This is a comprehensive set of engineering and landscape design plans for the Shelton Ditch Improvements Project, Phase 1 - Reach 4, prepared by the City of Salem Department of Public Works in Oregon. The project involves improving approximately 1.5 miles of the Shelton Ditch, extending from Ford Street SE to east of 24th Street SE. The design documents cover multiple aspects of the project, including site preparation, traffic control, erosion prevention, bank repair, revegetation, and irrigation. The work is scheduled to be completed within the in-water work window of July 1 to October 31, with construction activities focused on stream corridor restoration, bank stabilization, and ecological enhancement.
The project includes detailed specifications for riprap installation, high-performance turf reinforcement mat (HPTRM) slope treatments, native plant restoration, and temporary irrigation systems. The landscape plan calls for planting a variety of native trees, shrubs, and willows, including red alder, bigleaf maple, Douglas hawthorn, and multiple willow species, totaling approximately 132 individual plants. The project will also involve seeding approximately 0.187 acres with native riparian and wetland seed mixes. While specific budget details are not explicitly outlined in the design plans, the comprehensive nature of the documents suggests a significant infrastructure and ecological restoration investment by the City of Salem.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF SALEM - DEPARTMENT OF PUBLIC WORKS
555 LIBERTY STREET SE - SALEM, OREGON 97301
VICINITY MAPPHASE 1 REACH 4
PN 720200
SHELTON DITCH, FROM FORD ST SE TO EAST OF 24TH ST SE
SHELTON DITCH
IMPROVEMENTS
Call before you dig.
Know what's below.
ATTENTION:
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _G
_0
G
_0 2.
dw g
G
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
UTILITY CONTACTS
G-01
TITLE SHEET
PN: 720200
AS SHOWN
AS SHOWN
PROJECT AREA
SHELTON DITCH
MILL CREEK
TH
S T
SE
N
D S
T
SE
MISSION ST E
IN WATER WORK WINDOW JULY 1 - OCTOBER 31
NTS
HINES ST SE
FO
RD
S T
SE
TH
S T
SE
Sheet List Table Sheet Number Sheet Title Sheet Description tthomson Snapshot
EXISTING SANITARY MANHOLE
EXISTING WATER LINE
EXISTING STORM MANHOLE
EXISTING GAS LINE
EXISTING TREE - CONIFEROUS
EXISTING TREE - DECIDUOUS
EXISTING STUMP
EXISTING GAS SHUT OFF VALVE
EXISTING UTILITY POLE
EXISTING WATER METER
EXISTING WATER VALVE
EXISTING CATCH BASIN
EXISTING SANITARY LINE
EXISTING FENCE
EXISTING COMMUNICATION LINE
PERMANENT EASEMENT BOUNDARY
CHAINLINK FENCE
COIR SLOPE
EXISTING RIPRAP
STAGING AREA
TEMPORARY CONSTRUCTION ACCESS
REMOVE TREE
WORK AREA ISOLATION DAM
REMOVE EXISTING FENCE
GRAVITY BYPASS PIPE
INLET PROTECTION
FISH BLOCK NET
PERMANENT EASEMENT AREA
VEGETATED RIPRAP
RIPRAP
TOP TREE
HPTRM SLOPE
HPTRM TOP OF SLOPE TRENCH
GRADING LIMITS
EXISTING STORM LINE
X X
GRAVEL CONSTRUCTION ACCESS
TREE PROTECTION FENCE
PERFORMANCE GRADEDPG
FLOWLINEFL
EACH WAYEW
BK BACK
CONTINUOUS
CONSTRUCTION JOINT
CONT
CJ
MINIMUMMIN
NORTH/NORTHINGN
BOW BACK OF WALL
ON CENTER
MANHOLE
MAXIMUM
EAST/EASTING
CLEARANCE
CONTROLLED DENSITY FILL
CATCH BASIN
OC
MH
MAX
CLR
CDF
CB
ADA
AC
LF
LB
LINEAR FEET
POUND
FOW FACE OF WALL
GASG
CITY OF SALEMCOS
COMMUNICATIONSCOMM
FIRE HYDRANTFH
CONCRETECONC
OUTSIDE DIAMETEROD
BOC BACK OF CURB
FT FEET
IN INCH
GA GAUGE
ELEVATIONELEV
CENTERLINE℄
LT LEFT
NORTHEASTNE
NORTHWESTNW
NOT TO SCALENTS
BEGIN VERTICAL CURVE ELEVATIONBVCS
END VERTICAL CURVE STATIONEVCS
END VERTICAL CURVE ELEVATIONEVCEADT
APPROX
BMPS BEST MANAGEMENT PRACTICES
CLASSCL
DUCTILE IRON PIPEDIP
DIAMETERDIA
CUBIC YARDCY
DRAWINGDWG
ELECTRICALELECT
EROSION PREVENTION AND EPSC
ET CETERAETC
EXISTINGEXIST
K CURVE COEFFICIENT
LAT LATERAL
MJ
MILES PER HOUR
NORTH AMERICAN DATUMNAD
POINT OF CURVATUREPC
IRRIG IRRIGATION
OVERHEAD POWEROHP
EXISTING GRADEEG
DEMOLITIONDEMO
DUCTILE IRONDI
MPH
MUTCD
FINISHED GRADEFG
BR BEGIN RETURN
END RETURNER
ELEVATIONEL
AASHTO
AVENUEAVE
AMERICAN WELDING SOCIETYAWS
BOT BOTTOM
CONSTRUCTIONCONST
DIMENSIONDIM
EACHEA
EXPANSIONEXP
EXTERIOREXT
GV GATE VALVE
HORIZ
IE INVERT ELEVATION
HORIZONTAL
ID INSIDE DIAMETER
AMERICAN ASSOCIATION OF STATE HIGHWAY
TRANSPORTATION OFFICIALS
ACRES
AMERICANS WITH DISABILITIES ACT
AVERAGE DAILY TRIPS
APPROXIMATELY
MECHANICAL JOINT/RESTRAINED
MECHANICAL
MANUAL OF UNIFORM TRAFFIC
TEMPORARY WATER MANAGEMENT PLANTWMP
STANDARD CONSTRUCTION SCS
SPECIFICATIONS
SEDIMENT CONTROL
CONTROL DEVICES
E
HPTRM HIGH PERFORMANCE TURF
REINFORCED MAT
SALEM REVISED CODESRC
DECIDIOUSDEC
GAL GALLON
NUMBERNO
OFFSETOFF
OUNCESOZ
ORDINARY HIGH WATEROHW/OHWM
MARK
RIGHTR
RIGHT OF WAYROW
POLYVINYL CHLORIDEPVC
SOUTHS
SHELTON DITCH CENTER LINESD CL
SOUTHEASTSE
SQUARE FEETSF
SANITARYSS
STREETST
STATIONSTA
STANDARDSTD/SD
TEMPORARY CONSTRUCTION EASEMENTTCE
TYPICALTYP
L LINE OR LENGTH OR LEFT
LS LUMP SUM
YARDYD
CONTROL POINT - RED OTAK CONTROL CAPC-RPCotak
CONTROL POINT - HUB AND TACKC-HT
CONTROL POINT - BENCH MARKC-BM-FND
CONTROL POINT - BRASS CAPC-BC
B.
OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER.
(NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503)-232-1987).
C. PROVISIONS SHALL BE MADE BY THE CONTRACTOR TO KEEP ALL EXISTING UTILITIES IN
D. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL
BE REMOVED BY THE CONTRACTOR TO THE EXTENT NECESSARY TO ACCOMPLISH THE WORK.
THE CONTRACTOR SHALL PLUG THE REMAINING EXPOSED ENDS OF ABANDONED UTILITIES.
A. THE LOCATION AND DESCRIPTION OF EXISTING UTILITIES SHOWN ARE COMPILED FROM
AVAILABLE RECORDS AND/OR FIELD SURVEYS. THE CITY OR UTILITY COMPANIES DO NOT
SERVICE AND PROTECT THEM DURING CONSTRUCTION.
GUARANTEE THE ACCURACY NOR THE COMPLETENESS OF SUCH RECORDS.
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY
4. UTILITY COORDINATION:
1. ALL CONSTRUCTION SHALL BE TO CITY OF SALEM STANDARDS AND SPECIFICATIONS AND THE SPECIAL PROVISIONS
3. REFERENCE SCS FOR TRAFFIC PROTECTION AND CONTROL REQUIREMENTS.
2. REFERENCE SCS FOR REQUIREMENTS REGARDING PROTECTION OF EXISTING FACILITIES AND TREES.
DEVELOPED FOR THIS PROJECT.
5. REFERENCE SCS FOR ANY ADDITIONAL UTILITY COORDINATION REQUIREMENTS.
6. THE CONTRACTOR SHALL BE EXPECTED TO VISIT THE SITE AND MAKE THEIR OWN DETERMINATION OF
TOPOGRAPHIC FEATURES REQUIRING RESTORATION FROM CONSTRUCTION IMPACTS.
NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH
7. DO NOT REMOVE TREES EXCEPT AS APPROVED BY THE ENGINEER. PROTECT ALL ROOTS TWO INCHES
AND LARGER IN DIAMETER. TRIM TREES, SHRUBS AND HEDGES ONLY AS DIRECTED BY THE ENGINEER.
8. ALL CONSTRUCTION SHALL CONFORM TO OREGON D.E.Q. PERMIT No. 1200-CA AND ACOE/DSL JOINT PERMIT
NWP-2023-80TA, COPIES OF WHICH ARE INCLUDED IN THE SPECIAL PROVISIONS.
9. REFERENCE SECTION OF THE SPECIAL PROVISIONS AND SCS REGARDING
TEMPORARY ASPHALT PATCHING REQUIREMENTS.
ATTENTION:
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _G
_0
G
_0 2.
dw g
G
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
ABBREVIATIONSLEGEND
G-02
CONSTRUCTION
NOTES
AND
LEGEND
PN: 720200
AS SHOWN
AS SHOWN
TEMPORARY CONSTRUCTION EASEMENT
10. IT IS POSSIBLE THAT TOPO CHANGES HAVE OCCURED WITHIN THE STREAM CORRIDOR.
CONTRACTOR TO VERIFY SITE CONDITIONS PRIOR TO BIDDING.
GENERAL CONSTRUCTION NOTES
F O
R D
S T
S E
TOWNSEND WAY SE
HYDE ST SE
SHELTON DITCH
SHELTON ST SE
23R D
S T
S E
24T H
S T
S E
22 23 24 25
164.64 C-HTplastic
470435
SHEET SP-02, EC-02SHEET SP-01, EC-01
SHEET SP-03, EC-03
CONTROL TABLE
POINT # NORTHING EASTING
470435
469624.04
469611.34
469645.59
469687.85
469692.94
469591.06
469392.03
469661.25
469669.83
469738.63
469741.35
469742.14
469532.74
469709.21
469667.68
469541.29
7551427.67
7551629.48
7551569.18
7551589.52
7551476.84
7551494.58
7551456.39
7551040.33
7550963.01
7550789.44
7550725.59
7550650.39
7550599.63
7550604.05
7550640.47
7551081.42
ELEVATION
182.25
179.91
179.78
178.91
178.93
181.56
178.01
178.80
171.39
179.33
179.34
178.02
176.96
178.09
178.05
178.23
DESCRIPTION
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
1-1/8" COPPER DISK STAMPED "OTAK CONTROL"
ALUMINUM CAP STAMPED "CITY OF SALEM 470435"
5/8" IRON ROD W/RED PLASTIC CAP STAMPED "OTAK CONTROL"
1-1/8" COPPER DISK STAMPED "OTAK CONTROL"
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
1-1/8" COPPER DISK STAMPED "OTAK CONTROL"
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
1-1/8" COPPER DISK STAMPED "OTAK CONTROL"
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
PLASTIC HUB STAMPED "SURVEY MARK" WITH MAGNETIC LOCATOR
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _G
_0 3.
dw g
G
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
G-03
SHEET INDEX AND
SURVEY CONTROL
PN: 720200
AS SHOWN
AS SHOWN
PERMANENT
EASEMENT
6/30/2026
HWY 22
O
R D
S T
S E
TOWNSEND WAY SE
HYDE ST SE
SHELTON DITCH
SHELTON ST SE
R
D S
T S
E
T
H S
T S
E
10R
8 11
10L
10L
10L
10R
8 11
LEE ST SE
10R
0'
T Y
P
IC
A L
T
H S
T S
E
MILL ST SE
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _T
C _0
1.
dw g
T C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
TC-01
TRAFFIC CONTROL
PLAN
PN: 720200
AS SHOWN
AS SHOWN
DETOUR
TYPICAL TC SIGNS (SEE TC-02)
TYPE 3 BARRICADES
STREET CLOSED WITH LOCAL ACCESS ONLY
STAGING AREA WITH LOCAL ACCESS
LEGEND
WORK LOCATIONS
SEE SHEET EC01 FOR CONFIGURATION OF CLOSURE
GENERAL NOTES
1. PLACE SIGNS 8 & 11 ON BARRICADE. PLACE
SIGN 9 AT STAGING AREA.
10R
TC-02
TRAFFIC CONTROL
DETAILS
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _T
C _0
1.
dw g
T C
-0
(2 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
TYPICAL TEMPORARY
TRAFFIC CONTROL SIGNS
36" x 36" W20-3
W20-1 36" x 36"
R11-2 48" x 30"
W20-2 36" x 36"
60" x 30" R11-4
24" x 30"
LOCAL
ONLY
ACCESS
STREET CLOSED
TO
THRU TRAFFIC
M4-10L 48" x 18"
M4-10R 48" x 18"
10L
EC-00
EPSC AND TWMP
NOTES AND
COVER SHEET
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _E
C _0
0- E
C _0
3.
dw g
E C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) NOTES
1. THE CONTRACTOR SHALL PROVIDE DAILY MEASURES TO ENSURE SEDIMENT
CONTROL DURING NON-WORK HOURS.
2. THE CONTRACTOR SHALL PROVIDE PROTECTION AS REQUIRED ON PUBLIC AND
PRIVATE INLETS TO ENSURE SEDIMENT CONTROL WITHIN THE WORK AREA.
3. ALL TEMPORARY STOCKPILES AND CONCRETE MANAGEMENT FACILITIES SHALL BE
LOCATED A MINIMUM OF 50 FEET FROM ANY DRAINAGE INLET OR WATERCOURSE.
4. EROSION PREVENTION AND SEDIMENT CONTROL PLAN (EPSC) SHALL SERVE AS THE
MINIMUM OF CONTROLS NECESSARY TO PROTECT THE SITE. CONTRACTOR SHALL
MONITOR TURBIDITY IN THE STREAM. ADDITIONAL CONTROL MEASURES MAY BE
REQUIRED IN ORDER TO DIMINISH THE POTENTIAL FOR SEDIMENT LADEN WATER TO
ENTER THE STORM DRAIN SYSTEM OR WATERWAY.
5. SD CL ALIGNMENT SHOWN FOR GENERAL REFERENCE ONLY.
6. CONTRACTOR TO SUBMIT EROSION PREVENTION AND SEDIMENT CONTROL (EPSC)
PLAN AS DESCRIBED IN THE PROJECT SPECIAL PROVISIONS.
7. CONTRACTOR TO INSTALL PERMANENT CHAIN LINK FENCE PRIOR TO REMOVING
EXISTING FENCE. CONTRACTOR TO NOTIFY HOMEOWNERS OF SCHEDULE FOR
PERMANENT FENCE INSTALLATION AT LEAST ONE WEEK BEFORE PERFORMING
WORK.
8. CONTRACTOR TO PROVIDE QUALIFIED PROFESSIONAL TO PERFORM FISH SALVAGE
PER REQUIREMENTS IN SPECIAL PROVISIONS.
9. COORDINATE DEWATERING AND FISH SALVAGE OPERATIONS WITH OWNER.
GENERAL EPSC NOTES
(A) PRE-CONSTRUCTION
(1). PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING AND
GRADING LIMITS, VEGETATED BUFFERS, AND ANY SENSITIVE AREAS SHOWN ON THIS PLAN
SHALL BE CLEARLY DELINEATED IN THE FIELD. UNLESS OTHERWISE APPROVED, NO
DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS. THE CONTRACTOR MUST
MAINTAIN THE DELINEATION FOR THE DURATION OF THE PROJECT. NOTE: VEGETATED
CORRIDORS TO BE DELINEATED WITH ORANGE CONSTRUCTION FENCE OR APPROVED
EQUAL.
(2). BMPS THAT MUST BE INSTALLED PRIOR TO LAND DISTURBING ACTIVITIES ARE
CONSTRUCTION ENTRANCE, PERIMETER SEDIMENT CONTROL, AND INLET PROTECTION.
(3). HOLD A PRECONSTRUCTION CONFERENCE TO REVIEW THE EPSC WITH THE CITY’S
PROJECT MANAGER AND INSPECTOR.
(B) CONSTRUCTION
(1). ALL SEDIMENT IS REQUIRED TO STAY ON SITE. SEDIMENT AMOUNTS GREATER THAN 1/2
CUBIC FOOT WHICH LEAVE THE SITE MUST BE CLEANED UP WITHIN 24 HOURS AND PLACED
BACK ON THE SITE AND STABILIZED OR PROPERLY DISPOSED. VACUUMING OR DRY
SWEEPING MUST BE USED TO CLEAN UP RELEASED SEDIMENT AND IT MUST NOT BE SWEPT
OR WASHED INTO STORM SEWERS, DRAINAGE WAYS, OR WATER BODIES. THE CAUSE OF
THE SEDIMENT RELEASE MUST BE FOUND AND PREVENTED FROM CAUSING A RECURRENCE
OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT
SHALL BE PERFORMED ACCORDING TO THE DSL REQUIRED TIME FRAME.
