AMND 02 SICG025-24.pdf

PDF 107 KB Posted

Attached to
Aberdeen Testing Center - PAAF Taxiway and Apron Remarking
Solicitation number
SICG025-24
Issued by

About this file

This document appears to be a series of questions and answers related to Amendment 02 of a Request for Quote (RFQ) for the Aberdeen Testing Center - PAAF Taxiway and Apron Remarking project. The RFQ is a Firm Fixed Price, Construction Type Purchase Order for work at the US Army Aberdeen Test Center, Aberdeen Proving Ground. The project involves removing and repainting faded/degraded lines on the runway and ramps at the PAAF facility. The contractor will be responsible for clearing vegetation where necessary, but not for repairing any deteriorated concrete or asphalt. The method of award will be based on the evaluation factors in Section M. The Project Site Manager must be present whenever work is performed. Pricing should be provided per the RFQ, and the government will consider teaming partner/subcontractor past performance. The OSHA 30 certification is required, and the MDE Responsible Person certification has been removed. Photos and a description of the existing conditions will be provided separately.

View the file

Other files

File Type Posted
Pavement Design Extract.pdf PDF
AMND 04.pdf PDF
Pavement Marking Proposal.pptx PPTX presentation
AMND 03.pdf PDF
AMND 02.pdf PDF
AMND 01.pdf PDF
ACH Vendor Enrollment Form 2022.pdf PDF
FORMSF-25A PAYMENT BOND.pdf PDF
Striping Plan.pdf PDF
FORM SF-25 PERFORMANCE BOND.pdf PDF
FORM SF-24 BID BOND.pdf PDF
SICG025-24.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SICG025-24

AMD 02

Question 1: Will the contractor be responsible for removing vegetation prior to remarking?

Answer: The contractor will be responsible for clearing the site for vegetation where necessary.

Question 2: Will the contractor be responsible for repairing deteriorated concrete/asphalt in areas that are slated for remarking?

Answer: The contractor is not responsible for repairing any deteriorated concrete/asphalt. This is strictly a painting job regardless of the condition of the surface.

Question 3: What is the method of award for this contract (LPTA, best value, etc.)?

Answer: See Section M Evaluations Factors for Award: 52.212-2, Evaluation - Commercial Items.

Question 4: Are the Contractor Project Site Manager and Contractor Project Superintendent both required to be on site at all times while work is being performed?

Answer: The Project Site Manager shall be present in the work area whenever work is being performed.

Question 5: During the site visit, APG personnel requested that pricing for the bomb ramp taxiway be broken out from the rest of the work. Please provide an updated Section B reflecting that request.

Answer: Section B will not be updated, pricing should be provided per RFQ.

Question 6: Will the government consider teaming partner/subcontractor past performance in addition to self-performed examples?

Answer: The government will consider teaming partner/subcontractor past performance in addition to self-performed examples.

Question 7: The MDE Responsible Person (Green Card) certification typically relates to erosion/sediment control, excavation, and earth moving work. Since none of those trades are part of this project, please consider removing this requirement.

Answer: Yes, the requirement will be removed.

SICG025-24

Question 8: Both OSHA 30 and OSHA 40 are mentioned under the technical go/no go requirements. Please confirm if OSHA 30 is the required certification.

Answer: OSHA 30 is the required certification.

Question 9: Please provide photos and/or a written description of the existing condition of the concrete/asphalt in areas to be remarked.

Answer: Please see "Stripping Plan" post on SAM.gov