SF-30 Amendment 1.pdf

PDF 158 KB Posted

Attached to
Supply and Installation of kitchenettes at U. S. Embassy Madrid, Spain
Solicitation number
19SP5025Q0025QuestionsAndAnswersandAmendment1
Issued by

About this file

This document is an Amendment of Solicitation/Modification of Contract for a solicitation number 19SP5025Q0025, issued by the General Services Office at the American Embassy in Madrid. The amendment modifies the Statement of Work with specific requirements for furniture and appliance installations, including: recessed pulls on refrigerators, handles for integrated refrigerators, a non-enclosed existing refrigerator on the 1st floor, aluminum-colored baseboard, matte finish furniture, and waste bin cabinets with a 180-degree rotating tray mechanism. The amendment is effective 09/12/2025 and was originally dated 09/08/2025, with a requisition number PR15491017. The solicitation is not extended, and offers must acknowledge receipt of this amendment prior to the specified hour and date.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
Amendment 1 - Attachment 1 Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/12/2025

4. REQUISITION/PURCHASE REQ. NO.

PR15491017

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

7. ADMINISTERED BY (If other than Item 6)

CODE

General Services Office American Embassy Serrano, 75 28006 Madrid

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

9a. AMENDMENT OF SOLICITATION NO.

19SP5025Q0025

9b. DATED (SEE ITEM 11)

09/08/2025 10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1____ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1__ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. Attachment 1 – Statement of Work is hereby changed to include/modify the following:

• Recessed pulls are preferred. Handles may be installed on the integrated refrigerators for ease of opening.

• The existing refrigerator on the 1st floor must not be encased in a cabinet.

• The baseboard should be aluminum color.

• The furniture must be matte finish.

• The waste bins cabinets should feature a rotating tray mechanism with a 180-degree rotation.

A revised Attachment 1 – Statement of Work is hereby attached.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

File details come from the government source that posted it. Updated .