Sidewalk_Repair_Work_Order_-_Draft_-_v4.2.5.pdf
PDF 1 MB Posted
- Solicitation number
- CWB014279
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
This is a draft work order template issued by the City of Bridgeport, Connecticut for sidewalk repair and related construction services as part of the 2026 Sidewalk Bid program. The work order establishes the framework for contracted sidewalk repair services and references a master agreement between the City of Bridgeport and a contractor. The scope of services encompasses multiple construction-related line items including excavation and disposal, concrete sidewalk and driveway apron installation, brick sidewalk installation, stamped concrete work, granite curb installation and reset, permanent pavement repair, tree gates and tree pits, grass strips, concrete curbs, trash receptacles, sidewalk benches, conduit installation, street lighting components, bollards, catch basin relocation, truncated domes, and concrete panel edge grinding. The bidding process requires electronic submissions through the City's OpenGov Procurement Portal at https://procurement.opengov.com/portal/bridgeportct, with a submission deadline of 2:00 pm on Tuesday, September 22, 2026. Questions must be submitted in writing by 5:00 pm on Tuesday, September 8, 2026, with all answers published as addenda on the procurement website.
Compensation for contracted work is structured on a unit price basis with a lump sum not-to-exceed amount, with all costs including reimbursable expenses. The work order requires contractors to submit itemized unit price schedules for project costs, beginning and ending project photographs, and a final itemized unit price schedule. The template incorporates references to insurance requirements outlined in Article 6 of the master agreement and includes provisions for bond requirements as specified in individual work orders. Contractors are required to create free accounts on the OpenGov Procurement platform to submit bids, and all participants must regularly monitor the procurement website for any issued addenda or modifications to bid requirements.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Bridgeport 2026 Sidewalk Bid
Sidewalk Work Order - Draft
Work Order No. Work Order Date: , , 202
Subject to the Master Agreement by and between the CITY OF BRIDGEPORT and _____________________ ________________________ (the “Contractor”) dated ___________, ___, _____, for Sidewalk related Services (hereinafter referred to as the “Agreement”), the City hereby directs the Contractor to perform the professional Construction services specified in this Work Order No._____. In accordance with the Agreement and subject to the terms and conditions thereof.
1. Project Description and Location: As set forth in the Contractor’s Proposal
Dated , entitled “__________________________”) (the “Proposal”) attached hereto as
Exhibit A.
2. Scope of Services: As set forth in Section _____________ of the Proposal.
a. Itemized Unit Price Schedule of Project with Quote Total
b. Photos of beginning and end of Project Area
c. Itemized Unit Price Schedule of Project Final Total
3. Schedule: The commencement and completion dates, performance and milestones schedule, as set forth in Section ______________ of the Proposal.
4. Compensation:
a. Lump Sum, Not to Exceed Compensation: Subject to the terms of the
Agreement, the City shall compensate the Contractor for the satisfactory performance of the service set forth in the Proposal based on the applicable Unit Price Schedule set forth in the Agreement. The total amount of fees payable under the Agreement for this Work Order shall not exceed _____________ DOLLARS
AND ______ /100 CENTS ($ _______ . __) inclusive of all reimbursable expenses.
b. Schedule of Values: As set forth in Section ______________ of the Proposal.
5. Special Conditions:
a. Assumptions: As set forth in Section ______________ of the Proposal.
b. Deliverables: As set forth in Section ______________ of the Proposal.
c. Information Provided by the City: As set forth in Section ______________ of the Proposal.
d. Assumptions: As set forth in Section ______________ of the Proposal.
e. Specific Out of Scope Items: As set forth in Section _______________ of the Proposal.
6. C ontractor’s Standard Terms and Conditions: It is the intention of the
Parties that the Standard Terms and Conditions of this Work Order are set forth in the Agreement. In the event that the Contractor’s Proposal sets forth its Standard Contract Terms and Conditions within the
Proposal, whether expressly or by incorporation, they shall be void ab initio unless expressly accepted by the
City.
7. IInsurance Requirements: Modifications, if any, to the insurance requirements contained in Article 6 of the Master Agreement:
8. BBond Requirements: Bond requirements, if any: .
I ISSUED AND AUTHORIZED
BY:
ACCEPTED AND AGREED TO
BY:
City of Bridgeport
By:
Its
By:
Its
Duly Authorized Date:
Duly Authorized Date:
Exhibit A - (Page 1 of 3)
Item Description Unit Cost (Amount in Words) Unit Cost Unit of Measure
Excavation, Disposal Per Cubic Yard
8" Concrete Driveway Apron Per Square Foot
5" Concrete Sidewalk with wire mesh Per Square Foot
Brick Sidewalk on Concrete base Per Square Foot
Stamped Concrete 5" with wire mesh Per Square Foot
Granite Curb 5" x 18" Per Linear Foot
Reset Existing Granite Curb Per Linear Foot
Permanent Pavement Repair Per Square Foot
Tree Gate Installed Per Each Item
Tree Pit Includes Tree Per Each Item
3' Wide Grass Strip Per Square Foot
18" Concrete Sidewalk Curb Per Linear Foot
12" Concrete Driveway Curb Per Linear Foot
Trash Receptacle Per Each Item
Sidewalk Bench Per Each Item
2" Diameter PVC Conduit Per Linear Foot
2" Diameter Rigid Metal Conduit Per Linear Foot
Street Light Cable & Electrical Service Per Each Item
Standard Light & Foundation Per Each Item
Metal Hatchways Per Each Item
Box Per Each Item
Cabinet and Enclosures Per Cubic Yard
Bollard Per Each Item
Catch Basin Relocation Per Each Item
Truncated Dome Per Each Item
Grinding Concrete Panel Edge(s) Per Linear Inch
Exhibit A - (Page 2 of 3)
A color photo of the repair location that clearly indicates where the sidewalk work will begin.
Exhibit A - (Page 3 of 3)
A color photo of the repair location that clearly indicates where the sidewalk work will end.