Sidewalk_Repair_Work_Order_-_Draft_-_v4.2.5.pdf

PDF 1 MB Posted

Attached to
Citywide Sidewalk, Curb, Apron & ADA Ramp Repair and Replacement
Solicitation number
CWB014279
Issued by
Fairfield County, Bridgeport City, Connecticut

About this file

This is a draft work order template issued by the City of Bridgeport, Connecticut for sidewalk repair and related construction services as part of the 2026 Sidewalk Bid program. The work order establishes the framework for contracted sidewalk repair services and references a master agreement between the City of Bridgeport and a contractor. The scope of services encompasses multiple construction-related line items including excavation and disposal, concrete sidewalk and driveway apron installation, brick sidewalk installation, stamped concrete work, granite curb installation and reset, permanent pavement repair, tree gates and tree pits, grass strips, concrete curbs, trash receptacles, sidewalk benches, conduit installation, street lighting components, bollards, catch basin relocation, truncated domes, and concrete panel edge grinding. The bidding process requires electronic submissions through the City's OpenGov Procurement Portal at https://procurement.opengov.com/portal/bridgeportct, with a submission deadline of 2:00 pm on Tuesday, September 22, 2026. Questions must be submitted in writing by 5:00 pm on Tuesday, September 8, 2026, with all answers published as addenda on the procurement website.

Compensation for contracted work is structured on a unit price basis with a lump sum not-to-exceed amount, with all costs including reimbursable expenses. The work order requires contractors to submit itemized unit price schedules for project costs, beginning and ending project photographs, and a final itemized unit price schedule. The template incorporates references to insurance requirements outlined in Article 6 of the master agreement and includes provisions for bond requirements as specified in individual work orders. Contractors are required to create free accounts on the OpenGov Procurement platform to submit bids, and all participants must regularly monitor the procurement website for any issued addenda or modifications to bid requirements.

View the file

Other files

File Type Posted
HW-0813_02_-_Stone_Curbing.pdf PDF
133-GUIDE_SHEET_-_Pedestrian_Refuse_Island(s).pdf PDF
Sidewalk_Specifications_&_Standard_Details.pdf PDF
121-GUIDE_SHEET_-_Perpendicular_Ramp(s).pdf PDF
HW-0922_01_-_Bituminous_Concrete_Sidewalk_&_Driveway.pdf PDF
HW-0815_01_-_Bituminous_Curbing.pdf PDF
124-GUIDE_SHEET_-_Single_Direction_Perpendicular_Ramp(s).pdf PDF
136-GUIDE_SHEET_-_Railroad_Crossing_Ramp(s).pdf PDF
130-GUIDE_SHEET_-_Restricted_Pedestrian_Crossing_Ramp(s).pdf PDF
139-GUIDE_SHEET_-_Driveway(s).pdf PDF
118-GUIDE_SHEET_-_Parallel_&_Perpendicular_Ramp(s).pdf PDF
HW-0813_01_-_Granite_Transistion_Curbing.pdf PDF
Construction_Contract.pdf PDF
127-GUIDE_SHEET_-_Penpendicular_Ramp(s).pdf PDF
115-GUIDE_SHEET_-_Perpendicular_Ramp(s)_with_Street.pdf PDF
112-GUIDE_SHEET_-_Two_Directional_Perpendicular_&_Blended_Ramp(s).pdf PDF
HW-0803_01_-_Paved_Aprons.pdf PDF
HW-0921_01_-_Concrete_Sidewalks.pdf PDF
109-GUIDE_SHEET_-_Basic_Ramp.pdf PDF
HW-0811_01_-_Concrete_Curb.pdf PDF
Construction_Services_Insurance_Rider_-_2026_08_28.pdf PDF
HW-0924_01_-_Concrete_Driveway_Ramps.pdf PDF
106-GUIDE_SHEET_-_General_Sidewalk_Ramp(s).pdf PDF
General_Conditions_-_Final_Rev._Feb_2026_-_Higher_Limits.pdf PDF
Instruction_to_Sidewalk_Bidders_-_2026_08_28.pdf PDF
Invitation_To_Sidewalk_Bid_-_2026_08_28.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Bridgeport 2026 Sidewalk Bid

Sidewalk Work Order - Draft

Work Order No. Work Order Date: , , 202

Subject to the Master Agreement by and between the CITY OF BRIDGEPORT and _____________________ ________________________ (the “Contractor”) dated ___________, ___, _____, for Sidewalk related Services (hereinafter referred to as the “Agreement”), the City hereby directs the Contractor to perform the professional Construction services specified in this Work Order No._____. In accordance with the Agreement and subject to the terms and conditions thereof.

