AMND 02.pdf

PDF 764 KB Posted

Attached to
DCMA Pease Repair
Solicitation number
SICG030-25
Issued by

About this file

This document is an Amendment of Solicitation (Standard Form 30) for solicitation SICG030-25, issued by Federal Prison Industries, UNICOR. The amendment provides a set of questions and answers related to a repair project for the Defense Contract Management Agency (DCMA) at the Pease location, which sustained water damage. Key details include:

The project involves repairing and replacing drywall, insulation, drop ceiling tiles, and carpet tiles, with specific requirements such as building a new wall from deck to ceiling grid, no new electrical work, and no sprinkler modifications needed. The office will be closed during construction, with employees' personal property removed. Contractors are advised that this is a new contract, no hazardous materials are known, and the wall is not a fire-rated partition. The award will be made after proposal reviews, with no taxes to be included in proposals and contractors required to follow the Wage Determination.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AMND 02 07/11/2025

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

FEDERAL PRISON INDUSTRIES, UNICOR

400 FIRST STREET, N.W.

WASHINGTON, DC 20534

ATTN: Deatrice Luck, Contract Specialist

SEE BLOCK 6.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

SICG030-25 ⊠

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers _ is XX, __ is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate Letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the Solicitation and this amendment and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor __ is not, ⊠ is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation identified in block 10 A is hereby amended as followed:

Questions and answers are provided as ATTACHMENT 02-SICG030-25.

As provided, all other terms and conditions remain unchanged.

A signed copy of this solicitation must be included with your proposal.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Deatrice Luck, Contract Specialist 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

___________________________________________ BY _________________________________________ 07/11/2025 (Signature of the person authorized to sign) (Signature of contracting officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE 30-105

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR(48 CFR) 53.243

SICG03-25

Question 1: Is this a new contract or if there is (was) an incumbent performing these services?

Answer: This is a new contract.

Question 2: Are there any outlets/electrical components being added in the newly framed wall in the office?

Answer: Not aware of any plans to include new outlets on the new wall.

Question 3: Will a lay down area be provided?

Answer: Because the office is limited on space, there is no room for a lay down area.

Question 4: Will employees be working in this area while work is being conducted? If so, will poly walls be required?

Answer: The plan is to close the office to the staff while construction takes place. Only access to the office would be to enter to obtain/return keys for any NTV’s being used during this phase.

Question 5: Are dumpster rentals allowed, or is all trash required to be removed off site each day?

Answer: Historically, when the office was being repaired the excess construction material was removed from the site each day. Note initial removal of affected material from the flood was removed and taken away already.

Question 6: Office furniture will be removed temporarily, so we have access to prep and install the flooring. Is this a possibility?

Answer: DCMA will not be moving any furniture but will have all employee property removed.

Question 7: What is the expected date of awarding the job?

Answer: The award will be made after all proposals have been reviewed and a selection has been made.

Question 8: Is make safe to be carried in our contract or through onsite maintenance?

Answer: The only make safe measure to be carried out is that DCMA will secure the office at the end of the day. DCMA will not be responsible for any contractor equipment left in the office , Question 9: Are we to plan on repairing these data drops and terminate? If so, how far away are the patch panels to terminate the run?

Answer: I would plan on repairing any affected data ports if applicable to return the layout to it original condition as it was prior to the incident. No new work to add is needed to our understanding.

Question 10: Please confirm if taxes should be carried out in proposals?

Answer: No. You will be required to follow the Wage Determination.

Question 11: Please confirm if any state, local, and/or Federal permits will be required on this project?

Answer: No. DCMA would provide a copy of the final plan the Pease base POC for review.

Then once it as approved by the base they would provide authorization in writing to start and complete the planned work.

Question 12: Please confirm if there are any known hazardous materials?

Answer: There is no known hazardous material

Question 13: Do you have manufacturer and color for carpet tiles or new tile with transition strips where tile border other tiles?

Answer: Please see Section M - Technical Factors.

Question 14: Please provide the make and model for ceiling grid and tile?

Answer: Please see Section M - Technical Factors.

Question 15: No electrical identified in SOW. Should contractors assume no light switch for the new room or outlet in the new wall? Please confirm there is no emergency lighting needed in this room.

Answer: There is currently a switch to control the lights in this area already in the wall dedicated for this area.

Question 16: Can we also assume no sprinkler work is required in new room or main room from the wall installation?

Answer: No sprinkler work is required.

Question 17: Is the new wall to be build flush to the bottom of the existing ceiling grid?

Answer: The wall does now require to be deck-to-deck, but it must be properly braced overhead to prevent swaying.

Question 18: Is the new wall being build …6” above the ceiling or to the deck?

Answer: The SOW specifies a wall from deck to ceiling grid. If the wall is built 6” above the grid, the contractor will be responsible for installing addition grid track.

Question 19: Is the new wall a fire rated partition wall?

Answer: No.

AMND 02
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT

ATTACHMENT 02 - SICG030-25