Sim Center Scope of Work.pdf
PDF 510 KB Posted
- Attached to
- CBJTC SIM Center HVAC Replacement
- Solicitation number
- ITB-05302
- Issued by
- Clay County, Florida
About this file
This document is a Scope of Work for Project #1223032 CBJTC Sim Center HVAC Replacement, located in the State of Florida, specifically in the jurisdictions of St. Johns County and St. Petersburg City. The project requires the removal of 6 existing wall-hung HVAC units and the installation of 3 new 10-ton package heat pump units on the rear of the building. The new units must be Carrier or an equivalent product, placed as close to the back wall as possible to minimize exterior ductwork. Associated work includes repairing wall openings, providing weather-tight sealing, installing new ductwork with insulation, and constructing a chase wall to conceal the ductwork. All finishes must match the existing building.
The contract requires the provision of all necessary power circuits, thermostats, control wiring, piping, fire alarm, and shop drawings for a turnkey HVAC system. The contractor is responsible for obtaining all required permits and ensuring the work is installed per CBJTC standards and manufacturer recommendations. The project includes a one-year parts and labor warranty, and a five-year manufacturer compressor warranty.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign in sheet.pdf | ||
| 223032 SIM HVAC Exhibit 1 ITB.pdf | ||
| Bid Tab.pdf | ||
| 223032 SIM Center ADDENDUM #1.pdf | ||
| 22032 SIM Center HVAC Non Techs Specs.pdf | ||
| 223032 SIM Exhibit_4_5_Proposal_SubList.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Project #1223032
CBJTC Sim Center HVAC Replacement
Remove 6 existing wall hung (Bard) HVAC units, 3 from the front, and 3 from the rear of building with all associated equipment dispose of off CBJTC property. Repair all openings on the exterior and interior walls existing per manufacture recommendations. Furnish and install 3 new 10-ton package units
New units will be placed as close to the back wall as possible to minimize the amount of exterior duct . Provide all necessary flashings, metal, UV protection and sealant for a weather tight seal around duct work
. All supply return heet metal with externally wrapped insulation . A new chase wall will need to be installed to hide the duct work from where it enters the building to where it enters the ceiling space. All finishes are to match existing.
Furnish all power circuits, thermostats , control wiring, piping, fire alarm, shop drawing and all associated equipment for a turnkey system.
recommendation
All supply return heet metal with externally wrapped insulation .
Furnish all power circuits, thermostats , control wiring, piping, fire alarm, shop drawing and all associated equipment for a turnkey system.
exterior duct .