This is a standard engineering specification sheet issued by the Connecticut Department of Transportation (CTDOT) Office of Engineering in Newington, Connecticut, depicting detailed construction standards for concrete driveway ramps. The document, designated as Standard Sheet HW-924_01 and dated November 25, 2024, provides comprehensive technical guidelines for the design and construction of driveway ramps in residential and commercial applications. The specifications include multiple plan and section views (Plans A, B, and C) that illustrate ramp configurations with specific dimensional requirements, including maximum grade specifications of 8 percent for commercial applications and 12 percent for residential applications. Key construction details include 8-inch concrete thickness with 2-inch bituminous concrete overlay, 6-inch granular fill base, minimum 4x4 W6.5x W6.5 welded steel wire fabric reinforcement, and variable ramp configurations with pedestrian sidewalk setbacks. The sheet was submitted by Leo Fontaine, P.E., and approved by Michael N. Calabrese, P.E., on January 29, 2025, indicating current regulatory applicability for projects within Connecticut jurisdictions.

This standard specification sheet serves as a reference document for the City of Bridgeport's Citywide Sidewalk, Curb, Apron & ADA Ramp Repair and Replacement project, for which electronic bids are being received through the City's OpenGov Procurement Portal until 2:00 p.m. on September 22, 2026. The technical guidelines establish minimum construction standards and material specifications that bidders must comply with when submitting proposals for sidewalk, curb, and ADA ramp work throughout Bridgeport. All bidders are required to review addenda posted on the procurement portal, with the deadline for written questions set at 5:00 p.m. on September 8, 2026, ensuring bidders have access to clarifications regarding these engineering standards prior to proposal submission.

View the file

Other files

File Type Posted
HW-0813_02_-_Stone_Curbing.pdf PDF
133-GUIDE_SHEET_-_Pedestrian_Refuse_Island(s).pdf PDF
Sidewalk_Specifications_&_Standard_Details.pdf PDF
121-GUIDE_SHEET_-_Perpendicular_Ramp(s).pdf PDF
HW-0922_01_-_Bituminous_Concrete_Sidewalk_&_Driveway.pdf PDF
HW-0815_01_-_Bituminous_Curbing.pdf PDF
124-GUIDE_SHEET_-_Single_Direction_Perpendicular_Ramp(s).pdf PDF
136-GUIDE_SHEET_-_Railroad_Crossing_Ramp(s).pdf PDF
130-GUIDE_SHEET_-_Restricted_Pedestrian_Crossing_Ramp(s).pdf PDF
139-GUIDE_SHEET_-_Driveway(s).pdf PDF
118-GUIDE_SHEET_-_Parallel_&_Perpendicular_Ramp(s).pdf PDF
HW-0813_01_-_Granite_Transistion_Curbing.pdf PDF
Construction_Contract.pdf PDF
127-GUIDE_SHEET_-_Penpendicular_Ramp(s).pdf PDF
Sidewalk_Repair_Work_Order_-_Draft_-_v4.2.5.pdf PDF
115-GUIDE_SHEET_-_Perpendicular_Ramp(s)_with_Street.pdf PDF
112-GUIDE_SHEET_-_Two_Directional_Perpendicular_&_Blended_Ramp(s).pdf PDF
HW-0803_01_-_Paved_Aprons.pdf PDF
HW-0921_01_-_Concrete_Sidewalks.pdf PDF
109-GUIDE_SHEET_-_Basic_Ramp.pdf PDF
HW-0811_01_-_Concrete_Curb.pdf PDF
Construction_Services_Insurance_Rider_-_2026_08_28.pdf PDF
106-GUIDE_SHEET_-_General_Sidewalk_Ramp(s).pdf PDF
General_Conditions_-_Final_Rev._Feb_2026_-_Higher_Limits.pdf PDF
Instruction_to_Sidewalk_Bidders_-_2026_08_28.pdf PDF
Invitation_To_Sidewalk_Bid_-_2026_08_28.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2''

2½''

8% MAX. GRADE FOR COMMERCIAL

12% MAX. GRADE FOR RESIDENTIAL

8" CONCRETE

BITUMINOUS CONCRETE DRIVEWAY

GRANULAR FILL 8"

ELEVATION

6"6"

CONCRETE DRIVEWAY RAMP

PLAN

DRIVEWAY RAMP

SECTION A

R=10' MIN. (TYP.)

4 x 4 W6.5 x W6.5 MIN.

WELDED STEEL WIRE FABRIC

8"

2"

7% MAX.

PLAN

B

6"6"

DRIVEWAY RAMP

ELEVATION

A

2''2½''

8% MAX. GRADE FOR COMMERCIAL

12% MAX. GRADE FOR RESIDENTIAL

BITUMINOUS CONCRETE DRIVEWAY

GRANULAR FILL

2% MAX.

1.5% TYP.

OR AS DIRECTED

4 x 4 W6.5 x W6.5 MIN.

WELDED STEEL WIRE FABRIC

SECTION B

1½''

PLAN

6"6"

ELEVATION

2''

R=1''

2½''

8"

8% MAX. GRADE FOR COMMERCIAL

12% MAX. GRADE FOR RESIDENTIAL

8" CONCRETE

BITUMINOUS CONCRETE DRIVEWAY

GRANULAR FILL

2% MAX.

1.5% TYP.

4 x 4 W6.5 x W6.5 MIN.

WELDED STEEL WIRE FABRIC

OR AS DIRECTED

8"

2"

SECTION C

VARIABLE

VARIABLE

C

WITH A PEDESTRIAN SIDEWALK SETBACK WITH PEDESTRIAN SIDEWALK AT THE CURB

CONCRETE DRIVEWAY RAMP CONCRETE DRIVEWAY RAMP

8.33% MAX.

DRIVEWAY RAMP

8.33% MAX.

6" CURBING6" CURBING

VARIABLE

6" CURBING

6" CURBING

DRIVEWAY LIP 1½''

TOP OF CURB TOP OF CURB

DRIVEWAY RAMP (TYP.)

BE MEASURED WITH THE

CURB ON RAIDUS IS TO

DRIVEWAY LIP 1½''

DRIVEWAY RAMP (TYP.)

BE MEASURED WITH THE

CURB ON RAIDUS IS TO

6" CURBING

DRIVEWAY LIP 1½''

TOP OF CURB

SURFACE (TYP.)

NON-WALKING

SURFACE (TYP.)

NON-WALKING

DRIVEWAY ELEVATION (TYP.)

TRANSITION CURBING TO MATCH

BACK OF SIDEWALK RAMP

SURFACE (TYP.)

NON-WALKING

DRIVEWAY ELEVATION (TYP.)

TRANSITION CURBING TO MATCH

R=1''

2½''

8" CONCRETE

8"

8"

2"

7% MAX.

1½''

5'-0"

5'-0"

BACK OF SIDEWALK

FRONT OF SIDEWALK

1½''

R = 1''

PAVEMENT

4/19/24 updated version

12"

PAVEMENT

12"

PAVEMENT

12"

STANDARD SHEET TITLE: STANDARD SHEET NO.:

11/25/2024

SIGNATURE BLOCK:

CONCRETE DRIVEWAY RAMPS

HW-924_01

PLOTTED DATE:

NOT TO SCALE

NEWINGTON, CT 06111

2800 BERLIN TURNPIKE

OFFICE OF ENGINEERING

STANDARD SHEET

CTDOT

SUBMITTED BY: APPROVED BY:

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

2024-12-19T15:10:16-0500
Leo Fontaine, P.E.
2025-01-29T12:48:28-0500
Michael N. Calabrese, P.E.

File details come from the government source that posted it. Updated .