About this file
This is a site plan document prepared by the Town of Groton, Connecticut Public Works Department Engineering division for the Shennecossett Golf Course Clubhouse exterior stair resurfacing project located at 93 Plant Street, Groton, Connecticut. The project involves the removal of existing rubber tiles and installation of 1.5-inch thick bluestone stair treads across three designated areas (A, B, and C) of the porch stairs and top landings. The work includes patching spalled concrete in Area C with quick-setting cement, painting all vertical surfaces with exterior white paint suitable for concrete substrates, and installing bluestone treads with a 1-inch overhang at nosings and 1/4-inch radius bevels. Key specifications require stair riser heights between 4 and 7 inches with uniform heights within each flight, stair tread depths that are uniform within each flight with a minimum 1 percent to maximum 2 percent slope for water drainage, and exterior-rated mortar and sealant materials subject to engineer approval. The contractor must maintain foot traffic access to the Pro Shop at all times by directing pedestrians to available stairs and must protect work areas from damage until completion.
The site plan establishes critical project constraints and responsibilities, including contractor obligations to install directional signage for Pro Shop access, protect existing features such as the porch and concrete side walls throughout construction, and follow all manufacturer instructions for product installation. The Town of Groton will manage the removal and reinstallation of existing guardrails and handrails upon completion of stair tread resurfacing. Bluestone stair tread samples must be submitted to the engineer for approval, as must datasheets for all mortar and sealant products. The project date is referenced as August 12, 2025, and the prospective bidder must complete a bid form and company information sheet, with tax exemptions handled by the Town in accordance with Connecticut law.
Text of this file
PUTTING GREEN
EXISTING CONCRETE C
URB
PLANTING
BED
PLANT STREET
AREA A: REMOVE EXISTING RUBBER TILES
AND INSTALL BLUESTONE TREADS. SEE
DETAIL ON THIS SHEET.
AREA B: REMOVE EXISTING
RUBBER TILES AND INSTALL
BLUESTONE TREADS. SEE
DETAIL ON THIS SHEET.
93 PLANT STREET
SHENNECOSSETT CLUB HOUSE
AREA C:
REMOVE EXISTING RUBBER TILES AND
INSTALL BLUESTONE TREADS. SEE DETAIL
ON THIS SHEET. PATCH SPALLED
CONCRETE WITH QUICK-SETTING CEMENT.
SE
E
N O
TE
NOTES:
1. STAIR RISER HEIGHT SHALL BE BETWEEN 4" AND 7" AND SHALL BE UNIFORM AT EACH FLIGHT OF STAIRS ±3/8". COORDINATE LAYOUT
OF RISER HEIGHT WITH ENGINEER.
2. STAIR TREAD DEPTH SHALL BE UNIFORM AT EACH FLIGHT OF STAIRS ±3/8".
3. SLOPE TREADS 1% MIN. TO 2% MAX. TO SHED WATER DOWN THE STAIRS.
4. MORTAR SHALL BE EXTERIOR-RATED AND APPROPRIATE FOR THE SPECIFIC APPLICATION. SUBMIT DATASHEET TO ENGINEER FOR
APPROVAL.
5. SUBMIT SAMPLE OF BLUESTONE STAIR TREAD TO ENGINEER FOR APPROVAL.
6. PROTECT EXISTING FEATURES INCLUDING THE PORCH AND CONCRETE SIDE WALLS THROUGHOUT COURSE OF WORK.
7. PAINT ALL VERTICAL SURFACES INCLUDING RISERS AND EXPOSED SIDE FACES WITH EXTERIOR WHITE PAINT SUITABLE FOR
CONCRETE SUBSTRATES.
8. NUMBER OF RISERS VARIES BETWEEN AREAS OF WORK.
9. TOWN OF GROTON WILL REMOVE EXISTING GUARDRAILS AND HANDRAILS AND REINSTALL UPON COMPLETION OF STAIR TREAD
RESURFACING.
TYPICAL BLUESTONE STAIR TREAD INSTALLATION:
· REMOVE EXISTING RUBBER TILES.
· NEATLY REMOVE SUBSTRATE TO APPROPRIATE DEPTH.
· INSTALL NEW 1.5" THICK BLUESTONE SLAB IN MORTAR BED.
· INCLUDE 1" OVERHANG AT NOSINGS ±1/4".
BLUESTONE STAIR TREAD
APPLY APPROVED SEALANT BETWEEN NEW
BLUESTONE AND EXISTING TILES.
MASTERSEAL NP1 OR APPROVED EQUAL.
BLUESTONE SHALL BE FLUSH WITH EXISTING
ADJACENT SURFACE.
SEE NOTE 2
1/4" RADIUS BEVEL (TYP.)
EXISTING PORCH
1/2" SAWCUT DRIP EDGE (TYP)
EXISTING CONCRETE STEPS
SCALE:
DATE:
PAGE NO.:
D E S
IG
N E D
B Y
D A
TE
D R A W N
B Y
D A
TE
C H E C K E D
B Y
D A
TE
A P P R O V E D
B Y
D A
TE
P R O
JE
C T N O
F
IL
E
N O
R E V
D A
TE
D E S C R
IP
TI
O N
OF
X X
TR
T
TR
T
NTS
8/12/2025
PROJECT DESCRIPTION
· INSTALL BLUESTONE STAIR TREADS OVER ALL STAIRS AND TOP LANDINGS IN AREAS A, B AND C AS SHOWN ON DETAIL.
· PATCH SPALLED CONCRETE IN AREA C.
GENERAL NOTES
1. EITHER "AREA A", "AREA B" OR "AREA C" STAIRS SHALL BE OPEN TO FOOT TRAFFIC AT ALL TIMES FOR ACCESS TO THE PRO SHOP.
CONTRACTOR SHALL INSTALL SIGNS TO DIRECT PEDESTRIANS FOR ACCESS TO THE PRO SHOP.
2. CONTRACTOR SHALL PROTECT AREAS OF WORK FROM DAMAGE UNTIL THEY CAN BE OPENED TO FOOT TRAFFIC.
3. FOLLOW ALL MANUFACTURER'S INSTRUCTIONS WHEN INSTALLING PRODUCTS.
AREA A
AREA B
AREA C
PATCH SPALLED CONCRETE WITH APPROVED
QUICK-SETTING CEMENT. QUIKRETE 1240 OR APPROVED
EQUAL. PAINT PATCHED SURFACE WITH EXTERIOR-RATED
WHITE PAINT SUITABLE FOR CONCRETE SUBSTRATES.
REMOVE SIGN DURING WORK AND
REINSTALL UPON COMPLETION.
AutoCAD SHX Text
TOWN OF GROTON
AutoCAD SHX Text
134 GROTON LONG POINT ROAD
AutoCAD SHX Text
(860) 448-4066
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
GROTON, CONNECTICUT 06340
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
EXTERIOR STAIR RESURFACING
AutoCAD SHX Text
SHENNECOSSETT GOLF COURSE CLUBHOUSE
AutoCAD SHX Text
%%USITE PLAN
AutoCAD SHX Text
93 PLANT STREET, GROTON, CT 03640
| Sheets and Views |
| Site Plan |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .