Simple Pricing Format Cost Breakdown.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- RCCTO COMMAND POST TRAILERS LEASE
- Solicitation number
- W911S625QA035
About this file
The file is a Simple Pricing Format Cost Breakdown template for a federal contract opportunity related to trailer leasing. The spreadsheet provides a structured format for pricing labor categories, including Project Management, Administrative, Laborer(s), and Engineering Tech, with columns for hourly rates and estimated hours. The template also includes sections for overhead/fringe costs, G&A, fees, equipment/supplies, other direct costs (ODCs), subcontracting, travel, and additional cost calculations.
The related federal contract opportunity is a solicitation by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood for the Rapid Capabilities and Critical Technologies Office (RCCTO). The requirement is to lease one single-wide trailer (12x60) configured as a Command Post and two double-wide portable trailers (24x60 each) - one for conferencing and one for a classroom. Specific trailer requirements include furniture, appliances, heating/cooling, entrance stairs, electrical connections, and generator hookup compatibility. The initial lease term is 12 months with options for up to four additional years, with flexibility to adjust the number of trailers as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1 W911S625QA0350001 SF 30.pdf | ||
| CLASSROOM TRAILER.pdf | ||
| Trailer SOW v3 082825.docx | DOCX document | |
| COMMAND TRAILER.pdf | ||
| Solicitation - W911S625QA035.pdf | ||
| CONFERENCE TRAILERS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Labor | |||
| Labor Category | Hourly Rate | Estimated Hours | Total |
| Project Management | 20 | ||
| Administrative | 20 | ||
| Laborer(s) | 20 | $ - 0 | |
| Engineering Tech | 20 | $ - 0 | |
| TOTAL | $ - 0 | ||
| Labor Subtotal | $ - 0 | ||
| This section is required only when hourly rates above are not fully loaded. | |||
| Overhead/Fringe @ | 33% | $ - 0 |
G&A @ 15% $ - 0
Fee @ 0% $ - 0
Labor Total $ - 0
| Other Costs | |||
| Equipment/ Supplies | Unit Price | Quantity | Total |
| description, part number, etc. | 0 | $ - 0 | |
| $ - 0 | |||
| Miscellaneous | $ - 0 | ||
| Equipment/Supplies Subtotal | $ - 0 |
| ODCs | Unit Price | Quantity | Total |
| shipping, etc. | $ - 0 | ||
| $ - 0 | |||
| $ - 0 | |||
| ODCs Subtotal | $ - 0 |
| Subcontracting | Unit Price | Quantity | Total |
| subcontractor costs - position titles, hours, fees, etc. | $ - 0 | ||
| $ - 0 | |||
| $ - 0 | |||
| Subcontracting Subtotal | $ - 0 |
| Travel | Unit Price | Quantity | Total |
| separate each item, such as flight, lodging, meal per diem, etc. | $ - 0 | ||
| $ - 0 | |||
| $ - 0 | |||
| Travel Subtotal | $ - 0 |
Other Other Costs - Subtotal $ - 0
G&A (not including travel) 15% $ - 0
Fee (not including travel) 0% $ - 0
Other Costs - Total $ - 0
Total Cost Estimate $ - 0
File details come from the government source that posted it. Updated .