(2). CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF EROSION
PREVENTION AND SEDIMENT CONTROL FACILITIES IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED, APPROVED, AND PERMANENT
EROSION CONTROL (I.E., VEGETATION/LANDSCAPING) IS ESTABLISHED ON ALL DISTURBED
AREAS.
(3). ALL RECOMMENDED EROSION PREVENTION AND SEDIMENT CONTROL PROCEDURES ARE
DEPENDENT ON CONSTRUCTION METHODS, STAGING, SITE CONDITIONS, WEATHER, AND
SCHEDULING. DURING THE CONSTRUCTION PERIOD, EROSION CONTROL FACILITIES SHALL
BE REVISED, UPGRADED, REPLACED, OR ADDED, TO COMPLY WITH SRC AND STATE AND
FEDERAL REGULATORY REQUIREMENTS.
(4). THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROTECTION OF ALL ADJACENT
PROPERTY AND DOWNSTREAM FACILITIES FROM EROSION AND SILTATION DURING PROJECT
CONSTRUCTION. ANY DAMAGE RESULTING FROM SUCH EROSION AND SILTATION SHALL BE
CORRECTED AT THE SOLE EXPENSE OF THE CONTRACTOR.
(5). WHEN SATURATED SOIL IS PRESENT, WATER-TIGHT TRUCKS MUST BE USED TO
TRANSPORT SATURATED SOILS FROM THE CONSTRUCTION SITE. SOIL MAY BE DRAINED ON
SITE AT A DESIGNATED LOCATION, USING APPROPRIATE BMPS. SOIL MUST BE DRAINED
SUFFICIENTLY TO DRIP LESS THAN ONE GALLON PER HOUR PRIOR TO LEAVING THE SITE.
(6). ALL MATERIALS SPILLED, DROPPED, OR WASHED INTO STORM DRAINS MUST BE
REMOVED IMMEDIATELY, AND THE CONTRACTOR SHALL PROVIDE PROTECTION OF
DOWNSTREAM INLETS AND CATCH BASINS TO ENSURE SEDIMENT-LADEN WATER DOES NOT
ENTER THE STORM DRAIN SYSTEM.
(7). ALL DISCHARGE OF SEDIMENT-LADEN WATER MUST BE TREATED WITH AN APPROPRIATE
BMP TO REMOVE SEDIMENT FROM DISCHARGE WATERS AND TO COMPLY WITH SRC AND
STATE AND FEDERAL REGULATORY PERMITS.
(8). IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMPS MUST BE USED WHICH MAY
INCLUDE THE APPLICATION OF FINE WATER SPRAYING, PLASTIC SHEETING, MULCHING, OR
OTHER APPROVED MEASURES.
(9). THE EPSC MEASURES AND BMPS SHOWN ON THIS PLAN ARE THE MINIMUM
REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD,
THESE MEASURES SHALL BE UPGRADED AS NEEDED TO MAINTAIN COMPLIANCE WITH ALL
REGULATIONS.
(10). THE CONTRACTOR SHALL PROVIDE ONSITE WATER OR OTHER APPROPRIATE BMPS TO
PREVENT DUST AND WIND EROSION OF FINE GRAIN SOILS.
(11). DISTURBED AREAS MUST BE STABILIZED AFTER 14 DAYS OF INACTIVITY, OR
IMMEDIATELY IF RAIN IS FORECASTED. SEE SALEM CONSTRUCTION STANDARD SUBSECTION
207.4.04C - WET WEATHER SEASON.
(12). DURING THE WET WEATHER WORK PERIOD OR WHEN RAIN IS FORECASTED, ALL
ACTIVE AND INACTIVE SOIL STOCK PILES MUST BE COVERED WITH APPROPRIATE PLASTIC
SHEETING. PLASTIC SHEETING MUST COVER THE ENTIRE STOCK PILE AND BE SUFFICIENTLY
ANCHORED.
(C) POLLUTANTS, SOLID WASTE AND HAZARDOUS MATERIALS MANAGEMENT
(1). ANY USE OF TOXIC OR OTHER HAZARDOUS MATERIALS MUST INCLUDE PROPER
STORAGE, APPLICATION, AND DISPOSAL.
(2). THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROPERLY MANAGE POLLUTANTS,
HAZARDOUS WASTES, USED OILS, CONTAMINATED SOILS, CONCRETE WASTE,
SANITARY WASTE, LIQUID WASTE, OR OTHER TOXIC SUBSTANCES DISCOVERED OR
GENERATED DURING CONSTRUCTION TO PREVENT LEAKAGE, SPILLS OR RELEASE OF
POLLUTANTS TO THE ENVIRONMENT AND SURFACE WATERS.
(3). CONTRACTOR SHALL DEVELOP A PROJECT SPECIFIC WRITTEN SPILL PREVENTION AND
RESPONSE PROCEDURES THAT INCLUDES EMPLOYEE TRAINING ON SPILL PREVENTION AND
PROPER DISPOSAL PROCEDURES; REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND
MACHINERY; AND MATERIAL DELIVERY AND STORAGE CONTROLS, SIGNAGE, MATERIAL USE,
AND USE OF COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. THE PLAN SHALL
COMPLY WITH SRC AND FEDERAL AND STATE REQUIREMENTS, AND SHALL BE AVAILABLE ON
SITE AT ALL TIMES.
(D) WET WEATHER PERIOD (OCTOBER 15 THROUGH APRIL 30)
(1). CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE THE DURATION OF DISTURBED
AREAS.
(2). TEMPORARY STABILIZATION OF THE SITE INCLUDING COVERING OF BARE SOILS WITH
APPROVED BMPS, MUST BE INSTALLED AT THE END OF THE SHIFT BEFORE A HOLIDAY OR
WEEKEND, OR AT THE END OF EACH WORKDAY IF RAINFALL IS FORECAST IN THE NEXT 24
HOURS.
(3). TEMPORARY STABILIZATION OR COVERING OF SOIL STOCKPILES AND PROTECTION OF
STOCKPILES LOCATED AWAY FROM CONSTRUCTION ACTIVITY MUST OCCUR AT THE END OF
EACH WORKDAY.
(E) MAINTENANCE
(1). EROSION CONTROL MEASURES SHALL BE MAINTAINED IN SUCH A MANNER AS TO
ENSURE THAT EROSION IS PREVENTED AND SEDIMENT-LADEN WATER DOES NOT ENTER A
DRAINAGE SYSTEM, ROADWAY, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
(2). SEDIMENT SHALL NOT BE WASHED OR SWEPT INTO STORM SEWERS, DRAINAGE WAYS,
OR WATER BODIES.
(3). SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL MEASURES WHEN
IT HAS REACHED A HEIGHT OF 1/3 THE BARRIER HEIGHT, AND PRIOR TO THE CONTROL
MEASURES REMOVAL.
(4). REMOVAL OF TRAPPED SEDIMENT IN A SEDIMENT BASIN OR SEDIMENT TRAP OR CATCH
BASINS MUST OCCUR WHEN THE SEDIMENT RETENTION CAPACITY HAS BEEN
REDUCED BY 50 PERCENT; IS NOT FUNCTIONING PROPERLY AND/OR AT THE COMPLETION OF
PROJECT.
(5). CLEANING OF ALL STRUCTURES, INLET PROTECTION BMPS, AND SUMP PUMPS MUST BE
COMPLETED REGULARLY AND AS REQUIRED TO ENSURE STRUCTURES AND INLETS
FUNCTION PROPERLY AND FLOW FREELY.
(6). CONSTRUCTION SITE EXITS SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT
TRACKING OR FLOW OF MUD ONTO THE ROW OR APPROVED ACCESS POINT. THE ENTRANCE
MAY REQUIRE PERIODIC TOP DRESSING AS CONDITIONS DEMAND, AND REPAIR AND/OR
CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT. WHEEL WASHING SHALL BE
REQUIRED TO PREVENT SEDIMENT AND MATERIAL TRACKING ON ROAD SURFACES IF
PASSIVE BMPS ARE NOT EFFECTIVE.
(F) INSPECTION
(1). THE EPSC MUST BE KEPT ONSITE AT ALL TIMES. ALL MEASURES SHOWN ON THE PLAN
MUST BE INSTALLED PROPERLY TO ENSURE COMPLIANCE WITH SRC AND STATE AND
REGULATORY PERMITS, AND THAT SEDIMENT DOES NOT ENTER A SURFACE WATER
SYSTEM, ROADWAY, OR OTHER PROPERTIES.
(2). WRITTEN EPSC INSPECTION LOGS SHALL BE MAINTAINED ONSITE AND AVAILABLE TO
CITY INSPECTORS UPON REQUEST.
(3). ALL BMPS SHALL BE INSPECTED AT LEAST EVERY WEEK. WHEN A RAINFALL EVENT
EXCEEDS 1/2" IN A 24-HOUR PERIOD, DAILY INSPECTION OF THE EROSION CONTROLS,
SEDIMENT CONTROLS, AND DISCHARGE OUTFALLS MUST BE CONDUCTED AND
DOCUMENTED. INSPECTIONS SHALL BE DONE BY A REPRESENTATIVE OF THE PERMIT
REGISTRANT WHO IS KNOWLEDGEABLE AND EXPERIENCED IN THE PRINCIPLES, PRACTICES,
INSTALLATION, AND MAINTENANCE OF EROSION AND SEDIMENT CONTROLS.
