This document is a two-page architectural floor plan and scope of work for renovation at the Defense Contract Management Agency (DCMA) Pease Air National Guard Base (ANGB). The work involves restoration of an office area (176 SF), conference room (231 SF), and corridor, with specific renovation tasks including:
Office Area Requirements: Jack up workstations to replace carpeting, install a new floor-to-ceiling wall with gypsum board, paint both wall sides with acrylic latex, install a new 3'0" door with matching hardware, and install commercial grade carpet tile and vinyl cove base. Conference Room Requirements: Infill missing rigid foam insulation, install new gypsum wall board, paint walls, remove damaged carpet, install commercial grade carpet tile, install vinyl cove base, repair or replace damaged metal ceiling grid components, and replace approximately 20 missing or damaged ceiling tiles. Corridor Area Work: Install new commercial grade carpet tile and new vinyl cove base. The detailed renovation plan is specifically for the DCMA Pease ANGB location, focusing on comprehensive interior restoration and repair.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-in Sheet 07.02.25_FE.pdf | ||
| AMND 02.pdf | ||
| AMND 01.pdf | ||
| FORMSF-25A PAYMENT BOND.pdf | ||
| PAST PERFORMANCE QUESTIONNAIRE (2).pdf | ||
| SICG030-25.pdf | ||
| FORM SF-25 PERFORMANCE BOND.pdf | ||
| ACH Vendor Enrollment Form 2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11·-4· 0 0
OFFICE
e:::: 176 SF
II
e::::
CONFERENCE ROOM
10'-8"
231 SF
21'-2"
DCMA PEASE ANGB
WORK TO BE PERFORMED
OFFICE:
JACK UP WORKSTATIONS TO REPLACE CARPETING
PROVIDE & INSTALL NEW WALL FROM FLOOR TO CEILING GRID WITH i" GYPSUM WALL BOARD BOTH SIDES FINISH, PRIME & PAINT BOTH SIDES OF NEW WALL COMPLETE WITH 2 COATS OF ACRYLIC LATEX PAINT
....J PROVIDE & INSTALL NEW 3'0 DOOR IN NEW WALL WITH HARDWARE TO MATCH OTHERS IN THE SPACE
PROVIDE & INSTALL NEW COMMERCIAL GRADE CARPET TILE
PROVIDE & INSTALL NEW VINYL COVE BASE AROUND PERIMETER FLOOR
CONFERENCE ROOM:
PROVIDE & INFILL MISSING RIGID FOAM INSULATION
PROVIDE & INSTALL NEW i" GYPSUM WALL BOARD WHERE MISSING, FINISH & PRIME
PAINT CONFERENCE ROOM COMPLETE WITH 2 COATS OF ACRYLIC LATEX PAINT
REMOVE DAMAGED CARPET WHERE APPLICABLE CARPETING
PROVIDE & INSTALL COMMERCIAL GRADE CARPET TILE
PROVIDE & INSTALL VINYL COVE BASE AROUND PERIMETER FLOOR
PAINT OR REPLACE DAMAGED METAL CEILING GRID COMPONENTS
PROVIDE & REPLACE MISSING OR DAMAGED CEILING TILES (APPX 20)
CORRIDOR AREA � PROVIDE & INSTALL NEW NEW COMMERCIAL GRADE CARPET TILE
PROVIDE & INSTALL NEW VINYL COVE BASE
AREA OF WORK