Striping Plan.pdf
PDF 3 MB Posted
- Solicitation number
- SICG025-24
About this file
This document appears to be a Striping Plan related to a federal contract opportunity for the Aberdeen Testing Center - PAAF Taxiway and Apron Remarking project.
The Striping Plan outlines the government's mission objective and relevant reference documents for the project, which has a period of performance requiring completion within 120 calendar days after the Notice to Proceed. The Statement of Work (SOW) covers general conditions, requirements, existing conditions, and applicable codes and specifications.
The related federal contract opportunity is a Solicitation for a Firm Fixed Price, Construction Type Purchase Order, set aside for Small Businesses located within the state of Maryland. The project's North American Industrial Classification System (NAICS) Code is 237310, Highway, Street, and Bridge Construction. The goal is to remove and repaint faded/degraded lines at the PAAF runway and ramps in accordance with an existing striping plan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pavement Design Extract.pdf | ||
| AMND 04.pdf | ||
| Pavement Marking Proposal.pptx | PPTX presentation | |
| AMND 03.pdf | ||
| AMND 02 SICG025-24.pdf | ||
| AMND 02.pdf | ||
| AMND 01.pdf | ||
| ACH Vendor Enrollment Form 2022.pdf | ||
| FORMSF-25A PAYMENT BOND.pdf | ||
| FORM SF-25 PERFORMANCE BOND.pdf | ||
| FORM SF-24 BID BOND.pdf | ||
| SICG025-24.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRIPING PLAN
| MISSION OBJECTIVE |
| STRIPING PLAN |
| RELEVANT REFERENCE DOCUMENTS |
| PERIOD OF PERFORMANCE |
| Barring any contingencies that arise during construction, the Government requires completion of this project within 120 calendar days after the Notice to Proceed. The Contract defines completion as the completion of all contractual obligations and re... |
| GOVERNMENT SERVICES |
| STATEMENT OF WORK (SOW) |
| General Conditions |
| General Requirements |
| Existing Conditions |
| Codes and Specifications |