1. Project Description and Location: As set forth in the Contractor’s Proposal

Dated , entitled “__________________________”) (the “Proposal”) attached hereto as

Exhibit A.

2. Scope of Services: As set forth in Section _____________ of the Proposal.

a. Itemized Unit Price Schedule of Project with Quote Total

b. Photos of beginning and end of Project Area

c. Itemized Unit Price Schedule of Project Final Total

3. Schedule: The commencement and completion dates, performance and milestones schedule, as set forth in Section ______________ of the Proposal.

4. Compensation:

a. Lump Sum, Not to Exceed Compensation: Subject to the terms of the

Agreement, the City shall compensate the Contractor for the satisfactory performance of the service set forth in the Proposal based on the applicable Unit Price Schedule set forth in the Agreement. The total amount of fees payable under the Agreement for this Work Order shall not exceed _____________ DOLLARS

AND ______ /100 CENTS ($ _______ . __) inclusive of all reimbursable expenses.

b. Schedule of Values: As set forth in Section ______________ of the Proposal.

5. Special Conditions:

a. Assumptions: As set forth in Section ______________ of the Proposal.

b. Deliverables: As set forth in Section ______________ of the Proposal.

c. Information Provided by the City: As set forth in Section ______________ of the Proposal.

d. Assumptions: As set forth in Section ______________ of the Proposal.

e. Specific Out of Scope Items: As set forth in Section _______________ of the Proposal.

6. C ontractor’s Standard Terms and Conditions: It is the intention of the

Parties that the Standard Terms and Conditions of this Work Order are set forth in the Agreement. In the event that the Contractor’s Proposal sets forth its Standard Contract Terms and Conditions within the

Proposal, whether expressly or by incorporation, they shall be void ab initio unless expressly accepted by the

City.

7. IInsurance Requirements: Modifications, if any, to the insurance requirements contained in Article 6 of the Master Agreement:

8. BBond Requirements: Bond requirements, if any: .

I ISSUED AND AUTHORIZED

BY:

ACCEPTED AND AGREED TO

BY:

City of Bridgeport

By:

Its

By:

Its

Duly Authorized Date:

Duly Authorized Date:

Exhibit A - (Page 1 of 3)

Item Description Unit Cost (Amount in Words) Unit Cost Unit of Measure

Excavation, Disposal Per Cubic Yard

8" Concrete Driveway Apron Per Square Foot

5" Concrete Sidewalk with wire mesh Per Square Foot

Brick Sidewalk on Concrete base Per Square Foot

Stamped Concrete 5" with wire mesh Per Square Foot

Granite Curb 5" x 18" Per Linear Foot

Reset Existing Granite Curb Per Linear Foot

Permanent Pavement Repair Per Square Foot

Tree Gate Installed Per Each Item

Tree Pit Includes Tree Per Each Item

3' Wide Grass Strip Per Square Foot

18" Concrete Sidewalk Curb Per Linear Foot

12" Concrete Driveway Curb Per Linear Foot

Trash Receptacle Per Each Item

Sidewalk Bench Per Each Item

2" Diameter PVC Conduit Per Linear Foot

2" Diameter Rigid Metal Conduit Per Linear Foot

Street Light Cable & Electrical Service Per Each Item

Standard Light & Foundation Per Each Item

Metal Hatchways Per Each Item

Box Per Each Item

Cabinet and Enclosures Per Cubic Yard

Bollard Per Each Item

Catch Basin Relocation Per Each Item

Truncated Dome Per Each Item

Grinding Concrete Panel Edge(s) Per Linear Inch

Exhibit A - (Page 2 of 3)

A color photo of the repair location that clearly indicates where the sidewalk work will begin.

Exhibit A - (Page 3 of 3)

A color photo of the repair location that clearly indicates where the sidewalk work will end.