SHEET SD_1_Poplar Street Bridge Repair.pdf
PDF 299 KB Posted
- Solicitation number
- PE-72650-NONST-2024-000000009
- Issued by
- Spalding County, Georgia
About this file
This document is a site development plan for the Poplar Street Bridge Repair project in Spalding County, Georgia. The project involves excavation, cleaning, and repair of fourteen (14) bridge H-piles, including painting, encasement, and backfill, as well as the removal of asphalt overlay and seal to expose existing joints for placement of new header material and repair of steel angle, plate, or rail as directed by the Engineer. The project also requires the placement of new backer rod and seal for each joint.
The project is identified as No. 22059.00 with an issue date of May 2024. The project is being managed by Paragon Consulting Group, Inc., a professional engineering firm with a Certificate of Authorization (COA #: PEF004167).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SD-1
PO
PL
A R
S T
R E
E T
B R
ID
G
E R
E
PA
IR
L
O C
A T
E D
I N
L A
N D
L O
T S
O F
T H
E
N D
D
IS
T R
IC
T
, S
PA
L D
IN
G
C O
U N
T Y
SI
T
E D
E V
E L
O
PM
E N
T P
L A
N S
F O
R
Project No.
22059.00
Issue Date:
MAY 2024
Checked By:
CNP
Drawn By:
KLB
Revisions:No. Date
XXXXXXXXXXXXXXX2. 4/12/2006
Comments1. 4/12/2006
XXXXXXXXXXXXXXX3. 4/12/2006
XXXXXXXXXXXXXXX4. 4/12/2006
XXXXXXXXXXXXXXX5. 4/12/2006
GSWCC LEVEL II CERT. # 0000010472
P N
C
O R
A O N
S U
L T
I N
G G
R O
U P
SHEET:
The client acknowledges that these documents are the work papers of Paragon Consulting Group, Inc. and are their instruments of professional service.
These documents shall not be reused or modified in any way without the prior written authorization of Paragon Consulting Group, Inc.
COA #: PEF004167
an c o m p an y
SUPPLEMENTAL DETAIL
NOTES
| Sheets and Views |
| 02-OVERALL_SITE |
File details come from the government source that posted it. Updated .