(G) INACTIVE CONSTRUCTION PERIODS AND POST-CONSTRUCTION
(1). SHOULD WORK CEASE IN ANY AREA FOR 14 DAYS, THE INACTIVE AREA MUST BE
STABILIZED WITH APPROPRIATE SOIL STABILIZATION BMPS. IF ALL CONSTRUCTION ACTIVITY
CEASES THE ENTIRE SITE MUST BE TEMPORARILY STABILIZED USING VEGETATION, HEAVY
MULCH LAYER, TEMPORARY SEEDING, OR OTHER METHOD.
(2). ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL FACILITIES SHALL BE
REMOVED BY THE CONTRACTOR WITHIN 30 DAYS AFTER PERMANENT
LANDSCAPING/VEGETATION IS ESTABLISHED AND THE THREAT OF EROSION AND
SEDIMENT TRANSPORT HAS BEEN MITIGATED.
(3). TEMPORARY GRASS COVER MEASURES MUST BE FULLY ESTABLISHED BY OCTOBER 15
OR OTHER COVER MEASURES (I.E., EROSION CONTROL BLANKETS WITH ANCHORS,
ONE-INCH OF STRAW MULCH, SIX MIL HDPE PLASTIC SHEET, ETC.) SHALL BE IN PLACE OVER
ALL DISTURBED SOIL AREAS UNTIL APRIL 30. TO ESTABLISH AN ADEQUATE GRASS STAND
FOR CONTROLLING EROSION BY OCTOBER 15, IT IS RECOMMENDED THAT SEEDING AND
MULCHING OCCUR BY SEPTEMBER 1.
(4). PERMANENT EROSION CONTROL VEGETATION ON ALL EMBANKMENTS AND DISTURBED
AREAS SHALL BE RE-ESTABLISHED AS SOON AS CONSTRUCTION IS COMPLETED.
(H) SPECIFICATIONS
(1). SOIL PREPARATION. TOPSOIL SHOULD BE PREPARED ACCORDING TO THE LANDSCAPE
PLANS AND SPECIFICATIONS. SLOPES SHALL BE TEXTURED BEFORE SEEDING BY RACK
WALKING (I.E., DRIVING A CRAWLING TRACTOR UP AND DOWN THE SLOPES TO LEAVE A
PATTERN OF CLEAT IMPRINTS PARALLEL TO SLOPE CONTOURS) OR OTHER METHOD TO
PROVIDE STABLE AREAS FOR SEEDS TO REST.
(2). SEEDING. EROSION CONTROL GRASS SEED MIX SHALL BE AS FOLLOWS: DWARF GRASS
MIX (LOW HEIGHT, LOW MAINTENANCE) CONSISTING OF DWARF PERENNIAL RYEGRASS (60
PERCENT BY WEIGHT), CREEPING RED FESCUE (40) PERCENT BY WEIGHT). APPLICATION
RATE SHALL BE 100 POUNDS PER ACRE MINIMUM.
(3). NO FERTILIZER SHALL BE USED WITHIN 50 FEET OF OHWM OR ON SLOPES STEEPER
THAN 4: 1 (h ; v)..
(4). WHEN USED, HYDROMULCH SHALL BE APPLIED WITH GRASS SEED AT A RATE OF 2,000
POUNDS PER ACRE BETWEEN APRIL 30 AND JUNE 10, OR BETWEEN SEPTEMBER 1 AND
OCTOBER 1. ON SLOPES STEEPER THAN TEN PERCENT, HYDROSEED AND MULCH SHALL BE
APPLIED WITH A BONDING AGENT (TACKIFIER). APPLICATION RATE AND METHODOLOGY
SHALL BE IN ACCORDANCE WITH SEED SUPPLIER RECOMMENDATIONS.
(5). WHEN USED IN LIEU OF HYDROMULCH, DRY, LOOSE, WEED-FREE STRAW USED AS MULCH
SHALL BE APPLIED AT A RATE OF 4,000 POUNDS PER ACRE (DOUBLE THE HYDROMULCH
APPLICATION REQUIREMENT). ANCHOR STRAW BY WORKING IN BY HAND OR WITH
EQUIPMENT (ROLLERS, CLEAT TRACKERS, ETC.). MULCH SHALL BE SPREAD UNIFORMLY
IMMEDIATELY FOLLOWING SEEDING.
(6). WHEN CONDITIONS ARE NOT FAVORABLE TO GERMINATION AND ESTABLISHMENT OF THE
GRASS SEED, THE CONTRACTOR SHALL IRRIGATE THE SEEDED AND MULCHED AREAS AS
REQUIRED TO ESTABLISH THE GRASS COVER.
(7). SEDIMENT FENCES SHALL BE CONSTRUCTED OF CONTINUOUS FILTER FABRIC TO AVOID
USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED
TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM SIX-INCH OVERLAP, AND BOTH ENDS
SECURELY FASTENED TO A POST.
(8). THE STANDARD STRENGTH FILTER FABRIC SHALL BE FASTENED SECURELY TO STITCHED
LOOPS INSTALLED ON THE UPSLOPE SIDE OF THE POSTS, AND SIX INCHES OF THE FABRIC
SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 30
INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED
TO EXISTING TREES.
(10). BIO-FILTER BAGS SHALL BE CLEAN 100 PERCENT WOOD PRODUCT WASTE. BAGS SHALL
BE 18-INCH X 18-INCH X 30-INCH, WEIGH APPROXIMATELY 45 POUNDS, AND BE CONTAINED IN
A BAG MADE OF ½ INCH PLASTIC MESH.
(11). MINIMUM WET WEATHER SLOPE PROTECTION. FOR 3H:1V OR STEEPER SLOPES USE
BON TERRA TYPE C2 OR NORTH AMERICAN GREEN TYPE C125 EROSION CONTROL
BLANKETS. USE A MINIMUM OF TWO INCHES STRAW MULCH OR NORTH AMERICAN GREEN
TYPE S150 FOR SLOPES FLATTER THAN 3H:1V AND GREATER THAN 6H:1V. SLOPES FLATTER
THAN 6H:1V USE ONE INCH STRAW MULCH, HYDROSEED WITH HYDROMULCH AND TACKIFIER.
SLOPE PROTECTION SHALL BE PLACED ON ALL DISTURBED AREAS IMMEDIATELY AFTER
COMPLETION OF EACH SECTION OF CONSTRUCTION ACTIVITY, UNTIL THE EROSION
CONTROL SEEDING HAS BEEN ESTABLISHED. AS AN OPTION DURING TEMPORARY OR
SEASONAL WORK STOPPAGES, A SIX-MIL HDPE PLASTIC SHEET MAY BE PLACED ON
EXPOSED SLOPES. THE PLASTIC SHEET SHALL BE PROVIDED WITH AN ANCHOR TRENCH AT
THE TOP AND BOTTOM OF THE SLOPE, AND SHALL BE SANDBAGGED ON THE
SLOPES AS REQUIRED TO PREVENT DAMAGE OR DISPLACEMENT BY WIND.
DESIGN STANDARD NOTES
CONSTRUCTION SEQUENCING
FISH BLOCK NET
WORK AREA ISOLATION DAM
STAGING AREA
TEMPORARY CONSTRUCTION ACCESS
TOP OF EXISTING TREE REMOVED BY
OTHERS. REMOVE STUMP AND ROOTS.
REMOVE EXISTING FENCE
TEMPORARY CONSTRUCTION
EASEMENT
GRAVITY BYPASS PIPE
INLET PROTECTION
LEGEND
PROPERTY OR PERMANENT
EASEMENT ACQUISITION BY CITY
PERMANENT EASEMENT
GRADING LIMITS
TOP OF EXISTING TREE REMOVED BY
OTHERS. REMOVE STUMP AND ROOTS
AS NEEDED TO ACCOMMODATE
CONSTRUCTION.
1. REQUEST CITY TO INSTALL WEIRS AT SHELTON DITCH DIVERSION TO REDUCE FLOWS
ON SITE. 48 HOURS NOTICE IS REQUIRED.
2. PLACE PERIMETER PROTECTION BMPS IN WORK AREA AND STAGING/ACCESS AREAS.
3. INSTALL BLOCK NET UPSTREAM AND DOWNSTREAM OF IN-STREAM WORK AREAS AND
PERFORM FISH SALVAGE IN ADVANCE OF WORK UNDER THE SUPERVISION OF A
QUALIFIED BIOLOGIST.
4. ESTABLISH TEMPORARY PUMPS, PIPES, AND ASSOCIATED BMPS IN THE ISOLATED
WORK ZONE. DEWATER THE SITE.
5. CONSTRUCT TEMPORARY ACCESS IMPROVEMENTS AS NEEDED.
6. INSTALL TEMPORARY MATS OVER THE STREAMBED GRAVEL FOR EQUIPMENT ACCESS.
7. CONSTRUCT BANK IMPROVEMENTS.
8. REMOVE WORK ISOLATION MEASURES.
9. PERFORM RIPARIAN PLANTING AND OTHER SITE STABILIZATION WORK.
GRAVEL CONSTRUCTION
ENTRANCE
TREE PROTECTION FENCE
DEC
16"
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X X
X X
X X
X X
X X
X X
(R
(R
(R)
910 FORD ST SE
2265 TOWNSEND WAY SE 2271 TOWNSEND WAY SE
888 FORD ST SE 2258 FORD ST SE 2260 FORD ST SE
EC-01
AREA NO. 4.028
SITE PREP
STA 0+00 TO 2+10
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _E
C _0
0- E
C _0
3.
dw g
E C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
1 4
INSTALL TEMPORARY 36"
GRAVITY BYPASS PIPE.
FLOWS ARE PROVIDED IN
SPECIAL PROVISIONS.
INSTALL FISH BLOCK NET.
INSTALL ISOLATION DAM
PER DETAIL B ON SHEET
EC-04.
TEMPORARY
CONSTRUCTION ACCESS.
REMOVE EXISTING FENCE.
SEE NOTE 3 OF THE
GENERAL EPSC NOTES ON
SHEET EC-00.
STAGING AREA.
INSTALL INLET PROTECTION
PER STD. PLAN NO. 914.
INSTALL DEWATERING
PUMP.
PROTECT EXISTING BRIDGE
RAILS AND PAVEMENT.
TOP OF EXISTING TREE
REMOVED BY OTHERS.
REMOVE STUMP AND
ROOTS.
INSTALL SEDIMENT
CONTROL BAG PER DETAIL
A ON SHEET EC-04.
CONTRACTOR TO MAINTAIN
DRIVEWAY ACCESS.
STRUCTURES NOT
SURVEYED. LOCATION/SIZE
APPROXIMATE.
INSTALL TREE PROTECTION
FENCE PER STANDARD
DETAIL NO. 820 ON SHEET
EC-05.
INSTALL TEMPORARY CHAIN
LINK FENCE.
RELOCATE STRUCTURE (BY OTHERS)
TEMPORARY CONSTRUCTION EASEMENT
VEGETATED RIPRAP AND HPTRM
SLOPE GRADING LIMITS
SEE SHEET SP-01
PERMANENT EASEMENT
"SD CL" ALIGNMENT
RELOCATE CONCRETE WALL
WITHIN TCE (BY OTHERS)
ACCESS GATE
SHELTON DITCH
M A
T C
H
LI
N E
S T
A
S E
E S
H E
E T
E C
-0
F O
R D
S T
R E
E T
S E
CONSTRUCTION NOTES
14"
STMP
36"
DEC
26" DEC
3x12"-14"
DEC
14"
DEC
10"
DEC
10"
DEC
14"
DEC
12"DEC
18"
DEC
10"
CEDAR
18"
X X
X X X
X X
X X
X X
X X X X X X X X X
X
X X X X X X X X
GRAVEL
2260 FORD ST SE 2266 FORD ST SE 2270 FORD ST SE 2280 FORD ST SE 795 23RD ST SE
2275 TOWNSEND WAY SE 2285 TOWNSEND WAY SE 2291 TOWNSEND WAY SE
2295 TOWNSEND WAY SE
DEC
20"
OAK
8"
REMOVE DEAD END BARRIER
PRIOR TO CONSTRUCTION
AND REPLACE WITH NEW
BARRIER AT EDGE OF
ROADWAY ON COMPLETION
A
EC-05
A
EC-05
EC-02
AREA NO. 4.025
SITE PREP
STA 2+10 TO 4+70
PN: 720200
AS SHOWN
AS SHOWN
SHELTON DITCH
R
D S
T R
E E
T S
E
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _E
C _0
0- E
C _0
3.
dw g
E C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
RELOCATE STRUCTURES
(BY OTHERS)
INTALL TEMPORARY 36" GRAVITY
BYPASS PIPE.
INSTALL FISH BLOCK NET.
INSTALL ISOLATION DAM PER DETAIL
B ON EC-04
TEMPORARY CONSTRUCTION
ACCESS.
REMOVE EXISTING FENCE. SEE NOTE
7 OF THE GENERAL EPSC NOTES ON
SHEET EC-00.
STAGING AREA.
TOP OF EXISTING TREE REMOVED BY
OTHERS. REMOVE STUMP AND
ROOTS.
PROTECT EXISTING FENCE ALONG
WEST PROPERTY LINE OF PROPERTY
AT 2295 TOWNSEND WAY SE.
REMOVE EXISTING LOG.
CONTRACTOR TO MAINTAIN
DRIVEWAY ACCESS.
INSTALL GRAVEL CONSTRUCTION
ENTRANCE PER DETAIL A ON EC-05
AND STD. PLAN NO. 901.
TOP OF EXISTING TREE REMOVED
BY OTHERS. REMOVE STUMP AND
ROOTS AS NEEDED TO
ACCOMMODATE CONSTRUCTION.
STRUCTURES NOT SURVEYED.
LOCATION/SIZE APPROXIMATE.
INSTALL TREE PROTECTION FENCE
PER STANDARD DETAIL NO. 820 ON
SHEET EC-05.
INSTALL TEMPORARY CHAIN LINK
FENCE.
PROTECT EXTG. 8" STORM PIPE AND
CONNECT TEMPORARY BYPASS PIPE
AND OUTFALL UPSTREAM OF
STREAM ISOLATION.
TEMPORARY CONSTRUCTION EASEMENT
VEGETATED RIPRAP AND HPTRM
SLOPE GRADING LIMIT
SEE SHEET SP-02
PERMANENT EASEMENT
"SD CL" ALIGNMENT
CONSTRUCTION NOTES
RELOCATE STRUCTURE
(BY OTHERS)
8REMOVE WOOD DECK
WITHIN TCE
(BY OTHERS).
ACCESS
GATE
SLOPE RESTORATION
GRADING LIMIT
SEE SHEET SP-02
13 15
M A
T C
H
LI
N E
S T
A
S E
E S
H E
E T
E C
-0
(5) 6"-8"
DEC
36"
DEC
16"
DEC
10"
DEC
10"
DEC
8"
DEC
12"
DEC
14"
DEC
8"
DEC
16"
DEC
16"
DEC
8"
DEC
6"
DEC
30"
DEC
6"
DEC
10"
DEC
28"
DEC
10"
DEC
22"
DEC
12"
DEC
6"
DEC
12"
DEC
12"
DEC
2X6"-12"
DEC
26"
DEC
8"
DEC
8"
EVR
24"
DEC
14"
DEC
2X9"-12"
DEC
2X8"-10"
DEC
6"
DEC
2X6"-8"
DEC
3X3"-6"
DEC
2X6"
DEC
7"
DEC
6"
FIR
26"
X
X
X
X X
795 24TH ST SE
802 24TH ST SE
850 24TH ST SE
796 24TH ST SE
845 24TH ST SE
W W
W W
W W
W W
W W
SHELTON DITCH
COIR SLOPE
GRADING LIMITS,
SEE SHEET SP-03
EXISTING EASEMENT
EXISTING
EASEMENT
SD CL ALIGNMENT
REMOVE DEAD END BARRIER PRIOR TO
CONSTRUCTION AND REPLACE WITH NEW
BARRIER AT EDGE OF ROADWAY ON COMPLETION
B
EC-05
B
EC-05
PROTECT TREES
FENCING NOT REQUIRED
131513
EC-03
AREA NO. 4.017
SITE PREP
STA 20+25 TO 22+50
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
1:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _E
C _0
0- E
C _0
3.
dw g
E C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
CONSTRUCTION NOTES
T
H S
T S
E
INSTALL TEMPORARY 36" GRAVITY
BYPASS PIPE.
INSTALL FISH BLOCK NET.
INSTALL ISOLATION DAM PER DETAIL B
ON SHEET EC-04.
TEMPORARY CONSTRUCTION ACCESS.
TOP OF EXISTING TREE REMOVED BY
OTHERS. REMOVE STUMP AND ROOTS
AS NEEDED TO ACCOMMODATE
CONSTRUCTION.
STAGING AREA.
TOP OF EXISTING TREE REMOVED BY
OTHERS. REMOVE STUMP AND ROOTS.
INSTALL INLET PROTECTION PER STD.
PLAN NO. 914.
PROTECT EXISTING PAVEMENT AND
STRUCTURES NOT SCHEDULED FOR
REMOVAL.
CONSTRUCT GRAVEL CONSTRUCTION
ENTRANCE PER DETAIL B ON EC-05
AND STD. PLAN NO. 901.
PROTECT EXISTING FENCE.
INSTALL TREE PROTECTION FENCE
PER STANDARD DETAIL NO. 820.
CONTRACTOR TO MAINTAIN DRIVEWAY
ACCESS.
PROTECT EXISTING UTILITY POLE AND
GUY WIRE.
INSTALL TEMPORARY CHAIN LINK
FENCE.
PROTECT EXTG. 8" STORM PIPE AND
CONNECT TEMPORARY BYPASS PIPE
AND OUTFALL DOWNSTREAM OF
STREAM ISOLATION.
REMOVE EXTG. CHAIN LINK FENCE
T
H S
T R
E E
T S
E
FLOW
IF LOCATED OVER SOIL, PLACE BAG ON
3" OF CLEAN 1" COARSE AGGREGATE
SEDIMENT CONTROL
BAG
FLOW ACROSS
VEGETATION
8' X 10' (MIN.)
SEDIMENT
CONTROL BAG
FLOW
FROM
PUMP
C C'
PUMP DISCHARGE
4" HOSE (TYP.)
STRAW BALE BERM
SECTION C-C'
PUMP DISCHARGE
4" HOSE (TYP.)
STRAW BALE BERM
PLAN
FLOW
BARRIER LENGTH VARIES, SEE PLANS
IMPERMEABLE LINEREMERGENCY SPILLWAY MIN 1 FT
FROM TOP OF DISCHARGE PIPE
NOTE:
THIS BARRIER WILL NOT PREVENT
SUBSURFACE FLOW FROM ENTERING
WORK ZONE. CONTINUED PUMPING MAY
BE REQUIRED IN ISOLATED WORK AREAS
THAT NEED TO BE DEWATERED.
IMPERMEABLE LINER
EXCESS
IMPERMEABLE LINER
IMPERMEABLE LINER
FOLD EXCESS
IMPERMEABLE LINER
WIDTH VARIES WITH HEIGHT
(H) VARIES
IMPERMEABLE LINER
1FT
1FT
FREEBOARD
=75% (H)
CONSTRUCT TRENCH
ALONG TOE OF BARRIER
BYPASS PIPE
STABILIZE WITH
SANDBAG
EC-04
TEMPORARY
WATER
MANAGEMENT
DETAILS
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
2:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _E
C _0
4.
dw g
E C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
SEDIMENT CONTROL BAGA NOT TO SCALE WORK AREA ISOLATION DAM DETAILB NOT TO SCALE
1. THE SEDIMENT CONTROL BAG SHALL BE MANUFACTURED USING A POLYPROPYLENE 8 OZ. NON-WOVEN
GEOTEXTILE SEWN INTO A BAG WITH A DOUBLE NEEDLE, USING A HIGH-STRENGTH THREAD.
2. THE NON-WOVEN GEOTEXTILE SHALL MEET OR EXCEED THE PROPERTIES LISTED IN TABLE 1.
3. AVOID PLACEMENT OF THE SEDIMENT CONTROL BAG ABOVE STEEP SLOPES OR WHERE SATURATED SOIL
CONDITIONS MAY CAUSE SOIL INSTABILITY.
4. INSTALL THE SEDIMENT CONTROL BAG ON A MILD SLOPE SO INCOMING WATER FLOWS DOWNHILL THROUGH THE
BAG.
5. THE SEDIMENT CONTROL BAG MUST BE MONITORED DURING USE. THE SEDIMENT CONTROL BAG IS FULL WHEN IT
NO LONGER CAN EFFICIENTLY FILTER SEDIMENT OR PASS WATER AT A REASONABLE RATE.
6. DISPOSE OF THE SEDIMENT CONTROL BAG WHEN FULL OR AS DIRECTED BY THE ENGINEER.
7. WHEN PLACED IN UPLAND LOCATIONS, THE SEDIMENT CONTROL BAG MAY BE CUT OPEN IN AN APPROPRIATE
LOCATION AND THE CONTENTS SEEDED AFTER REMOVING VISIBLE FABRIC.
8. SIZING AND MAINTENANCE OF THE SEDIMENT CONTROL BAG IS DEPENDENT ON THE PUMPED FLOW RATE AND
AMOUNT OF SEDIMENT. CONTRACTOR SHALL VERIFY THAT SEDIMENT CONTROL BAG IS SUFFICIENT TO TREAT PUMPED DEWATERING WATER TO MEET ALL APPLICABLE STANDARDS AND PERMIT CONDITIONS. IF TURBIDITY CANNOT BE REDUCED WITH ONE SEDIMENT TRAP, CONTRACTOR TO PLACE ADDITIONAL TRAPS IN SERIES.
9. DEWATERING DEVICES SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. NO DISCHARGE SHALL BE MADE TO A PAVED STREET OR STORMWATER COLLECTION SYSTEM WITHOUT APPROVAL AND REMOVING SEDIMENT. SEDIMENT CONTROL BAG PLACED ON A VEGETATED AREA IS THE MINIMUM SEDIMENT CONTROL TO BE USED FOR DEWATERING. ADDITIONAL
MEASURES MAY BE NECESSARY TO PREVENT DISCHARGE OF SEDIMENT.
NOTES
TABLE 1
PROPERTY TEST METHOD TEST RESULTS
WEIGHT ASTM D-3776 8 OZ/YD
GRAB TENSILE ASTM D-4632 205 LB.
CBR PUNCTURE ASTM D-6241 525 LB.
FLOW RATE ASTM D-4491 90 GAL/MIN/FT2
PERMITTIVITY ASTM D-4491 1.4 SEC-1
UV RESISTANCE ASTM D-4355 70%
AOS %
RETAINED
ASTM D-4751 SIEVE NO. 80
OVERALL
REMOVAL
EFFICIENCY
ASTM D-7880 97.55%
0+25 0+40 0+60 0+80 1+00
0+00 0+20 0+40 0+60 0+80
EC-05
EROSION CONTROL
DETAILS 1 OF 2
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
2:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _E
C _0
5.
dw g
E C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
EXISTING
GRADE
TEMPORARY
ACCESS GRADE
GRAVEL CONSTRUCTION
ENTRANCE PER STANDARD
PLAN NO. 901
EXISTING
GRADE
TEMPORARY
ACCESS GRADE
NTS
AREA NO. 4.025 ACCESS DETAILA DETAIL
NTS
AREA NO. 4.017 ACCESS DETAILB DETAIL
GRAVEL CONSTRUCTION
ENTRANCE PER STANDARD
PLAN NO. 901
(24TH ST SE)
(23RD ST SE)
NOTE: USE WOOD STAKES, NOT STAPLES. USE TWO LAYERS OF FABRIC AS
SHOWN ON DETAIL A ON SHEET DET02. OVERLAP FABRIC PIECES BY 12"
MINIMUM FOR BOTH HORIZONTAL AND VERTICAL OVERLAPPING.
EC-06
EROSION CONTROL
DETAILS 2 OF 2
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
2:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _E
C _0
5.
dw g
E C
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
NOTE: A TIRE WASH FACILITY MAY BE NEEDED IF TRACKING CANNOT BE
PREVENTED WITH A GRAVEL CONSTRUCTION ENTRANCE ALONE.
A
DET-01
POINT REFERENCE COORDINATE TABLE
POINT ID
A
B
C
D
E
F
LINE
RS
RS
RS
RS
RS
RS
STA
100+00.69
100+11.05
100+67.19
100+87.30
101+03.63
101+61.67
OFFSET
22.46R
21.12R
21.15R
20.27R
19.98R
20.11R
NORTHING
469675.81
469676.97
469676.02
469676.56
469676.24
469670.89
EASTING
7550641.76
7550652.14
7550708.28
7550728.34
7550743.86
7550800.93
LINE TABLE: "RS" ALIGNMENT
LINE #
L1
L2
L3
L4
LENGTH
86.15
77.50
42.28
114.58
DIRECTION
S89° 03' 01.07"E
S84° 31' 20.46"E
N81° 49' 12.69"E
S88° 57' 02.61"E
START POINT (E, N)
(7550641.45,469698.28)
(7550759.67,469695.05)
(7550848.70,469687.93)
(7550898.58,469694.44)
END POINT (N, E)
(7550727.59,469696.85)
(7550836.81,469687.65)
(7550890.55,469693.94)
(7551013.14,469692.35)
CURVE TABLE: "RS" ALIGNMENT
CURVE #
C1
C2
C3
RADIUS
406.77
50.00
50.00
LENGTH
32.15
11.92
8.05
CHORD DIRECTION
S86° 47' 10.76"E
N88° 38' 56.12"E
N86° 26' 05.04"E
START POINT (E, N)
(7550727.59,469696.85)
(7550836.81,469687.65)
(7550890.55,469693.94)
END POINT (E, N)
(7550759.67,469695.05)
(7550848.70,469687.93)
(7550898.58,469694.44)
A
DET-01
C O
N C
AS
PH
AL
T
AS
PH
AL
T
C O
N C
(R
(R)
910 FORD ST SE
2265 TOWNSEND WAY SE 2271 TOWNSEND WAY SE
888 FORD ST SE 2258 FORD ST SE 2260 FORD ST SE
SP-01
AREA NO. 4.028
SITE PLAN
STA 0+00 TO 2+10
PN: 720200
AS SHOWN
AS SHOWN
SHELTON DITCH
M A
T C
H
LI
N E
S T
A
S E
E S
H E
E T
S P
-0
F O
R D
S T
R E
E T
S E
STA. "RS" 100+01 TO STA. "RS" 101+83
CONSTRUCT VEGETATED RIPRAP AND
HPTRM SLOPE. PER DETAIL B ON SHEET
DET-02.
STA. "RS" 100+04 TO STA. "RS" 101+83
INSTALL CHAIN LINK FENCE. PER DETAIL
ON SHEET DET-05
CONSTRUCT HPTRM SLOPE END
TREATMENT PER DETAIL F ON SHEET
DET-03.
INSTALL 4' - WIDE CHAIN LINK FENCE
SINGLE GATE PER DETAIL ON SHEET
DET-05.
CONNECT EXISTING FENCE TO
CONSTRUCTED FENCE.
INSTALL LARGE WOODY MATERIAL PER
DETAIL A AND TABLE ON SHEET DET-06.
TEMPORARY CONSTRUCTION EASEMENT1
TIE RIPRAP SLOPE INTO EXISTING
RIPRAP LOCATED UNDER BRIDGE.
SEE GENERAL NOTE 3.
PERMANENT EASEMENT
EXISTING RIPRAP
NOT SURVEYED,
LOCATION IS
APPROXIMATE
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
2:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _S
P _0
S P
_0 2.
dw g
S
P -0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
"RS" ALIGNMENT
"SD CL" ALIGNMENT
CONSTRUCTION NOTES
LEGEND
PERMANENT EASEMENT
TEMPORARY CONSTRUCTION
EASEMENT
VEGETATED RIPRAP
RIPRAP
HPTRM SLOPE
HPTRM TOP OF SLOPE TRENCH
GRADING LIMITS
GENERAL NOTES
1. AUTOCAD SURFACE FILES AND ALIGNMENTS WILL BE
PROVIDED TO CONTRACTOR TO INFORM
CONSTRUCTION STAKING LAYOUTS.
2. SD CL ALIGNMENT SHOWN FOR GENERAL REFERENCE
ONLY.
3. LIMIT EXCAVATION IN VICINITY OF BRIDGE AND DO NOT
EXCAVATE BELOW OR WITHIN 20 FEET HORIZONTALLY
OF BRIDGE SPREAD FOOTING. CONTRACTOR TO
NOTIFY ENGINEER ONE WEEK PRIOR TO GRADING AND
PLACING MATERIAL IN CLOSE PROXIMITY OF THE
BRIDGE. FINAL CONSTRUCTED CONFIGURATION TO BE
DETERMINED BY FIELD-FIT APPROACH.
4. CONTRACTOR TO LIMIT DISTURBANCE TO THE STREAM
BED AND BANK TO WHAT IS NEEDED TO PERFORM THE
WORK. ANY ADDITIONAL DISTURBANCE TO BE
RESTORED PER THE DIRECTION OF THE ENGINEER AT
THE CONTRACTOR'S EXPENSE.
6 TYP.
LARGE WOODY MATERIAL
ORDINARY HIGH WATER
B
DET-01
B
DET-01
POINT REFERENCE COORDINATE TABLE
POINT ID
G
H
I
J
LINE
RS
RS
RS
RS
STA
101+99.71
102+05.86
102+53.56
103+43.87
OFFSET
19.69R
19.65R
20.96R
21.83R
NORTHING
469667.74
469668.16
469673.42
469671.05
EASTING
7550840.38
7550848.94
7550895.59
7550983.99
REMOVE AND STOCKPILE DEAD END BARRIERS
PRIOR TO CONSTRUCTION. REPLACE AT EDGE OF
ROADWAY ON COMPLETION
GRAVEL
2260 FORD ST SE 2266 FORD ST SE 2270 FORD ST SE 2280 FORD ST SE 795 23RD ST SE
2275 TOWNSEND WAY SE 2285 TOWNSEND WAY SE 2291 TOWNSEND WAY SE
2295 TOWNSEND WAY SE
SP-02
AREA NO. 4.025
SITE PLAN
STA 2+10 TO 4+33
PN: 720200
AS SHOWN
AS SHOWN
SHELTON DITCH
STA. "RS" 101+83 TO STA. "RS" 103+43
CONSTRUCT VEGETATED RIPRAP AND HPTRM
SLOPE PER DETAIL B ON SHEET DET-02.
STA. "RS" 101+83 TO STA. "RS" 103+55
INSTALL CHAIN LINK FENCE PER DETAIL ON
SHEET DET-05.
CONSTRUCT SLOPE RESTORATION FROM TOP
OF BANK AFTER TEMPORARY CONSTRUCTION
ACCESS IS REMOVED PER DETAIL C ON SHEET
DET-02.
REPAIR GRAVEL SURFACING AFTER
CONSTRUCTION TO BE A SMOOTH COMPACT
SURFACE THAT DRAINS WITHOUT LOW SPOTS.
CONSTRUCT HPTRM SLOPE END TREATMENT
PER DETAIL F ON SHEET DET-03.
INSTALL 4' - WIDE CHAIN LINK FENCE SINGLE
GATE PER DETAIL ON SHEET DET-05.
CONNECT EXISTING FENCE TO CONSTRUCTED
FENCE.
INSTALL LARGE WOODY MATERIAL PER DETAIL
A AND TABLE ON SHEET DET-06.
TRIM PIPE TO MATCH SLOPE ANGLE.
TEMPORARY CONSTRUCTION EASEMENT
PERMANENT EASEMENT
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
2:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _S
P _0
S P
_0 2.
dw g
S
P -0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
TIE INTO EXISTING RIPRAP
EXISTING RIPRAP NOT
SURVEYED. LOCATION IS
APPROXIMATE.
"RS" ALIGNMENT
"SD CL" ALIGNMENT
CONSTRUCTION NOTES
R
D S
T R
E E
T S
E
M A
T C
H
LI
N E
S T
A
S E
E S
H E
E T
S P
-0
PERMANENT EASEMENT
TEMPORARY CONSTRUCTION
EASEMENT
VEGETATED RIPRAP
RIPRAP
HPTRM SLOPE
HPTRM TOP OF SLOPE TRENCH
GRADING LIMITS
LEGEND
GENERAL NOTES
1. "RS" ALIGNMENT DATA SHOWN ON SHEET SP-01.
2. AUTOCAD SURFACE FILES AND ALIGNMENTS WILL BE
PROVIDED TO CONTRACTOR TO INFORM CONSTRUCTION
STAKING LAYOUTS.
3. SD CL ALIGNMENT SHOWN FOR GENERAL REFERENCE
ONLY.
4. CONTRACTOR TO LIMIT DISTURBANCE TO THE STREAM
BED AND BANK TO WHAT IS NEEDED TO PERFORM THE
WORK. ANY ADDITIONAL DISTURBANCE TO BE RESTORED
PER THE DIRECTION OF THE ENGINEER AT THE
CONTRACTOR'S EXPENSE.
62 6 67
8 TYP.
LARGE WOODY MATERIAL
ORDINARY HIGH WATER 9
LINE TABLE: "CS" ALIGNMENT
LINE #
L5
L6
L7
L8
L9
LENGTH
38.97
20.35
15.57
32.95
33.59
DIRECTION
S68° 38' 43.49"E
S58° 20' 30.25"E
S72° 26' 00.64"E
S52° 25' 51.81"E
S67° 21' 12.52"E
START POINT
(7551424.31,469693.51)
(7551468.63,469675.31)
(7551497.11,469659.52)
(7551527.35,469646.78)
(7551564.70,469620.18)
END POINT
(7551460.60,469679.32)
(7551485.96,469664.63)
(7551511.95,469654.82)
(7551553.46,469626.69)
(7551595.70,469607.24)
CURVE TABLE: "CS" ALIGNMENT
CURVE #
C4
C5
C6
C7
RADIUS
50.00
50.00
50.00
50.00
LENGTH
8.99
12.30
17.46
13.02
CHORD DIRECTION
S63° 29' 36.87"E
S65° 23' 15.45"E
S62° 25' 56.22"E
S59° 53' 32.17"E
START POINT
(7551460.60,469679.32)
(7551485.96,469664.63)
(7551511.95,469654.82)
(7551553.46,469626.69)
END POINT
(7551468.63,469675.31)
(7551497.11,469659.52)
(7551527.35,469646.78)
(7551564.70,469620.18)
8" CONC
IE = 170.57
TRAILER OVER INLET
S
SS MH
48" CONC CONE
RIM = 179.29
8" CONC (S) IE= 175.09
8" CONC (E) IE= 175.09
8" PVC (N) IE= 174.94
SS
SS
795 24TH ST SE
802 24TH ST SE
850 24TH ST SE
796 24TH ST SE
845 24TH ST SE
W W
W W
W W
W W
W W
C
DET-01
C
DET-01
REMOVE DEAD END BARRIER PRIOR
TO CONSTRUCTION AND REPLACE
WITH NEW BARRIER AT EDGE OF
ROADWAY UPON COMPLETION
"CS" ALIGNMENT
"SD CL" ALIGNMENT
SP-03
AREA NO. 4.017
SITE PLAN
PN: 720200
AS SHOWN
AS SHOWN
SHELTON DITCH
T H
S T
R E
E T
S E
STA. "CS" 200+55 TO STA. "CS" 201+87
CONSTRUCT COIR SLOPE PER DETAIL A
ON SHEET DET-02.
CONSTRUCT COIR SLOPE END
TREATMENT PER DETAIL A ON SHEET
DET-04.
CONSTRUCT COIR SLOPE END
TREATMENT PER DETAIL B ON SHEET
DET-04.
ADJUST EXISTING 8" STORM PIPE
OUTFALL TO DISCHARGE AT RIPRAP TOE
OF SLOPE. TRIM PIPE TO MATCH SLOPE
ANGLE.
RELOCATE WATER METER TO TOP OF
SLOPE (BY OTHERS). CONNECT TO
WATER METER PER DETAIL 1 ON LA-06.
INSTALL LARGE WOODY MATERIAL PER
DETAIL A AND TABLE ON SHEET DET-06.
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 3/
1:
:1
A
M O
:\P R
O
JE
C T
\1
\1
N \C
A D
D \A
C A
D \D w g\
C
1N
_S P
_0 3.
dw g
S
P -0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
CONSTRUCTION NOTES
COIR SLOPE
TEMPORARY CONSTRUCTION
EASEMENT
VEGETATED RIPRAP
RIPRAP
GRADING LIMITS
LEGEND
GENERAL NOTES
1. AUTOCAD SURFACE FILES AND ALIGNMENTS
WILL BE PROVIDED TO CONTRACTOR TO
INFORM CONSTRUCTION STAKING LAYOUTS.
2. SD CL ALIGNMENT SHOWN FOR GENERAL
REFERENCE ONLY.
3. CONTRACTOR TO LIMIT DISTURBANCE TO THE
STREAM BED AND BANK TO WHAT IS NEEDED TO
PERFORM THE WORK. ANY ADDITIONAL
DISTURBANCE TO BE RESTORED PER THE
DIRECTION OF THE ENGINEER AT
THECONTRACTOR'S EXPENSE.
6 TYP.
LARGE WOODY MATERIAL
ORDINARY HIGH WATER
STATION
0+00 0+60
0+00 0+20 0+40 0+60
R O
W
H O
U
SE
PE
R
M
AN
EN
T
EA
SE
M
EN
T X
X
XFE
N C
E
TC
E
E
LE
V A
T
IO
N
0+00 0+60
0+00 0+20 0+40 0+60
R O
W
SH
ED
FE
N
C E
X X
X
PE
R M
AN
EN
T
EA
SE
M
EN
T
TC
E
E
LE
V A
T
IO
N
0+00 0+60
0+00 0+20 0+40 0+60
COIR SLOPE
SEE DETAIL A ON
SHEET DET-02
SECTION B-BSECTION A-A
SECTION C-C
VERTICAL SCALE 1" = 5'
HORIZONTAL SCALE 1" = 5'
VERTICAL SCALE 1" = 5'
HORIZONTAL SCALE 1" = 5'
VERTICAL SCALE 1" = 5'
HORIZONTAL SCALE 1" = 5'
EXISTING
GRADE
EXISTING
GRADE
EXISTING GRADE
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
4:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _D
E T
_0 1.
dw g
D
E T
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
PROPOSED
GRADE
PROPOSED
GRADE
PROPOSED GRADE
DET-01
CROSS SECTIONS
PN: 720200
AS SHOWN
AS SHOWN
VEGETATED RIPRAP SLOPE SEE
DETAIL B ON DET-02
VEGETATED RIPRAP SLOPE
SEE DETAIL B ON DET-02
1.5
1.5
5.6'
HPTRM SLOPE TREATMENT
SEE DETAIL B ON DET-02
2.1'
HPTRM SLOPE TREATMENT
SEE DETAIL B ON DET-02
HPTRM SLOPE
ANCHOR (TYP)
ARMORMAX SLOPE
ANCHOR (TYP)
HPTRM SLOPE PIN
(TYP)
HPTRM SLOPE PIN
(TYP)
SHED TO BE RELOCATED
(BY OTHERS)
0.5'
3.0'
0.5'
3.0'
LARGE WOODY
MATERIAL
LARGE WOODY
MATERIAL
LARGE WOODY
MATERIAL
DET-02
BANK REPAIR
DETAILS
PN: 720200
AS SHOWN
AS SHOWN
7654321
F
E
D
C
B
A
7654321 SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MEN
T
NOISIVIDGNIREE
N NIGE
SHELTON DITCH
IMPROVEMENTS
PHASE 1 - REACH 4
8 9
8 9
SHEET PREPARED BY:
3/ 2/
:0
4:
P M
O :\P
R O
JE
C
T \1
\1
N
\C A
D D
\A C
A D
\D w g\ C
1N _D
E T
_0 2.
dw g
D
E T
-0 ta b)
700 Washington St., Suite 300 Vancouver, WA 98660
360. 737. 9613 www.otak.com
Otak, Inc.
NAD 83(2011)
NGVD 1929(47)
KN
MP
RM
75683PE
EXPIRES: 12/31/2026
OREGONKAR I NA R . NORDAHLDEC 29 , 2009
REG I STERED PROFESS IONALENG I NE E R
NTS
TYP. COIR SLOPEA DETAIL
2.
5'
VARIES 2-3
SEE PLAN
FINISH GRADE
BROKEN STONE RIPRAP,
CLASS 200. VOIDS FILLED
WITH 50/50 IMPORTED
TOPSOIL AND SELECTED
NATIVE BACKFILL MIX.
COIR SLOPE, WOVEN AND
UNWOVEN FABRIC BLANKET.
SEE INSTALLATION NOTES THIS SHEET
FOR ADDITIONAL REQUIREMENTS
EXISTING GRADE
2' DEPTH BROKEN STONE RIPRAP, CLASS 200. VOIDS
FILLED WITH 50/50 IMPORTED TOPSOIL AND SELECTED
NATIVE BACKFILL MIX
EXISTING GRADE
UNDISTURBED SUBGRADE
2'
4.
5'
6" DEPTH FILTER BLANKET,
4" MINUS
NTS
TYP. VEGETATED RIPRAP AND HPTRM SLOPEB DETAIL
TIE INTO EXISTING
GRADE
"RS" ALIGNMENT
2'
"CS" ALIGNMENT
TIE INTO EXISTING
GRADE
UNDISTURBED SUBGRADE
TIE INTO EXISTING GRADE
KEY IN COIR BLANKET,
SEE ANCHOR TRENCH
DETAIL ON STANDARD
DETAIL NO. 906
12" DEPTH 50/50
IMPORTED TOPSOIL AND
SELECTED NATIVE
BACKFILL MIX
REFER TO LANDSCAPE SHEETS
FOR VEGETATIVE TREATMENT
6" DEPTH FILTER BLANKET,
4" MINUS
COIR MATTING INSTALLATION NOTES:
1. SMOOTH SLOPE USING HAND TOOLS TO THE GREATEST EXTENT PRACTICABLE BEFORE INSTALLING FABRIC.
2. PROVIDE TWO LAYERS OF COIR FABRIC TO CREATE THE "BLANKET." THE BOTTOM LAYER SHALL BE NON-WOVEN ROLANKA BIOD-OCF 30 OR APPROVED EQUAL. THE TOP LAYER SHALL BE WOVEN BON TERRA CF-7, DKOWE 700, NEDIA KOIR MAT 700, ROLANKA BIODMAT 70, OR APPROVED EQUAL.
3. COIR FABRIC LAYERING PROCEDURE (SEE INSET ABOVE):
1) PLACE TOPSOIL
2) PLACE SEED MIX
3) PLACE NON-WOVEN COIR FABRIC
4) PLACE WOVEN COIR FABRIC
5) PLACE STAKES
4. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF FABRIC EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF WOOD STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAKING. FOLD REMAINING 12" PORTION OF FABRIC BACK OVER COMPACTED SOIL. SECURE FABRIC OVER COMPACTED SOIL WITH A ROW OF STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE FABRIC.
5. ROLL THE FABRIC DOWN THE SLOPE. FABRIC WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL FABRIC MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAKES A MINIMUM OF 5' ON CENTER IN A GRID PATTERN AS SHOWN. SEE STANDARD DETAIL NO. 906 ON SHEET EC05 FOR ANCHOR TRENCH DETAIL
6. THE EDGES OF PARALLEL FABRIC PIECES MUST BE STAKED WITH MINIMUM 1' OVERLAP. STAKE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE FABRIC LENGTH. SEE STANDARD DETAIL NO. 906 ON SHEET EC05 FOR
VISUAL DEPICTION OF OVERLAP AND STAKING.
7. CONSECUTIVE FABRIC PIECES SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH MINIMUM 1' OVERLAP.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .