NONE
GROUND CONTROL FREQ: 121.9
UNICOM FREQ: 122.95
MANAGER: MICHAEL LANGUTH 919-840-7701
CITY: RALEIGH/ DURHAM
STATE: NORTH CAROLINA
NAME: RALEIGH-DURHAM INTERNATIONAL AIRPORT
EXISTING EQUIPMENT TO BE MOVED TO NEW SHELTER.
3. REMOVE AND REPLACE EXISTING SHELTER WITH NEW 10'x 16' MALSR SHELTER.
THE ATTENTION OF THE RE IN WRITING.
2. ANY SCHEDULE/SEQUENCE INTERFERENCE SHALL BE IMMEDIATELY BROUGHT TO
IN THE WORK AREA SUCH THAT THERE ARE NO KNOWN INTERFERENCES.
AND PARSONS, THAT IS COORDINATED WITH ALL OTHER PROJECTS
SEQUENCE OF CONSTRUCTION FOR REVIEW AND APPROVAL BY THE FAA, AIRPORT,
1. WITHIN 10 DAYS OF NOTICE OF AWARD THE SUBCONTRACTOR SHALL PREPARE A
rdu-1704175-g004
2020-08-13T15:26:09-0400
VI V HO
2020-08-12T11:07:39-0400
BRYAN B PENNAMON
File details come from the government source that posted it. Updated .