Addendum _1_10MAY2024.pdf

PDF 23 KB Posted

Attached to
24-011 City of Griffin Poplar Street Bridge Repair
Solicitation number
PE-72650-NONST-2024-000000009
Issued by
Spalding County, Georgia

About this file

This document is an Addendum to the original Bidding Documents for the City of Griffin Poplar Street Bridge Repair project, Bid #24-011. The Addendum clarifies that the selected contractor must possess a valid General Contractor license issued by the State of Georgia, and that the City of Griffin will provide the required Railroad Protective Liability insurance. Additionally, the Addendum states the Contractor is not responsible for any permitting or associated fees in connection with the project, including road and sidewalk closures, but must coordinate with the City of Griffin prior to any closures.

The original contract opportunity is for the excavation, cleaning, and repair of fourteen (14) bridge H-piles, including painting, encasement, and backfill, as well as the removal of asphalt overlay and seal to expose existing joints for placement of new header material and repair of steel angle, plate, or rail as directed by the Engineer. The new backer rod and seal for each joint must also be placed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF GRIFFIN

POPLAR STREET BRIDGE REPAIR

BID # 24-011

FROM: PARAGON CONSULTING GROUP, INC.

350 AIRPORT ROAD

GRIFFIN, GA 30224

TO: ALL BIDDERS OF RECORD

RE: Addendum No. 1, dated May 10, 2024

This Addendum forms a part of the Contract Documents and modifies the original Bidding

Documents dated April 2024.

This Addendum consists of one (1) page.

CONTRACT DOCUMENTS AND SPECIFICATIONS

Add. 1.1 Modification: The selected contractor must posses a valid General Contractor license issued by the State of Georgia. A Utility Contractor license is not required.

Add. 1.2 Clarification: The City of Griffin will provide the required Railroad Protective

Liability insurance.

Add. 1.3 Clarification: The Contractor is not responsible for any permitting or associated fees in connection with the project, including road and sidewalk closures.

However, the Contractor must coordinate with the City of Griffin prior to road and sidewalk closures associated with the project.

End of Addendum No. 1

File details come from the government source that posted it. Updated .