About this file
This document is an Addendum to the Bidding Documents for the City of Griffin's Poplar Street Bridge Repair project, Bid #24-011. The Addendum modifies the original Bidding Documents dated April 2024 and includes a Supplemental Drawing, a revised Bid Tabulation, and responses to contractor questions. The project involves excavation, cleaning, and repair of fourteen bridge H-piles, including painting, encasement, and backfill with required shoring to protect the adjacent railroad track. It also includes removal of the asphalt overlay and seal to expose existing joints for placement of new header material and repair of steel angle, plate, or rail as directed by the Engineer, as well as placement of new backer rod and seal for each joint.
The revised Bid Tabulation includes a new line item for a 'STORMWATER BOX COMPLETE PER DRAWING SD-1'. The Addendum also provides clarifications on the use of epoxy-coated rebar for the encasement reinforcement, the paint required for the existing piles and sway bracing, and the contractor's responsibility to coordinate with Norfolk Southern to provide railroad flagmen as required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF GRIFFIN
POPLAR STREET BRIDGE REPAIR
BID # 24-011
FROM: PARAGON CONSULTING GROUP, INC.
350 AIRPORT ROAD
GRIFFIN, GA 30224
TO: ALL BIDDERS OF RECORD
RE: Addendum No. 2, dated May 16, 2024
This Addendum forms a part of the Contract Documents and modifies the original Bidding
Documents dated April 2024.
This Addendum consists of two (2) pages, one (1) Supplemental Drawing, and a revised Bid
Tabulation.
CONTRACT DOCUMENTS AND SPECIFICATIONS
Add. 2.1 Modification: Drawing SD-1 is attached to this addendum and becomes a part of the Contract Documents.
Add. 2.2 Modification: A revised Bid Tabulation dated 05/16/2024 is attached to this addendum and becomes a part of the Contract Documents. The revised Bid
Tabulation must be used by the contractor when submitting a bid. The line item
‘STORMWATER BOX COMPLETE PER DRAWING SD-1’ with a quantity of 1 LS has been added to the BID TABULATION.
Add. 2.3 Contractor Question: Is it necessary to only work on one column at a time?
Response: Yes.
Add. 2.4 Contractor Question: Does the shoring have to stay in place until each column is complete?
Response: The shoring must remain in place until immediately before the excavation is backfilled.
Add. 2.5 Contractor Question: Does each column have to be set up, complete, and inspected before moving to the next column?
Response: Yes.
Add. 2.6 Contractor Question: Can multiple columns be worked on at the same time?
Response: No.
Add. 2.7 Clarification: All rebar used for the encasement reinforcement shall be epoxy coated. Refer to SHEET 4, MATERIAL NOTES, NOTE 2.
Add. 2.8 Clarification: Refer to SHEET 4, GENERAL NOTES, NOTE 4 regarding the paint required for the existing piles and sway bracing.
Add. 2.9 Clarification: The contractor will be responsible for coordinating with Norfolk
Southern to provide railroad flagmen as required. The City of Griffin already has an approved permit from Norfolk Southern to work within the railroad right-of-way.
End of Addendum No. 2